Sie sind auf Seite 1von 2

54586 Federal Register / Vol. 70, No.

178 / Thursday, September 15, 2005 / Notices

applicant on a material issue of law or Counsel, U.S. Nuclear Regulatory For the Nuclear Regulatory Commission.
fact.1 Contentions shall be limited to Commission, Washington, DC, 20555– Samson S. Lee,
matters within the scope of the action 0001, and it is requested that copies be Acting Program Director, License Renewal
under consideration. The contention transmitted either by means of facsimile and Environmental Impacts Program,
must be one that, if proven, would transmission to 301–415–3725 or by e- Division of Regulatory Improvement
entitle the requestor/petitioner to relief. Programs, Office of Nuclear Reactor
mail to OGCMailCenter@nrc.gov. A copy
A requestor/petitioner who fails to Regulation.
of the request for hearing and petition
satisfy these requirements with respect [FR Doc. E5–5024 Filed 9–14–05; 8:45 am]
for leave to intervene should also be
to at least one contention will not be sent to the attorney for the applicant,
BILLING CODE 7590–01–P
permitted to participate as a party. Kathryn M. Sutton, Esquire, Morgan,
The Commission requests that each
Lewis, & Bockius LLP, 1111 NUCLEAR REGULATORY
contention be given a separate numeric
Pennsylvania Avenue, NW., COMMISSION
or alpha designation within one of the
following groups: (1) Technical Washington, DC, 20004.
[Docket Nos. 50–325 AND 50–324]
(primarily related to safety concerns); Non-timely requests and/or petitions
(2) environmental; or (3) miscellaneous. and contentions will not be entertained Carolina Power & Light Company,
As specified in 10 CFR 2.309, if two absent a determination by the Brunswick Steam Electric Plant, Units
or more requestors/petitioners seek to Commission, the presiding officer, or 1 and 2; Notice of Withdrawal of
co-sponsor a contention or propose the Atomic Safety and Licensing Board Applications for Amendments to
substantially the same contention, the that the petition, request and/or Facility Operating Licenses
requestors/petitioners will be required contentions should be granted based on
to jointly designate a representative who The U.S. Nuclear Regulatory
a balancing of the factors specified in 10 Commission (the Commission) has
shall have the authority to act for the CFR 2.309(a)(1)(I)–(viii).
requestors/petitioners with respect to granted the request of Carolina Power &
that contention. Detailed information about the license Light Company (the licensee) to
Those permitted to intervene become renewal process can be found under the withdraw its November 12, 2002,
parties to the proceeding, subject to any Nuclear Reactors icon at http:// application, as supplemented on March
limitations in the order granting leave to www.nrc.gov/reactors/operating/ 5, 2004, for proposed amendments to
intervene, and have the opportunity to licensing/renewal.html on the NRC’s Facility Operating License No. DPR–71
participate fully in the conduct of the Web site. Copies of the application to and Facility Operating License No.
hearing. A request for a hearing or a renew the operating license for Oyster DPR–62 for Brunswick Steam Electric
petition for leave to intervene must be Creek Nuclear Generating Station are Plant, Units 1 and 2, respectively,
filed by: (1) First class mail addressed available for public inspection at the located in Brunswick County, North
to the Office of the Secretary of the Commission’s PDR, located at One Carolina.
Commission, U.S. Nuclear Regulatory The proposed amendments would
White Flint North, 11555 Rockville
Commission, Washington, DC, 20555– have revised the Technical
Pike, First Floor, Rockville, Maryland
0001, Attention: Rulemaking and Specifications, as necessary, to support
20852–2738, and at http://www.nrc.gov/ an expansion of the core flow operating
Adjudications Staff; (2) courier, express reactors/operating/licensing/renewal/
mail, and expedited delivery services: range (i.e., Maximum Extended Load
applications.html, the NRC’s Web site Line Limit Analysis Plus (MELLLA+)).
Office of the Secretary, Sixteenth Floor, while the application is under review.
One White Flint North, 11555 Rockville As part of the MELLLA+
The NRC maintains an Agencywide implementation, Carolina Power & Light
Pike, Rockville, Maryland, 20852, Documents Access and Management
Attention: Rulemaking and Company would implement the Detect
System (ADAMS), which provides text and Suppress Solution-Confirmation
Adjudications Staff; (3) E-mail
and image files of NRC’s public Density (DSS–CD) approach to
addressed to the Office of the Secretary,
documents. These documents may be automatically detect and suppress
U.S. Nuclear Regulatory Commission,
accessed through the NRC’s Public neutronic/thermal-hydraulic
HEARINGDOCKET@NRC.GOV; or (4)
facsimile transmission addressed to the Electronic Reading Room on the Internet instabilities.
at http://www.nrc.gov/reading-rm/ The Commission had previously
Office of the Secretary, U.S. Nuclear
adams.html under ADAMS accession issued a Notice of Consideration of
Regulatory Commission, Washington,
number ML052080172. Persons who do Issuance of Amendment published in
DC, Attention: Rulemakings and
not have access to ADAMS or who the Federal Register on February 18,
Adjudications Staff at 301–415–1101,
encounter problems in accessing the 2003 (68 FR 7813), and renoticed on
verification number is 301–415–1966.2
documents located in ADAMS may April 27, 2004 (69 FR 22880). However,
A copy of the request for hearing and
contact the NRC Public Document Room by letter dated August 25, 2005, the
petition for leave to intervene must also
(PDR) Reference staff by telephone at 1– licensee withdrew the proposed change.
be sent to the Office of the General For further details with respect to this
800–397–4209, 301–415–4737, or by e-
action, see the application for
1 To the extent that the application contains mail to pdr@nrc.gov.
attachments and supporting documents that are not amendments dated November 12, 2002,
publicly available because they are asserted to The staff has verified that a copy of as supplemented March 5, 2004, and the
contain safeguards or proprietary information, the license renewal application is also licensee’s letter dated August 25, 2005,
petitioners desiring access to this information available to local residents near the which withdrew the application for
should contact the applicant or applicant’s counsel
to discuss the need for a protection order. Oyster Creek Nuclear Generating Station license amendments. Documents may be
2 If the request/petition is filed by e-mail or at the Lacey Public Library, 10 East examined, and/or copied for a fee, at the
facsimile, an original and two copies of the Lacey Road, Forked River, NJ 08731. NRC’s Public Document Room (PDR),
document must be mailed within 2 (two) business located at One White Flint North, Public
days thereafter to the Secretary, U.S. Nuclear Dated at Rockville, Maryland, this 9th day
Regulatory Commission, Washington, DC 20555– of September, 2005.
File Area 01 F21, 11555 Rockville Pike
0001; Attention: Rulemaking and Adjudications (first floor), Rockville, Maryland.
Staff. Publicly available records will be

VerDate Aug<18>2005 15:03 Sep 14, 2005 Jkt 205001 PO 00000 Frm 00067 Fmt 4703 Sfmt 4703 E:\FR\FM\15SEN1.SGM 15SEN1
Federal Register / Vol. 70, No. 178 / Thursday, September 15, 2005 / Notices 54587

accessible electronically from the generation are either demolished or in 3.0 Discussion
Agencywide Documents Access and an advanced state of demolition. There NRC licensees are required to
Management Systems (ADAMS) Public are no safety-related structures, systems maintain their records according to the
Electronic Reading Room on the Internet and components (SSCs) remaining at the NRC regulatory recordkeeping
at the NRC Web site, http:// HNP. Transfer of the spent fuel (SF) and requirements. Pursuant to the
www.nrc.gov/reading-rm/adams/html. greater-than-Class C (GTCC) waste from requirements of 10 CFR 50.12, ‘‘Specific
Persons who do not have access to the SF pool to the HNP Independent Exemptions,’’ CY filed a request for a
ADAMS or who encounter problems in Spent Fuel Storage Installation (ISFSI) partial exemption from the NRC
accessing the documents located in was completed on March 30, 2005, but recordkeeping requirements contained
ADAMS, should contact the NRC PDR the SF pool has not yet been drained, so in 10 CFR Part 50 Appendix A, Criterion
Reference staff by telephone at 1–800– it is not ready for demolition. 1, 10 CFR Part 50 Appendix B, Criterion
397–4209, or 301–415–4737 or by e-mail On February 16, 2005, CY filed a XVII, and 10 CFR 50.59 (d)(3). The NRC
to pdr@nrc.gov. request for NRC approval of an recordkeeping requirements at issue in
Dated at Rockville, Maryland, this 8th day exemption from the recordkeeping CY’s request for exemption are as
of September 2005. requirements of 10 CFR Part 50 follows.
For the Nuclear Regulatory Commission. Appendix A, Criterion 1, 10 CFR Part 50 10 CFR Part 50, Appendix A,
Brenda L. Mozafari, Appendix B, Criterion XVII, and 10 CFR ‘‘General Design Criteria for Nuclear
Senior Project Manager, Section 2, Project 50.59(d)(3). Power Plants,’’ establishes the necessary
Directorate II, Division of Licensing Project 2.0 Request/Action design, fabrication, construction,
Management, Office of Nuclear Reactor testing, and performance requirements
Regulation. Pursuant to the requirements of 10 for structures, systems, and components
[FR Doc. E5–5022 Filed 9–14–05; 8:45 am] CFR 50.12, CY requested the following important to safety. Specifically, CY
BILLING CODE 7590–01–P exemption, to the extent necessary, from requests an exemption from Criterion 1,
the record retention requirements of: ‘‘Quality standards and records,’’ which
(1) 10 CFR Part 50 Appendix A, states in part:
NUCLEAR REGULATORY Criterion 1, which requires certain Appropriate records of the design,
COMMISSION records be retained ‘‘throughout the life fabrication, erection, and testing of
[Docket No. 50–213] of the unit’’; structures, systems, and components
(2) 10 CFR Part 50 Appendix B, important to safety shall be maintained by or
under the control of the nuclear power unit
Connecticut Yankee Atomic Power Section XVII, which requires certain licensee throughout the life of the unit.
Company, Haddam Neck Plant; Partial records be retained consistent with
Exemption from Requirements of 10 applicable regulatory requirements for a 10 CFR Part 50, Appendix B, ‘‘Quality
CFR Part 50 Appendix A, Criterion 1, duration established by the licensee; Assurance Criteria for Nuclear Power
10 CFR Part 50 Appendix B, Criterion and Plants and Fuel Reprocessing Plants,’’
XVII, and 10 CFR 50.59(d)(3) establishes quality assurance
(3) 10 CFR Part 50.59(d)(3), which
requirements for the design,
1.0 Background requires certain records be maintained
construction, and operation of
until ‘‘termination of a license issued
Connecticut Yankee Atomic Power structures, systems, and components
pursuant to’’ Part 50.
Company (CY) is the licensee and that prevent or mitigate the
CY proposes to eliminate these consequences of postulated accidents
holder of Facility Operating License No.
records when: (1) The nuclear power that could cause undue risk to the
DPR–61 for the Haddam Neck Plant
unit and associated support systems no health and safety of the public.
(HNP), a permanently shutdown
longer exist for SSCs associated with Specifically, CY requests an exemption
decommissioning nuclear plant.
safe power generation, or (2) spent from Criterion XVII, ‘‘Quality Assurance
Although permanently shutdown, this
nuclear fuel has been completely Records’’, which states:
facility is still subject to all rules,
transferred from the spent fuel pool and Sufficient records shall be maintained to
regulations, and orders of the U.S.
the building is ready for demolition. furnish evidence of activities affecting
Nuclear Regulatory Commission (NRC).
CY is not requesting any exemption quality. The records shall include at least the
On December 5, 1996, CY notified following: Operating logs and the results of
NRC that operations had permanently associated with record keeping
requirements for storage of spent fuel at reviews, inspections, tests, audits,
ceased and that all fuel had been monitoring of work performance, and
permanently removed from the reactor. its ISFSI under 10 CFR Part 50 or the materials analyses. The records shall also
On July 7, 2000, CY submitted its general license requirements of 10 CFR include closely-related data such as
License Termination Plan (LTP), which Part 72. qualifications of personnel, procedures, and
the NRC approved on November 25, Most of these records are for SSCs that equipment. Inspection and test records shall,
have been removed from HNP and as a minimum, identify the inspector or data
2002.
disposed of offsite. Disposal of these recorder, the type of observation, the results,
CY began actively decommissioning the acceptability, and the action taken in
HNP in April 1999, through a contract records will not adversely impact the connection with any deficiencies noted.
with Bechtel Power Corporation. In June ability to meet other NRC regulatory Records shall be identifiable and retrievable.
2003, CY began managing the requirements for the retention of records Consistent with applicable regulatory
decommissioning using staff [e.g., 10 CFR 50.54(a), (p), (q), and (bb); requirements, the applicant shall establish
augmentation and subcontractors for 10 CFR 50.59(d); 10 CFR 50.57(g)]. requirements concerning record retention,
speciality work. These regulatory requirements ensure such as duration, location, and assigned
The nuclear reactor and all associated that records from operation and responsibility.
systems and components necessary for decommissioning activities are CY also requests an exemption from
the safe generation of power have been maintained for safe decommissioning, 10 CFR 50.59(d)(3), which states: ‘‘The
removed from the facility and disposed spent nuclear fuel storage, completion records of changes in the facility must
or sold off-site. Additionally, the and verification of final site survey, and be maintained until the termination of
structures necessary for safe power license termination. a license issued pursuant to this part or

VerDate Aug<18>2005 15:03 Sep 14, 2005 Jkt 205001 PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 E:\FR\FM\15SEN1.SGM 15SEN1

Das könnte Ihnen auch gefallen