Sie sind auf Seite 1von 45

User Manual

Energy Audit Process


(BSNL_PM_UM_10_Energy_Audit_V2.0.doc)

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 1

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 2

Contents

Overview................................................................................................................. 3
Create Maintenance Plan......................................................................................... 4
Schedule Maintenance Plan...................................................................................10
Deadline Monitoring for Maintenance Plan............................................................15
List of Call Objects................................................................................................. 25
Process Notification..

..26
Complete
Notification
.30
Report generation for audit done..........................................................................34
Report generation for audit pending cases...........................................................36

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 3

Overview

Business Process Description Overview


Energy Audits are carried out at regular periods. These are planned
maintenance activities and hence are controlled by maintenance
plans.

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 4

Create Maintenance Plan


SAP Menu
T Code
User Menu

SAP Menu

Type IP42 in Command Field and press


Select corresponding Node for IP42

Enter the T-code


IP42

Click on

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 5

Select the Maint.


Plan cat. From
dropdown

Select the
strategy

Click on

or Press Enter to execute

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 6

Select the Maintenance plan cat.

Fill the all required


data for
Maintenance Plan
creation

Select the notification


type

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 7

Select the notification TYPE B9 i.e. Energy Audit

Select the notification


type B9 or Energy
Audit

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 8

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 9

Click on

to save

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 10

After all the data is maintained all the Tabs, when you saved the
Maintenance plan the system will prompt a message that Maintenance
plan is created with the number XXXXXXXXXXXXX

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 11

Schedule Maintenance Plan


SAP Menu
T Code
User Menu

SAP Menu---Logistics---Plant Maintenance---Preventive Maintenance--Maintenance Planning---Maintenance Plans---Scheduling Maintenance


Plans----Schedule
Type IP10 in Command Field and press
Select corresponding Node for IP10

Enter the T-code


IP10

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 12

Click on

Schedule Maintenance Plan

Fill the Maintenance Plan


no. E.g. 101000000127

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 13

Press Enter or click on

Start of plan cycle

Click here to start


cycle

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 14

Click on

to start the cycle

Fill start date:-

Fill the start


date for cycle

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 15

Click on

Schedule Maintenance Plan final screen:-

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 16

Click on Save

Deadline Monitoring for Maintenance Plan


SAP Menu

T Code
User Menu

SAP Menu---Logistics---Plant Maintenance---Preventive Maintenance--Maintenance Planning---Maintenance Plans---Scheduling Maintenance


Plans----Deadline Monitoring
Type IP30 in Command Filed and click on
Select corresponding Node for IP30 / Deadline Monitoring

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 17

Enter the T-code


IP30

Press Enter or click on

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

System will generate one internal


number for this plan

Page 18

Enter the Maintenance plan, Sort


field and set the Time period for
interval for call objects

Click on Execute in Background

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 19

Click on Program and than


click on Execute in

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 20

Click
here

Click on

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 21

Click
here

Click on

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 22

Check on the
checkbox as shown
checkbox
Click
here

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 23

Click on

Select the period value:-

Click here to select


desired period
values

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 24

Click here to save

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 25

Click on

Click here to save

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 26

Click on

to save

Deadline Monitoring for Maintenance Plan final screen:Background Job is to be scheduled for program RISTRA20

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 27

After clicking on save system will prompt a message that Background


Job is to be scheduled for program RISTRA20

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 28

List of Call Objects

SAP Menu

T Code
User Menu

SAP Menu---Logistics---Plant Maintenance---Preventive Maintenance--Maintenance Planning---Maintenance Plans---Scheduling Maintenance


Plans----Deadline Monitoring
Type IP24 in Command Filed and click on
Select corresponding Node for IP24

Fill the Maintenance


plan no.

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 29

Press F8 to execute or click on


List of Call Objects final screen:-

List of Call Objects will be shown over final screen as above

Process Notification
SAP Menu
T Code
User Menu

SAP Menu---Logistics---Plant Maintenance---Maintenance Processing--Notification---Change


Type IW22 in Command Field and press
Select corresponding Node for IW22 / Change

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 30

Input the Notification number and click on Enter

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 31

In the above screen the system status is OSNO (Out standing Notification) to
change the status from OSNO to NOPR (Notification in Process) click on Release
(Green Flag)

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 32

Click on Save

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 33

System will prompt a message as Notification


XXXXXXXXXX Saved

Complete Notification

SAP Menu
T Code
User Menu

SAP Menu---Logistics---Plant Maintenance---Maintenance Processing--Notification---Change


Type IW22 in Command Field and press
Select corresponding Node for IW22 / Notification Change

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 34

Input the notification Number and click on Continue

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 35

System will prompt a warning message at the bottom left of the above screen as
below

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 36

Click on Save

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 37

System will prompt a message as Notification


XXXXXXXXXX completed and system will update the
status as NOCO for this notification

To see the NOCO status access the Notification change mode screen through T
code IW22

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 38

Report generation for audit done


SAP Menu

T Code
User Menu

SAP Menu---

Type IW29 in Command Filed and click on


Select corresponding Node for IW29

Following point should be considered before running this


report for status Completed
1) Notification Status: Completed

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 39

2) Notification type: B9
3) Status Included: NOCO
4) Required start date: input date
5) Required end date: input date
Initial screen for Report generation for audit done:-

Check the desired


checkbox

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 40

Press F8 to execute or click on

Here under is the list of all Notification which has the status NOCO as per the
checkbox checked in the previous screen
Final Screen for Report generation for audit done:-

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 41

Report generation for audit pending cases


SAP Menu

SAP Menu---

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 42

T Code
User Menu

Type IW29 in Command Filed and click on


Select corresponding Node for IW29

Following point should be considered before running this


resport for status Outstanding / In process
1) Notification Status: Outstanding / In process
2) Notification type: B9
3) Required start date: input date
4) Required end date: input date

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 43

Check the desired


checkbox

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 44

Final Screen for Report generation for audit pending cases:-

This screen will show all notification which is still pending or not completed

BSNL_PM_UM_10_Energy_Audit_V2.0.doc

Page 45