45386 Federal Register / Vol. 70, No.

150 / Friday, August 5, 2005 / Notices

Reservoir; (2) Slab Creek Penstock—A Powerhouse—A new underground Milestone Tentative date
40-foot-long, 24-inch diameter steel powerhouse along the Iowa Hill Tunnel
penstock that passes through the dam that would include three variable speed Issue Acceptance/Deficiency November
and connects Slab Creek Reservoir with turbines each with a nominal rating of Letter and request Addi- 2005.
Slab Creek Powerhouse; (3) Slab Creek 133 MW, and a three generators each tional Information, if need-
Powerhouse—The powerhouse, which rated at 170 MW as a pump motor. The ed.
Notice asking for final terms April 2006.
is located at the base of Slab Creek Dam powerhouse would have a maximum
and conditions.
and utilizes minimum stream flow capability of 400 MW; (4) Iowa Hill Notice of the availability of December
releases, has one turbine with a rated Switchyard—A new Iowa Hill the draft EIS. 2006.
capacity at best gate opening of 450 kW, Switchyard; and (5) Transmission Notice of the availability of June 2007.
and one generator rated at 485 kW, with Line—A new 230 kV transmission line the final EIS.
a total powerhouse maximum capability that would connect the Iowa Hill Ready for Commission’s de- August 2007.
of 400 kW; (4) White Rock Tunnel—an Switchyard to the existing Camino- cision on the application.
approximately 20- to 24-foot-diameter White Rock Transmission Line. SMUD
modified horseshoe tunnel 4.9-mile- anticipates that from the time a new Final amendments to the application
long and has a surge shaft that connects project license is issued by FERC and must be filed with the Commission no
Slab Creek Reservoir with White Rock accepted by SMUD, seven years would later than 30 days from the issuance
Penstock; (5) White Rock Penstock—A 9 be required to complete the engineering, date of the notice soliciting final terms
to 15-foot-diameter, 0.3-mile-long procurement, and construction of the and conditions.
aboveground steel penstock that Iowa Hill Development.
Linda Mitry,
connects White Rock Tunnel to White In addition, as part of the License
Application, SMUD proposes to exclude Deputy Secretary.
Rock Powerhouse; (6) White Rock
from the project description and FERC [FR Doc. E5–4198 Filed 8–4–05; 8:45 am]
Powerhouse—The powerhouse is
equipped with two turbines, one rated Project Boundary certain transmission BILLING CODE 6717–01–P

at 112,976 kW and the other at 120,000 line sections included in the current
kW at best gate opening, and two license and FERC Project Boundary. The
excluded sections are: (1) A 9.3-mile DEPARTMENT OF ENERGY
generators, rated at 109,250 kW and
133,000 kW, with total powerhouse long section of 230 kV line from Folsom
Junction to Orangevale Substation; (2) a Federal Energy Regulatory
maximum capability of 224,000 kW; and Commission
(7) Transmission Lines—There are two 17.8-mile long section of 230 kV line
230 kV overhead transmission lines and from Folsom Junction to Hedge [Project No. 2155]
one 12 kV distribution line. The two Substation; and (3) a 1.9-mile long
section of 230 kV line from Folsom Pacific Gas and Electric; Notice of
transmission lines, both 21.8 miles in
Junction to Lake Substation. Application Tendered for Filing With
length, connect the White Rock
n. A copy of the application is the Commission, Soliciting Additional
switchyard to SMUD’s Folsom Junction.
available for review at the Commission Study Requests, and Establishing
The 600-foot-long 12 kV Slab Creek tap
in the Public Reference Room or may be Procedural Schedule for Relicensing
line connects the Slab Creek
viewed on the Commission’s Web site and a Deadline for Submission of Final
Powerhouse to the junction with Pacific
at: http://www.ferc.gov using the Amendments
Gas and Electric Company’s 12-kV
‘‘eLibrary’’ link. Enter the docket
distribution line. July 28, 2005.
number, excluding the last three digits
SMUD’s Proposed Action includes the in the docket number field (P–2101), to Take notice that the following
addition of the Iowa Hill Development. access the document. For assistance, hydroelectric application has been filed
The development would be composed contact FERC Online Support at with the Commission and is available
of the following features: (1) Iowa Hill FERCOnlineSupport@ferc.gov, or toll- for public inspection.
Reservoir—A new off-stream, rock filled free at 1–866–208–3676, or for TTY, a. Type of Application: New major
earthen dike of varying height (202) 502–8659. A copy is also available license.
depending on natural terrain (maximum for inspection and reproduction at the b. Project No.: 2155.
height 280 feet) and 5,900 feet in address in item h above. You may also c. Date Filed: July 15, 2005.
circumference with a geotextile liner on register online at: http://www.ferc.gov/ d. Applicant: Pacific Gas and Electric
the reservoir floor and inside surface of esubscribenow.htm to be notified via e- Company.
the dike; (2) Iowa Hill Tunnel—A new mail of new filings and issuances e. Name of Project: Chili Bar Project.
underground water conduit extending related to this or other pending projects. f. Location: On the South Fork
from Iowa Hill Reservoir and connecting For assistance, contact FERC Online American River in El Dorado, near
to Slab Creek Reservoir, and comprised Support. Placerville, California. The project
of: a 1,120-foot-long, 19.02-foot- o. With this notice, we are initiating affects 48 acres of Federal land
diameter, concrete-lined vertical shaft; a consultation with the California State administered by the Bureau of Land
1,110-foot-long, 19.02-foot-diameter Historic Preservation Officer (SHPO), as Management.
concrete-lined high pressure tunnel; a required by section 106, National g. Filed Pursuant to: Federal Power
250-foot-long, 15.74-foot-diameter, steel- Historic Preservation Act, and the Act 16 U.S.C. 791 (a)–825(r).
lined high pressure tunnel; a 150-foot- regulations of the Advisory Council on h. Applicant Contact: Randal S.
long, 12.45-foot-diameter, steel Historic Preservation, 36 CFR 800.4. Livingston, Power Generation Senior
manifold; three 180-foot-long, 7.87-foot- p. Procedural schedule and final Director, Pacific Gas and Electric
diameter, steel penstocks; three 450- amendments: The application will be Company, P.O. Box 770000, Mail Code:
foot-long, 12.46-foot-diameter draft tube processed according to the following N11E, San Francisco, CA 94177.
extensions; a 150-foot-long, 17.22-foot- Hydro Licensing Schedule. Revisions to i. FERC Contact: Jim Fargo, (202) 502–
diameter steel manifold; and a 1,230- the schedule will be made if the 6095 or James.Fargo@ferc.gov.
foot-long, 20.93-foot-diameter, concrete- Commission determines it necessary to j. Cooperating Agencies: We are
lined low pressure tunnel; (3) Iowa Hill do so: asking Federal, state, local, and tribal

VerDate jul<14>2003 15:34 Aug 04, 2005 Jkt 205001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\05AUN1.SGM 05AUN1
Federal Register / Vol. 70, No. 150 / Friday, August 5, 2005 / Notices 45387

agencies with jurisdiction and/or http://www.ferc.gov using the with Commission and is available for
special expertise with respect to ‘‘eLibrary’’ link. Enter the docket public inspection:
environmental issues to cooperate with number excluding the last three digits in a. Type of Application: New major
us in the preparation of the the docket number field to access the license.
environmental document. Agencies who document. For assistance, contact FERC b. Project No: 2170–029.
would like to request cooperating status Online Support at c. Date filed: April 22, 2005.
should follow the instructions for filing FERCOnlineSupport@ferc.gov or toll- d. Applicant: Chugach Electric
comments described in item l below. free at 1–866–208–3676, or for TTY, Association.
k. Pursuant to section 4.32(b)(7) of 18 (202) 502–8659. A copy is also available e. Name of Project: Cooper Lake
CFR of the Commission’s regulations, if for inspection and reproduction at the Hydroelectric Project.
any resource agency, Indian Tribe, or address in item h above. f. Location: On Cooper Lake,
person believes that an additional You may also register online at http:/ approximately 4.8 river miles from the
scientific study should be conducted in /www.ferc.gov/docs-filing/ mouth of Cooper Creek in south central
order to form an adequate factual basis esubscription.asp to be notified via e- Alaska on the Kenai Peninsula, 55 air
for a complete analysis of the mail of new filings and issuances miles south of Anchorage.
application on its merit, the resource related to this or other pending projects. g. Filed Pursuant to: Federal Power
agency, Indian Tribe, or person must file For assistance, contact FERC Online Act, 16 U.S.C. 791(a)–825(r).
a request for a study with the Support. h. Applicant Contact: Burke Wick,
Commission not later than 60 days from p. With this notice, we are initiating Chugach Electric Association, 5601
the date of filing of the application, and consultation with the California State Minnesota Drive, Anchorage, Alaska
serve a copy of the request on the Historic Preservation Officer (SHPO), as 99519. (907) 762–4779.
applicant. required by (106, National Historic i. FERC Contact: David Turner (202)
l. Deadline for Filing Additional Preservation Act, and the regulations of 502–6091 or david.turner@ferc.gov.
Study Requests and Requests for j. Deadline for filing scoping
the Advisory Council on Historic
Cooperating Agency Status: September comments: October 10, 2005.
Preservation, 36 CFR 800.4.
15, 2005. All documents (original and eight
q. Procedural Schedule and Final
All Documents (Original and Eight copies) should be filed with: Magalie R.
Amendments: The application will be
Copies) Should be Filed With: Magalie Salas, Secretary, Federal Energy
processed according to the following
R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First
Hydro Licensing Schedule. Revisions to
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
the schedule will be made as The Commission’s Rules of Practice
Street, NE., Washington, DC 20426. appropriate.
The Commission’s Rules of Practice and Procedure require all intervenors
require all intervenors filing documents Issue Acceptance/Deficiency Letter and filing documents with the Commission
with the Commission to serve a copy of request additional information, if needed, to serve a copy of that document on
November 2005. each person on the official service list
that document on each person on the
Issue Scoping Document for comments,
official service list for the project. for the project. Further, if an intervenor
December 2005.
Further, if an intervenor files comments Notice of application is ready for files comments or documents with the
or documents with the Commission environmental analysis, April 2006. Commission relating to the merits of an
relating to the merits of an issue that Notice of the availability of the draft EIS, issue that may affect the responsibilities
may affect the responsibilities of a December 2006. of a particular resource agency, they
particular resource agency, they must Notice of the availability of the final FEIS, must also serve a copy of the document
also serve a copy of the document on June 2007. on that resource agency.
that resource agency. Ready for Commission’s decision on the Scoping comments may be filed
Additional study requests and application, August 2007. electronically via the Internet in lieu of
requests for cooperating agency status Final amendments to the application paper. The Commission strongly
may be filed electronically via the must be filed with the Commission no encourages electronic filings. See 18
Internet in lieu of paper. The later than 30 days from the issuance CFR 385.2001(a)(1)(iii) and the
Commission strongly encourages date of the notice of ready for instructions on the Commission’s Web
electronic filings. See 18 CFR environmental analysis. site (http://www.ferc.gov) under the ‘‘e-
385.2001(a)(1)(iii) and the instructions Filing’’ link.
Linda Mitry, k. This application is not ready for
on the Commission’s Web site (http://
www.ferc.gov) under the ‘‘e-Filing’’ link. Deputy Secretary. environmental analysis at this time.
m. This application is not ready for [FR Doc. E5–4199 Filed 8–4–05; 8:45 am] l. The existing project consists of: (1)
environmental analysis at this time. BILLING CODE 6717–01–P The Cooper Lake Dam, a 52-foot-high
n. The existing Chili Bar Project earth-and-rockfilled structure; (2) the
consists of: (1) A 120-foot-high concrete 2,910-acre, 5-mile-long Cooper Lake
gravity dam; (2) a 110-acre reservoir DEPARTMENT OF ENERGY Reservoir; (3) two vertical-shaft Francis
with a useable storage of 1,339 acre-feet; turbines with a total capacity of 19.38
(3) a powerhouse with one 7-MW unit Federal Energy Regulatory megawatts; (4) an intake structure
and (4) appurtenant facilities. The Commission located on Cooper Lake; (5) a tunnel and
applicant estimates that the total [Project No. 2170–029–AK]
penstock extending 10,686 feet east
average annual generation would be from the intake to the powerhouse; (6)
33,500 megawatt hours. All generated Chugach Electric Association; Notice a 6.3-mile-long, 69-kV transmission line
power is utilized within the applicant’s of Scoping Meetings and Site Visit and from the powerhouse to Quartz Creek
electric utility system. Soliciting Scoping Comments Substation; and 90.4-mile-long, 115-kV
o. A copy of the application is transmission line from the Quartz Creek
available for review at the Commission July 28, 2005. Substation to Anchorage.
in the Public Reference Room or may be Take notice that the following m. A copy of the application is
viewed on the Commission’s Web site at hydroelectric application has been filed available for review at the Commission

VerDate jul<14>2003 15:34 Aug 04, 2005 Jkt 205001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\05AUN1.SGM 05AUN1