Sie sind auf Seite 1von 1

WELDER JOB CLEARANCE CARD

Al-Khafji Joint Operations (KJO)


CONTRACT NO.

Required by SAEP-321

Welder Job Clearance Card

HQ979PC11

Al-Khafji Joint Operations (KJO)

QUALIFICATION RANGE

Project
HOUT (KRL) ONSHORE FACILITIES PROJECTS

Material P-No's / S-No's

Welder's Name

WPS / Process

JERRY D. CHAVEZ

P1 THRU P15F,P34 &P41 THRU P49


HOGFQ-1A1-SM-01, REV.0/ SMAW
E7018-1, F4

Electrodes Class / F-No's

Welder's Symbol

HOGFQ-F-510

Groove: F,V & O, Fillet: F,H & V / Uphill

Position Progression

Note: This clearance card is for welding on the above-mentioned project and may
be revoked if in the opinion of the Project Inspector, weld quality is not satisfactory
or in accordance with Saudi Aramco Specifications.

Min/Max Thickness

Inspector Issuing Card (Print Name)

Inspector's Signature

Date

Unlimited
All Fillet

Diameter Range

Date

Anil Kumar P
WELDER JOB CLEARANCE CARD
Al-Khafji Joint Operations (KJO)
CONTRACT NO.

Required by SAEP-321

Welder Job Clearance Card

HQ979PC11

Al-Khafji Joint Operations (KJO)

QUALIFICATION RANGE

Project
HOUT (KRL) ONSHORE FACILITIES PROJECTS

Material P-No's / S-No's

Welder's Name

WPS / Process

MICHAEL D. PAPA

P1 THRU P15F,P34 &P41 THRU P49


HOGFQ-1A1-SM-01, REV.0/ SMAW
E7018-1, F4

Electrodes Class / F-No's

Welder's Symbol

HOGFQ-F-511

Groove: F & V, Fillet: F,H & V / Uphill

Position Progression

Note: This clearance card is for welding on the above-mentioned project and may
be revoked if in the opinion of the Project Inspector, weld quality is not satisfactory
or in accordance with Saudi Aramco Specifications.

Min/Max Thickness

Inspector Issuing Card (Print Name)

Inspector's Signature

Date

Unlimited
All Fillet

Diameter Range

Date

Anil Kumar P
WELDER JOB CLEARANCE CARD
Al-Khafji Joint Operations (KJO)
CONTRACT NO.

Required by SAEP-321

Welder Job Clearance Card

HQ979PC11

Al-Khafji Joint Operations (KJO)

QUALIFICATION RANGE

Project
HOUT (KRL) ONSHORE FACILITIES PROJECTS

Material P-No's / S-No's

Welder's Name

WPS / Process

CHEMBAKA P. ELDHO

P1 THRU P15F,P34 &P41 THRU P49


HOGFQ-1A1-SM-01, REV.0/ SMAW
E7018-1, F4

Electrodes Class / F-No's

Welder's Symbol

HOGFQ-F-512

Groove: F,V & O, Fillet: F,H & V / Uphill

Position Progression

Note: This clearance card is for welding on the above-mentioned project and may
be revoked if in the opinion of the Project Inspector, weld quality is not satisfactory
or in accordance with Saudi Aramco Specifications.

Min/Max Thickness

Inspector Issuing Card (Print Name)

Inspector's Signature

Date

Unlimited
All Fillet

Diameter Range

Date

Anil Kumar P
WELDER JOB CLEARANCE CARD
Al-Khafji Joint Operations (KJO)
CONTRACT NO.

Required by SAEP-321

Welder Job Clearance Card

HQ979PC11

QUALIFICATION RANGE

Project
HOUT (KRL) ONSHORE FACILITIES PROJECTS

Material P-No's / S-No's

Welder's Name

WPS / Process

JAYA A. GOUDA

Electrodes Class / F-No's

Welder's Symbol

HOGFQ-F-513

Position Progression

Note: This clearance card is for welding on the above-mentioned project and may
be revoked if in the opinion of the Project Inspector, weld quality is not satisfactory
or in accordance with Saudi Aramco Specifications.

Min/Max Thickness

Inspector Issuing Card (Print Name)

Inspector's Signature

Anil Kumar P

Al-Khafji Joint Operations (KJO)

Date

Diameter Range

P1 THRU P15F,P34 &P41 THRU P49


HOGFQ-1A1-SM-01, REV.0/ SMAW
E7018-1, F4
Groove: F,V & O, Fillet: F,H & V / Uphill
Unlimited
All Fillet
Date

Das könnte Ihnen auch gefallen