Federal Register / Vol. 70, No.

155 / Friday, August 12, 2005 / Notices 47193

extending from Columbia’s existing Comments will be considered by the DEPARTMENT OF ENERGY
Louisa Compressor Station to the south. Commission but will not serve to make
In addition, Columbia would modify the commentor a party to the Federal Energy Regulatory
various appurtenances at the existing proceeding. Any person seeking to Commission
Bickers Compressor Station in Greene become a party to the proceeding must
County, Virginia; Boswells Tavern Notice of Application Tendered for
file a motion to intervene pursuant to Filing With the Commission, and
Measuring and Regulating (M&R) Rule 214 of the Commission’s Rules of
Facility in Louisa County, Virginia; Establishing a Procedural Schedule for
Practice and Procedures (18 CFR Relicensing and Deadline for
Manor Road M&R Facility in Baltimore 385.214).2 Only intervenors have the
County, Maryland; and the Lost River Submission of Final Amendments
right to seek rehearing of the
Compressor Station in Hardy County, August 5, 2005.
Commission’s decision.
West Virginia. Take notice that the following
The EA has been placed in the public Affected landowners and parties with
hydroelectric applications have been
files of FERC. A limited number of environmental concerns may be granted filed with the Commission and are
copies of the EA are available for intervenor status upon showing good available for public inspection.
distribution and public inspection at: cause by stating that they have a clear a. Type of Applications: New major
Federal Energy Regulatory Commission, and direct interest in this proceeding licenses.
Public Reference Room, 888 First Street, which would not be adequately b. Project Nos.: 2545–091 and 12606–
NE. Room 2A, Washington, DC 20426, represented by any other parties. You do 000.
202–502–8371. not need intervenor status to have your c. Date Filed: July 28, 2005.
Copies of the EA have been mailed to comments considered. d. Applicant: Avista Corporation.
federal, state, and local agencies, public e. Name of Projects: (1) Spokane River
interest groups, interested individuals, Additional information about the Hydroelectric Project No. 2545; and (2)
libraries, newspapers, and parties to this project is available from the Post Falls Hydroelectric Project No.
proceeding. Commission’s Office of External Affairs, 12606.
Any person wishing to comment on at 1–866–208-FERC (3372) or on the The Spokane River Project, as
the EA may do so. To ensure FERC Internet Web site (http:// currently licensed, consists of five
consideration prior to a Commission www.ferc.gov) using the ‘‘eLibrary’’ link; developments, one of which is the Post
decision on the proposal, it is important select ‘‘General Search’’ from the Falls development. Avista has filed two
that we receive your comments before eLibrary menu, enter the selected date applications to relicense the Spokane
the date specified below. Please range and ‘‘Docket Number’’ (i.e., CP05– River Project. One application, docketed
carefully follow these instructions to 150) and follow the instructions. P–2545, is for four of the project’s
ensure that your comments are received Searches may also be done using the developments. The other application,
in time and properly recorded: phrase ‘‘Hardy Storage’’ in the ‘‘Text docketed P–12606, is for the Post Falls
• Send an original and two copies of Search’’ field. For assistance with development only. The separate
your comments to: eLibrary, the eLibrary helpline can be docketing of these applications
Magalie R. Salas, Secretary, Federal reached at 1–866–208–3676, TTY (202) corresponds to the applicant’s filings. It
Energy Regulatory Commission, 888 502–8659 or at does not reflect any decision by the
First Street, NE., Room 1A, Washington, Commission as to whether the Post Falls
ferconlinesupport@ferc.gov. The
DC 20426; development will be licensed
• Label one copy of the comments for eLibrary link on the FERC Internet Web
separately. Commission staff intends to
the attention of Gas 1, PJ–11.1; site also provides access to the texts of
prepare one draft and one final
• Reference Docket Nos. (Hardy formal documents issued by the
environmental document that
Storage Company, LLC) Docket No. Commission, such as orders, notices, collectively analyzes Avista’s proposals
CP05–150–000, CP05–151–000, CP05– and rulemakings. in both license applications.
152–000, and (Columbia Gas In addition, the Commission now f. Location: Spokane River
Transmission Corporation) CP05–144– offers a free service called eSubscription Hydroelectric Project No. 2545—
000; which allows you to keep track of all Spokane River in portions of Spokane
• Mail your comments so that they formal issuances and submittals in County, Steven County, and Lincoln
will be received in Washington, DC on specific dockets. This can reduce the County, Washington. The project does
or before September 6, 2005. amount of time you spend researching not occupy Federal lands.
Please note that the Commission Post Falls Hydroelectric Project No.
encourages electronic filing of proceedings by automatically providing
you with notification of these filings, 12606—Spokane River and Coeur
comments. See 18 Code of Federal d’Alene Lake in portions of Kootenai
Regulations (CFR) 385.2001(a)(1)(iii) document summaries, and direct links
to the documents. To register for this County and Benewah County, Idaho.
and the instructions on the The project occupies Federal lands
Commission’s Internet Web site at service, go to http://www.ferc.gov/
under the supervision of the U.S.
http://www.ferc.gov under the ‘‘e- esubscribenow.htm.
Bureau of Indian Affairs, U.S. Forest
Filing’’ link and the link to the User’s Magalie R. Salas, Service, and U.S. Bureau of Land
Guide. Prepare your submission in the Management.
Secretary.
same manner as you would if filing on g. Filed Pursuant to: Federal Power
paper and save it to a file on your hard [FR Doc. E5–4364 Filed 8–11–05; 8:45 am]
Act 16 U.S.C. 791(a)–825(r).
drive. Before you can file comments you BILLING CODE 6717–01–P h. Applicant Contact: Bruce F.
will need to create an account by Howard, License Manager, Avista
clicking on ‘‘Login to File’’ and then Corporation, 1411 East Mission, P.O.
‘‘New User Account.’’ You will be asked Box 3727, Spokane, Washington 99220–
to select the type of filing you are 2 Interventions may also be filed electronically via 3727; telephone: (509) 495–2941.
making. This filing is considered a the Internet in lieu of paper. See the previous i. FERC Contact: John S. Blair, at (202)
‘‘Comment on Filing.’’ discussion on filing comments electronically. 502–6092, john.blair@ferc.gov.

VerDate jul<14>2003 17:14 Aug 11, 2005 Jkt 205001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\12AUN1.SGM 12AUN1
47194 Federal Register / Vol. 70, No. 155 / Friday, August 12, 2005 / Notices

j. Cooperating Agencies: We are (4) Long Lake development is a Notice soliciting final terms and conditions—
asking Federal, State, local, and tribal storage-type facility consisting of a 593- February 2006;
agencies with jurisdiction and/or foot-long, 213-foot-high main dam; a Notice of the availability of the draft EIS—
special expertise with respect to 247-foot-long, 108-foot-high cutoff dam; September 2006;
environmental issues to cooperate with a 105,080-acre-foot reservoir; four 236- Notice of the availability of the final EIS—
us in the preparation of the foot-long, 16-foot-diameter penstocks; March 2007;
environmental document. Agencies who and a 4-unit powerhouse with a Ready for Commission’s decision on the
would like to request cooperating status nameplate capacity of 71.7 MW. application—July 2007.
should follow the instructions in item k The Post Falls Hydroelectric Project
below. Final amendments to the applications
consists of a 431-foot-long, 31-foot-high
k. Deadline for filing requests for must be filed with the Commission no
dam across the north channel of the
cooperating agency status: September Spokane River; a 127-foot-long, 25-foot- later than 30 days from the issuance
27, 2005. high dam across the south channel; a date of the notice soliciting final terms
All documents (original and eight 215-foot-long, 64-foot-high dam across and conditions.
copies) should be filed with: Magalie R. the middle channel; six 56-foot-long, Magalie R. Salas,
Salas, Secretary, Federal Energy 11.25-foot-diameter penstocks; and a 6-
Regulatory Commission, 888 First Secretary.
unit powerhouse integral to the middle
Street, NE., Washington, DC 20426. [FR Doc. E5–4369 Filed 8–11–05; 8:45 am]
channel dam with a generator
The Commission’s Rules of Practice nameplate capacity of 14.75 MW. The BILLING CODE 6717–01–P
require all intervenors filing documents project impounds the upper 9 miles of
with the Commission to serve a copy of the Spokane River between the three
that document on each person on the dams and the Coeur d’Alene Lake outlet DEPARTMENT OF ENERGY
official service list for the project. and influences water levels in Coeur
Further, if an intervenor files comments Federal Energy Regulatory
d’Alene Lake as well as portions of the
or documents with the Commission Commission
St. Joe River, St. Maries River, and
relating to the merits of an issue that Coeur d’Alene River. Coeur d’Alene
may affect the responsibilities of a Lake and the affected Spokane River, St. [Docket No. ER02–1656–000]
particular resource agency, they must Joe River, St. Maries River, and Coeur
also serve a copy of the document on d’Alene River reaches provide a California Independent System
that resource agency. combined usable storage capacity of Operator Corporation; Notice of FERC
Requests for cooperating agency status 223,100 acre-feet. Staff Attendance
may be filed electronically via the n. Copies of the applications are
Internet in lieu of paper. The August 5, 2005.
available for review at the Commission
Commission strongly encourages in the Public Reference Room or may be The Federal Energy Regulatory
electronic filings. See 18 CFR viewed on the Commission’s Web site at Commission (Commission) hereby gives
385.2001(a)(1)(iii) and the instructions http://www.ferc.gov using the notice that on August 16, 2005,
on the Commission’s Web site (http:// ‘‘eLibrary’’ link. Enter the appropriate members of its staff will attend a
www.ferc.gov) under the ‘‘e-Filing’’ link. docket number excluding the last three stakeholder meeting on the California
l. The applications are not ready for digits in the docket number field to Independent System Operator
environmental analysis at this time. access the document. For assistance,
m. The Spokane River Hydroelectric Corporation’s (CAISO) proposed
contact FERC Online Support at changes to its tariff. The purpose of this
Project consists of four hydroelectric
FERCOnlineSupport@ferc.gov or toll- meeting is to receive stakeholder input
developments with a total authorized
free at 1–866–208–3676, or for TTY, on: (1) the CAISO’s proposed simplified
capacity of 122.92 megawatts (MW) as
(202) 502–8659. Copies are also and revised tariff; and (2) the CAISO’s
follows:
(1) Upper Falls development is a run- available for inspection and proposed Market Redesign and
of-river facility consisting of a 366-foot- reproduction at the address in item h Technology Upgrade (MRTU) tariff
long, 35.5-foot-high dam across the above. language. This meeting will be held at
north channel of the Spokane River; a You may also register online at the CAISO’s facility, located at 151 Blue
70-foot-long, 30-foot-high intake http://www.ferc.gov/docs-filing/
Ravine Road, Folsom, CA 95630.
structure across the south channel; an esubscription.asp to be notified via e-
mail of new filings and issuances Sponsored by the CAISO, the meeting
800-acre-foot reservoir; a 350-foot-long, is open to the public, and staff’s
18-foot-diameter penstock; and a single- related to these or other pending
projects. For assistance, contact FERC attendance is part of the Commission’s
unit powerhouse with a generator
Online Support. ongoing outreach efforts. The meeting
nameplate capacity of 10 MW.
(2) Monroe Street development is a o. With this notice, we are initiating may discuss matters at issue in Docket
run-of-river facility consisting of a 240- consultation with the Washington and No. ER02–1656–000.
foot-long, 24-foot-high dam; a 30-acre- Idaho State Historic Preservation For further information, contact
foot reservoir; a 332-foot-long, 14-foot- Officers (SHPOs), as required by section Katherine Gensler at
diameter penstock; and an underground 106 of the National Historic katherine.gensler@ferc.gov; (916) 294–
single-unit powerhouse with a generator Preservation Act, and the regulations of
0275.
nameplate capacity of 14.82 MW. the Advisory Council on Historic
(3) Nine Mile development is a run- Preservation, 36 CFR 800.4. Magalie R. Salas,
of-river facility consisting of a 466-foot- p. Procedural schedule and final Secretary.
long, 58-foot-high dam; a 4,600 acre-foot amendments: The applications will be [FR Doc. E5–4366 Filed 8–11–05; 8:45 am]
reservoir; a 120-foot-long, 5 foot- processed according to the following
BILLING CODE 6717–01–P
diameter diversion tunnel; and a 4-unit Hydro Licensing Schedule. Revisions to
powerhouse with a nameplate capacity the schedule will be made as needed.
of 26.4 MW. Issue Acceptance letter—October 2005;