Federal Register / Vol. 70, No.

195 / Tuesday, October 11, 2005 / Notices 59029

ACTION: Notice of meeting. the Seminole Generating Station (SGS). commercial operation in January 1985.
The Station is located in Putnam Unit 3, a high efficiency, advanced
SUMMARY: Pursuant to the authorities in County, Florida, about six miles north of technology coal unit with state of the art
the Federal Advisory Committee Act Palatka. SGS Unit 3 will be constructed emission controls, will be constructed
(Pub. L. 92–463) and under the Secure near the existing SGS Units 1 and 2. The near Units 1 and 2. Unit 3 proposes to
Rural Schools and Community Self- new unit can be readily accommodated start commercial operation by May 1,
Determination Act of 2000 (Pub. L. 106– on the existing site. The financing and 2012. It has been determined that a third
393), the Caribou-Targhee National construction of the SGS Unit 1 and 2 unit can be readily accommodated on
Forests’ Eastern Idaho Resource was evaluated in a previous EIS. SECI the existing plant site. Fuel (coal and
Advisory Committee will meet is requesting RUS provide financing for petroleum coke) for all three units will
Wednesday, November 30, 2005 in the proposed project. continue to be delivered to the site by
Idaho Falls for a business meeting. The rail.
DATES: RUS will conduct a public
meeting is open to the public. The Unit 3 project is estimated to cost
scoping meeting in an open-house
DATES: The business meeting will be $1.2 billion, which includes
format, seeking the input of the public
held on November 30, 2005 from 10 approximately $440 million for
and other interested parties, on October
a.m. to 1 p.m. environmental controls. In addition,
20, 2005, 3 p.m. to 7 p.m., at the
ADDRESSES: The meeting location is the Seminole will also invest more than
Campbell Center at Ravine Gardens
Caribou-Targhee National Forest State Park, 1600 Twigg Street, Palatka, $200 million for advanced air emissions
Headquarters Office, 1405 Hollipark Florida 32177, 386–329–3721. controls on Units 1 and 2 to remove
Drive, Idaho Falls, Idaho 83402. A scoping document for the additional amounts of sulfur dioxide,
FOR FURTHER INFORMATION CONTACT: preparation of a supplemental nitrogen oxide, and mercury. A new
Larry Timchak, Caribou-Targhee environmental impact statement will be zero discharge system will be installed
National Forest Supervisor and available for review at the public to reuse and evaporate process
Designated Federal Officer, at (208) scoping meeting. The document also is wastewater from all three units resulting
524–7500. available for public review at RUS at the in further improvement of the quality of
SUPPLEMENTARY INFORMATION: The address provided in this notice, at the Station’s water discharge to the St.
business meeting on November 30, Seminole Electric Cooperative, 16313 Johns River.
2005, begins at 10 a.m., at the Caribou- Alternatives considered include no
North Dale Mabry Highway, Tampa,
Targhee National Forest Headquarters action, purchased power, renewable
Florida 33618, at Seminole Generating
Office, 1405 Hollipark Drive, Idaho energy sources, distributed generation,
Station, 890 North Highway 17, Palatka,
Falls, Idaho. Agenda topics will include and alternative site locations. Comments
Florida 32177, and at,
looking at funding for this upcoming regarding the proposed project may be
Putnam County Library System:
year, briefed on project status from last submitted (orally or in writing) at the
Headquarters Palatka Library, 601
year’s approved projects, and public scoping meetings or in writing
College Road, Palatka, Florida 32177–
welcoming the new Forest Supervisor/ for receipt no later than November 21,
3873.
Designated Federal Officer. Crescent City Public Library Branch, 610 2005, to RUS at the address provided in
this notice.
Dated: October 3, 2005. N. Summit, Crescent City, Florida
As mentioned previously, the
Lawrence A. Timchak, 32212–2148.
financing and construction of the
Bostwick Community Library Branch,
Caribou-Targhee Forest Supervisor. existing SGS Units 1 and 2 were
125 Tillman Street, P.O. Box 489,
[FR Doc. 05–20320 Filed 10–7–05; 8:45 am] evaluated in a previous EIS prepared by
Bostwick, Florida 32007.
BILLING CODE 3410–11–M the Rural Electrification Administration.
FOR FURTHER INFORMATION CONTACT: The final EIS and Record of Decision for
Stephanie Strength, Environmental the Seminole Plant Unit 1 and 2 and
DEPARTMENT OF AGRICULTURE Protection Specialist, USDA, Rural Associated Transmission Facilities were
Development, Utilities Programs, published in 1979. This EIS evaluated
Rural Utilities Service Engineering and Environmental Staff, the environmental effects of the
1400 Independence Avenue, SW., Stop construction of two 600 MW coal-fired
Seminole Electric Cooperative, Inc.; 1571, Washington, DC 20250–1571, electric generating units and associated
Notice of Intent To Hold Public telephone: (202) 720–0468 or e-mail: 230 kV transmission facilities. This EIS
Scoping Meeting and Prepare a stephanie.strength@wdc.usda.gov, or will be supplemented to evaluate the
Supplemental Environmental Impact James Frauen, Manager of environmental effects of the proposed
Statement Environmental Affairs, Seminole action.
AGENCY: Rural Utilities Service, USDA. Electric Cooperative, Inc., P.O. Box RUS will use input provided by
272000, Tampa, Florida 33688–2000 or government agencies, private
ACTION:Notice of intent to hold a public
e-mail: jfrauen@seminole-electric.com. organizations, and the public in the
scoping meeting and prepare an
Environmental Impact Statement (EIS). SUPPLEMENTARY INFORMATION: SECI preparation of a Draft Supplemental EIS.
proposes to construct and operate a The Draft Supplemental EIS will be
SUMMARY: The Rural Utilities Service nominal 750-megawatt coal-based available for review and comment for 45
(RUS) intends to hold a public scoping electric generating facility (Unit 3) at its days. A Final Supplemental EIS will
meeting and prepare a supplemental existing Seminole Generating Station, then be prepared that considers all
Environmental Impact Statement (EIS) located in Putnam County, Florida, comments received. The Final
in connection with possible impacts about six miles north of Palatka on U.S. Supplemental EIS will be available for
related to a project proposed by Highway 17. SECI intends to license the review and comment for 30 days.
Seminole Electric Cooperative, Inc. construction and operation of SGS Unit Following the 30-day comment period,
(SECI), with headquarters in Tampa, 3 in conjunction with the continued RUS will prepare a Record of Decision
Florida. The proposal consists of the operation of the existing Units 1 and 2. (ROD). Public notices announcing the
construction of a nominal 750 megawatt Unit 1 began commercial operation in availability of the Draft and Final
coal-based electrical generating unit at January 1984 and Unit 2 began Supplemental EIS and the ROD will be

VerDate Aug<31>2005 16:40 Oct 07, 2005 Jkt 208001 PO 00000 Frm 00002 Fmt 4703 Sfmt 4703 E:\FR\FM\11OCN1.SGM 11OCN1
59030 Federal Register / Vol. 70, No. 195 / Tuesday, October 11, 2005 / Notices

published in the Federal Register and in No factual analyses, conclusions or OMB Desk Officer: David Rostker,
the Palatka Daily News. findings should be considered final. (202) 395–3897.
Any final action by RUS related to the Only after the Board has considered a Copies of the above information
proposed project will be subject to, and final staff presentation and approved the collection proposal can be obtained by
contingent upon, compliance with all staff report next year will there be an calling or writing Diana Hynek,
relevant Federal, State and local approved final record of this incident. Departmental Paperwork Clearance
environmental laws and regulations and The meeting will be open to the Officer, (202) 482–0266, Department of
completion of the environmental review public. Please notify CSB if a translator Commerce, Room 6625, 14th and
requirements as prescribed in the RUS or interpreter is needed, at least 5 Constitution Avenue, NW., Washington,
Environmental Policies and Procedures business days prior to the public DC 20230 (or via the Internet at
(7 CFR part 1794). meeting. For more information, please dHynek@doc.gov).
Dated: October 4, 2005. contact the Chemical Safety and Hazard Written comments and
Glendon D. Deal, Investigation Board at (202) 261–7600, recommendations for the proposed
Director, Engineering and Environmental or visit our Web site at: http:// information collection should be sent
Staff, USDA/Rural Development/Utilities www.csb.gov. within 30 days of publication of this
Programs. notice to David Rostker, OMB Desk
Christopher W. Warner,
[FR Doc. 05–20309 Filed 10–7–05; 8:45 am] Officer, FAX number (202) 395–7285, or
General Counsel. David_Rostker@omb.eop.gov.
BILLING CODE 3410–15–P
[FR Doc. 05–20443 Filed 10–6–05; 2:28 pm]
Dated: October 5, 2005.
BILLING CODE 6350–01–P
Gwellnar Banks,
CHEMICAL SAFETY AND HAZARD Management Analyst, Office of the Chief
INVESTIGATION BOARD Information Officer.
DEPARTMENT OF COMMERCE
[FR Doc. 05–20339 Filed 10–7–05; 8:45 am]
Sunshine Act Meeting
Submission for OMB Review; BILLING CODE 3510–22–P
In connection with its investigation Comment Request
into the cause of an explosion and fire
which occurred at BP’s Texas City The Department of Commerce has DEPARTMENT OF COMMERCE
refinery on March 23, 2005, the United submitted to the Office of Management
and Budget (OMB) for clearance the Membership of the Office of the
States Chemical Safety and Hazard
following proposal for collection of Secretary Performance Review Board
Investigation Board (CSB) announces
that it will convene a community information under the provisions of the
AGENCY: Department of Commerce.
meeting starting at 6 p.m. local time on Paperwork Reduction Act (44 U.S.C.
Chapter 35). ACTION: Notice of membership on the
Thursday, October 27, 2005, at the Office of the Secretary Performance
Agency: National Oceanic and
Charles T. Doyle Convention Center, Review Board.
2010 5th Avenue North, Texas City, Atmospheric Administration (NOAA).
Title: Coastal Zone Management
Texas 77590. At the meeting CSB staff SUMMARY: In accordance with 5 U.S.C.
Program Administration.
will present to the Board the Form Number(s): None. 4314(c)(4), DOC announces the
preliminary results of their investigation OMB Approval Number: 0648–0119. appointment of persons to serve as
into this incident. There will be a public Type of Request: Regular submission. members of the Office of the Secretary
comment period after the investigators’ Burden Hours: 17,974. (OS) Performance Review Board (PRB).
presentation. Number of Respondents: 35. The OS/PRB is responsible for
At approximately 1:20 p.m. on Average Hours Per Response: 35. reviewing performance appraisals and
Wednesday, March 23rd, a series of Needs and Uses: Coastal zone ratings of Senior Executive Service
explosions occurred at the BP Texas management grants provide funds to (SES) members. The appointment of
City refinery during the restarting of a states and territories to implement these members to the OS/PRB will be
hydrocarbon isomerization unit. Fifteen federally-approved coastal zone for a period of 24 months.
workers were killed and about 170 management plans; revise assessment DATES: The effective date of service of
others were injured. Many of the victims documents and multi-year strategies; appointees to the Office of the Secretary
were in or around work trailers located submit requests to approve amendments Performance Review Board is upon
near a blowdown drum and stack that or program changes; submit section publication of this notice.
were open to the atmosphere. The 306A documentation on their approved FOR FURTHER INFORMATION CONTACT:
explosions occurred when a distillation coastal zone management plans; and Mary King, Director, Office of Executive
tower flooded with hydrocarbons and submit coastal management Resources, Office of Human Resources
was over pressurized, resulting in a performance measurement data. The Management, Office of the Director,
release of flammable hydrocarbons from funds are also provided to states and 14th and Constitution Avenue, NW.,
the blowdown stack. After the staff territories to develop their coastal Washington, DC 20230, (202) 482–3321.
presentation, the Board will allow a management documents. The
SUPPLEMENTARY INFORMATION: The
time for public comment. Following the information submitted is used to
conclusion of the public comment names, position titles, and type of
determine if activities achieve national
period, the Board will consider whether appointment of the members of the OS/
coastal management and enhancement
the preliminary facts presented PRB are set forth below by organization:
objectives and if states and territories
necessitate any recommendations prior are adhering to their approved plans. Department of Commerce, Office of the
to the final completion of the Board’s Affected Public: State, local or tribal Secretary, 2005–2007, Performance
investigative report. government. Review Board Membership
All staff presentations are preliminary Frequency: Annually, semi-annually
and are intended solely to allow the and on occasion. Office of the Secretary
Board to consider in a public forum the Respondent’s Obligation: Required to Fred L. Schwien, Director, Executive
issues and factors involved in this case. obtain or retain benefits. Secretariat; David S. Bohigian, Deputy