1.

GENERAL ACTIVITIES
Bored piling
Substatantial completion of permanent roads & drainage.
Erection fire detection system CYE
Erection fire fighting systems SGA/ SGC/ SGE/ SGM/ SGY
Summary erection outdoor earthing/lightning
Summary cabling MV/LV cable
Summary erection cable trays
Remaining erection/comm. Lighting/small power
Erection/comm. Lighting/small power for backenergizing
2. GAS TURBINE, BUILDING AND AUXILIARIES
BUILDING STRUCTURE
Summary steel structure UMC.
Summary steel platforms UMC
Lift crane smm01/02 into place UMC
Erection cladding UMC
Erection crane smm01/02 for UMC
Construction finishing works UMC
Crane available for component placing smm01/02 in UMC
TURBOSET & AUXILIARIES
Summary erection condenser MAG
Summary ST Turboset erection (1 equipment on site - prep. Pipe cleaning)
Summary erection generator (Phase 1)
Erection lube oil modul MAV
Erection seal/leak steam system MAW
Erection hydraulic system MAX
Summary erection k-turbine MA
Summary final assembling steam turbine MA
Summary erection LP steam turbine ma
Summary placing and erection gas turbine (Phase 2)
Erection steelwork gt enclosure MPB/SAM
Erection water steam system
Erection auxiliary electrical system
Foundation (incl.excavation) UBA61-66/UBD
Contruction foundation incl excavation for UMY/UMX
Construction foundation UBD03
Construction concrete structure ULD
Construction foundation UBN
Placing see transformer MKC
Placement/erection auxiliary transformer BBT
Erection steel structure UBF/UBE
Erection steel structure UMX
Erection condensate extraction pump LCB
Erection electrical superheater LBG
Erection condenser tube cleaning sys. PAH
Erection service cooling water pump PCB
Erection equipment hvac-sys. For UMC/ SAM
Erection compressed air system SCA
Erection & cabling sfc transformer MBJ
Placing see transformer MKC
Erection condensate polishing pump LDK
Erection generator circuit breaker BAC
3. BOILER AREA
Summary erection steelwork/casing/galleries & ladders/ducts, stack HRSG
Erection secondary steel boiler galleries & ladders HRSG
Erection boiler outlet duct, stack HRSG incl, pre-assemble
Erection of hrsg pipes / valves
Erection boiler inlet duct HRSG
Construction foundation ULA
Erection steam generator drain pump LCL
Erection condensate recirculating pump LCA51

Erection feedwater pump LAC


Summary construction foundation incl. Excavation UMY
Erection steel structure ULA
Erection of HRSG harps
Erection of HRSG drums
Erection steel structure UHY
Erection steel structure UHW
Erection steel structure UMY
4. CIRCULATING WATER AREA
Section 2 erection piping system (outside) PAB on shore (unit 80/90) incl excavation & backfill
Section 3 erection piping system (outside) PAB on shore (UQA-unit90) incl.excavation & backfill
Section 2 (70UMC to unit 90) piping installation/ lamination, leak test backfilling and compaction.
Summary excavation & foundation for UQA/UQJ
Civil works cooling structure UQA/UQJ
Construction foundation UQN02
Erection piping system UQN03
5. WATER/WASTE WATER TREATMENT
Construction foundation 02UGC
Erection demin. Water pump GHC
Erection demin. Water tank GHC
Construction foundation UGY02
6. FUEL GAS SUPPLY AREA
Construction foundation 02UEN
Erection reducing station 02EK
7. CONTROL ROOM/ADMIN/WORKSHOPBUILDING
Construction UCA
8. SWITCHYARD
Foundation UAA incl. excavation zone1
Erection hv-switchgear at zone 01
9. YARD
Construction concrete structure UGH
Erection steel structure UGH
Construction foundation UGF (UGA)
Erection fire fighting raw water tank gad
Construction foundation USG
Erection steel structure 01UGY01/ 01UEY04/ 01UEY20/ 01UEY05/ 01UEY