I. ADMINISTRATIVE
A. BACKGROUND
1. Introduction
Gone were the days when it was wise to take things at slow pace to
make obstinate marks for growth and development. We are in a world of
continuous change where we are prompted to look beyond the future,
now. We owe it or we blame it to the fast transformation of information
technology (IT) that now dictates an e-global (electronic global) way of life.
Precisely, this IT has to improve the quality of public service that
the Philippine National Police (PNP) mulls about. Within the mandate of
the law and concurrent to the governments national transformation
program, the PNP has identified the need to an organized information
gathering and storage system that can help decision-makers in the PNP
assess the different strategies, with geographic, socioeconomic and socio
demographic factors coming less into play.
This need for modern technological advancement has prompted
the PNP to opt for on IT reengineering strategy which would necessitate
for the integration of the two existing major technologies available in the
PNP which are being managed separately by the Information Technology
Management System (ITMS) and the Communications and Electronics
Service (CES). The system would provide the PNP an unhampered realtime connectivity to all its police stations nationwide through Internet
Service Providers (ISPs) and utilities which means less paper works, fast
and real-time accessibility, more accurate data and information sharing
and on-line transmission.
Meanwhile, the fusion of the existing Information Technology
Management and Communications and Electronics Service into an
integrated Information and Communications Technology Management
shall pave the way for the reengineering of a PNP IT infrastructure,
necessitating the birth of a new directorate which would carry the
mandate, embody the aspiration and manage the assimilation of
technologies in its directional capacity and as the one policy-making body
pertaining to all ICTs of the PNP. It is along this pursuit that the
Directorate for Information and Communications Technology Management
(DICTM) was activated on April 1, 2009 through GO DPL-09-08.
2. Conceptualization of DICTM
Through Executive Order Nr. 269 on January 12, 2004, the Philippine
Government Commission of Information and Communications Technology
(CICT) was created to develop, promote and advance Information and
Communications Technology as a prerequisite for the continued growth of
the economy, competitiveness of local firm/industry using ICT, and
achievement of national development goals by providing legal, policy and
institutional development in this field.
Parallel to the creation of the CICT and to be able to assimilate the
information and telecommunications system of the PNP, the Revised
Reorganization Plan of the PNP was adopted on August 21, 2008 through
NAPOLCOM Resolution No. 2008-447.
On March 2, 2009, Her Excellency President Gloria Macapagal
Arroyo approved the proposal of the Chief PNP Police Director General
Jesus Ame Verzosa for the creation of the Directorate for Information and
Communications Technology Management (DICTM).
On April 1, 2009, the Directorate for Information and Communications
Technology Management (DICTM) was officially activated through General
Order Number DPL-09-08 with Police Director (Atty) Magtanggol B. Gatdula
as its first director.
B. MISSION, VISION AND FUNCTIONS OF THE DICTM
1. Vision
The Directorate for Information and Communications Technology
Management (DICTM) envisions an integrated Information Systems that
converge with data communications infrastructure for the PNP to provide
effective and efficient innovative police services to the people by creating
environment that promotes and advances ICT development.
2. Mission
The Directorate for Information and Communications Technology
Management (DICTM) shall assist the Chief, PNP in policy formulation and
managing information, electronics and communications technology
C. ORGANIZATION STRUCTURE
TDICTM
DDICTM
EX-O
ICTPPD
(ICT Plans & Programs
Division)
Policies and Plans Section
Program Management
Section
Monitoring and Evaluation
Section
DICTM
Personnel Officer
Administrative Officer
Budget and Fiscal Officer
RDD
SIMD
(Research and
Development Division)
(Systems Integration
and Mgmt. Division)
Information Systems
Integration and Management
Section
Communications & Electronics
System Section
ITMS
CES
RICTOs
Acronyms:
DICTM Directorate for
Information and Communications
Technology Mgmt
TDICTM The Director for
Information and Communications
Technology Mgmt
DDICTM Deputy Director for
Management Service
CES Communications and
Electronics Service
RICTOs Regional Information
and Communications Technology
Offices
1. Manning Chart
2/2
2/1
5
1
1/2
1/1
4
1
1/2
1
1
Budget & Fiscal Officer
2/1
2/1
2/1
1/1
4
3
3/1
3
2
2/1
4
3
1/1
5
3
2/1
6
3
6
5
2/1
5
4
Legend:
A/B
(OFFICE)
A.
(D)
PNCOs
NUPs
PDIR
SPO4
SG25
SG15
SG8
PCSUPT
SPO3
SG24
SG14
SG7
PSSUPT
SPO2
SG22
SG13
SG6
PSUPT
SPO1
SG19
SG12
SG4
PCINSP
PO3
SG18
SG11
SG3
PSINSP
PO2
SG17
SG10
SG2
PINSP
PO1
SG16
SG9
SG1
TOTAL
24
17
16
12
GRAND TOTAL = 72
for
Information
and
AND
Communications
1.1.1 Assists and advises the Chief, PNP in the areas of policy
formulation and management for the integration,
application and development of Information and
Communications Technology in the organization.
1.5.6
1.5.7
Directs,
coordinates
and
monitor
personnel
activities/projects designed to attain the greatest degree of
personnel effectiveness.
Reviews statement of service records, certification for
approval of immediate supervisor.
Prepares and updates the directorates Qualifications Standard.
Prepares the assessment proposals of candidates for promotion.
Monitors and supervises the preparation of action on
appointments, transfer, resignation, reinstatement, salary
adjustment attendance and other matters pertaining to
personnel services for approval of TDICTM.
Prepares communications on personnel matters.
Performs other duties as may be directed TDICTM.
and
Organizational Structure
Chief, Plans and Programs Division
Monitoring and
Evaluation Section
Information Systems
Integration and Mgmt Section
3.4
Communications and
Electronics System Section
II. OPERATIONS
1. ADMINSTRATIVE OFFICE
1.1.
TITLE
Certification
INTERFACES
Certification
Procedure No.
No. of Pages
1.1
3
DICTM Admin Office and Personnel
1.1.1. OBJECTIVE
Prescribing the guidelines and procedures in the issuance of
Certificate of Duty Status.
1.1.2. REFERENCE
1.1.3. DEFINITION OF TERMS
1.1.3.1.
1.1.4. REQUIREMENTS
1.1.4.1. For Processing of Claims
1.1.4.2 Implementing Order like RCA Order, Long Pay Order and
the
1.1.4.3
1.1.4.4
1.1.4.5
1.1.4.6
likes.
For Loan Purposes
Filled out Loan Form from Lending Investor
Latest Photocopy of Pay slip
Others Client Purpose
1.1.5. FLOWCHART
START
Submission of
requirements to Admin
Office
Evaluation of the
requirements & preparation
of the certificate.
Verification of the
Certification
Notation of the
Certification
Releasing of Certificate of
Duty Status
END
1.1.6. NARRATIVE
1.1.6.1. The Client will submit the required documents to the
Administrative Office.
1.1.6.2.
The Personel PNCO will evaluate the submitted
requirements and prepare the Certificate of Duty Status.
1.1.6.3. The Personnel Officer will verify the documents and sign to
certificate.
1.1.6.4. The Administrative Officer will sign the Certificate of Duty
Status.
1.1.6.5. Admin Office will release/issue the certification.
1.2.
2 hours
1 hour
30 mins
3 hours and
30 mins
Commutation Order
TITLE
Commutation Order
INTERFACES
Procedure No.
No. of Pages
1.2
3
DICTM Admin Office and Personnel
1.2.1. OBJECTIVE
Prescribing the guidelines and procedures in the applications of
issuance of Commutation Order.
1.2.2. REFERENCES
1.2.2.1. Section 39 of RA 6975, An Act Establishing The Philippine
National Police Under A Reorganized Department Of The
Interior And Local Government, And For Other Purposes.
1.2.3. DEFINITION OF TERMS
1.2.3.1.
1.2.4. REQUIREMENTS
1.2.4.1.
1.2.4.2.
Unit Endorsement
Retirement Orders
1.2.4.3.
1.2.4.4.
1.2.4.5.
1.2.5. FLOWCHART
START
Submission of
requirements to Admin
Office
Countersignature of the
Administrative Officer
Countersignature
of the
Administrative Officer
Verification
Verification
of the requirements
of the
(Personnel
requirements
Officer)
END
1.2.6. NARRATIVE
1.2.6.1.
1.2.6.2.
1.2.6.3.
1.2.6.4.
1.2.6.5.
1.2.6.6.
of
2 hours
1 hour
30 mins
1 hour & 30
mins
1 hour
6 hours
Compulsory Retirement
TITLE
Compulsory Retirement
INTERFACES
Procedure No.
No. of Pages
1.3
3
DICTM Admin Office and Personnel
1.3.1. OBJECTIVE
Prescribing the guidelines and procedures in the compulsory
retirement of DICTM personnel.
1.3.2. REFERENCES
1.3.2.1. Section 39 of RA 6975, An Act Establishing The Philippine
National Police Under A Reorganized Department Of The
Interior And Local Government, And For Other Purposes.
1.3.3. DEFINITION OF TERMS
1.3.3.1.
Unit Endorsement
Basic Letter Request
Service Record
Latest Promotion Order
PLEB Clearance
NAPOLCOM Clearance
Unit Clearances (Non Money/Property and Non-Pending
Case)
1.3.4.8. IAS Clearance
1.3.4.9. DIDM Clearance
1.3.4.10.
Latest Statement of Assets, Liabilities and Net worth.
1.3.5. FLOWCHART
START
Submission of requirements
to Admin Office
Countersignature of the
Administrative Officer
Evaluation of the
requirements & preparation of
the endorsement
(Personnel PNCO)
Verification of the
requirements
(Personnel Officer)
Submission of Folder to
DPRM for issuance of
implementing orders
END
1.3.6. NARRATIVE
Average
Transaction
Time
2 hours
1 hour
30 mins
1 hour & 30
mins
1 hour
6 hours
Conferment of Awards
TITLE
Conferment of Awards
INTERFACES
Procedure No.
No. of Pages
1.4
3
DICTM Admin Office and Personnel
1.4.1. OBJECTIVE
To issue and confer awards to DICTM personnel following the
prescribed guidelines and procedures in the conferment of authorized
decorations, service medals, ribbons and badges of the PNP.
1.4.2. REFERENCES
START
1.4.5. FLOWCHART
Deliberation of the
Personnel Board
Recommendation for
Approval of the Board
Resolution
Issuance of Order of
Admin Office
Conversion of Leave
Credits to DPRM
Administrative and Operations Manual
END
1.4.6. NARRATIVE
1.4.6.1. The Client Division Chief/Key Officers will submit
administrative accomplishment to Administrative Office
(Working Committee) for preliminary screening and
evaluation.
1.4.6.2. The Working Committee will assess and evaluate the
accomplishment/s prior deliberation to the Board.
1.4.6.3. The Personnel Board will reevaluate the accomplishment
and recommend approval or disapproval of the awards,
medals and recognition.
1.4.6.4. The Administrative Office will issue appropriate awards,
medals and recognition to the personnel.
1.4.6.5. The Administrative Office will furnish a copy of the issued
Medals to DPRM for the conversion of such to leave
credits to be enjoyed by concerned personnel from date of
conferment onwards but not later than the last day of the
next calendar year.
1.4.7
SERVICE STANDARD
Transaction Type
Average Transaction
Time
1 to 2 days
2 days
1 day
Issuance of Order
Total Average Transaction Time
1.5.
1 hour
5 days and 1
hour
PNP ID Application
TITLE
ID Application
INTERFACES
Procedure No.
No. of Pages
1.5
4
DICTM Admin Office and Personnel
1.5.1. OBJECTIVE
Prescribing the guidelines and procedures in the applications of
PNP ID.
1.5.2. REFERENCES
1.5.2.1. DPRM Form 1A 2007.
1.5.3. DEFINITION OF TERMS
1.5.3.1. DPRM Form 1A 2007 - the revised PNP ID Application
Form.
1.5.4. REQUIREMENTS
1.5.4.1. New Applicant
1.5.4.1.1. Endorsement from the Administrative Officer
1.5.4.1.2. Accomplished PNP ID Form
1.5.4.1.3. Appointment Order
1.5.4.1.4. Authenticated Latest Payslip
1.5.4.2. Renewal/Update
1.5.4.2.1. Endorsement from the Admin Officer
1.5.4.2.1. Accomplished PNP ID Form
1.5.4.2.1. Surrender Old/Expired ID
1.5.4.2.1. Promotion Order if newly promoted
1.5.5. FLOWCHART
START
Submission of requirements
to Admin Office
Release of PNP ID
END
1.5.6. NARRATIVE
1.5.6.1. The Client will submit the accomplished ID Application
Form required and required documents to the
Administrative Office.
1.5.6.2. The Personnel PNCO will evaluate the submitted
requirements and prepare the Unit Endorsement.
1.5.6.3. The Personnel Officer will verify the documents and
countersign to the ID application form.
1.5.6.4. The Administrative Officer will sign the ID Application Form
and the endorsement.
1.5.6.5. The liaison officer will submit the application to RMD,
DPRM for issuance of PNP ID.
1.5.6.5. Distribution of PNP ID to the concerned Personnel.
1.6.
TITLE
Filing of leave of absence
for all DICTM personnel.
INTERFACES
Procedure No.
1.6
No. of Pages
6
1.6.1. OBJECTIVE
To provide procedures and guidelines in the application of leave of
absence for all DICTM personnel.
1.6.2. REFERENCES
1.6.2.1. PNP Circular No.2002-009 dated May 21, 2002
1.6.2.2. Rule XVI of the Omnibus Rules Implementing Book V of
the Administrative Code of 1987 (Executive Order 292)
1.6.3. DEFINITION OF TERMS
1.6.3.1. Leave form (CSC Form No.6) For to be accomplished
for filing a Leave of Absence
1.6.3.2. Leave of Absence (LOA) - is a term used to describe a
period of time that one is to be away from his/her primary
job, while maintaining the status of employee. This term is
in contrast to normal periods away from the workplace,
such as vacations, holidays, hiatuses, sabbaticals, and
working from home programs, in that they are considered
to be exceptional circumstances, rather than benefits.
Generally such an arrangement has a predefined
termination at a particular date or after a certain event has
occurred.
1.6.4. REQUIREMENTS
1.6.4.1. For vacation/sick leave abroad
1.6.4.1.1. Letter endorsement from unit chief
1.6.4.1.2. Basic letter request, including the number of
days, reason for leave and address while on
leave
1.6.4.1.3. Duly accomplished CSC form No.6
1.6.4.1.4. Breakdown of leave credits from RMD, DPRM
1.6.4.1.5. NHQ IAS and Legal Service clearances
1.6.5. FLOWCHART
START
Client will
will duly
dulyaccomplish
accomplishCSC
DICTMC
Form No.
Form
6
and 6prepare
No.
and prepare
necessary
necessary
document.
document.
1
TDPRM,
RMD
issues
appropriate
implementing order and furnish the unit
concerned.
END
1.6.6. NARRATIVE
1.6.6.1. The clients duly accomplish CSC Form No. 6 (2 copies)
and files leave application at the admin office.
1.6.6.2. The personnel clerk receives the application, check the
completeness of the requirements then forward the
applications to NUP Supervisor for NUP and to C, Clerk for
Uniformed Personnel.
1.6.6.3. NUP Supervisor/C, Clerk record the dates indicated on the
leave form then countersigns.
1.6.6.4. The Personnel Officer signs the leave form.
1.6.6.5. The Morale and Welfare Staff prepares unit endorsement.
1.6.6.6. The Administrative Officer signs the leave form.
1.6.6.7. The Deputy Director for Administration signs the unit
endorsement.
1.6.6.8. The Liaison Officer forwards the accomplished leave form
and endorsement to TDPRM, RMD.
1.6.6.9. TDPRM will issue implementing orders and furnish the
concerned unit.
1.6.7. SERVICE STANDARDS
Transaction Type
1.7.
TITLE
Issuance of Letter of
Accommodation
INTERFACES
Procedure No.
No. of Pages
1.7
1.7.1. OBJECTIVE
Prescribing the guidelines and procedures in the issuance of Letter
of Accommodation to a uniformed personnel
1.7.2. REFERENCES
1.7.2.1. PNP MEMO CIRCULAR NO 99 016, Guidelines on the
Transfer/Reassignment of PNP Personnel.
1.7.2.2. Memo from TADPRM dated June 29, 2007 re:
Requirements for Transfer of PNP Personnel.
1.7.3. DEFINITION OF TERMS
1.7.3.1. Letter of Accommodation - is a letter given to personnel
who are willing to be assigned to a unit/office which was
duly signed by the Director/Chief of Office of the gaining
unit/office.
1.7.4. REQUIREMENTS
1.7.4.1. Basic Letter Request
1.7.4.2. Projected Designation to position commensurate to the
rank based on T.O. Position if personnel is a PCINSP to
PSSUPT rank.
1.7.4.3. Updated CSC Personal Data Sheet
1.7.5. FLOWCHART
START
Submission of requirements
to Admin Office
Evaluation of the
requirements and
Preparation of the Letter
(Personnel PNCO)
Releasing of Letter of
Accommodation
END
1.7.6. NARRATIVE
1.7.6.1. The Client will submit the requirements to Administrative
Office.
1.7.6.2. The Personnel PNCO will evaluate the submitted
requirements and prepare the Letter of Accommodation.
1.7.6.3. The Personnel Officer will verify the documents and
countersign to the letter.
1.7.6.4. The Administrative Officer may/may not talk to the client
then will recommend approval of the accommodation.
1.7.6.5. The Director will approve or disapprove the letter of
accommodation.
1.7.6.6. Releasing of Letter of Accommodation.
2 hours
1 hour
4 hours
3 hours
2 hour
1 day and 4
hours
ACCOMMODATION
ATTY
MAGTANGGOL
Ph.D/CEO VI
Police Director
GATDULA,
1.8.
TITLE
Transfer/Reassignment of
Uniformed Personnel
INTERFACES
Procedure No.
No. of Pages
1.8
1.8.1. OBJECTIVE
Prescribing
the
guidelines
and
procedures
transfer/reassignment of uniformed personnel to other Units.
in
the
1.8.2. REFERENCES
1.8.2.1. PNP MEMO CIRCULAR NO 99 016, Guidelines on the
Transfer/Reassignment of PNP Personnel.
1.8.2.2. Memo from TADPRM dated June 29, 2007 re:
Requirements for Transfer of PNP Personnel.
1.8.3. DEFINITION OF TERMS
1.8.3.1. Transfer - is a movement from one position to another
which is of equivalent rank, level or salary without break in
service involving the issuance of an appointment.
1.8.3.2. Reassignment - is the movement of an employee from
one organizational unit to another in the same department
or agency which does not involve a reduction in rank,
status, or salary and doest not require the issuance of
appointment.
1.8.3.3. Availability of Reassignment - is a certificate being given
by the losing unit duly signed by its Director/Chief of Office
granting the transfer of personnel to another unit.
1.8.3.4. Letter of Accommodation - is a letter given to a
personnel who are willing to be assigned to a unit/office
Unit Endorsement
Availability of Reassignment
Basic Letter Request of the Uniformed Personnel
Updated DICTMC Personal Data Sheet
Letter of Accommodation
Clearances (Non Money/Property and Non-Pending Case
and IAS)
1.8.4.7. Certification that subject personnel is not a witness in
admin/criminal case
1.8.4.8. Certificate of no pending case for resolution if he/she is a
Summary Hearing Officer
1.8.5. FLOWCHART
START
Recommend approval of the
Administrative Officer
Submission of requirements
to Admin Office
Approval of the Director
Evaluation of the requirements
and Preparation of Certificate
(Personnel PNCO)
Submission of Folder to DPRM for
the issuance of implementing
order
Verification of the requirements and
certificate
(Personnel Officer)
1.8.6. NARRATIVE
END
2 hours
1 hour
4 hours
3 hours
2 hour
1 day and 4
hours
1.8.8. SAMPLE
Republic of the Philippines
Department of the Interior and Local Government
NATIONAL POLICE COMMISSION
NATIONAL HEADQUARTERS PHILIPPINE NATIONAL POLICE
DIRECTORATE FOR INFORMATION AND COMMUNICATIONS TECHNOLOGY MANAGEMENT
Procedure No.
No. of Pages
1.9
3
DICTM Admin Office/Personnel
1.9.1. OBJECTIVE
Prescribing the guidelines and procedures in the processing of resignation
of personnel.
1.9.2. REFERENCES
1.9.2.1. Civil Service guideline on resignation of personnel
1.9.2.2.
PNP guidelines on resignation of personnel
1.9.3. DEFINITION OF TERMS
1.9.3.1. Resignation - is the formal act of giving up or quitting one's office
or position. A resignation can occur when a person holding a
position gained by election or appointment steps down, but
leaving a position upon the expiration of a term is not considered
resignation. An employee who chooses to leave a position is
considered a resignation, as opposed to termination, which
occurs when the employee involuntarily loses a job.
19.4. REQUIREMENTS
19.4.1.
19.4.2.
19.4.3.
19.4.4.
Unit Endorsement
Basic Letter Request
Service Record
Clearances (Non Money/Property and Non-Pending Case and
IAS)
19.4.5. Latest Statement of Assets, Liabilities and Net worth.
1.9.5. FLOWCHART
START
Submission of requirements
to Admin Office
END
1.9.6. NARRATIVE
19.6.1. The Client will submit the requirements to Administrative Office.
19.6.2. The Personnel PNCO will evaluate the submitted requirements
and prepare the Unit Endorsement.
19.6.3. The Personnel Officer will talk to the client regarding his/her
resignation. The documents will also be verified.
19.6.4. The Administrative Officer may/may not talk to the client then will
recommend approval of the resignation.
19.6.5. The Director will approve or disapprove the letter of
accommodation.
19.6.6. Releasing of Letter of Accommodation.
2 hours
1 hour
4 hours
3 hours
2 hour
1 day and 4
hours
Procedure No.
No. of Pages
1.10
3
DICTM Admin Office/Personnel
1.10.1. OBJECTIVE
Prescribing the guidelines and procedures in the optional retirement of
DICTM personnel.
1.10.2. REFERENCES
1.10.2.1. Section 40 of RA 6975, An Act Establishing The Philippine
National Police Under A Reorganized Department Of The
Interior And Local Government, And For Other Purposes.
1.10.3. DEFINITION OF TERMS
1.10.3.1. Optional Retirement - Upon accumulation of at least twenty
(20) years of satisfactory active service, an officer or nonofficer, at his own request and with the approval of the
Commission, shall be retired from the service and entitled to
receive benefits provided by law.
1.10.4. REQUIREMENTS
1.10.4.1.
1.10.4.2.
1.10.4.3.
1.10.4.4.
1.10.4.5.
1.10.4.6.
1.10.4.7.
1.10.4.8.
Unit Endorsement
Basic Letter Request
NAPOLCOM Approval
Service Record
Latest Promotion Order
PLEB Clearance
NAPOLCOM Clearance
Unit Clearances ( Non Money/Property and Non-Pending
Case)
1.10.4.9. IAS Clearance
1.10.4.10. DIDM Clearance
1.10.4.11. Latest Statement of Assets, Liabilities and Net worth.
1.10.5. FLOWCHART
START
Submission of requirements
to Admin Office
END
1.10.6. NARRATIVE
1.10.6.1. The Client will submit two copies of the requirements to
Administrative Office.
1.10.6.2. The Personnel PNCO will evaluate the submitted
requirements and prepare the Unit Endorsement.
1.10.6.3. The Personnel Officer will talk to the client regarding his/her
optional retirement. The documents will also be verified.
1.10.6.4. The Administrative Officer may/may not talk to the client then
will recommend approval of the resignation.
1.10.6.5. The Director will approve or disapprove the application of
optional retirement.
1.10.6.6. Submission of folder to DPRM for issuance of implementing
order.
2 hours
1 hour
4 hours
3 hours
2 hour
1 day and 4
hours
Procedure No.
2.1
No. of Pages
3
2.1.1. OBJECTIVE
To provide fund for the procurement/purchase of approved request by D,CS for
supplies, equipment and other logistics.
2.1.2. REFERENCES
RA 6975 as amended by RA 8551
2.1.3. DEFINITION OF TERMS
2.1.3.1.
2.1.4. REQUIREMENTS
2.14.1.
2.1.4.2.
2.1.4.3.
2.1.4.4.
2.1.4.5.
2.1.5. FLOWCHART
START
Memo Request
for Funding/Procurement
(From Different Divisions/Offices)
For Recommendation
For
Approval / Notation
of TDICTM
For Procurement/
Implementation
Forward to SAO
For Recording
END
2.1.6. NARRATIVE
2.1.6.1. Memo request for funding and procurement from different PNPCS
Division and Office for the purchase of supplies, equipment and other
resources for the conduct of their respective task. Other purpose of
request is with regards to the implementation of specific project or for
the conduct of particular activity/program.
2.1.6.2. Validate request based on the requirement of the division and on their
monthly-required supplies. Validation includes reference on signed or
approved implementation of project. Other aspect of validation includes
programmed/scheduled activity of the service.
2.1.6.3. Creation of memo for recommendation or comment for the said request.
2.1.6.4. For approval/notation or disapproval of D, CS.
2.1.6.5. Upon approval, program for procurement requested resources based
on available funds.
2.1.6.6. Forward to SAO procured resources for recording/inventory purpose
and subsequent release of said resources to the requesting
division/office.
2.1.7. SERVICE STANDARDS
Transaction Type
1 day
1 day
1 days
1 day
4 days
Procedure No.
No. of Pages
3.1
3.1.1 OBJECTIVE:
3.1.1.1 To create action plans, programs and activities pertaining to
Information and Communications Technology which will serve as
guidelines for the DICTM and all its units.
3.1.2
REFERENCES
3.1.2.1 Activation of DICTM pursuant to NHQ-PNP General Orders Number
DPL-09-08 dated April 1, 2009.
3.1.2.2 PNP Information Systems Strategic Plan
3.1.4 REQUIREMENTS
3.1.4.1
3.1.4.2
Monitoring of compliance
(Command Group)
3.1.6 NARRATIVE
END
3.1.6.1 The Plans and Programs Division shall formulate an plans,
programs and activities for the Directorate for Information and
Communications Technology Management which will act as
guidelines for all DICTM units/divisions.
3.1.6.2 The ADMO shall schedule a seminar/workshop for the formulation
of plans, programs and activities to be participated by all DICTM
Staff, Chief Plans of ITMS and CES.
3.1.6.3 The output of the workshop shall be consolidated by the Plans and
Programs Division.
3.1.6.4 Route of the draft plan to the DICTM Command Group for review,
comments and suggestions. Subsequently, revision to finalize the
plan.
3.1.6.5 Approval of TDICTM
3.1.6.6 Implementation of the plan by all divisions/offices.
3.1.6.7 Monitoring of the implementation of the plan.
3.1.7 SERVICE STANDARDS
Transaction
Type
Average
Transaction
Time
1 day
2 days
5 days
3 days
1 day
Period of the
activity
Period of the
activity
12 days
excluding the
period of
implementation
Procedure No.
No. of Pages
3.2
OBJECTIVE
3.2.1.1 To evaluate the viability of PNP IT projects that would suit the
various needs for IT services in the different PNP Regional sites;
3.2.2
3.2.3
REFERENCES
3.2.2.1 Activation of DICTM pursuant to NHQ-PNP General Orders
Number DPL-09-08 dated April 1, 2009.
3.2.2.2 PNP ITP Action Plan for 2009, Integration of Operational and
Administrative database of the PNP.
3.2.2.3 Verbal Instruction of C, PNP to standardize the PNP policies,
programs, and projects pertaining to ICT.
3.2.2.4 Verbal Instruction of the C, PNP to integrate the operational and
administrative database of the PNP.
3.2.2.5 Memorandum Update on Leaders Q and IT Capabilty of PNP
Field Units from D, ITMS dtd May 13, 2009.
DEFINITION OF TERMS
3.2.3.1 Inspection - is, most generally, an organized examination or
formal evaluation exercise. It involves the measurements, tests,
and gauges applied to certain characteristics in regard to an
object or activity. The results are usually compared to specified
requirements and standards for determining whether the item or
activity is in line with these targets.
3.2.3.2 Information Systems (IS) - is the system of persons, data
records and activities that process the data and information in a
given organization, including manual processes or automated
processes.
3.2.3.3 Information Technology (IT) - is "the study, design,
development, implementation, support or management of
REQUIREMENTS
3. 2.4.1 Approved IMPLAN regarding Field Visitations to Police Regional
Offices
3.2.5
FLOW CHART
START
Conference
Designate Tasks
Prepare Tools/Materials
Jump off
END
NARRATIVE
3.2.5.1
3.2.5.2
3.2.5.3
3.2.5.4
3.2.5.5
3.2.5.6
3.2.5.7
3.2.5.8
3.2.6
SERVICE STANDARDS
Transaction
Type
1 day
1day
1day
1 day
1-2 days
1 day
7 8 days
3.3.2 REFERENCES
3.3.2.1 Activation of DICTM pursuant to NHQ-PNP General Orders
Number DPL-09-08 dated April 1, 2009.
3.3.2.2 Powers and Functions of DICTM
3.3.3 DEFINITION OF TERMS
3.3.3.1 Plan is a proposed or intended method of getting from one set
of circumstances to another. They are often used to move from
the present situation, towards the achievement of one or more
objectives or goals.
3.3.3.2 Policy - A specific decision or set of decisions designed to carry
out such a course of action
3.3.3. REQUIREMENTS
3.3.3.1 Issues and concerns that need policies
START
Implementation Phase
END
Chief PPD shall develop or revise a
policy regarding a particular issue and
concern
Finalizes/revises the
(Plans Office)
3.3.5 NARRATIVE
3.6.1 Plans and Programs Division of DICTM shall identify issues that need
policies
3.6.2 Check for existing policies and procedures to research policy context and
to avoid redundancy and possible conflicts
3.6.3 Plans and Programs Division shall develop a new policy or revised
existing policy. PPD shall look for references, state the purpose of the policy,
define the terms and state explain the procedures and guidelines of the policy.
3.6.4 Route the initial draft to D-staff for review, comments and suggestions to
be spearheaded by Plans and Program Division
3.6.5 PPD will finalize the revised policy based on the suggestions by D-Staff
3.6.6 The final draft will be submitted to TDICTM for approval.
3.6.7 Policy will then be disseminated to the lateral and units for
implementation.
3.6.8 DICTM will monitor the effectively of the new policy used by different
offices
3.3.6 SERVICE STANDARDS
Transaction Type
Average
Transaction Time
1 day
2 days
3 days
3 days
1 day
1 day
Period of the
activity
Period of the
activity
13 days
excluding the
period of
implementation
3.4.6 NARRATIVE
4.6.1 DICTM creates a Technical Working Committee/Group for the
drafting/update/revision of the PNP ISSP. The Plans and Programs Division shall
be the secretariat of the committee and shall initiate the review process.
4.6.2 The Systems Integration and Management Division shall be charged for
the consolidation of information/description of different IS being used by the PNP.
The SIMD is also tasked to evaluate and review PNP offices requirements with
regard to there IS needs.
4.6.3 Research and Development Division shall research and consolidate
technical details/contents of the ISP.
4.6.4 Inputs and other information from other PNP offices and DICTM divisions
shall be consolidated by the Plans and Programs Division.
4.6.5 Inventory of ICT resources from all PNP offices shall also be consolidated
by the Plans and Programs Division.
4.6.6 After consolidation, Plans and Programs Division shall encode revision,
proofread the revised ISSP as an initial draft for further review.
4.6.7 The Technical Working Group (TWG) shall review the initial draft and
report all updates to the Plans and Programs Division for editing.
4.6.8 Plans and Programs Division shall revise/edit the initial draft based on the
outputs of the TWG.
4.6.9 Plans and Programs Division shall then submit the ISSP to the TWG for
final review before endorsement to TDICTM for signature and forwarding to the
higher office.
4.6.10 Upon approval of the ISSP by the TWG it shall be routed to the command
group for information and comments/suggestions.
4.6.11 Upon approval and signature of the ISSP by the TCITM, it shall be
forwarded to the Office of the Chief Philippine National Police (OCPNP).
4.6.12 Upon approval and signature of the ISSP by the C,PNP, it shall be
submitted to the National Computer Center (NCC) for review and evaluation.
4.6.13 The PNP ISSP shall be evaluated and reviewed by NCC. Upon review,
comments and inputs of NCC shall be reviewed by the TWG and Plans and
Programs Division shall make corresponding revision to the ISSP.
4.6.14 It shall be submitted back to the NCC for further review, evaluation and
subsequently, approval.
4.6.15 Upon approval of the PNP ISSP by the NCC, it shall be forwarded to the
DBM for further confirmation and funding - GAA appropriation/fund
allocation/NCA.
4.6.16 The approved PNP ISSP shall be forwarded back to the PNP and to the
DICTM for implementation. DICTM shall then form a monitoring team that shall
monitor in the implementation and status of projects programmed/planned in the
ISSP.
1 day
1 month
1 month
1 month
1 month
2 weeks
2 weeks
2 weeks
2 weeks
2 weeks
1 day
1 month
1 month
1 month
2 weeks
2 months
1 year
Procedure No.
No. of Pages
1.1
3
DICTM PPD and other PNP
Offices
3.4.1 OBJECTIVE.
Provides support for the development of projects, in accordance with the
approved priority areas, for local and foreign funding.
3.4.2 REFERENCES
3.4.2.1
3.4.2.2
3.4.3.2
3.4.3.3
3.4.3.4
3.4.3.5
3.4.3.6
3.4.4 REQUIREMENTS
3.4.4.1 Memorandum/HWI or routine slip from Higher Office
3.4.4.2 Proponent Project Proposal and the Proponent Company
profile.
3.4.5 Flowchart
START
Memorandum/HWI/Routine
Slip from NHQ
DICTM Admin
Consolidation of ITMS/CES
after activity report
END
Administrative and Operations Manual
3.4.6 NARRATIVE
3.4.6.1
3.4.6.2
3.4.6.3
3.4.6.4
3.4.6.5
3.4.6.6
1 day
2 weeks
1 days
1 day
1 day
18 days
PROCEDURE NO.
No. of Pages
3.5.3 REQUIREMENTS
3.5.3.1
3.5.3.2
Directives/Policies/Guidelines
3.5.4 FLOWCHART
Start
Receipt of Project Activity
Report
(PPD, DICTM)
Evaluation of Reports
(MES,PPD)
Choose appropriate
monitoring tool/system for
the project. Design one if
needed.
(MES)
Formulation of
Action/Implementation Plan
for monitoring and
evaluation of the project
(MES)
Route/Request for
comment/approval of
the plan
(DICTM Staff)
NO
COMMENT
YES
3.5.5 NARRATIVE
3.5.5.1
3.5.5.2
3.5.5.3
3.5.5.4
3.5.5.5
3.5.5.6
3.5.5.7
3.5.5.8
3.5.5.9
3.6
TITLE
Implementation of Plan
for Monitoring and
Evaluation of Plan of ICT
Projects
INTERFACES
PROCEDURE NO.
No. of Pages
3.6.1 OBJECTIVE - To see that effective procedures are put in place to ensure
the optimum use of PNP resources and to enable realization of priority
projects on time.
3.6.2
REFERENCES
3.6.2.1
3.6.2.2
3.6.2.3
3.6.2.4
Directives/Policies/Guidelines;
Functions of the Monitoring and Evaluation Section (MES), Plans
and Programs Division, DICTM.
Action Plan/Monitoring Tools and Systems; and
2.2.4. Plan for Monitoring and Evaluation of ICT Project
3.6.5
FLOWCHART
Start
Preparation of directive for
implementation
(MES, PPD)
Documentation of the
Findings
(Project Monitoring &
Evaluation Officer/s)
Delegation/Tasking of
responsibilities
(Project Monitoring and
Evaluation Officer/s)
Submission of Project
Monitoring and Eval.
Report to the C, MES
(Project Monitoring &
Evaluation Officer/s)
Dissemination of
directives/Coordination
with Project Officer/s
(POs, DICTM, ITMS, CES
& other PNP Units)
Evaluation, preparation
and submission of
report and recommenddations to the C, PPD and
TDICTM (MES)
(C, MES)
End
Evaluation of the
achievements using
performance indicators/
appropriate monitoring
systems (PMEOs)
3.6.6 NARRATIVE
3.6.6.1 Directives for the implementation of the Plan for Monitoring and
Evaluation of ICT project is prepared by the MES, DICTM
3.6.6.2 Tasking and responsibilities are delegated to the Project
Monitoring and Evaluation Officers of the DICTM.
3.6.6.3 Directives are disseminated and coordination is conducted with
PNP Units/Personnel involved in the project.
3.6.6.4 The Project Monitoring and Evaluation Officers (PMEO)
establishes the project activity and performance tracking using
key performance indicator systems and other operational
measures.
3.6.6.5 The PMEOs documents the related findings to support report to
the C, MES.
3.6.6.6 The Chief, MES evaluates the findings, draws recommendations
and submit them to the Chief, PPD for further evaluation.
3.6.6.7 The Chief, MES evaluates the reports submitted by the PMEOs
then prepares/submit related report and recommendations for the
information/ signature of the Chief, PPD for the information of
TDICTM.
3.6.7 PLAN IMPLEMENTATION STANDARD
TURN-AROUND TIME
Preparation of directives for
2 hours
implementation of plan.
Delegation/Tasking of responsibilities
1 hour
to PMOEs
Dissemination of Directives/
Coordination with PNP Units/
2 days
Personnel involved in the project.
Evaluation of the achievements of
1 day
the project objectives.
Documentation of the findings
1 day
Submission of report to the C, MES
2 hours
Evaluation, submission of report/
recommendations to the C, PPD and
1 day
TDICTM
Total Average Period
5 days and 5
hours
3.7
TITLE
Evaluation of Plan for
Monitoring of ICT Project
INTERFACES
PROCEDURE NO.
No. of Pages
3.7.1 OBJECTIVES
3.7.1.1 To develop the findings and recommendations made by the
PMEOs/MES regarding resource management, practices and the
requirements of the project specialists;
3.7.1.2 To develop/improve monitoring and evaluation methods; and
3.7.1.3 To document lessons, experience and management/operational
issues relative to project implementation.
3.7.2 REFERENCES
3.7.2.1 Directives/Policies/Guidelines;
3.7.3 DEFINITION OF TERMS
3.7.3.1 RESOURCE MANAGEMENT
3.7.3.2 PRACTICES
3.7.4 REQUIREMENTS
3.7.4.1 Monitoring and Evaluation Tools and Systems;
3.7.4.2 Plan for Monitoring and Evaluation of ICT Project; and
3.7.4.3 Project Monitoring and Evaluation Reports and
documents.
related
3.7.5 FLOWCHART
StartEn
d
Receipt of Monitoring &
Evaluation Reports from the
PMEOs
(MES, PPD)
Evaluation of the
effectiveness of the plan and the
mechanisms used for monitoring
and evaluation of the project.
(MES)
Needs
Improvement
NO
Submission of
Recommendation
(PPD)
YES
Preparation of Proposal for
the improvement of Project
Monitoring and Evaluation
mechanisms
(MES)
Approval of the
Recommendation/ Proposal
(TDICTM)
End
Submission of Proposal to
the C, PPD
(MES)
NO
Route for comment/
recommendations of the
DICTM Staff
(PPD)
YES
COMMENT
Legend :
MES Monitoring and Evaluation Section
PMEO Project Monitoring and Evaluation Officer
3.7.6
NARRATIVE
3.7.6.1
TURN-AROUND TIME
Receipt of Monitoring Report
1 day
Average Period for
Evaluation of Report
1 day
the Evaluation of
Review of existing monitoring tools
1 day
Plan for Monitoring
Evaluation of the Effectiveness of
2 days
and Evaluation of
The Plan & Monitoring mechanism
ICT Projects.
Preparation, submission of
1 day
Recommendation
Approval of the Recommendation
1 hour
Total Average Period when no improvement is
6 days and 1 hour
recommended
Preparation of Proposal when improvement is needed
2 days
Submission of proposal to the C, PPD
1 hour
Request for comments
1 day
When there is no comment, submit for approval
1 hour
When there is comment, allow time to process accordingly
4 days and 1 hour
Total Average Period when improvement is proposed
11 days and 2 hrs.
3.7.7 EVALUATION OF PLAN FOR MONITORING STANDARD
3.8
TITLE
PROCEDURE NO.
Formulation of Projects and
Activities consonant to
4
Project Monitoring and
Evaluation of ICT Projects of
the PNP
INTERFACES
DICTM, ITMS, CES
No. of Pages
3
3.8.1 OBJECTIVE
3.8.1.1 To monitor the effectiveness of the project, its plan and the
mechanisms/ tools being utilized for reviewing and maintaining
project development strategies.
3.8.1.2 Use of performance indicators and other effective monitoring
tools/systems based on progress and output; and
3.8.1.3 Review and maintain project strategies to ensure that it meets the
requirements of all stakeholders and that it is adjusted to reflect
the changing priorities of time and external events.
3.8.2
REFERENCES
3.8.2.1 Directives/Policies/Guidelines;
3.8.2.2 Functions of the Monitoring and Evaluation Section (MES), Plans
and Programs Division, DICTM; and
3.8.2.3
3.8.3
DEFINITION OF TERMS
3.8.4
REQUIREMENTS
3.8.4.1 Project Monitoring and Evaluation Tools and Systems;
3.8.4.2
Project Monitoring and Evaluation Plan; and
3.8.4.3
Project Implementation Plan
3.8.5
FLOWCHART
Start
Receipt of the
Directives and
Requirements
(PPD)
Evaluation of the
Requirements
(MES, PPD)
Adopt/Design/Formulate
monitoring and evaluation
mechanism/s for particular
projects
(MES, PPD)
Route/Proposal for
Comments/
Recommendations
Of DICTM Staff
COMMENT
3.8.6
NARRATIVE
End
NO
YES
3.8.6.1
3.8.6.2
3.8.6.3
3.8.6.4
3.8.6.5
3.8.6.6
3.8.7
TURN-AROUND TIME
Receipt of requirements and
1 day
directives
Evaluation of the requirements
1 day
Formulation of Monitoring and
2 days
Evaluation mechanism
Preparation of Proposal for the
2 days
Project/Activity for monitoring
Routing of the proposal for comment/
1 day
recommendations of the DICTM Staff
When there is no comment, submit to
2 hours
TDICTM for approval
Total Average Period
7 days and 2
hours
When there is comment allow time to reprocess accordingly
6 days
Total Average Period when reprocessing is done.
13 days and 2
hours
The average period when routed for comment of the D-Staff is not included.
Average Period for
the Formulation of
Projects and
Activities consonant
to Project Monitoring
and Evaluation of
ICT Projects of the
PNP
3.9
TITLE
PROCEDURE NO.
Submission of Reports of
the Output of Monitoring and
5
Evaluation of ICT projects.
INTERFACES
DICTM, ITMS, CES
No. of
Pages
3
3.9.1 OBJECTIVE
3.9.1.1 To document and disseminate lessons, experiences and
management/operational
issues
relative
to
project
implementation.
3.9.2
REFERENCES
3.9.2.1
3.9.2.2
3.9.2.3
3.9.2.4
Directives/Policies/Guidelines;
Action Plan/Monitoring Tools and Systems;
Plan for Monitoring and Evaluation of ICT Project; and
Functions of the Monitoring and Evaluation Section (MES), Plans
and Programs Division, DICTM.
3.9.5 FLOWCHART
Start
Receipt of monitoring and
evaluation reports from
PMEOs
(PPD)
Submission of report
to TDICTM
(PPD)
Exploitation of knowledge,
experiences, lessons from
the report
(MES)
Dissemination of
information to all
concerned units
(Mssg Ctr.) End
3.9.6 NARRATIVE
3.9.6.1 The PPD receives Monitoring and Evaluation Reports of ICT
Projects from the PMEOs.
3.9.6.2 The MES evaluates the reports and related documents.
3.9.6.3 The MES analyses the documents to gather lessons, knowledge,
experiences and adjustments that could be used to other ICT
projects.
3.9.6.4 The MES, PPD prepares report of the output of monitoring and
evaluation activities.
3.9.6.5 The PPD submits report for the information of the TDICTM.
3.9.6.6 The DICTM through its Message Center disseminates reports to
all concerned units.
3.9.7 OUTPUT REPORTING STANDARD
TURN-AROUND TIME
Receipt of Monitoring and Evaluation
1 day
Report
Evaluation of the reports, documents
1 day
Exploitation of knowledge
1 day
Preparation of report of the output
6 hours
Submission of report
2 hours
Dissemination of information
2 hours
Total Average Period
3 days and 10
hours
3.9.8 FLOWCHART
Start
Receipt of Monitoring &
Evaluation Reports
from the PMEOs
(MES, PPD)
Establishment of the
effectiveness of the plan
and the mechanisms used
for monitoring and
evaluation of the project.
(MES)
Review of existing
Monitoring tools and
systems.
(MES)
Submission of Proposal
and recommendation to
the C, PPD, TDICTM
(MES)
YES
COMMENTS
NO
4.1.1
4.1.2
REFERENCES
4.1.2.1
4.1.2.2
4.1.3
DEFINITION OF TERMS
4.1.3.1
Information Systems Strategic Plan (ISSP) is an Information and
Communications Technology (ICT) blueprint that supports both the
short-term and long-term Information System needs of the PNP that is
aligned with its strategic thrust and programs.
4.1.3.2
Policy - a deliberate plan of action to guide decisions and achieve
rational outcome(s).
4.1.3.3
System - is a set of interacting or interdependent entities forming
an integrated whole.
4.1.3.4
Information System (IS) - a system of people, data records and
activities that process the data and information in an organization, and
it includes the organization's manual and automated processes. In a
narrow sense, the term information system (or computer-based
information system) refers to the specific application software that is
used to store data records in a computer system and automates some
of the information-processing activities of the organization.
4.1.3.5
Information and Communications Technology (ICT) - is an umbrella
term that covers all advanced technologies in manipulating and
communicating information. The term is sometimes used in reference
to information technology (IT), particularly in these two communities:
education and government. The common usage ICT is synonymous
assumed the fact that IT or ICT encompasses all mediums, to record
information (magnetic disk/tape, optical disks (CD/DVD), flash
memory etc. and arguably also paper records); technology for
broadcasting information - radio, television; and technology for
communicating through voice and sound or images - microphone,
camera, loudspeaker, telephone to cellular phones. It includes the
wide varieties of computing hardware (PCs, servers, mainframes,
networked storage).
4.1.3.6
System Integration - the process by which smaller pieces of
software are brought together to form a larger piece of software that
was designed to solve a problem.
4.1.3.7
4.1.3.8
4.1.4
REQUIREMENTS
4.1.4.1
4.1.4.2
4.1.4.3
4.1.5
FLOWCHART
Start
Reviews
assessment
report
received from PNP concerned
units on system capability and
limitations.
Monitoring
of implementation
Finalize
and revise
the proposed
Administrative
and Operations Manual
and
compliance
of allcover
PNP offices
Memo Circular with
Memo
(DICTM).
(SIMD).
End
4.1.6
NARRATIVE
4.1.6.1
4.1.6.2
4.1.6.3
4.1.6.4
4.1.6.5
4.1.6.6
4.1.7
SERVICE STANDARD
Transaction Type
System audit and assessment
of deployed information systems
Preparation of guidelines for
implementation
Route draft copy of the
proposed circular for comments
and suggestions.
Revision of the circular for
approval and signature of
TDICTM.
Route proposed circular to the
D-Staff and Command Group
for comment.
Finalization of the circular and
approval of CPNP.
Dissemination of the approved
circular for implementation.
Total Average Transaction
Time
Time
3 days
2 days
3 days
1 day
5 days
1 day
1 day
16 ays
4.2 Policy formulation and updates for the Integration and Management of
Information Systems
4.2.1
4.2.2
REFERENCES
4.2.2.1
4.2.2.2
4.2.3
DEFINITION OF TERMS
4.2.3.1
4.2.3.2
4.2.3.3
4.2.3.4
4.2.3.5
4.2.3.6
4.2.3.7
4.2.3.8
4.2.4
REQUIREMENTS
4.2.4.1
4.2.4.2
4.2.4.3
4.2.4.4
4.2.4.5
4.2.4.6
4.2.4.7
4.2.4.8
4.2.4.9
4.2.4.10
4.2.4.11
4.2.4.12
4.2.4.13
4.2.5
FLOWCHART
Start
Conduct system audit on the
subjected PNP Information
System.
Monitoring of implementation
and compliance of all PNP offices
(DICTM).
End
SERVICE STANDARD
Transaction Type
System audit and assessment of deployed information systems
Preparation of guidelines for implementation
Route draft copy of the proposed circular for comments and
suggestions.
Revision of the circular for approval and signature of TDICTM.
Route proposed circular to the D-Staff and Command Group for
comment.
Finalization of the circular and approval of CPNP.
Dissemination of the approved circular for implementation.
Total Average Transaction Time
Time
3 days
2 days
3 days
1 day
5 days
1 day
1 day
16 days
4.3 Evaluation and supervision of Plans and Programs of ITMS and CES
4.3.1
4.3.2
REFERENCE
4.3.2.1
4.3.2.2
4.3.2.3
4.3.2.4
4.3.3
DEFINITION OF TERMS
4.3.3.1
4.3.3.2
4.3.3.3
4.3.3.4
4.3.3.5
4.3.3.6
4.3.3.7
4.3.3.8
4.3.4
REQUIREMENTS
4.3.4.1
4.3.4.2
4.3.4.3
4.3.4.4
4.3.5
FLOWCHART
Start
Receive the accomplishment report and
schedule plans and programs of ITMS and
CES
End
4.3.6
NARRATIVE
4.3.6.1
4.3.6.2
4.3.6.3
4.3.6.4
4.3.6.5
4.3.6.6
4.3.6.7
4.3.6.8
4.3.7
SERVICE STANDARD
PROCEDURE NO.
1.0
NO. OF PAGES
3
5.1.1 OBJECTIVE
This is to determine if the formulated ICT Trainings to be conducted by
ITMS/CES for their personnel can be accommodated or not.
5.1.2 REFERENCES
5.1.2.1
5.1.2.2
5.1.2.3
5.1.3.2
5.1.3.3
5.1.3.4
5.1.3.5
5.1.4 REQUIREMENT
5.1.4.1
5.1.4.2
Approval of TDICTM
ICT Trainings to be offered periodically
5.1.5 FLOWCHART
START
RDD
Review and Research of ICT Training
RDD
Endorsement of ICT Training
CES
Evaluation/Comments
ITMS
Evaluation/Comments
DICTM Ex-O
For Consolidation of Comments
TDICTM
Approval/
Recommendation of ICT Training
RDD
Accommodation/
Non Accommodation of ICT Training
END
5.1.6 NARRATIVE
5.1.6.1 The Research and Development Division (RDD) will conduct
review and research re proposed ICT Trainings (Requirements,
Detailed Program of Instruction (POI), Training Directives and
Lectures).
5.1.6.2 RDD will prepare memo for the proposed detailed ICT Trainings
to be forwarded to TDICTM for endorsement to AD, CES and D,
ITMS.
5.1.6.3 The memo will be forwarded to AD, CES and D, ITMS for
evaluation and comments of the proposed ICT Trainings.
5.1.6.4 CES and ITMS shall prepare memo (reply) of their evaluation
and comments to be forwarded to DICTM Ex-O (Attn: RDD).
5.1.6.5
TDICTM either approve or disapprove the proposed ICT
trainings based on the evaluation and recommendation of the
consolidated data from ITMS and CES.
5.1.6.6 RDD will prepare for the accommodation/non accommodation of
the proposed ICT Trainings as per instruction from TDICTM.
5.1.7 SERVICE STANDARDS
TRANSACTION TYPE
Procedure in the
Formulation of ICT
Trainings
PROCEDURE
NO. OF
NO.
PAGES
2.0
5.2.1 OBJECTIVE
This is to determine if the Request for Product Presentation by requesting
company/ corporation can be accommodated or not.
5.2.2 REFERENCES
5.2.2.1 Request Letter/Letter of Intent/Memo from requesting
Company/Corporation
5.2.2.2 Instructions from TDICTM
5.2.2.3 Memo from RDD
5.2.2.4 Memo from ITMS and CES
5.2.3 DEFINITION OF TERMS
5.2.3.1
5.2.3.2
5.2.3.3
5.2.3.4
5.2.3.5
5.2.4 REQUIREMENT
5.2.4.1 Approval of TDICTM
5.2.4.2 Memo from requesting company/corporation indicated therein
the products name, proposed schedule (date/time) and
attendees.
5.2.5 FLOWCHART
START
Product Presentation by
Requesting Company/Corporation
CES
Evaluation/Comments
ITMS
Evaluation/Comments
RDD
Preparation of After Product
Presentation Report
TDICTM
For Signature of After Product
Presentation Report
C, PNP
Submission of After Product
Presentation Report
END
5.2.6 NARRATIVE
Procedure in the
processing of the
Request for Product
Presentation
5.3 Procedure in the processing of the Request for ICT Training by other
PNP Unit/Office
TITLE
PROCEDURE NO.
NO. OF
PAGES
3.0
5.3.1 OBJECTIVE
This is to determine if the request of other PNP Unit/Office to conduct an
ICT Training exclusively for their personnel can be accommodated or not.
5.3.2 REFERENCES
5.3.2.1
5.3.2.2
5.3.2.3
5.3.2.4
5.3.4.2
5.3.5 FLOWCHART
START
RDD
Memo for Endorsement of
Request to ITMS and CES
ITMS
Memo (Reply) to conduct ICT Trainings
CES
Memo (Reply) to conduct ICT
RDD
Memo for Recommendation to
TDICTM to conduct ICT Trainings
TDICTM
Approval/Disapproval of ICT Training
RDD
Memo (Reply) to Requesting
PNP Unit/Office
Memo to CES and ITMS for
accommodation of ICT Trainings
CES
Coordination with Concerned PNP Unit/Office
for the Conduct ICT Trainings/
Submission of After Activity Report
ITMS
Coordination with Concerned PNP Unit/Office
for the Conduct ICT Trainings/
Submission of After Activity Report
TDICTM
For Signature of After Activity Report
C, PNP
Submission of After Product
Presentation Report
5.3.6 NARRATIVE
5.3.6.1 The Memo from other PNP Unit/Office requesting to conduct an
ICT Training exclusively for their personnel shall be received by
the Message Center and shall endorse it to AdmO.
processing of the
Request for ICT Training
by Other PNP
Units/Offices
PROCEDURE
NO. OF
NO
PAGES
5.4.1 OBJECTIVE
This is to determine the procedures in the conduct of research and
development on the latest ICT products that are applicable and advantageous to
the PNP.
5.4.2 REFERENCES
5.4.2.1 Memo from RDD
5.4.2.2 Instruction from TDICTM
5.4.2.3 Memo from AD, CES and D, ITMS
5.4.3 DEFINITION OF TERMS
5.4.3.1 Research it is a careful, systematic, patient study and
investigation in some field of knowledge, undertaken to discover
or establish facts or principles.
5.4.3.2 Development systemic use of scientific and technical
knowledge to meet specific objectives or requirements.
5.4.3.3 Information Communications Technology (ICT) it is the
broader term of IT to explicitly include the field of electronic
communications.
5.4.4 REQUIREMENT
5.4.4.1 Memo from the RDD indicated therein the proposed ICT products
to be researched.
5.4.5 FLOWCHART
START
RDD conduct Research latest ICT
products
ITMS
Review/Recommendation
CES
Review/Recommendation
RDD
Consolidate, Evaluate and Proposed
Ex-O, DICTM
For Comments
DICTM
For Approval
END
5.4.6 NARRATIVE
INSTALL the PNP
SALARY SYSTEM
CONNECT
INSTALL
MAGIC 7.1E
SOFTWARE
1. LOAD THE PNP
5.4.6.1 RDD will conduct research through the use of internet and other
sources such as product demonstration on the latest ICT products
and services that are applicable to the needs and advantageous
of the PNP.
5.4.6.2 Part of the research is to check the product for its competitiveness
as to what will be its usage to the PNP.
BRIEF
RECORD
ACKNOWLED
REPORT
INSTALL
PREPARE
NMD THE
SF
THE
AND
and
the
FILL-UP
ACKNOWLED
RECORD
REPORT
CONFIGURE
DESIGNATE
ENTRUST
PREPARE
NMD SF
NMD
THE
and
USER
ACCOMPLISH
FILL-UP
ACKNOWLED
CONSOLIDAT
RECORD
REPORT
TOOLS/MAT
SHARED
DESIGNATE
BRIEF
NOTATION
ENTRUST
PREPARE
GED
NMD
LOG
GED
AVthe
THE
SF
NMD
THE
and
PIS
ACCOMPLISH
TOOLS/MAT
THE
NOTATION
BROWSER
LOG
GED
SF
TASK
(Designated
ACCOMPLISH
ERIALS/FOR
TOOLS/MAT
MAGIC
SOFTWARE
(NMD
RENDERED
THE
NOTATION
(C,
ED
EUSER
LOG
GED
NMD
SF
ETASK
NAS)
TASK
Duty
7.1e
ERIALS/FOR
(Designated
(NMD
RENDERED
SETTINGS
(C,
(C,
ED NMD)
TASK
NAS)
Duty
NAS
Staff)
12.
ERIALS/FOR
(Designated
of
(NMD
RENDERED
(C,
RUNTIME
(C,
ED
SERVICE
(C,
the
RUN
NMD
MS
NMD)
TASK
NAS)
NAS)
Duty
Day)
(Designated
of
NAS
SERVICE
the
MS
Staff)
Day)
DIRECTORATE
FOR INFORMATION AND COMMUNICATIONS TECHNOLOGY MANAGEMENT
4.
(Client/User
(Designated
of
NAS
DONGLE
SERVICE
(C,
FORM
the
DELETE
THE
MS
Staff)
staff)
NAS)
Day)
PIS
(Client/User
(Designated
NAS Staff)
staff)
(Client/User
(Designated
INSTALLED
NAS
(NMD
FORM
FILES
SETUP
Staff)
staff)
) Duty
NAS Staff)
)
1-5 days
15-30 mins
recommendation
Consolidation of the recommendations and
submission of the proposal to TDICTM
30 mins