Sie sind auf Seite 1von 7

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Site Test Record

Contract No.

BUS COUPLER D130


FUNCTION TEST

Sheet No.

SUD1-03-001
Page 1 of 6

Projects & Supplies Co.

1. General Data and Information:


Manufacture

HICO

2. Mechanical Check And Visual Inspection: As per TCS P105 Item no 4.1
Item
Description
Check tightness of all connections
1
Inspect for physical damage / defects
2
Panel condition, cleanliness, organization, labeling, readiness for service, panel
3
doors, handles...etc
4
CT shorting checked
Indications checked
5
6
Check the ferrules as per specification
Panel Earthing checked
7
Confirm that each panel has been properly secured to the floor in its final service
8
location.
Confirm that panels are constructed and wired as per SEC relevant
9
specification.
10
Check case cover and gasket for proper seal against dust.
Check all installed equipment nameplate information for compliance to
11
approved drawings and equipment /material lists.
For all internal and external panel wiring, confirm that all screw terminations are
tight and that crimp connectors are firmly secured to the wire and to the
12
termination point. Ensure that no part of the wire is bent
at the termination point. Check Ferrules.
Check that panel equipment is mounted securely and protected against
13
mal operation due to vibration, shock, etc
Use of ring type terminals for wire termination for current circuit wires.
14
15
16

Disconnectors Manual operation by handle and related interlocking


conditions to be checked
Mechanical interlocking between DS & ES to be checked

Checked
Yes
N/A
Yes
N/A
Yes
N/A
Yes
Yes
Yes
Yes
Yes

N/A
N/A
N/A
N/A
N/A

Yes

N/A

Yes
Yes

N/A
N/A

Yes

N/A

Yes

N/A

Yes

N/A

Yes

N/A

Yes

N/A

3. Electrical Tests
Item
1
2
3
4
5

Description
Insulation Resistance Test report of all wires to be submitted by the
contractor prior witnessing and made available
Dc power/ control supply checked.
AC Power/ Control supply checked.
Circuit Breaker, Disconnector and Earth Switch Open/Close status
checked
All CBS, DSWs and ESWs should be tested before starting function
Check

Test Performed by:


Name:

ENG/MOHAMED AMIN

Yes

Checked
N/A

Yes
Yes
Yes

N/A
N/A
N/A

Yes

N/A

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

10/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

BUS COUPLER D130


FUNCTION TEST

Site Test Record


Projects 4.
& Supplies
Co. breaker
Circuit

Sl no.

Contract No.
Sheet No.

Page 2 of 6

closing / tripping blocking conditions :


Setting
values

Description
st

1
2
3
4
5

SUD1-03-001

CB blocked status
Closing
Tripping

5.7 bar
5.5 bar
6.7 bar
20 SEC
----

SF6 Gas pressure 1 Stage


nd
SF6 Gas pressure 2 Stage
rd
SF6 Gas pressure 3 Stage
CB spring charged condition
Anti-Pumping condition

Remarks

OK
OK
OK
OK
OK

6. Checking of operation and indications


Equip.
ref
134

136

Operation
Command
Open/
close
Open/
close

Close
130
Open
131A
131B

Open/
close

Condition

Remarks

Service

OK

Test

OK

Service

OK

Test

OK

Service

OK

Test

OK

Service

OK

Test

OK

LCC

CR

SAS

LCC

CR

SAS

Test Performed by:


Name:

Indication

ENG/MOHAMED AMIN

OK
independent
condition

OK

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

10/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Site Test Record


Projects 7.
& Supplies
Co.
Functional

Contract No.

BUS COUPLER D130


FUNCTION TEST

SUD1-03-001

Sheet No.

Page 3 of 6

and interlocking test for circuit breaker 130

Operation
Condition
Close/open
Test
Close*
Service
Trip
Test & Service

Equipments
Ds 134 & 136
DS 134 & 136
Protection Relays

Status
Fo
FC
Operated

Remarks
OK
OK
As Per Sch Dwg

All checked under normal sf6 gas pressure operating conditions


*Protection Relays Reset, Bus VT Mcb on & Synchronizing condition ok
Note:
FO: Fully Open
FC: Fully Close
8. Functional test for C.B Trip & open blocking:
C.B Open Blocking while load transfer in one feeder or more to be connected to
two bus bars which coupled by this bus coupler (130) or load transfer in one
feeder or more to be connected to another two bus bars which coupled by bus
section and this bus coupler (130).

9. Functional and interlocking test for Bus Disconnector 134:


Operation

Condition

Close/open

Test

Close/open

Service

Equipments
Es 131A & 141A
ES 131B
CB130
ES 131A, 131B & 141A

Status
FC
FO
O
FO

Remarks
OK
OK

10. Functional and interlocking test for Bus Disconnector 136


Operation

Condition
1

Close/open

Test

Close/open

Service

Equipments
ES 131B & 261A
ES 131A

Status
FC
FO

CB130
`ES 131A, 131B & 261A

O
FO

Remarks
OK
OK

.
Test Performed by:
Name:

ENG/MOHAMED AMIN

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

10/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Site Test Record


Projects 11.
& Supplies
Co.
Functional

Contract No.

BUS COUPLER D130


FUNCTION TEST

Sheet No.

SUD1-03-001
Page 4 of 6

and interlocking test for Earth-Switch 131A

Operation
Close/open

Condition
Service

Equipments
DS 134 & 136

Status
FO

Remarks
OK

12. Functional and interlocking test for Earth-Switch 131B


Operation
Close/open

Condition
Service

Equipments
DS 134 & 136

Status
FO

Remarks
OK

Note:
FO: fully open

FC: fully close

O: open

14. Checking of LCC, Annun. Indication &Alarm :( annunciator)


Test Performed by:
Name:

ENG/MOHAMED AMIN

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

10/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Site Test Record


Projects
& Supplies Co.
Channel

ENG/MOHAMED AMIN

Sheet No.

SUD1-03-001
Page 5 of 6

Status
OK
OK
OK
OK
OK

CB MOTOR SUPPLY FAIL


DS/ES MOTOR SUPPLY FAIL
CB CLOSE SUPPLY FAIL
DS/ES CONTROL SUPPLY FAIL
CB TRIP-1 SUPPLY FAIL

Test Performed by:


Name:

BUS COUPLER D130


FUNCTION TEST
Events

no.
1
2
3
4
5

Contract No.

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

10/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Site Test Record

Contract No.

BUS COUPLER D130


FUNCTION TEST

Projects6& Supplies
CBCo.
TRIP-2

7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Channel
no.
38
39
40
41
42
43

SUPPLY FAIL
INDICATION & GAS ALARM SUPPLY FAIL
LOAD TRANSFER CONTACT MULTIPLICATION RELAY FAIL
ALARM DC SUPPLY FAIL
ALARM AC SUPPLY FAIL
BCU SUPPLY FAIL
LCC AC SUPPLY FAIL
DS SWITCHING INCOMPLETE
ES SWITCHING INCOMPLETE
CB MOTOR RUNTIME EXCEED &SPRING UNCHARGE
CB OPERATING MECHANISM FAIL
DS/ES MANUAL MODE
SPARE
VT ISOLATOR(194A) OPEN
VT ISOLATOR(194A) SWITCHING INCOMPLETE
VT ISOLATOR(226A) OPEN
VT ISOLATOR(226A) SWITCHING INCOMPLETE
SPARE
SPARE
COMP.G130-1 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-1 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-2 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-2 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-3 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-3 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-5 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-5 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-6 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-6 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-7 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-7 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-1 SF6 GAS PRESSURE HIGH
Events

SPARE
COMP.G130-2 SF6 GAS PRESSURE HIGH
SPARE
COMP.G130-3 SF6 GAS PRESSURE HIGH
SPARE
COMP.G130-5 SF6 GAS PRESSURE HIGH
Test Performed by:

Name:

Sheet No.

ENG/MOHAMED AMIN

SUD1-03-001
Page 6 of 6

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Status

OK
OK
OK
OK
OK
OK

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

10/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Site Test Record

Contract No.

BUS COUPLER D130


FUNCTION TEST

Projects
44& Supplies
CBCo.
SF6

45
46
47
48
49
50
51
52
53
54
55
56

GAS PRESSURE LOW STAGE-1


COMP.G3-6 SF6 GAS PRESSURE HIGH
CB SF6 GAS PRESSURE LOW STAGE-2
COMP.G3-7 SF6 GAS PRESSURE HIGH
CB SF6 GAS PRESSURE HIGH
LCC (VT-1A) VT MCB TRIP
GIS (VT-1A) VT MCB TRIP
LCC (VT-2A) VT MCB TRIP
GIS (VT-2A) VT MCB TRIP
SPARE
SPARE
SPARE
SPARE

Sheet No.

SUD1-03-001
Page 7 of 6

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Note:
All interlock points were checked according to interlocking conditions table which is approved
by system Operation department

Test Performed by:


Name:

ENG/MOHAMED AMIN

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

10/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Das könnte Ihnen auch gefallen