Beruflich Dokumente
Kultur Dokumente
Coordinated by:
Prepared by:
ii
iii
Abbreviations
AAY
BOT
BPL
BT
Bitumen Top
CAGR
CBO
CC
Cement Concrete
CDP
CIP
CPHEEO
CSC
CUR
DCB
DSCR
EPC
EWS
FOP
FY
Financial Year
GIS
GoI
Government of India
GoMP
HNPP
IHSDP
IMaCS
INR
Indian Rupee
ISWM
JNNURM
LIG
LPCD
MC
Municipal Council
MIS
ML
Million Liters
MLA
MLD
MP
Member of Parliament
MPHB
MPPCB
MPSEB
MSW
NGO
Non-Governmental Organization
NUIS
O&M
iv
OHT
PHED
PHFW
PSC
PWD
ROB
SADA
SC/ST
SFC
SH
State Highway
SJSRY
STP
SWDS
SWMS
SWOT
TCPD
TFC
TFC
UADD
UDPFI
UGD
UIDSSMT
ULB
ULCRA
Executive Summary
The Urban Administration and Development Department (UADD) of Government of Madhya Pradesh
(GoMP) retained ICRA Management Consulting Services Limited (IMaCS) for assistance in the
.preparation of City Development Plan for Hoshangabad town.
The objectives of the exercise are three-fold: a) to assess existing demand-supply gaps in service
delivery and derive a comprehensive infrastructure improvement plan (including a Capital Investment
Plan) required, b) to identify revenue enhancement and financial improvement measures and c) to
develop a Financial and Operating Plan to implement a sustainable infrastructure improvement plan.
Weakness:
Poor drainage system
Poor Solid Waste Management system
Low rate of employment
vi
Value
Sanitation:
5
Presence of a Safe Disposal Mechanism
for Waste Water
6
Slum Population per Public convenience
(nos.)
Roads and Street Lights:
7
Road length (Km)
8
Road length per Street Light (m)
Solid Waste Management:
9
Waste generation per capita (gms)
83
23.5
68.1
No
380
107
21
413
2005-06
2006-07
2007-08
2008-09
2009-10
CAGR
%
319.5
590.5
626.4
684.3
1,043.40
34.4
17.7
424.6
513.2
557.9
614.8
814
-105.1
77.3
68.5
69.5
229.4
Receipts
236.9
216.7
284.6
632.1
1,607.50
61.4
Payments
118.1
294.6
444.4
672
1,796.20
97.5
Surplus/ Deficit
118.8
-78
-159.8
-39.9
-188.7
69.1
69.1
-30.4
-30.4
-14.8
Surplus/ Deficit
Capital Account
1. CUR: Capital Utilisation Ratio of HNPP is 1.12 which is more than 1 which indicates that
HNPP are utilising their revenue surplus in the capital expenditure hence having a high
utilization ratio. HNPP is found to be very less dependent on the Revenue Grants and other
revenue sources as grants accounts for only 6% of their revenue income. Tax revenue
accounts only 10% of the revenue income whereas Non tax revenue accounts 37%, which
indicates need for identification of new tax revenue streams.
2. Property Tax contribution low: Property tax as a revenue source accounts is very limited in
HNPP indicates the need of property tax rationalisation with improved collection efficiency.
vii
viii
from tube wells should be discouraged and contribution expected from tube wells should be
brought from other sources.
The additional water requirement can be met by adopting either of the following options:
a. Drawing additional water from Narmada River
b. Sourcing water from the rain water harvesting
b) Water treatment facility: The proposed water treatment facility is planned for 24 MLD of water;
hence treatment infrastructure needs to be installed for the additional 6 MLD of water.
c) Distribution Network: As discussed with Hoshangabad Municipality officials, at present,
Hoshangabad has a distribution network of 90 km which is approximately 68 % of the road
network. The proposed water supply scheme includes the strengthening of distribution
network. In total, to meet the growing demand, Hoshangabad would need an additional
network of 86 km so that total network length is 176 Km to increase the coverage to 85% of
road network by the year 2035.
d) Elevated Storage Capacity: As per the prescribed norm, 33% of net water requirement should
be the Elevated storage capacity which at present is around 24% for the Hoshangabad. The
proposed water supply scheme includes an OHT of 0.4 ML capacity. This would increase the
Storage capacity to 2.75 ML. In addition, Hoshangabad needs to augment the existing
storage capacity of 2.35 ML and proposed capacity addition of 0.4 ML by 3.6 MLD to take the
net storage capacity to 6.35 MLD by the year 2015. In the long term, Hoshangabad would
need to add another 4 MLD to take the storage capacity to 10.3 MLD by 2035.
2.
At present, the Hoshangabad Nagar Palika does not have a sewerage system network in the town.
On the basis of both the demandgap assessment of the sewerage network and the consultation
process with the ULB officials and the stakeholders, the need for developing a sewerage network in
the town is evident. Though DPRs have been prepared by Hoshangabad Municipality for 100%
sewerage coverage of town and sewage treatment under NRCP and UIDSSMT, but analyses done by
WSP-SA, consultants working on City Sanitation Plan for Hoshangabad, shows that a 100%
networked sewerage system in the city is not feasible. Hence, to achieve the desired 100% sewerage
coverage, the city should adopt a mixture of technical options (as articulated in the Draft CSP for
Hoshangabad), including:
1. Fully On-site Sanitation: Septic Tanks or Twin Soak Pits
2. Fully Off-site Sanitation: Settled (Small bore) sewerage
3. Part on-site (Septic Tanks or Twin Soak Pits) / Part off-site (Conventional Sewerage)
4. Simplified sewerage with decentralized wastewater treatment
5. Mixed system
3. Roads & Transportation
Details of projects to be undertaken as the realization of strategies are:
a) Road Construction: To address the current gap of per capita road length, and the future
demand, the Nagar Palika would have to construct 42 km of additional roads, comprising 6.94
km of CC and 35.18 km of BT, by 2015. The Nagar Palika should on a priority basis identify
City Development Plan Hoshangabad
ix
the stretches and areas where roads at present do not exist and or have poor connectivity.
Also the areas where future residential growth is anticipated or planned, road construction
can be undertaken.
b) Road Up gradation: The Nagar Palika would have to upgrade the internal roads from their
existing type to CC or BT category. The road up-gradation may be taken up on the priority
basis; a total of 35 km of road needs to be upgraded to BT category.
c) Parking Spaces: With the growing number of vehicles and increasing commercial activities in
the town, issue of lack of parking spaces becomes much more relevant. The consultations
with stakeholders have concluded that parking spaces should be developed near the key
commercial area of the town. Multi-storeyed parking lots have been proposed at three
locations:
1) Tar Ahata at Itwara Bazar,
2) Near bus stand at Satrasta and
3) Near City Hospital.
4. Storm water drainage
Details of projects to be undertaken:
a) Cleaning / Desilting of existing drains: As an immediate measure, Nagar Palika should aim at
timely cleaning and maintenance of existing drainage network. Under this project, some of the
major natural drains should be given proper attention.
b) Construction of storm water drains: The Nagar Palika needs to undertake laying of 90 km of
Pucca closed drains by 2015. In addition to the construction of Pucca closed drains, the
Nagar Palika is required to construct 40 km of Pucca open drains and upgrade 24 km of
Pucca open to Pucca closed drains. This construction may be done in tandem to the
construction/up-gradation of roads. These construction activities would have to be carried out
on an immediate basis to address the existing and future demand-supply gap.
c) Up-gradation of existing drains: The Nagar Palika is also required to undertake drain upgradation works for the existing drains in town.
5. Solid waste management
Details of projects to be undertaken as the realization of the strategies:
A. Collection Infrastructure:
a) Door-to-door Collection: The practice currently being followed includes a majority of residents
dumping waste outside their houses or at the collection point. This results in scattering of
waste which results in poor collection. To achieve an effective waste collection, practice of
door-to-door collection should be initiated which needs to be supported by necessary
awareness generation programmes.
b) Primary Collection: Augmentation of primary collection involves capacity addition in the area
of equipment used in the waste collection including community bins. As per the demand
assessment, on a priority need, a total of 12 tricycles and 119 wheel barrow would need to be
added to the existing fleet by year 2015 to meet the respective demand in the year 2015. In
addition around 147 community bins will need to be added to the existing capacity of 152
community bins.
City Development Plan Hoshangabad
A. Health
Details of Projects to be undertaken as the realization of strategies:
a) General Hospital: As per the UDPFI guidelines, the city need bed capacity of 280 by year
2015 and 430 by 2035. Existing General hospital has around 180 beds which need to be
increased to 280 by year 2015. By year 2035, the city would require hospitals providing 430
beds. This can be either achieved by upgrading the existing facilities or developing new ones.
b) Nursing Homes: City requires an addition of 10 beds capacity in 2015, 2025 and 2035.
City Development Plan Hoshangabad
xi
c) Dispensaries: City would require additional 4 dispensaries to cater to the demand of 2015,
and addition of 3 dispensaries in both 2025 and 2035 each.
B. Education
Details of Projects to be undertaken as the realization of strategies:
a) Schools: This section deals with requirements for various kinds of schools.
Primary Schools: The overarching goal in this sector is to achieve 100% literacy rate in the
city. By year 2015, city would require 56 schools in total i.e. an addition of 8 primary schools,
each of which would accommodate average of 500 students. In the long term, i.e. by year
2035, city would need to add additional 35 primary schools to its fleet.
Secondary Schools: By year 2015, city would require 19 schools in total, an addition of 4
schools, each of which would accommodate around 1000 students. In the long term, i.e. by
year 2035, city would need to additional 11 senior secondary schools.
Integrated Schools with Hostel Facilities: The city need 1 such school to accommodate
around 1000 students.
b) College: City at present has sufficient number of this type of institution to deal with the
existing demand. But keeping future prospects of town in mind, a college with state-of-art
facilities is proposed in the town to accommodate around 1000 students.
Swimming Pool: A community swimming pool should be developed in the town. This project
can be developed either as a part of sports complex or independently depending on the
feasibility and availability of land.
8. Economic Development
Details of Projects to be undertaken as the realization of strategies:
1. Development of Commercial Areas: This can further be divided into development of new
commercial areas and up gradation of existing commercial areas. New commercial areas can
City Development Plan Hoshangabad
xii
include dedicated markets for important commodities or general markets. In addition to the
development of new markets, existing markets can be upgraded to increase their capacity
and provide better services to the users and customers.
2. Development of Industrial Area for Small & Medium scale industries: With the objective of
diversifying the economic base of Hoshangabad city, an industrial park small & medium scale
industries should be developed. A land should be identified either within the municipal limits
or near to the city boundary and proposal should be sent to the appropriate authorities for the
same. This would thrust to the employment generation activities result into the overall
upliftment of the society
3. Development of Hawkers Zone: Depending on the land availability and market demand,
hawkers zones should be developed in the city. The Hawkers zone would dedicate space to
the hawkers and hence reducing congestion on the city roads, making waste collection easier
and making it easier for customers to shop.
4. Organization of Trade Fairs and Other Exhibitions: With the objective of attracting private
investments, trade fairs and other exhibitions should be organized at regular intervals in the
city. This would serve the multiple purposes of showcasing Hoshangabad potential,
rejuvenating the stagnated hospitality institutions and employment generation.
9. Environment and Tourism
Beautification of Ghats
The city has about 5 km stretch of riverfront which has significant potential to be
developed into an attractive landscaped leisure area. The concept of riverfront development
bank could therefore feature on a riverfront heritage walkway, improvement to bathing
Ghats , developing sanitation facilities, public conveniences and relocation of burial facilities,
embankment wall and landscaping. The project could be structured with grant assistance for
developing the leisure walk.
The riverfront in Hoshangabad could be developed with landscaped garden and walkway as it has
substantial amount of relatively undeveloped land alongside the riverbank. The implementation of
this component could be phased out along with land development component.
Demand analysis of this unique project should be undertaken featuring on willingness to pay for
pay-n-use facilities for parking, leisure walk or garden to the extent feasible. Parking
facilities could be provided which would generate some revenue for meeting the operating costs.
Advertising and limited commercial activities could also be considered to the extent feasible for
meeting the operating costs. Implementation road map needs to be prepared which would phase
out the components and costs to the extent sustainable for the Municipality. Innovative revenue
mobilization strategies and packaging shall be reviewed for structuring on a cost recovery
format to meet the recurring/operation and maintenance costs to the extent feasible.
b.
As a measure to promote tourism, few viewpoints can be developed on the banks of river
Narmada to attract tourists and provide citizens with another spot for recreation. It was revealed
City Development Plan Hoshangabad
xiii
during the consultations that Kori Ghat and Raj Ghat offer enormous potential for their
development.
c.
In order to enhance tourism, ropeway trolley has been proposed across river Narmada. The
pilgrims visiting the city during festive seasons will be able to get the scenic view of the river, ghats
and its surrounding areas. This will become an affective source of income generation for Nagar
Palika.
b) Development of Entry Gates
Development of entry gates at four entry points like Bhopal Road, Itarsi Road, Pipariya Road and
Harda Road would give the tourists a taste of rich culture of Hoshangabad. It will also help in
demarcating the Municipal limits.
B. Environment
Details of Projects to be undertaken as the realization of strategies:
a) Air Quality: Periodic monitoring and review is essential to check air quality. To create
awareness amongst user groups, the status of air pollution may be revealed through display
systems instituted at major locations in the city. Suitable plantations or green cover should be
provided on major routes to supplement better air quality.
b) Water Pollution: Efforts/schemes should be designed to check the diversion of sewage flow
into city lakes through appropriately located sewage treatment plants. Considering the issues
related to the demand for treating large amounts of sewage generated in Hoshangabad city,
decentralized sewage treatment is recommended.
c) Water Bodies Conservation: For water body conservation and rejuvenation, proper attention
should be given to existing lakes and water bodies in the city. A comprehensive water body
restoration or revival program in the region is of utmost importance. It is important to draw up
plans for the regeneration of the extinct River Narmada and address issues related to its
pollution through city sewage and other wastes.
d) Ground Water Recharge: With the state government constantly stressing on curbing the
depletion of ground water level, Hoshangabad municipality should take proactive measures in
this direction.
e) Green Spaces: A critical issue that needs to be addressed on the priority basis is the
development of green spaces within the city limits to enhance the overall quality of the
environment.
f)
xiv
Based on our analysis, demand pertaining to various issues related to urban poor was identified.
These demands were found to be in tune with those identified under proposed IHSDP project. IHSDP
envisages rehabilitation of 297 households at 16 sites. Various proposals made under this scheme
are as follows:
a) Housing: Under this scheme, 297 housing units each of 30.2 sqm having two rooms, one
kitchen and one toilet are proposed. Houses will be constructed in Ground + 2 Floor
complexes.
b) Water: It has been proposed that all the households will be served through piped water. To
connect all proposed housing units, 11960 m of water supply pipeline and 4 new tube wells
will be needed.
c) Sanitation: A pour flush latrine integrated with each dwelling unit and 147 m of sewer line
which would be integrated with the proposed city sewerage system.
d) Roads: Cement concrete roads of 5474 m are proposed to be constructed to connect all the
housing units and internal roads with the main road. The proposal suggests a 2. 5, 3 and 6 m
wide Cement Concrete roads.
e) Storm Water Drainage: All roads are to be provided with storm water drains that translate into
8790 m of storm water drainage.
f)
g) Social Amenities: A Vendors platform and Gaushala are proposed under the IHSDP scheme.
11. Governance and Institutional Development
Details of Projects:
a) Computerization: Hoshangabad municipality should initiate the process of computerization in
its administration. Computerization will benefit most of its functions ranging from municipal
accounting to tax management. The introduction of E-Governance will help in smoothening
the processes and improvement in the efficiency.
b) Capacity Building: The procurement of computers should be supplemented by providing
training to the staff.
c) GIS Mapping: A GIS mapping of the city properties will be very helpful in the provision of
efficient services to the citizens. This would also help in keeping a tab on tax evaders.
Municipal Council of
Hoshangabad
Sectors
Water Supply
Sewerage and Sanitation
Urban Roads, Transport & Traffic
Investment Required
Investment
by 2015
Rs. Lakhs
2,016.86
843.84
2,758.53
Investment
by 2025
Rs. Lakhs
711.54
127.83
1,026.28
Investment
by 2035
Rs. Lakhs
941.23
240.15
1,232.00
Total
Investment
Rs. Lakhs
3,669.63
1,211.82
5,016.81
xv
S.No
.
Municipal Council of
Hoshangabad
Sectors
D
Storm Water Drains
E
Street Lighting
F
Solid Waste Management
G
Fire Infrastructure
H
Urban Poor/ Slums' Improvement
I
Health Infrastructure
J
Education Infrastructure
K
Socio-Cultural Facilities
L
Economy
M
Heritage & Tourism
N
Urban Environment
O
Urban Governance
Total Investment Identified
Investment Required
Investment
by 2015
Rs. Lakhs
2,162.32
57.02
172.44
81.00
517.52
1,726.67
1,540.00
256.00
195.00
462.50
95.00
45.00
12,929.69
Investment
by 2025
Rs. Lakhs
429.97
83.01
291.84
1,720.00
1,880.47
116.00
480.00
412.50
47.50
15.00
7,341.95
Investment
by 2035
Rs. Lakhs
641.10
123.52
212.75
76.00
920.00
2,473.34
88.00
175.00
100.00
27.50
30.00
7,280.59
Total
Investment
Rs. Lakhs
3,233.39
263.54
677.04
157.00
517.52
4,366.67
5,893.82
460.00
850.00
975.00
170.00
90.00
27,552.23
xvi
a. Property tax: through revision in ARV, widening assessee base and closer scrutiny.
b. Export tax By providing suitable environment for industries to flourish.
c.
User charges through increased penetration of water connections and new sewerage
connections could potentially triple user charges income from the current levels.
xvii
It is also recommended that on the same lines of the National Urban Information System (NUIS)
programme for strengthening of information system at Municipal Corporation level, GoMP should also
provide support to all the local bodies in Madhya Pradesh, which are not covered in the mentioned
programme.
xviii
xix
Table of Contents
Executive Summary
1
Introduction...................................................................................................................................... 1
1.1
Background ............................................................................................................................... 1
1.2
1.3
1.3.1
1.3.2
1.3.3
1.4
2
Introduction ............................................................................................................................. 10
2.2
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.4
3
Conclusion .............................................................................................................................. 14
Introduction ............................................................................................................................. 16
3.2
3.3
3.4
3.5
3.6
Issues ..................................................................................................................................... 21
3.7
3.8
Conclusion .............................................................................................................................. 21
Introduction ............................................................................................................................. 22
4.2
4.3
4.4
4.5
Socio-Economic Base............................................................................................................. 25
4.6
Tourism ................................................................................................................................... 25
4.7
Conclusion .............................................................................................................................. 26
xx
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
6.1.1
6.1.2
6.1.3
6.1.4
Drainage .......................................................................................................................... 53
6.1.5
6.1.6
6.2
6.2.1
6.2.2
Education......................................................................................................................... 67
6.2.3
6.2.4
6.3
6.4
6.4.1
Environment .................................................................................................................... 70
6.4.2
6.5
6.6
6.6.1
6.6.2
6.6.3
6.7
7
Conclusion .............................................................................................................................. 85
xxi
7.2
7.2.1
7.3
7.3.1
7.3.2
7.4
7.5
7.6
Conclusion .............................................................................................................................. 92
8.2
8.3
8.4
8.5
8.5.1
8.5.2
8.5.3
8.5.4
8.5.5
8.5.6
8.6
8.6.1
8.6.2
Education....................................................................................................................... 110
8.6.3
8.6.4
8.7
8.8
8.8.1
8.8.2
8.9
8.10 Sector Goal and Strategies - Urban Governance and Institutional Development ................ 120
8.11 Conclusion ............................................................................................................................ 121
9
9.2
9.3
9.4
xxii
9.5
9.5.1
9.5.2
9.5.3
9.5.4
9.5.5
9.6
9.6.1
9.6.2
9.6.3
9.7
9.8
9.8.1
9.8.2
9.9
10
9.12.1
9.12.2
10.3.2
11.2.1
11.2.2
11.2.3
11.2.4
11.2.5
xxiii
11.2.6
11.2.7
11.3 Mandatory Reforms at the level of the Urban Local Body .................................................... 155
11.3.1
11.3.2
11.3.3
11.3.4
11.3.5
11.3.6
11.4 Optional Reforms at level of the State Government/Urban Local Body ............................... 159
xxiv
Exhibit
Exhibit 1-1 Approach and Methodology .................................................................................................. 4
Exhibit 1-2developing a City Vision (source: JNNURM Toolkit) ............................................................. 7
Exhibit 2-1 Rainfall Data........................................................................................................................ 12
Exhibit 2-2 Area and population details of Hoshangabad planning area .............................................. 13
Exhibit 3-1 Population Growth Trend of Hoshangabad ........................................................................ 16
Exhibit 3-2 Population Density .............................................................................................................. 16
Exhibit 3-3 Other Demographic Indicators ............................................................................................ 17
Exhibit 3-4 Ward Wise Residential Area & Population ......................................................................... 17
Exhibit 3-5 Population Projections ........................................................................................................ 18
Exhibit 4-1Literacy rate and Sex ratio ................................................................................................... 22
Exhibit 4-2 Average Household Size .................................................................................................... 24
Exhibit 4-3 Workforce Details ................................................................................................................ 24
Exhibit 5-1 Existing Land Use Pattern - Hoshangabad ......................................................................... 32
Exhibit 5-2 Land use Classification according to 2001 & 2006 Master Plan ........................................ 34
Exhibit 6-1 Population Projection for Demand-Supply Gap Analysis ................................................... 37
Exhibit 6-2 Source of Water Supply ...................................................................................................... 38
Exhibit 6-3 Details of OHT in Hoshangabad ......................................................................................... 38
Exhibit 6-4 Water Connections.............................................................................................................. 39
Exhibit 6-5 Water Connections by Size ................................................................................................. 39
Exhibit 6-6 Water Supply - Service Level Indicators ............................................................................. 39
Exhibit6-7 Water Supply: Demand-Supply Gap Analysis ..................................................................... 41
Exhibit 6-8 Household Sanitation Arrangements (2001 and 2008)....................................................... 43
Exhibit 6-9 Location of Existing and Proposed Public Sanitary Conveniences (PSC) ......................... 44
Exhibit 6-10 Sewerage & Sanitation: Demand-Supply Gap Analysis ................................................... 46
Exhibit 6-11 Hoshangabad Municipality - Service Level Indicators ...................................................... 48
Exhibit 6-12 Details of Solid Waste Management System .................................................................... 49
Exhibit 6-13 Details of Vehicles used in Solid Waste Collection........................................................... 49
Exhibit 6-14 SWMS: Demand - Supply Gap Analysis ........................................................................... 51
Exhibit 6-15 Estimation of Waste Generation ....................................................................................... 51
Exhibit 6-16: Drainage: Demand - Supply Gap Analysis ...................................................................... 55
Exhibit 6-17 Details of Road Network ................................................................................................... 57
Exhibit 6-18 Traffic & Transportation: Demand - Supply Gap Analysis ................................................ 61
Exhibit 6-19 Street Lighting ................................................................................................................... 63
Exhibit 6-20 Street Lighting: Demand - Supply Gap Analysis............................................................... 63
Exhibit 6-21 Health Infrastructure ......................................................................................................... 64
Exhibit 6-22 Health: Demand - Supply Gap Analysis ........................................................................... 66
Exhibit 6-23 Educational institutions in Hoshangabad Municipality ...................................................... 67
Exhibit 6-24 Education: Demand - Supply Gap Analysis .................................................................... 67
Exhibit 6-25 Details of Slums and Slum Population .............................................................................. 74
Exhibit 6-26 Urban Governance: Coordination Model .......................................................................... 84
Exhibit 7-1 Financial Status at Glance .................................................................................................. 86
Exhibit 7-2 Source-wise Revenue Income ............................................................................................ 87
Exhibit 7-3 Tax Revenue (in Rs. Lakhs) ............................................................................................... 87
Exhibit 7-4 Non tax revenue (in Rs. Lakhs) .......................................................................................... 88
Exhibit 7-5 Assigned Revenue (in Lakhs) ............................................................................................. 88
Exhibit 7-6 Revenue from Grants/Contributions ................................................................................... 88
City Development Plan Hoshangabad
xxv
xxvi
Figures
Figure 1 Location & City Map of Hoshangabad .................................................................................... 11
Figure 2 Hoshangabad Municipality jurisdictional area ........................................................................ 15
Figure 3 Ward Wise Population ............................................................................................................ 20
Figure 4 Ward wise literacy rate ........................................................................................................... 23
Figure 5 Municipal Level Mapping - Base Map ..................................................................................... 28
Figure 6 Ward Delineation Map ............................................................................................................ 29
Figure 7 Ward Wise Population Density ............................................................................................... 31
Figure 8 Existing Land Use Pattern Hoshangabad ............................................................................ 33
Figure 9 Proposed Land use Pattern by 2001 & 2006 Master Plan ..................................................... 35
Figure 10 Water Supply - ...................................................................................................................... 40
Figure 11 Location of SW Landfill Sites ................................................................................................ 50
Figure 12 Existing Drainage Pattern ..................................................................................................... 54
Figure 13 Existing Road Network Pattern ............................................................................................. 58
Figure 14 Transportation Road network , Bus stand and Railway station and Congestion points .... 60
Figure 15 Social infrastructure including Health, Education and other Social Amenities ..................... 65
Figure 16 Slum Wards and Slum Pockets ............................................................................................ 77
Annexure
Annexure A Workshop Proceedings ................................................................................................... 161
Annexure B Questionnaire Survey ...................................................................................................... 172
Annexure C Financial Projections ....................................................................................................... 182
Annexure D Future Development Extension of Municipal Area ...................................................... 186
xxvii
1 Introduction
1.1 Background
Madhya Pradesh is on the path of urbanizing where the Urban Local Bodies (ULBs) are facing the
challenge of meeting the requirements of the growing population with limited technical and financial
resources. There are a number of initiatives taken by the Government of India (GoI) and Government
of Madhya Pradesh (GoMP) to meet the growing demands of infrastructure in the cities and for better
service delivery. These include both GoI schemes [including Urban Infrastructure Development
Scheme for Small and Medium Towns (UIDSSMT) and Integrated Housing and Slum Development
Programme (IHSDP)] and GoMP initiated schemes such as the Madhya Pradesh Urban Services for
the Poor (MPUSP).
With regard to the under performance of the ULBs and their limited capacity for exploring new
avenues to get back on development track, it was felt that a vision exercise with identified projects to
formulate a road map for development is essential. Benefit of such an exercise would not just be for
accessing GoI/GoMP funding but also for providing a strategic framework for converging and coordinating various development inputs towards positioning the city on a development path.
Therefore, the Urban Administration and Development Department (UADD) of Government of Madhya
Pradesh (GoMP) launched an initiative to support 97 ULBs in the state in preparing City Development
Plans (CDPs). This initiative aims to provide a comprehensive Medium Term Strategy (Vision 2035)
and a City Investment Plan (CIP) for each Urban Local Body, based on which the concerned ULB will
be able to develop detailed projects and access funds under schemes of Government of India (GoI)
and GoMP as well as from its own sources for implementation of priority actions and projects,
identified from this exercise. The document was also envisaged to provide a Financial Operating Plan
(FOP) to direct the ULBs for mobilising various financial resources to implement the identified
projects, adhering to the JNNURMs CDP preparation toolkit and keeping in view the Master Plan
(wherever exists) provisions as prepared by Town and Country Planning Department.
In this regard, UADD retained ICRA Management Consulting Services Limited (IMaCS) for assistance
in preparation of City Development Plans for Hoshangabad town.
Apart from this, our team would use this as a preparatory stage to :Review and analyse the current status and unique features of the city with regard to
the state of its development, systems and procedures, as equally its institutional and
financial context.
Identify the strengths and weaknesses in the citys development and to develop an
understanding of what impedes infrastructure provision and service delivery and
management within the existing set-up and what contributes to better service
provision.
Do a rapid assessment through interactions with stakeholders and initial data
collection to capture previous and ongoing development initiatives to factor the same
in the Consultations and Analysis module.
We concur with the broad activities and tasks outlined under the Inception stage by MPUADD
including the following:
a. Introductory meetings with elected representatives, City officials and other Government
agencies.
b. Formation of city level Steering Group for the CDP and a shared understanding of the role
and expectations from this group.
c. Preliminary Data collection including base maps and available secondary data, master plan,
other reports on recent and ongoing development programs, budget documents and other
information.
d. Identification and listing of stakeholders, in consultation with the ULB and the Steering Group,
and putting in place mechanisms for obtaining their views and inputs.
e. Field visits by our team to familiarize and get a grasp of the spatial and demographic patterns,
social and economic drivers and related issues.
f. Identify economic opportunities and bottlenecks and their implications for development.
This module will culminate in conduct of a one-day kick off workshop with stakeholders. The purpose
of the kick-off workshop would be build participative energy and commitment of stakeholders for the
study through articulation of the purpose, process, and expected outcomes of the CDP, and achieving
a shared understanding of the same. The kick off workshop will help in deriving a consensus along
with the stakeholders firming the process and agreeing upon a structured programme to take the CDP
forward. Further the institutional structures including the Steering Group for the consultative process
City Development Plan Hoshangabad
will also be spelt out during this workshop. Following the workshop, we would submit an Inception
Report and follow it up with a presentation to MPUADD and the ULB. Apart from capturing the
outcomes and points of discussion / action from the workshop the Inception report would also propose
special papers on select sectors identified and agreed during the course of the workshop.
Module I - Preparation
Inception & Kick-off
Preparation
Reconnaisance
Introductory meetings
Steering Group f ormation/role
Baseline Data collection
Stakeholder identif ication /listing
Field Visits
Understanding of Spatial, Social
and Economic development f actors
Sector Analysis
Data checklists
City Profiling
WS I KICK-OFF
Draft CDP
WS IV Stakeholder endorsement
and Performance Monitoring Plan
PresentationIIIIIIto
toMPUADD
MPUSP / ULB
Presentation
/ ULB
WS III Strategy & Priority Projects
FINAL CDP
Presentation
/ ULB
PresentationIIIIto
toMPUADD
MPUSP / ULB
d) Urban Housing
e) Public Transportation
f) Social amenities and infrastructure including Schools, Hospitals, Markets
We expect the sector level analysis to cover the following steps.
a. Review the baseline status of the sector in terms of operational service level and financial
indicators vis-a-vis benchmarks/norms and desired levels of service to arrive at the normative
gaps.
b. Identify the possible alternatives for improving service levels, policy
changes/implications and the magnitude of investment required to improve service levels
in a time-bound manner.
c.
Develop a sector strategy, targets for service level improvement and a list of potential
priority projects to be undertaken along with expected levels of improvement in service
levels through implementation of these projects. An illustrative
These steps would be undertaken in consultation with local counterparts and will be supported by
special papers commissioned by the TA team. While carrying out the sector level analysis, aspects
relating to the need for provisioning for urban poor, broad review of cost-benefits including social and
environmental impacts would be factored.
City Profile
In profiling the City and crystallizing its SWOT (Strength, Weakness, Opportunity, and Threat), we
would look at slightly wider issues beyond sectoral dimensions to cover the following:
Spatial growth patterns and drivers
Economic growth drivers - intrinsic and potential
Infrastructure - Physical and Social
Issues relating to Environment sustainability
Extent of Urban Poor and their requirements
Institutional Capacity gaps and requirements.
As can be observed, the idea is to get an over-arching and a holistic idea of the citys future growth
directions (both economic and spatial) to understand the implications for physical infrastructure and
administrative capacity building needed to support this growth.
The city profiles would also then draw from the Sector analysis and provide an assessment of the
existing situation in all the sectors identified, emerging issues, analysis and projection of the present
gaps and future requirements. This will be done within the framework of parameters relating to
demography, economic base, finance, physical and environmental issues, infrastructure, institutions
and universalization of services especially for the poor.
City Vision
Exhibit 1-2 presents an extract from the JNNURM Toolkit on the aspects to be considered in
developing a Citys Vision which we believe summarizes the key contours of a City level Vision
formulation quite succinctly.
The City Profile will be presented to the stakeholders and Steering Group followed with a discussion
on city perspective and city priorities as perceived by the stakeholders. With the background of city
profile, perspective and priorities, the participants will contribute to developing a collective and shared
vision for the city. Discussion will be initiated on strategies, priorities and major actions that may be
required in the next fifteen years to move towards the vision.
Exhibit 1-2 Developing a City Vision (source: JNNURM Toolkit)
Developing a vision for the city is central to the preparation of a CDP. A vision is a statement of where the city
wishes to go, within a given timeframe, and is often expressed in terms of clear expectations. It defines the
potential of the city and reflects its unique attributes in terms of comparative and competitive advantages, values
and preferences of the citys residents, relationship of the city to the state, national and global economies, and of
course, the history and physical characteristics of the city. A vision aligns stakeholders energies to work
cohesively for the development of the city. Cities need to systematically consider the future, and design strategies
to accordingly shape the future. All objectives, strategies, programmes and projects must be aligned with the
vision of the city.
Developing a common vision requires a significant effort of consensus building in order to balance the competing
demands arising from different economic infrastructure sectors, as also from different interest groups within the
city. In order to achieve an understanding on a common vision, it is useful to choose milestones and targets
such as provision of a minimum level of services to all; public disclosure and transparency in the formulation of
budget proposals; introduction of a single window in matters of service delivery and management and the like. In
developing the vision, cities must choose a set of criteria that are directly relevant to the JNNURM components. It
is important that when cities define outcomes and milestones on the vision, they ensure that these are
measurable and have a time frame.
capacity to undertake all capital investment programs. Apart from evaluating the potential financing
from schemes like JNNURM and other capital grant schemes of GoMP, it is critical to evaluate as part
of the strategic options, the ULBs potential to a) Improve its Revenue surplus through revenue
enhancement related reforms and rationalization of costs and b) leverage and access to external
capital through borrowings and Public Private Partnerships.
Our approach typically involves the following steps:
a. Estimation of unconstrained sector wise Investment requirements given normative gaps in
service levels (5 year, 10 year and 15 year horizons), sector wise service level improvement
targets and identified priority projects for the first five years
b. Preparation of Financial and Operating Plan and Estimation of borrowing capacity with
operating revenue surplus improvements and revenue reforms
c.
Developing a realistic and actionable Investment Plan and a Financial and Operating Plan
within borrowing capacity limitations with a 5-year action plan and 15-20 year financial
projections.
Needless to mention the 5 year action plan would involve an iterative process and would factor inputs
from consultations with stakeholders on priority projects to be taken up in consonance with the City
Vision, Sector wise strategy and service level targets.
Submission of City Development Plan, Consultations and Finalization
Following the finalization of the CIP, we would integrate the deliverables presented in Module I and II
along with the CIP and financing strategy to prepare and submit the City Development Plan.
We would then have a workshop with stakeholders to summaries the process and the building blocks
around which the CDP has been evolved and seek an endorsement from them. We would also work
with the stakeholders to develop procedures for performance monitoring and implementation of the
actions recommended in the CDP.
This would be followed by a presentation to MPUADD and the ULB. Based on the inputs we would
submit the final CDP to MPUADD and the ULB along with a summary of the CDP for publication and
wider dissemination by the MC.
2.
In this workshop, city profile was presented to the stakeholders followed by a discussion on city
perspectives and city priorities as perceived by the stakeholders. With the background of city
profile, perspective and priorities, a collective and shared vision was developed for the city. In
addition to the formulation of the vision and sector goals, the preliminary discussions were
carried out on strategies, priorities and major actions that would be required in the next five years
to move towards the vision 2035.
3.
4.
2.1 Introduction
Hoshangabad is a municipality in Hoshangabad district in the Indian state of Madhya Pradesh. It is
located on the south bank of the Narmada River and is the administrative center of Hoshangabad
District.
The city was earlier called Narmadapur after the river Narmada however later the name was changed
to Hoshangabad by taking its founder name SULTAN HUSHANG SHAH GHORI, the second king of
th
Mandu (Malwa) in early 15 Century. Hoshangabad is a city of religious importance with Narmada
being a Holy River; thousands of pilgrims visit the Ghats of Narmada to perform the ritual of taking
bath in it. There are several
bathing
Ghats
along
the
riverbank wherein roughly 0.10
to 0.15 million pilgrims visit
during the festive occasions.
Such occasions are reported to
be almost once every month.
Hoshangabad is district and
Tehsil
Headquarter
and
important
agriculture
trade
center
in
the
region.
Hoshangabad is also in between
two important locations of tourist
attraction Panchmarhi and
Bhimbetika.
10
11
1451
1065
832
1829
1594
1330
12
Name
Dongarwada
833.19
1225
Khojanpur
857.99
363
Byawara
697.87
1790
Pawaar Kheda
299.41
420
Budhwada
371.64
715
Agra Kala
273.65
361
Khedla
439.09
589
Tugaariya
123.97
212
Patlai Khurd
222.93
316
10
Kulmadi
577.12
573
11
Pathaudi
178.17
473
12
Plaasi
136.89
297
13
Undrakhedi
225.52
183
14
Deshmohani
228.38
289
15
Chandrapura
293.56
454
16
Jalalabad
173.92
17
Dogri
173.54
18
Malakhedi
562.09
23
19
Phefartaal
564.94
20
Rasuliya
295.10
21
Kishanpura
209.38
22
Raipur
2272.06
4801
23
Jaasalpur
984.4
2154
24
Nimsaadiya
1782.36
4279
12777.18
19517
1233.46
70914
14010.64
90431
Total
Hoshangabad Town
Grand Total
City Development Plan Hoshangabad
Area (Hectare)
13
As it can be seen the total planning area is of 14010.64 hectares, whereas the municipal jurisdictional
area is 2427 hectares, i.e. about 18 % of the planning area. There is also a presence of five
uninhabited villages in the planning area. These primarily consist of the agricultural fields possessed
by the agricultural workers who live in the city.
It can be seen that NH 69 and the railway line both run through the municipal jurisdictional area
moving downwards from the city. Also SH 15 and SH 22 cut out from the NH 69 and move into the
city giving it an enhanced connectivity.
2.4 Conclusion
This chapter dealt with the physical features of the town which included topography, natural drainage,
climate, rainfall and wind direction. It also provided information on its location and connectivity.
The next chapter discusses the demographic profile of the town.
14
15
3.1 Introduction
Demographic characteristics of a region provide an overview of its population size, composition,
territorial distribution and changes therein. This section on demographic indicators includes indicators
that measure the population size, sex ratio, density and dependency ratio. These indicators for the
region will help in identifying areas that need policy and programmed interventions, setting near and
far-term goals, and deciding priorities, besides understanding them in an integrated structure. Data in
this section has been taken mainly from the Census of India and Hoshangabad Municipality. The
demographic characteristics have been analysed in terms of decadal growth and spatial distribution of
density in the town.
Population
Decadal
Change
1961
1971
1981
1991
2001
19284
29434
46300
70914
97424
10150
16866
24614
26510
Hoshangabad
District
52.63%
57.30%
53.16%
37.38%
25.01
22.4
Hoshangabad
District
4.39
4.78
4.43
3.12
2.51
2.27
The high population growth could be a result of peoples migration from rural to urban areas which is
usually triggered by availability of employment opportunities in the service sector, high standard of
living and education and health infrastructure facilities.
Discussions with municipal officials reveal that the City has high floating population which is due to
the number of pilgrims visit the city for various rituals. The City being headquarters of the district and
has good connectivity with the surrounding villages also the reason behind the high floating
population.Exhibit 3-2 presents an overview of population densities in past three decades.
Exhibit 3-2 Population Density
Census Year
Population
Area (sq.km)
1971
29434
22
1337.909
1981
46300
22
2104.545
1991
70914
22
3223.364
2001
97424
22
4428.364
16
Total
97424
12957
14494
5399
70863
26561
882
889
881
853
83.9
28
55.6%
Male
54423
6859
40871
10885
-
Female
26561
6098
29992
15676
-
A critical look at Exhibit 3-3 reveals a higher percentage of women in the illiterate population. This can
be attributed to low importance attached to female education in earlier decades. A higher sex ratio in
the SC category suggests greater awareness in comparison to whole population. A starkly low sex
ratio in ST category needs immediate attention and should attract concerted actions to improve the
situation.
Population
Density
Shastri Ward
3.59
2679
746
Shanichara Ward
4.58
2170
474
Jagadirpura Ward
2.58
2192
850
Mangalwara Ward
4.79
2042
426
Naryanganj Ward
4.33
1755
405
3.45
2409
698
Azad Ward
2.47
2161
875
Subhash Ward
0.82
2094
2554
Balanganj Ward
2.62
1938
740
10
Ganesh Ward
2.24
1529
683
11
0.88
1723
1958
12
8.64
2600
301
13
40.65
3172
78
14
Tilok Ward
6.48
3050
471
15
42.56
3494
82
17
Ward No
Population
Density
16
21.76
3826
176
17
15.95
2527
158
18
30.12
6499
216
19
53.98
3796
70
20
Adamagad Ward
6.78
3324
490
21
Phephartal Ward
30
3956
132
22
1.5
3585
2390
23
2.2
3513
1597
24
Rasuliya Ward
23.64
2701
114
25
Rajendra Ward
38.45
4624
120
26
Rewaganj Ward
7.78
3142
404
27
Bhilpura Ward
3.97
2129
536
28
Krishanpuri Ward
0.95
2412
2539
29
Gokulpuri Ward
11.58
3377
292
30
Gwaltoli Ward
7.76
2662
343
31
Govindpura Ward
13.1
2667
204
32
Gandhi Ward
2.68
3839
1421
33
Tagour Ward
3.87
3837
982
406.75
97424
239
Total
Source: Census of India (or) Hoshangabad Master Plan
2001
nd
97357
Population projections
2011
2021
136,122
180,500
1,580,316
2,320,177
120,806
144,254
132,603
179,645
2,419,842
6,499,351
116,105
138,238
99,157
108,181
136,122
180,500
2031
231,606
3,257,204
167,703
238,485
17,456,331
160,213
115,811
231,606
18
Population projection analysis revealed that estimation using Incremental Increase method is nearest
to the actual population trend. Hence, for all purposes in this report, Incremental Increase method
has been considered for the estimation of future populations.
19
20
3.6 Issues
A high population growth rate has caused several problems in the recent times as existing
physical infrastructure and level of service has been restrained by several factors such as lack of
funds, lack of proper planning, political disturbances, etc.
Around 50% of population of Hoshangabad is living in slums with15 wards out of 33 wards have
been notified as slum wards.
One of the possible reasons for the ten percent reduction in population growth rate during 19912001 from 1981-91 and 1971-1981 can be the lack of economic prospects in Hoshangabad and
raising prospects in nearby towns like Itarsi.
Although population growth is found to be having a decreasing trend, by 2034, the population is
expected to be doubled which would further stress the infrastructure facilities in the town.
A higher proportion of female among the illiterates indicate lower attention paid to female
education.
3.8 Conclusion
This chapter discussed population growth trend and population density of the town. It was followed by
the analysis of other demographic indicators and ward-wise populations. The chapter ended with
population projections for next 25 years. The next chapter deals with the socio-economic profile of the
town.
21
4.1 Introduction
Socio-Economic profile of a region provides an overview of its social indicators and economy. The
section on Social Indicators includes Sex Ratio, Literacy Rate and Average Household size. This is
supported by the detailing of occupations of population. The economic profile of a town provides an
understanding of its economic base and trade & commerce activities. These indicators for the region
will help in identifying areas that need policy and programmed interventions, setting near and far-term
goals, and deciding priorities, besides understanding them in an integrated structure. Data in this
section has been taken mainly from the Census of India and Hoshangabad Municipality.
Male
Female
Total
Region
No. of Literates
40, 871
29,992
70,863
Hoshangabad
Sex
Ratio
882
80
66
73
Hoshangabad Dist.
896
Literacy Rate-District
Literate % - State Urban
67.92
58.04
48.26
41.95
58.64
67.76
M.P. state
920
As evident from the exhibit 4.1, Hoshangabad literacy rate is comparatively higher than that of urban
areas of state take together. But despite a higher literacy rate, sheer number of male and female
illiterates still needs our attention. Failure in addressing this issue can prove all the attempts towards
harnessing the whole potential of Hoshangabad futile. Turning our attention to sex ratio,
Hoshangabad overall sex ratio is in tune with that of Hoshangabad district. But if we take sex ratio of
M.P. state into consideration, Hoshangabad city fails to even come near the average.
Figure 4 provides a ward-wise mapping of literacy rate in Hoshangabad. It can be clearly seen from
Figure 4 that the slum wards have comparatively lower literacy rate with respect to the other wards.
Another observation is that that wards which one or more schools in their vicinity have higher literacy
rates.
22
23
Region
Hoshangabad Municipality
Hoshangabad dist-Urban
MP-Urban
The value of Average Household Size in Hoshangabad Municipality was 7.1 in the year 2001which
was substantially higher than that of urban areas of MP state (5.5) and Hoshangabad District (5.3) in
year 2001.
Hoshangabad
(% Population)
26.1
1.9
72
Hoshangabad Dist
Urban (% Population)
25.5
2.8
71.7
MP State Urban
(% Population)
27.1
3.6
69.3
3.0
2.2
2.2
92.6
3.4
2.3
3.6
90.7
6.2
5.4
6.6
81.8
The type of workers that come under Other Worker category include all government servants,
municipal employees, teachers, factory workers, plantation workers, those engaged in trade,
commerce, business, transport banking, mining, construction, political or social work, priests,
entertainment artists, etc. The work participation rate in an area is defined as the ratio of Main and
Marginal workers and total population of that area. The Work Participation Rate in Hoshangabad
stands at 28 which is close to that of urban areas of Hoshangabad dist. (28.3) but lower than that of
urban areas of MP state (30.7).
24
4.6 Tourism
Though primarily a city based on agriculture as its occupation, the city has great potential for tourism
as well. There are many tourist attractions falling in and around the city. These have been given
below:
Sethani ghat- This is an old ghat built on the bank of river Narmada. Many temples are
situated near to this.
Old age rock painting on Adamgarh hills consist of Rock paintings, it is a site of National
importance it is two kilometres away from the main city.
Salkanpur - Goddess Durga temple at a distance of approximate 35 km from Hoshangabad. It
can be reached via Budni or from the Bhopal-NasurullaGanj route
Hushang Shah Fort - This is an old fort built by Malwa ruler Hushang Shah located adjacent
to river Narmada.
The city also boasts a holy fair which takes place every year at Bandhrabhan which is a meeting point
of two main rivers Narmada and Tawa. This generates seasonal tourists to the city and boosts the
economic profile of the city.
Apart from tourist attractions in the city, there exist some important tourist destinations around the city
as well. Two major tourist attractions are Bhimbetaka and Panchmarhi
The Rock Shelters of Bhimbetaka (or Bhim Baithaka) lie 45 km from Hoshangabad, at the southern
edge of the Vindhyachal hills. South of these rock shelters are successive ranges of the Satpura hills.
The Bhimbetka shelters exhibit the earliest traces of human life in India; a number of analyses
suggest that at least some of these shelters were inhabited by man for in excess of 100,000 years.
Some of the Stone Age rock paintings found among the Bhimbetka rock shelters is approximately
25
9,000 years old. The word Bhimbetka is said to derive from Bhimbaithka, meaning sitting place of
Bhima (From the epic Mahabharata), a hero-deity renowned for his immense strength.
Pachmarhi, the only hill station of Madhya Pradesh, and a pilgrimage site for Siva bhaktas from the
surrounding country side, is now the base for enjoying the natural riches of the Satpura Tiger Reserve
as well. The tiger reserve encompasses the oldest forest reserve of India, the Bori Wildlife Sanctuary,
and the breathtaking scenery of the Pachmarhi Wildlife Sanctuary along with the Satpura National
Park. It was at Pachmarhi where Captain James Forsyth constructed the famous Bison Lodge and
founded the Forest Department of Madhya Pradesh. His travelogue titled 'The Central Indian
Highlands' on his march from Jabalpur to Pachmarhi in 1861-62, transports one into the long lost
times of tribal culture and rich wilderness
Issues
Although half of the city population lives in slums, the literacy rate of Hoshangabad is at par
with the state urban population and Hoshangabad District itself. This reflects people
willingness towards education and employment.
Hoshangabads overall sex ratio is a cause of concern. Sex ratio has been observed less
than MP State and Hoshangabad district would have been result of last decades low
population growth and immigration to nearby towns and cities for better education and
employment opportunities.
A high percentage of non-workers suggest that a significant proportion of population
remains unemployed for a substantial part of the year. This potential can be tapped by
creating job opportunities.
Although Hoshangabad could be a regional market place and hub for various services like
Health and Education none of them has been tapped adequately to increase the economy of
the city.
4.7 Conclusion
This chapter dealt with various aspects of socio-economic profile of the town such as sex ratio,
literacy rate, average household size, work participation rate, socio-economic base and trade &
commerce. The discussion was then followed by an analysis of critical issues in this area. The next
chapter talks about physical planning and growth management in the Hoshangabad city.
26
27
28
29
30
31
Land use
Category
Extended
Area
Total
Planning
Area
% to Total
Planning
Area
46.14
452.89
69.87
Residential
406.75
18.49
Commercial
24.41
1.11
24.41
3.77
Industrial
9.74
0.44
9.74
1.5
Institutional
87.45
3.98
87.45
13.49
Public Amenities
8.1
0.37
8.1
1.25
Recreational
Circulation
Vacant Land
Agricultural Land
10
Water Bodies
Total
6.55
0.3
6.55
1.01
59.08
2.69
59.08
9.11
268.56
12.21
1248.98
56.76
80.38
3.65
2200
100
648.22
100
46.14
As the town is a junction of major communication links to nearby other towns, the developments are
generally concentrated on both sides of the rail and road links. The public and semi-public places
mostly comprises of bus stand, railway station, Govt. offices, hospitals, education etc, which are
generally situated at the centre of development pocket.
Figure 8provides a snapshot of existing land-use pattern of Hoshangabad planning area.
32
33
Residential
Commercial
Industrial
Public & Semipublic
Public Utilities
Entertainment
Transportation
Total
Percentage
2001
452.89
24.41
9.74
87.45
8.1
6.55
59.8
648.22
Percentage
2006
69.87
3.77
1.5
13.49
1.25
1.01
9.11
100
1088.88
90.4
42.64
46.69
10.24
166.07
146.49
1591.41
68.32
5.68
2.68
3
0.65
10.45
9.22
100
In the 2006 master plan with the extended limits residential area has been projected for 68% and 9 %
for traffic and transportation which are in the lines of previous master plan. By considering tourism
impact on economic development of the city, 10% of the land has been allocated for entertainment
purposes and 6% for commercial purposes. Public and Semi-public spaces has been restrained to
about 4% of the area. Figure 9 provides a snapshot of proposed land use pattern of Hoshangabad city
as per 2001 and 2006 Master Plan.
34
Figure 9 Proposed Land use Pattern by 2001 & 2006 Master Plan
35
Income Group
Housing Demand
9179
6119
4080
1020
5.11 Conclusion
This chapter discussed physical growth of Hoshangabad city. The chapter presented maps and
analysis of spatial population growth, municipal boundary, ward delineation and tentative land use of
Hoshangabad.
The next chapter deals with the assessment of urban services. The assessment of existing situation is
followed by the demand-supply gap analysis, SWOT analysis and identification of critical issues in
each urban sector.
36
City Infrastructure
This chapter deals with the current status of various components of city infrastructure and services
provided by the Hoshangabad Municipality. Various sectors/services have been analyzed in
accordance with the methodology mentioned in Section 1.3.2. Sectors / Services identified for the
analysis have been classified into following six categories:
1. Physical Infrastructure
Water Supply
Sewerage & Sanitation
Solid Waste Management
Drainage
Traffic & Transportation
Street Lighting, Fire Fighting & Power
2. Social Infrastructure
Health
Education
Recreational
Social Security Schemes
3. Economic Development
4. Environment and Tourism
Urban Environment
Heritage and Tourism
5. Urban Poor and Accessibility to Basic Services
6. Urban Governance and Institutional Framework
Urban Governance
Institutional Framework for Development
Sector-wise analysis is presented in subsequent sub-sections. The Demand-Supply Gap Analysis for
various sectors has been done for short and long term, i.e. 5 years and 25 years. The projected
population for these timelines is provided in Exhibit 6-1 below.
Exhibit 6-1 Population Projection for Demand-Supply Gap Analysis
Year
Term
Population
2015
2025
2035
Short term
Medium term
Long term
141,182
180,672
228,614
The Demand Supply Gap analysis is followed by a listing of critical issues faced by that sector. It is
followed by SWOT analysis and sectoral strategies to achieve the sector goal.
City Development Plan Hoshangabad
37
Source
Number of Households
Tap
14,581
Hand Pump
71
Tube Well
1,249
Well
637
Others
96
Total
17,420
Storage
Water is pumped through headworks located at 2 Km away from the city and transmitted to the Over
Head Tanks (OHTs) located at various places in the town. Exhibit 6.3 gives details of the storage
infrastructure available within HNPP in terms of OHTs.. There are a total of 6 OHTs with a capacity of
23.5 lakh litres.
S.No
1
2
3
4
5
6
Total
38
Figures
6880
b. Non-Domestic / Commercial
c. Agriculture
Nos.
Nos.
931
569
TOTAL
Nos.
8380
S.No
3/4" Connection
Nos.
649
1/2" Connection
Nos.
7731
Total
Nos.
8380
Exhibit 6.6 provides a snapshot of service level indicators of Water Supply service provided by
Hoshangabad municipality.
Exhibit 6-6 Water Supply - Service Level Indicators
Water Supply Indicators
Value
Unit
a
c
d
e
g
h
83
23.5
23.5
0
15
1530
lpcd
%
%
%
%
Number
39
40
Daily Supply
Treatment
Elevated
Storage
capacity
Distribution
Network
Per-capita
supply
(lpcd)
Treatment capacity
against supply (%)
Elevated
Storage
capacity
W.r.t Supply (%)
Network w.r.t. Road
length
83
135
MLD
10
19.06
9.06
30.86
11.8
100
ML
0.00
19.06
19.06
30.86
11.8
24
33
ML
2.35
6.35
10.29
4.06
68
85
Km
90
127
37
177
50
It is evident from Exhibit6-7 that Hoshangabad needs a major revamping in Water Supply sector as
current level of service, 83 lpcd, fails to even come near the desired level of service. The huge gap in
the water supply area by the year 2015 well underscores the above point. By the end of year 2035,
Hoshangabad city would require 30.86 MLD of water i.e. an addition of around 20 MLD to the capacity
in year 2015. Hoshangabad city also falls behind in meeting the standards of UDPFI guidelines in the
area of storage capacity w.r.t. supply. An addition of 4 ML to the storage capacity is desired by the
year 2015. Hoshangabad city also requires a treatment plant to treat the raw water. In the area of
distribution network, existing service level stands at 68 percent of the road network against the
desired level of 85 percent of the same. The city would require additions of 37 km and 50 km of
distribution network before and after the year 2015 to meet the demand of year 2035
Issues & Gaps
Lack of adequate access
HNPP has 33 wards and had a population of 97357 during Census 2001, which is increased to
124137 in 2009. Given municipal norm of 135 LPCD, demand for water supply in HNPP has
increased from 7 MLD in 2001 to 10 MLD in 2009. As against this, the total water supplied within
HNPP is only about 5.6 MLD implying that HNPP is meeting about 50-60% of its 2009 requirements.
The population in HNPP could reach close to 2.3 lakh by 2035. Even at 120 LPCD norm of World
Health Organisation (WHO), this would imply that water demand would go up to 24.39 MLD by 2025..
To the extent this can be solved by reducing the transmission and distribution losses and utilizing
Narmada River Water efficiently.
No Treatment Infrastructure
Altough Narmada rive is known for its purity to avoid water born deseas treatment of the water is quite
necessary. It is evident from Exhibit 6.7 treatment infrastructure is totally lacking in the municipality.
By the UDPFI standards municipality should have atleast 20 MLD capacity treatment plant by 2015.
Lack of Storage Infrastructure
41
Present condition of storage infrastructure is very poor. The over head tanks are very age old and are
in dilapidated condition. Immediate measures are required to replace them with permanent structure.
In additon to the present capacity to satisfy the demand Hoshangabad City is required to add another
4 ML of storage capacity desired by the end of year 2015.
SWOT Analysis Water Supply
Strengths
1. City is blessed with Narmada a perennial
river passage.
2. People are well educated to adopt best
practices on water savings with
awareness improvement programs.
3. People respect Narmada River as source
of livelihood which can be a driving force
to keep Narmada clean.
Opportunities
1. Metered connections could be a major
source of revenue to the municipality
2. Improvement in the level of service by
augmenting daily supply of water and
storage capacity.
3. Installation of treatment plants to improve
the quality of drinking water
4. Looking at a PPP model to ensure better
efficiency
Weaknesses
1. Current level of water supply is lower
than level desired under the UDPFI
guidelines.
2. Poor maintenance of water supply
infrastructure
3. 20% of water yield is getting wasted on
supply and transmission
4. Lack of proper water treatment facilities
5. Lack of continuous(24X7) supply though
tremendous source is available
6. Unmetered water connections
Threats
1. Huge wastage of water in terms of supply
and transmission could be economic loss
to the municipality.
2. Dependence on Tube-wells for water
supply threatens the citys water security.
3. Unwillingness of users to pay water
charges
4. Dilapidated state of existing water supply
network.
5. Consumption of water from alternative
sources could be a threat to revenue loss
to the municipality.
th
42
Household Sanitation
According to census 2001, nearly three quarters of households had access to sanitation facilities.
This included-51 percent households with WC type latrines, 10 percent households with pit latrines
and 14 percent households with other type latrine. Nearly 25 percent households lacked access to
household sanitation facility.
Analysis of recent household sanitation survey covering 15,515 households (within Hoshangabad
Municipal Area) indicates that nearly 85 percent of the households access individual sanitation
facilities. This includes 74 percent households accessing WC type latrines, a little less than 11
percent households accessing pit type latrines and less than one percent households accessing
other latrines.
Exhibit 6-8 Household Sanitation Arrangements (2001 and 2008)
43
visit on festive occasions. Such occasions are reported to be almost once every month.
Hoshangabad is district and Tehsil headquarter and important agriculture trade centre in the region. It
is reported that even in ordinary days about 10,000 to 15,000 visitors arrive in Hoshangabad. Thus,
adequate public sanitary conveniences are vital for maintaining overall sanitation levels in the town.
There are 6 existing public sanitary conveniences. Additionally, 6 public sanitary conveniences are
proposed under sewerage scheme proposed under National River Action Plan (NRAP) ad presented
below in Exhibit 6.9.
Exhibit 6-9 Location of Existing and Proposed Public Sanitary Conveniences (PSC)
S.No
Location
Existing PSC
1 Sethani Ghat
2 Kori Ghat
3 Private Bus Stand
4 Machhali Bazar
5 Balaganj
6 Government Bus Stand
Proposed
1 Government Bus Stand
2 Gupta Ground
3 Chhoti Bajariya
4 Putlibai School
5 Raj Ghat
6 Meenaxi Chowk
Ownership
Tariff
25
20
15
15
15
15
Sulabh
Sulabh
HNPP
HNPP
HNPP
HNPP
15
15
15
15
15
15
NA
NA
NA
NA
NA
NA
Seats
PSCs at Sethani Ghat and Kori Ghat are newly constructed. Other existing blocks are being
reconstructed. Once reconstructed, HNPP proposes to hand these over to private agency for
operation and maintenance. Sulabh International is maintaining two toilets on pay and use basis
where as HNPP is maintaining other 4 toilets.
The deluxe toilet block at Sethani ghat was
constructed using MPLAD funds and the HNPP pays for water and electricity charges.
Waste Water Generation and Collection:
HNP reports daily water supply level of 80 litres per person. In 2001, the population of Hoshangabad
was 97,424. Considering annual growth rate of 4 percent (observed in 1991-2001), current
population is expected to be 124,657. Assuming a sewage return factor of 0.80(80 percent), the
current waste water generated can be estimated at 8 MLD [124,657 persons X 80 lpcd X 0.80 return
factor X 1/1,000,000].
Hoshangabad town does not have underground sewerage system. Sullage is mainly disposed
through roadside box drains of which some sections are covered. Overflow of septic tanks is also
discharged into the drains. In few cases, latrines directly discharge into the drainage. The drainage
system serves a dual purpose of carrying sullage as well as storm runoff.
Wastewater Disposal
Disposal from Septic tanks
The Hoshangabad Municipality has one vacuum emptying tank. The municipality charges Rs. 500 per
tank cleaning. It is reporting that on an average there are ten to fifteen calls every month. At this rate
the municipality cleans less than 200 septic tanks a year. This is less than 2 percent of the existing
septic tanks. Information on manual cleaning of septic tanks, by the households themselves, is
44
currently not available. The wastage collected from the tanks is disposal into Khojanpur nallah,
without any treatment.
Existing Schemes:
Trunk Sewerage and Sewage Treatment Scheme (NRCP)
Hoshangabad is one of the towns taken up under Government of Indias ambitious National River
Conservation Plan (NRCP). Under the programme, a wastewater collection and treatment scheme is
proposed for Hoshangabad town. A detailed project report for the scheme has been prepared by
Environmental Planning & Coordinated Organization, GoMP. The scheme was submitted to National
River Conservation Directorate in 2006 and has been approved. The scheme broadly comprises of
trunk sewerage network, sewage pumping station and 2 sewage treatment plants (4 MLD and 11
MLD). Proposed wastewater treatment system consists of facultative pond followed by maturation
pond. The scheme is estimated to cost about Rs 103 million;
For slum communities, low cost sanitation has been proposed under the scheme. A provision of Rs.
1.34 million has been made for the same. Only 2 toilet blocks are proposed under the scheme.
For the purpose of wastewater collection, the town has been divided in 6 sewerage zones based on
drainage catchment. Wastewater from zone 1 and 2 is diverted to Bheelpura STP site, whereas,
wastewater from remaining zones is diverted to Phephartaal STP site. The sewerage network does
not cover wards Phephartaal, SPM (East), SPM (West) and part of Rasooliya ward.
Recently HNPP has noticed notice inviting tenders for implementation of trunk sewerage network,
constructing of sewage pumping stations and 2 sewage treatment plants. HNPP on the other hand
has initiated process of land acquisition near Phephartaal.
Branch and Lateral Sewerage Network (Under UIDSSMT)
Under the NRCP scheme, trunk sewerage laying is proposed. The complete this, a separate scheme
for laying branch and lateral sewerage network is proposed under UIDSSMT.
The implementation of both the schemes can be expected to severely disrupt town wide
communication, especially since most streets in the dense core of the town are narrow.
45
100
HH
100
ML
15.3
15.3
24.7
9.4
75
60
Seat
195
250
55
35
Seat
112
112
As shown in Exhibit 6-10, Hoshangabad city would require a sewerage system to cater around
141182 and 228614citizens (as per UDPFI guidelines) by the year 2015 and 2035 respectively. A
comprehensive sewerage system needs an integrated treatment plant which can be developed in a
phased manner. The city would require sewerage treatment capacities of 15.3 MLD and 24.7 MLD by
the year 2015 and 2035 respectively. The sanitation facilities have been classified into Public Sanitary
Conveniences and Community Sanitary Conveniences. While Public Sanitary Conveniences will
largely cater to the floating population, Community Sanitary Conveniences will primarily serve the
households which are not equipped with a toilet. To provide safe and sufficient number of sanitation
facilities, city would need 250 PSCs respectively and112 CSCs to serve the households not equipped
with toilets.
Issues & Gaps
Absence of UGD system
All the wards are to be covered with UGD system. Though HNPP has some coverage through septic
tanks, the disposal of sewage through either open drainage or septic tanks is leading to the pollution
of ground water and surface water. An integrated UG system covering the entire town is critical, given
the expected growth of the town.
Treatment
Sewage water flowing through open drains without any treatment is the major cause of concern
regarding Narmada River Pollution. Its evident from Exhibit 6-10 that Hoshangabad needs atleast
about 25 MLD of sewage treatment plant to avoid polluting river Narmada.
Uncovered Population
While the absence of UGD itself exposes the entire town population to the hazards of unsanitary
conditions, nearly 20% of the towns population remains uncovered by safe sanitary disposal systems.
Need for greater coverage and better maintenance of Public conveniences
46
Absence of UGD itself exposes the entire town to the hazards of unsanitary conditions, nearly 35% of
the towns population in slums is covered through public conveniences. Being religious centre
and having high rate of floating population demanding immediate attention toward the facilities.
There is need to strengthen the network of public convenience throughout the town.
Poor coverage, overflows and blockages of Storm water drains
With the growth in population of the town, the poor coverage of road networks by storm water drains
without adequate linkages to main channels requires immediate attention. The drains also face the
overflow and blockage problems due to the plastic waste thrown in the drains.
SWOT Analysis
Lack of a sewerage system in the city forbids us from doing a SWOT analysis for this service. A
SWOT analysis for Sanitation is as follows:
Strengths
Opportunities
1. Increased
awareness
among
the
stakeholders for the improvement of
sanitation facilities.
Threats
47
Existing Status
Hoshangabad Municipality is responsible for all kinds of collection i.e. primary, secondary and tertiary
which include street sweeping, collection, transportation and disposal of all solid wastes generated in
the town. Hoshangabad Municipality has a dedicated staff of around 60 sanitary workers headed by a
Sanitary Supervisor. This team is supposed to be headed by a Sanitary Inspector but a vacancy at
this post transfers these responsibilities to Sanitary Supervisor. Exhibit 6.11 gives a snapshot of
service level indicators of SWMS of Hoshangabad city.
Exhibit 6-11 Hoshangabad Municipality - Service Level Indicators
1
2
3
4
5
6
7
8
9
10
11
12
Value
413.8
70.0
57.6
1049.6
8
16
3.6
870.1
0.1
Dumping
Unit
Grams
%
%
%
%
Meters
Tonnes
%
Nos.
Meters
Sq.Km
According to the health department of HNPP, 50 metric tons (MT) domestic solid waste is generated
daily. This includes 44 MT garbage from households, 4 MT garbage from vegetable markets and 2
MT garbage from other areas. There is no system of doors to door collections. Households are
responsible for disposing the waste at designated solid waste collection points. HNPP reports that
there are 74 designated collection points; 54 of which are masonry bins and 20 are open collection
points. The municipality clears these with the help of 2 Lorries and 4 tractors trailers. The garbage is
then dumped at designated site. HNPP practices uncontrolled dumping. There are two solid waste
dumping grounds. The old dumping site was located fairly near the river. According to HNPP,
dumping at the old site has been discontinued. The new dumping site is located at south eastern
edge of the town. This site is away from the river. However there is a need for organized and
controlled dumping.
Preliminary Collection
A recent household survey presents a bleak picture at primary collection and transfer end of the SWM
chain. Analysis of responses from 15, 515 households in the 33 wards indicates that a bulk (91
percent) of the households dispose garbage in the open (90 percent) or in drains (1 percent). Only a
small proportion of households (about 9 percent) practice proper disposal disposing in solid waste
bins (a little over 8 percent) or door-to-door pick up (less than a percent).
Ward wise data analysis indicates that the use of solid waste bin for garbage disposal is well
practiced only in four municipal wards (Janakpuri, Sadar Bazar, SPM East and SPM West), where
more than two thirds of the households reported to use municipal solid waste bin. Among these, all
households in SPM East ward use municipal solid waste bin. In contrast, nearly 22 percent
households in Rasooliya ward dispose garbage in drains. Similar practice is adopted by about 8
percent households in Ramganj ward.
48
Description
Collection Details
50
35
45
5
0
0.0
152
165
5
Daily
Daily
Daily
NA
7.47 Acres
Owned/
Rented
Trucks
Mini Trucks
Tractors
Owned
Owned
Owned
Nos Capacity
.
(tons)
1
1
3
3
2
1
Trips
per day
Distance
(km)/ day
Persons
per vehicle
Operation
(hrs/day)
3
3
3
10
5
5
2
3
5
5
10
10
49
50
Cur.
level
Des.
level
Per-capita waste
414
generation, gpcd
Collection
57.6
performance (%)
Trips per Vehicle
3.6
per day
Push Carts
Primary
4
Tricycles
collection
Community Bins
Secondary
5
Container bins
collection
Landfill site
Landfill
6 Disposal
infrastructure
Composting
414
50
58
95
47
40
159
119
257
98
18
12
51
33
152
299
147
416
117
No.
92
92
92
Acres
7.47
14.47
7.00
81.61
67.14
100
3.6
90
10
7.47
No.
67
MT/ day
39
39
64
25
33
MT/ day
19
19
31
12
Daily Generation
MT
Cu.M
50
100
58.42
117
74.76
150
94.60
189
Annual Generation
MT
Cu.M
18,250
36,500
21,324
42,648
27,288
54,577
34,530
69,059
Cumulative Total
Cu.M
36,500
2,76,801
7,67,565
13,90,177
Area Required
Sq.mt
Acres
9124
2.25
69,200
17.10
1,91,891 47.42
3,47,544 85.88
51
52
SWOT Analysis
Strengths
1. Sufficient waste collection capacity
2. Potential for income generation through
processing solid waste
Opportunities
1. Existing infrastructure can be utilized in
an effective manner.
2. With the availability of sufficient capacity,
a pilot study for the overall improvement
of SWMS can be undertaken.
3. Private participation could be explored for
revenue generation and best usage of
waste.
Weaknesses
1. High per capita waste generation
2. Lack of primary collection
Threats
1. Failure of maintenance of extra capacity
can result in loss of capacity
6.1.4 Drainage
Existing Status
The topography of Hoshangabad town and its surroundings is such that the natural drainage system
generally slopes towards north-west. There are four major natural drains Kori Ghat nallah, Lendia
nallah, Sukh Tawa nallah and Khojanpur nallah (Sukh Tawa Nallah discharges into Khojanpur nallah)
that carry the wastewater for ultimate disposal into River Naramada. The point where Kori Ghat nallah
discharges into Narmada River is located fairly upstream. Lendia Nalla and Khjanpur Nallahs on the
other hand join the river downstream of town. Of these two nallahs, Khojanpur nallah travels nearly 3
Km (through agricultural fields) after leaving the habited areas of the town and before meeting River
Narmada.
Figure 12shows the drainage pattern within the city. The city has a natural drainage pattern because
of its physiographic features. It also shows the disposal points of major drains.
Flood Prone Areas
Areas located along the Nallahs and other drains are among the flood prone areas. Apart from these,
areas of Adamgarh, Baldoli, Khojanpur, Phephertal, and Meenakshi Chowk also face problems of
flooding during heavy rains.
53
54
Exhibit 6-16 summarizes the current status and Demand-Supply Gap analysis for Drainage network
provided by Hoshangabad Municipality. Exhibit 6-16also provides a snapshot of comparative analysis
of existing level of service with level of service desired under the Urban Development Plans
Formulation & Implementation (UDPFI) guidelines.
Exhibit 6-16: Drainage: Demand - Supply Gap Analysis
Indicator
Service
head
60
130
70
Km
56
30
33
Km
67
Km
Km
80
24
64.08
40.08
80
89.31
65.31
40.08
15.92
30.66
Km
24.00
91.21
Km
24.00
45.76
Km
90.18
55
SWOT Analysis
Strengths
1. Presence of a strong network of natural
drains
2. Presence of a major water body to drain
out the flood water from the city
Weaknesses
1. Encroachments of natural drains
2. Mix of sewage and solid waste in the
drains
3. Low capacity of natural drains.
4. Lack of maintenance leading to clogging
of natural drains
Opportunities
1. Development of an integrated drainage
network to support the increasing
population of the city
2. Strengthening of natural drains to avoid
floods
Threats
1. Encroachments
and
improper
maintenance of drains resulting floods
every year
2. Mix of sewage and solid waste could
result in polluting Narmada River
Measures
Efforts should be concentrated towards the development of a new properly planned drainage
system
As an immediate measure, all the natural drains should be periodically cleaned to prevent flooding
of the city during monsoon and other occasional rains. Clean and properly maintained open
drains would also contribute towards the beautification of Hoshangabad City.
56
The road density of the town is worked out to be 6.1 km per sq. km. Exhibit 6-17provides the details of
road network.
Exhibit 6-17 Details of Road Network
Area under Roads
Maintained by Local Body (Km)
a
Concrete
b
BT
c
WBM
d
Stone Slab
e
Gravel & Earthen
f
Others
Total
Roads Maintained by other Departments (Km)
a
PWD Roads
b
NH
c
State Highway
Total
Source: Hoshangabad Nagar Palika Parishad
Length
As on 31/3/09
34.4
24.26
14.05
% of Urban area
107.25
26%
18%
11%
0%
26%
0%
81%
9
16
25
0%
7%
12%
19%
34.54
Travel Characteristics
While the preferred mode of travel (motorized) in Hoshangabad is Two-Wheeler, the predominant
number of short trips undertaken in the city is understood to be pedestrian in nature. Further, the
estimated numbers stage carriers and contract carriers and limited numbers of seven-seaters that
form the semi-public transport system of the city, which ply the roads on a given day not even account
In the absence of organized public transport system, apart from stage carriers, auto rickshaws are the
other mode of travel. There are about 2000 auto rickshaws are serving in the city. Alternatively, the
numbers of two-wheelers plying on city roads is understood to constitute about 50 percent of the total
vehicles and four-wheelers about 10 percent.
Traffic Management and Circulation
The road network can be catagorised into arterial roads, sub-arterial and internal roads. The major
travel corridors of Hoshangbad are
Roads in north to south direction are
Harda (Mumbai) road to itarsi
Narmada Mandir Marg, Cinema Marg and etc., are the major toads in the City
Roads in the west to east direction are
Road from Hoshangabad to Bhopal
Nehru Road, Shastri marg and the M.G road in the City
Figure 13 shows the road network pattern of Hoshangabad.
57
58
Parking Requirements
It is very essential to have sufficient parking places in the city as the rate of floating population is high.
Organized on-street parking facilities lack in almost all locations in the city, primarily due to crunch of
space faced by municipality to provide such facilities. This again spells out the lacking integration
between land use and transportation planning. Lack of sufficient parking lots and organized on-street
parking facilities has resulted in haphazard and unorganized parking on most stretches of commercial
roads in the city.
Present un-organized parking places in the city found to be at Bus stand, Railway Station, Near State
Bank, Sabji Mandi, Sotani Ghat, Collectors office, Taluka office, Market, Nehru Park and Satrastha.
Public Transport/Mass Transit and Intermediate Public Transport
At present, Hoshangabad does not have any Public Transport or Mass Transit facility.
In addition to the private vehicles, the majority of people movement in city is supported by
Intermediate Public Transport vehicles such as Share-Autos and Private Autos. A small portion of
passenger movement is also supported by Non-motorized vehicles (Cycle-Rickshaws).
Other Facilities
Inter-City Bus Transport:
There are two bus-terminuses which are located at the
central part of the city one for the private buses and
another for Madhya Pradesh State Road Corporation
Limited. Both the bus stations are not sufficient enough
to tackle the growing traffic demand. There is hardly
any proper shelter is available for the passengers to
travel and need immediate attention to make city much
approachable to near-by villages to increase trade and
commerce in the City.
Railway Terminus:
As earlier mentioned Hoshangabad is one of the prime stations of Indian Central Railway. Railway
station is established in the heart of the city. Trains running towards Bhopal, Delhi, Nagpur, Khandwa,
Bhusaval, Mumbai and Jabalpur have stoppage at the station. Annually about 9 lakh passengers are
boarding from this station.
Taxi Stand:
There is a taxi stand located adjoining to the private bus station. Taxis are available throughout the
day to tourist who would like to visit near-by tourist places
like Pachmari. Taxis are also one of the major modes of
transport to Capital city Bhopal and near-by town Itarsi.
Though, taxi stand has sufficient number of vehicles, this is
not authorized by the local body and also one of the major
reason for traffic jams at the main road.
Figure 14shows the existing road network in Hoshangabad.
It depicts major roads and the arterial roads of the city.
Figure also shows railway station, the bus stops and major
congestion areas.
59
Figure 14 Transportation Road network, Bus stand and Railway station and Congestion points
60
Exhibit 6-18 summarizes the current status and Demand-Supply Gap analysis for Traffic and
Transportation provided by Hoshangabad Municipality. Exhibit 6-18 also provides a snapshot of
comparative analysis of existing level of service with level of service desired under the Urban
Development Plans Formulation & Implementation (UDPFI) guidelines.
Exhibit 6-18 Traffic & Transportation: Demand - Supply Gap Analysis
Service Levels, Demand and Gaps
By Year 2015
By Year 2035
Existing
Current Desired Unit
(2009) Demand Gap Demand Gap
level
level
Km
107.25 149.37 42.12 208.18 58.81
Roads
BT (%)
Surface type WBM (%)
Earthen (%)
2 Up-gradation
32
30
Km
34.40
44.81
10.41
23
70
Km
24.26
104.56
13
Km
14.05
0.00
0.00
32
Km
34.54
0.00
0.00
62.45
17.64
BT to CC
Km
3.47
5.88
WBM to BT
Km
14.05
0.00
Earthen to BT
Km
34.54
0.00
CC
Km
6.94
11.76
BT
Km
35.18
47.05
3 New formation
Improvements Widening & Strengthening, utility
Km
4 to
identified shifting, beautification
major roads
Nos
ROBs/ Flyovers
5.36
10.93
Data used for the Gap Analysis have been collected from Hoshangabad municipality and the Census
of India, 2001.
Issues & Gaps
1) Problems of traffic congestion and inadequate parking facilities - Increase in the number
of vehicles and inadequate road networks are the major causes for traffic congestion.
Inadequate traffic management measures and inadequate parking facilities are major
problems of the town. The ongoing and planned transportation infrastructure improvements
need to be implemented on priority.
2) 26% of the internal roads are unpaved are vey invonvenient to vehicular passage and
are major reason for traffic congestions and require immediate attention to convert into CC
and BT roads.
3) With the demand estimation it is evident that another 11 Kms of CC road and 81 BT
roads has to be added to the present road network for free flow of traffic.
4) Encroachments along the roads - Presence of informal activities along the road margins
illegal encroachments of pedestrian areas and footpaths are the other causes for traffic
congestion in the town. There is considerable commercial activity on the main centre roads.
61
Many shops along these roads have encroached the road / footpath which creates congestion
in the centre of the town.
5) The eastern and western parts of the city are connected through a railway bridge, which also
functions as the sole channel of movement between the parts, apart from serving as a railway
station.
6) There is a concern towards safety about non-motorized traffic and pedestrians on the main
roads especially roads are linked to major schools and hospitals.
7) Both bus terminus found to be very poor in infrastructure facilities to tackle the passengers
SWOT Analysis
Strengths
Opportunities
for
Weaknesses
Threats
2. Accidents
62
Type
Nos
Tube lights
5895
93%
340
85
Type
Nos
0.11%
5%
1.00%
All Wards
6327
100
60.0m
30.0 m
Current Desired
level
level
30
Km
6327
4979
6939
75
24.75
0.25
No.
No.
No.
No.
No.
No.
5895
425
7
3734
1232
12
0
807
5
5204
1717
17
Km
22
0
807
5
0
485
5
1470
485
5
150
210
63
No.
No. of Doctors
No. of Beds
Hospitals
Maternity Centres
Homeopathic
Others- Ayurvedic Hosp (Govt)
67
2
1
1
50
4
2
1
708
20
-
64
Figure 15 Social infrastructure including Health, Education and other Social Amenities
65
Health
Infrastructure
Particular
General Hospital
Nursing Home
Dispensary
Existing
(2010)
No. of Beds
No. of Beds
No. of facilities
180
20
5
By Year 2015
Demand
Gap
280
30
9
100
10
4
By Year 2035
Demand Gap
430
50
15
150
20
6
Issues
1. Existing level of service in the health infrastructure demands a major revamping as these fall
among factors which would guide future development of the region.
2. A continuous flow of funds needs to be ensured for development of new infrastructure and upgradation of existing infrastructure.
3. Government Hospital which receives maximum number of patients from Hoshangabad and
nearby areas suffers from lack of infrastructure and poor maintenance of buildings and other
assets.
4. Utilization of existing facilities at Government Hospital is severely constrained due to long power
cuts. Hospital also lacks provisions of alternate power.
SWOT Analysis
Strengths
1. Decent existing base of primary health and (in
terms of numbers)
2. Substantial awareness for the improvement
Health Infrastructure
3. Vicinity to major cities for the specialized
treatments
Weaknesses
1. Lower Bed capacity of town than required
2. Quality of physical infrastructure of this sector
demands major revamping
3. Absence of alternate power supply in the
existing health facilities
Opportunities
1. Meeting of Gaps can develop Hoshangabad as
an health care hub for the region
2. Development of new health facilities supported
by an up-gradation/improvement of existing
health facilities will help in an overall
development of the region.
Threats
1. Lack of funds can derail the much needed upgradation and addition of capacity to the
existing fleet.
2. Lack of maintenance can degrade the existing
infrastructure.
3. Frequent power cuts hinder a continuous
supply of services.
66
6.2.2 Education
Presently, there are only 4 primary schools maintained by Hoshangabad Municipality. Rest all the
schools are either private or run by Department of Education (School and Higher Education),
Government of Madhya Pradesh. Exhibit 6-23 provides the details of schools and educational
institutions within Hoshangabad Municipality.
Exhibit 6-23 Educational institutions in Hoshangabad Municipality
Education Centers
1
2
3
4
5
ULB
maintained
Professional college
Graduation Level
High Schools
Middle Schools
Primary & Nursery schools
Govt.
2
4
11
28
14
Private
Total
1
1
15
6
6
1
3
19
17
48
Education
Infrastructure
Particular
Primary
Secondary
Integrated (I-XII)
School without
Hostel Facilities
College
Students per
Institution
Existing
(2010)
By Year 2015
Demand Gap
By Year 2035
Demand Gap
500
1000
1000
No.
No.
No.
48
15
-
56
19
-
8
4
1
91
30
2
35
11
1
1000
No.
Gap Analysis, as shown in Exhibit 6-24 suggests that Hoshangabad city faces significant crunch of
primary schools and would need a major capacity addition in long term. The situation in the areas of
Sr. Secondary schools and Colleges is somewhat better and would need only a bit of capacity
addition in longer term. Apart from these, Hoshangabad city also needs an Integrated (I-XII) schools.
Issues
1.
Existing level of service in the education infrastructure demands a major revamping as these fall
under those factors which would guide future development of the region.
2.
A continuous flow of funds needs to be ensured for development of new infrastructure and upgradation of existing infrastructure.
3.
Most of the schools of Hoshangabad city lack necessary infrastructure and hence, initiatives
should be taken in equipping existing educational institutions with necessary infrastructure.
67
4.
Lack of regulations on private schools leads to exploitation of students and their families.
5.
Citys educational institutions are running at over-capacity and an immediate attention needs to
be paid to the proper planning and development of new schools.
SWOT Analysis
Strengths
1. Commendable existing base of primary
health and education facilities (in terms of
numbers).
2. Substantial awareness for the improvement
of these facilities.
Weaknesses
1. Lack of boundaries to the schools
2. Lack of integrated schools
3. Lack of Intermediate hospitals and PolyClinics
4. Quality of physical infrastructure of this
sector demands major revamping
Opportunities
1. Meeting of Gaps can develop Hoshangabad
as an educational and health care hub for
the region
2. Development of new health facilities
supported by an up-gradation/improvement
of existing health facilities will help in an
overall development of the region.
Threats
1. Lack of funds can derail the much needed
up-gradation and addition of capacity to the
existing fleet.
2. Lack of maintenance can degrade the
existing infrastructure.
3. Frequent power cuts hinder a continuous
supply of services.
4. Lack of boundaries to the schools could
result of encroachments
5. Poor connectivity to the schools could result
of accidents.
68
SWOT Analysis
Initiatives
facilities
Strengths
towards developing
socio-cultural
Weaknesses
Quality of physical infrastructure of this sector
demands major revamping
Opportunities
Development of new facilities supported by an
up-gradation/improvement of existing facilities will
help in an overall development of the region.
Threats
Lack of funds can derail the much needed upgradation and addition of capacity to the existing
fleet.
Lack of maintenance can degrade the existing
infrastructure.
2.
3.
4.
5.
69
1.
2.
3.
4.
Weaknesses
Under-developed markets
Lack of a sound industrial base
No internal tourism potential
Underdeveloped infrastructure for Pilgrims
Opportunities
1. Development of markets with state-of-art
infrastructure can boost the economy
2. Potential for harnessing religious tourism
3. Improvements in logistical infrastructure
4. Development of a Small and Medium Scale
Industrial park
Threats
1. Development of alternate markets in the region
2. Failure to act can lead to the stagnation of the
economy
3. Failure to develop transportation infrastructure
4. Failure to provide sound infrastructure to the
citizens can lead to the migration
70
developed Storm Water Drainage system, Undeveloped Waste water disposal system, Dust and
particulate matters from vehicular traffic and industries, etc.
Municipalitys inability to collect 100% generated waste leads to scattering of waste which ultimately
find its way to drains, open lands and other sources of water. This leads to the pollution of land by
improper disposal of harmful waste, ground water pollution by leachate and surface water pollution by
mixing of waste with water. In addition to these, solid waste clogging the drains leads to stagnation of
water which ultimately leads to the unhygienic milieu.
Under-developed drainage network and undeveloped waste water conveyance system leads to the
stagnation of storm water and waste water in various parts of the city leading to unhygienic conditions
which poses severe threat to the health of the citizens.
Heavy vehicular traffic on roads is a constant source of dust and other particulate matters which
pollutes citys urban space and causes various kinds of respiratory problems to the citizens.
The major cause of water pollution in Hoshangabad is the discharge of untreated waste water in the
River Narmada. In the absence of specific studies/ monitoring of waste water, no specific conclusions
could be arrived at.
Pollution Levels
It was revealed from the consultations with the officials of Regional office of Pollution Control Board
(PCB) that the major air pollutant in Hoshangabad city is Suspended Particulate Matter (SPM).
3
Sometimes it also exceeds the prescribed limit of 200 micrograms/m for the residential areas. The
concentration of SO2 was found to be in the limits prescribed for the residential areas.
City Green Spaces
The city has few dedicated Green Spaces. Tree Plantation could be found along the roads, Railway
lines, River and in some of the open spaces. The Green Spaces constitute around 4% of the
Municipal area.
Existing Environmental Regulation
Various aspects of regulating the environment are covered under various Legislations. Most important
of these are provided below:
Policies
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
Legal
a. The Indian Forest Act, 1927
b. The Motor Vehicles Act, 1939, amended in 1988
71
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.
o.
p.
q.
r.
Issues
1. Disposal of untreated waste water in the River Narmada
2. Leakages in Solid Waste Collection System leading to water and land pollution.
3. Clogging of drains and poor waste water handling system leading to threatening
environmental situation
4. Impact of vehicular traffic on air quality of the city
5. Lack of adequate green cover in the city.
SWOT Analysis
Strengths
1. Awareness among the citizens towards the
need of better environment.
2. Presence of River Narmada in the city limits
Weaknesses
1. Shortage of land to develop for green areas
and other environment improvement works.
2. Inability to keep checks on untreated waste
water
Opportunities
1. Development of infrastructure related to the
handling of solid waste, waste water and storm
water can improve the citys environment
2. Conservation of Ground water
Threats
1. Failure to integrate the issue of urban
environment with infrastructure development
projects.
2. River pollution can cause an irreparable
damage to the environment.
Existing Status
Hoshangabad has great tourism potential as it boasts substantial tourism in and around the city.
Sethani Ghat, Old age rock paintings at Adamgarh Hills, Salkanpur Goddess temple and Hushang
Fort are among the most prominent one.
The annual Holy Fair at Bandhrabhan, which is meeting point of two main rivers, Narmada and Tawa,
is of significant importance which attracts huge number of tourists and adds to the economy of the
city.
72
Issues
5. Failure to effectively tap the ancillary tourism potential of Adamgarh Cave and Sethani Ghat
SWOT
Strengths
1. Presence of a diverse heritage & tourism base
i.e. Rock Paintings, Temples, Fort, etc.
2. Boasts River Narmada and various Ghats
which attract huge number of religious tourists.
3. Good connectivity with other parts of the
region.
Weaknesses
1. Lack of proper maintenance of heritage and
tourism sites.
2. Neglect faced by this area leading to
underdeveloped infrastructure
Opportunities
1. Ancillary tourism to Sethani Ghat and
Adamgarh Caves
2. Better Lodging facilities supported by the
development of recreational infrastructure
3. River Front Development
4. Development as a Tourism Hub
Threats
1. Insufficient measures to conserve heritage
may lead to the eventual degradation.
2. This area may lose focus as the immediate
needs of citizens are related to the basic
infrastructure facilities.
Based upon the total BPL card distributed, a total of nearly 2613 persons in Hoshangabad have been
identified as those living below Poverty Line (as per the HNP).
It can be analyzed that a considerable population in the Hoshangabad Town is below poverty line. It is
now widely understood that poverty is experienced through a variety of dimensions of which low
income is only one. Further that within the poor there are important differences in depths of poverty,
the ability of poor households to graduate from poverty and the relative vulnerability of different
73
Exhibit 6-25 shows the details of Ward-wise slum population. Typical Slums of Hoshangabad are
shown in pictures below.
Ward Name
Population
Slum Pocket
Slum Household
Ramganj Ward
2409
Lendiaya Bazar
236
Azad Ward
2163
262
15
3494
Pasi Mohalla
16
3830
Chakkar Road
806
20
Adamgad Ward
3326
Sardar Mohallah
160
21
Phephartal ward
3957
Talab Area
326
24
Rasuliya
2702
Bangali Colony
216
25
Rajendra Ward
4631
Kanchan Nagar
715
26
Rewaganj Ward
3144
Kori Mohallah
295
27
Bhilpura ward
2129
Bhilat Baba
215
29
Gokulpuri Ward
3378
Sanjay Nagar
870
30
Gwaltoli Ward
2603
390
31
Govindpura Ward
2667
Harijan Colony
398
32
Gandhi Ward
3807
Cabin Chouraha
489
33
Tagore ward
3871
527
Total
48111
6847
74
Slum Households
Housing Shortage
2005
6857
4800
2009
7848
5494
2011
8063
5644
Name of Ward
Ramganj ward
Azad ward
262
15
942
16
806
20
Adamgad ward
160
21
Phephartal ward
326
75
Ward No.
Name of Ward
24
Rasuliya ward
216
25
Rajendra ward
715
26
Rewaganj ward
295
27
Bhilpura ward
215
29
Gokulpuri ward
870
30
Gwaltoli ward
390
31
Govindpura ward
398
32
Gandhi ward
489
33
Tagore ward
527
In recent years, the Government has made efforts to reduce poverty, mainly through self-employment
initiatives, public works, food subsidies and nutrition programs, and increased spending for basic
education and primary health care. Programs addressing income poverty have been developed that
seek to create individual assets for the urban poor by financing fixed or working capital, providing
training, and generating wage employment. However, these programs often suffer from poor targeting
and leakage of resources, and in many cases have proved inefficient and Ineffective in addressing the
needs of the poor.
76
77
Rs.800 to Rs.3000.
Health
Health related obligatory functions of the Nagar Palika are restricted and health related activities are
insufficient. As the town has adequate medical facilities, it is also sufficient to cater to the selected
slum areas. The town has 4 nursing homes, 6 private hospitals and 2 govt hospitals which are
78
sufficient to cater to the slum areas too. Therefore no convergence of health facilities has been
proposed.
Education/ School
In most of the slums in the city, children have access to primary schools and middle school. Literacy
levels, especially female literacy in all, are extremely low. Most slum households send their children to
government schools. The education is not proposed as there are 26 primary; schools, 17 middle
schools, 2 high schools and 15 higher Secondary schools in the town which are adequate for the town
and which eventually cater to the slum pocket also.
WATER SUPPLY
Town level
The major source of water supply in the town is through Bore wells. Total storage capacity in the town
is 4.116 MLD and the total water supplied in the town is 4.116 MLD and the total water supplied in the
town is 4.114 MLD. Water supplied at the rate of 70 lpcd.
Slum level
It was found that the majority of the slums residents acquire their water either from an enhanced
source, such as a well or bore well, or from the municipal piped supply system.
SEWERAGE AND SANITATION
The main type of sanitation in the selected slum areas is the pit latrine. A few houses have water
closets with septic tanks, which has been a factor in ground water contamination. Many plots are of
small sizes on black cotton soils, this makes it difficult to construct pit latrines and residents in these
areas resort to alternative waste disposal methods including use of open spaces.
In the existing scenario, underground and protected sewerage is not adequate in the town as well as
in the slums. Sewage, sullage and storm water flows in open kuchha drains, which cause serious
health and safety risks.
ROADS
All the roads in the selected slums are narrow tracks eroded by runoff water, with homes constructed
close to the road or road reserves. These roads lack drainage which compounds the erosion problem.
Runoff water from the Ring Road has also increased erosion of the area's narrow roads. Only few
slums have reasonably good access roads on the periphery, largely asphalt. In the internal areas of
the slums there are largely stone paved and kuccha roads.
STREET LIGHTING
Street lighting is available in one of the slum areas. From the social security point of view and looking
at the overall development there is a need of Street lights in the different sub pockets.
SOLID WASTE MANAGEMENT
The overall solid waste management scenario in the town is satisfactory with 70% waste collection
coverage. The total quantity of solid waste generated in the town per day is 12-14 tons.
SOCIAL INFRASTRUCTURE
Social facilities such as schools (27 primary schools, 67 Aanganwadis), markets are quite adequate in
the town which eventually caters the slum pockets also. Town has 5 community parks. However it has
been observed that there is an urgent need of multipurpose halls in the identified slum pockets which
can be used for different purposes from time to time as required.
79
80
81
Education from pre- primary to higher secondary school. ( in Non Trible areas only)
Arrangement of Non formal Education.
Grant -in-Aid to Private schools.
Arrangement for the training of teachers.
To improve quality in teaching and teacher training
Innovation in education and researches.
To arrange facilities of physical education and sports.
Prescription of syllabus in school classes.
Arrangement of printing and distribution of text books.
To conduct Examinations
Removal of illiteracy in age group 15-35
82
10.
11.
12.
13.
14.
15.
16.
83
The main function of the regional offices is to monitor the implementation of provisions of various Acts
governing pollution control and prevention and the Rules framed under such Acts.
MPPCB is also responsible for implementation of the Municipal Solid Waste (Management and
Handling) Rules, 2000 of CPCB, which spell out responsibilities of the state pollution control boards
and the urban local bodies. MPPCB is the monitoring authority with respect to ground water, ambient
air, and compost quality in urban areas. The Board is also required to monitor processing and
disposal facilities for municipal waste, with the approval of the State Urban Development Department,
Town and Country Planning Department, and Ground Water Board. According to the Rules, the ULB
is responsible for implementation of the provisions and infrastructure development for collection,
storage, segregation, transport and processing of solid waste in the town.
The major areas of concern of MPPCB with regards to ULB functions are:
Management of solid and liquid waste disposal;
Waste water management;
Improvement of roads and plantation of trees;
Traffic management to control vehicular pollution; and
Proper planning of the city.
84
The responsibility of efficient urban governance lies with various government departments collectively.
While the responsibility of providing Water, Sanitation, Road, Solid Waste and Drainage falls solely on
Municipality, other functions are carried out in coordination with other departments. The Street lighting
is jointly undertaken with MPSEB. The provision of social infrastructure including Health and
Education primarily falls under Dept. of Public Health & Family Welfare and Education respectively.
City planning activities are jointly carried out by TCPD and Municipality.
Though roles of different organizations in the provisioning of urban services are clearly defined,
plans formulated by different organizations suffer because of lack of coordination among various
organizations.
2.
In case of street lighting, responsibility of installation of electricity poles and their electrification
lies with MPSEB. Any failure in the coordination between Municipality and MPSEB results in poor
urban governance.
3.
A substantial stretch of city land lies with Railways and any coordination issue between Railways
and Municipality results in achieving the efficient service delivery of urban services. Indian
railways should be involved in the city planning at the initial stage itself to result in the
implementable plans.
4.
MPPCB should be regularly contacted to keep a check on urban environment and curb pollution.
5.
Municipality should maintain a healthy interaction for effective and comprehensive city planning.
6.
The Departments of Health and Education should be provided with necessary assistance in the
implementation of their plans and day-to-day activities.
7.
MP Housing Board should consult Municipality at the planning stage to avoid any issues later at
the time of transfer of housing stocks to Municipality. Municipality should consult MP Housing
Board during the preparation of DPRs for various urban services.
8.
Meetings at regular intervals should be organized between various governing organizations for
effective urban governance.
6.7 Conclusion
This chapter dealt with the current status of various components of city infrastructure and services
provided by the Hoshangabad Municipality. Sectors/Services which were analyzed in the areas of
existing status, demand-supply gap, critical issues and SWOT are physical Infrastructure (Water
Supply, Sewerage & Sanitation, Solid Waste Management, Drainage, Traffic & Transportation and
Street Lighting, Fire Fighting & Power), Social Infrastructure (Health, Education, Other Social
Infrastructure recreational), Economic Development, Environment and Tourism (Urban
Environment, Heritage and Tourism), Urban Poor and Accessibility to Basic Services, Urban
Governance and Institutional Framework. The next chapter deals with the analysis of municipal
finance.
85
The financial analyses of the selected cities have been carried out to understand their current status.
The finances of the selected cities have been reviewed for the last four years, commencing from the
financial year 2005-06 to 2009-10. For the year 2008-09, revised estimates and for year 2009-10
budget estimates have been considered as; the actual figures were available only for the first nine
months of the financial year at the time of this study. The financial analyses of the individual cities are
discussed below.
2005-06
2006-07
2007-08
2008-09
2009-10
CAGR(%)
Revenue Account
Income
319.5
590.5
626.4
684.3
1,043.40
34.4
Expenditure
424.6
513.2
557.9
614.8
814
17.7
-105.1
77.3
68.5
69.5
229.4
Receipts
236.9
216.7
284.6
632.1
1,607.50
61.4
Payments
118.1
294.6
444.4
672
1,796.20
97.5
Surplus/ Deficit
118.8
-78
-159.8
-39.9
-188.7
69.1
69.1
-30.4
-30.4
-14.8
Surplus/ Deficit
Capital Account
86
2005-06
2006-07
2007-08
2008-09
2009-10
141.9
Tax Revenue
237.2
Share
CAGR
295.6
264.8
638.2
46
46
37
51.3
53
38.8
149.5
10
42
104.9
185.9
242.6
226
488.7
37
47
Assigned Rev
150.2
319.5
287.8
387.1
354.7
48
24
27.4
33.8
43
32.4
50.5
17
319.5
590.5
626.4
684.3
1,043.40
100
34
Revenue Grants
Total
Source: Annual Accounts, HNPP
Own Sources
Own source income includes income from Tax revenue and non-tax revenue. Own source of income
has been grown with a CAGR of 46% over the last five years. Own source of revenue has expected
to increase to Rs.638 Lakhs in FY 2010 from Rs. 141 Lakhs in FY2005,
Tax Revenue
Tax revenue accounts only for about 10% of the total revenue income. Among the tax revenues,
income from Property tax is the major income accounting for 61% of the tax revenue, followed by the
integrated tax at 16%. Other tax includes income from Export Tax, Advertisement Tax, Education
Cess and Other Taxes.
Exhibit 7-3 Tax Revenue (in Rs. Lakhs)
S. No.
Head of Account
1
Property Tax
Integrated Tax
Education Cess
Export Tax
2005-06
25.3
2006-07
29.8
2007-08
40.1
2008-09
26
2009-10
132
10.7
18.3
7.4
9.5
0.2
4.1
4.5
0.3
Advertisement Tax
0.2
0.8
2.7
0.3
0.3
37
51.3
53
38.8
149.5
87
Non-Tax Revenue
Non tax revenue accounts major percentage of own sources and accounts for about 37% of the total
revenue income. Among the Non-tax revenues, income from Rentals of municipal properties and
water charges are the major source of income accounts about 65% and 21% respectively. There is a
significant contribution from others with 10% contribution to the Non-tax revenue.
Exhibit 7-4 Non tax revenue (in Rs. Lakhs)
S. No.
Head of Account
2005-06
2006-07
2007-08
2008-09
2009-10
67.8
138.5
154.2
157.2
358.5
Water Charges
22.1
21.5
23.9
31.1
52.0
2.0
2.2
3.4
3.1
14.3
Development charges
0.0
0.0
0.0
0.0
0.0
Building permission
1.6
7.4
8.2
6.0
20.0
Others
11.5
16.3
52.9
28.6
43.9
104.9
185.9
242.6
226.0
488.7
Head of Account
2005-06 2006-07 2007-08
Assigned revenue and Compensations
Octroi compensation
87.9
259.6
179.9
Stamp duty
12.9
0.0
35.1
Passenger tax compensation
48.6
59.0
72.4
Income under special acts
0.7
0.8
0.5
Sub total (Assign Revenue)
150.2
319.5
287.8
2008-09
2009-10
282.8
29.0
75.0
0.3
387.1
311.1
35.0
8.3
0.3
354.7
Grants /Contributions
Income from Grants and contributions accounts for only about 6% of the total revenue income. HNPP
is majorly getting the revenue grants from GoMP in form of Road maintenance, mid day meal and
other state grants.
Exhibit 7-6 Revenue from Grants/Contributions
S. No.
Head of Account
State Government
1
Road maintenance
2
Mid day meal
3
Other state grants
Subtotal (Grants & contribution)
2005-06
27.4
0.0
0.0
27.4
2006-07
23.1
10.7
0.0
33.8
2007-08
36.8
6.2
0.0
43.0
2008-09
2009-10
32.0
0.4
0.0
32.4
50.0
0.5
0.0
50.5
88
Extraordinary Income
Incomes from deposits from contractors, loan recoveries from employees and advances are merged
as a extraordinary income to HNPP, this income is ranging from Rs. 28.5Lakhs in FY2005 to Rs.
31Lakhs in FY 2008 and expected to be 32 Lakhs for FY 2009.As this income is not fixed or
continuous in nature of income, so it will be kept aside while analysing the financial position of HNPP.
2005-06
2006-07
2007-08
2008-09
2009-10
256.06
284.83
292.26
362.95
524.87
Share
CAGR
58.34
19.65
Administrative Expenses
24.22
26.24
28.29
42.92
36.40
5.47
10.73
119.93
172.38
196.78
168.78
198.70
29.79
13.45
Programme Expenses
7.40
7.82
3.71
5.11
5.00
1.08
Repayment of Loans
0.00
0.00
0.00
0.00
0.00
0.00
16.96
21.94
36.87
35.06
49.07
5.32
30.43
424.57
513.20
557.91
614.83
814.04
100.00
17.67
(9.32)
-
89
Program expenses include mid-day meal, donations and etc., where mid-day meal accounts the
prominence in each year of the study. Program expenses accounts for only 2% of Revenue
expenditure and has been increasing with CAGR of 3.5%
Capital Income
2005-06
2006-07
2007-08
Sale of asset
Loans
2008-09
2009-10
Share
98.91
0.53
1.2
Special Projects
ii
Basic services
iii
UIDSSMT
iv
IHSDP
15.0
5.0
32.2
21.2
vi
vii
0.0
29.1
58.251
60
7.53
viii
Other Grants
75.2
24.0
88.3446
94.12
38
18.22
231.9
213.2
282.1656
628.4
1603
98.91
108.3
133.9
75.501
146
200
33.92
800
9.95
20.85
250
3.77
299.42
205
13.75
68
50
11.24
54.069
-
Public Contribution
4.0
2.6
0.5
0.5
0.62
0.9
0.9
1.9515
3.7
0.47
236.9
216.7
284.6
632.1
1607.5
100
104.5
263.1
427.4
639.3
1771.2
93.5
1.3
18.0
4.4
17.5
17.0
2.3
Reserve Fund
Total Capital Expenditure
12.3
13.6
12.5
15.1
8.0
4.1
118.1
294.6
444.4
672.0
1796.2
100.0
90
Hoshangabad
0.9
1.12
10%
37%
67%
6%
55.6%
58.3%
29.8%
Observations:
1. HNPP has Surplus Revenue: The operating ratio of the HNPP is 0.95 which is less than 1,
indicating that HNPPs revenue expenditure levels are lesser than the revenue income
generated whereby the revenue account in surplus.
2. CUR: Capital Utilisation Ratio of HNPP is 1.12 which is more than 1 indicates that HNPP are
utilising their revenue surplus in the capital expenditure hence having a high utilization ratio.
HNPP found to be very lease dependent on the Revenue Grants and other revenue sources
as grants accounts for only 6% of their revenue income. Tax revenue accounts only 10% of
the revenue income whereas Non tax revenue accounts 37%, which indicates need for
identification of new tax revenue streams.
3. Property Tax contribution low: Property tax as a revenue source accounts for about only 5
in HNPP indicates the need of property tax rationalisation with improved collection efficiency.
91
3. Move to GIS-based database to track, update and retrieve property tax information
4. Encourage greater accountability among bill collection staff by introducing targets and
incentivize the same by recognition of top performers.
Following steps/strategies shall be adopted to improve collection efficiency.
1. Draw a systematic plan for sending demand notices and ensure dispatch of demand
notices on time.
2. Conducts ward wise analysis of collection efficiency to focus more on troublesome
wards/ areas.
3. Involve council members and resident welfare associations / NGOs as pressure
groups to act against willful defaulters.
4. Simplify payment of property tax dues by providing multiple options; a) payment
through banks b) additional facilitation / e-governance counters, c) mobile vans and
door-to-door collection drives, d) online payment option and e) payment through
credit cards etc.
5. Make it compulsory for clearing property tax dues for provision of water and
sewerage connections.
6. Initiate a One-time drive and settlement scheme for arrears.
7. Prepare a list of top100 defaulters and disseminate the information online and
through other media to put pressure on such defaulters.
Evaluate PPP options for development of projects like sports complex, clubs, parking lots etc.
Introduction of sewer charges and rationalization of water charges in order to meet the O&M.
Actively encourage corporate / NGO partnerships for city beautification and asset
management in areas covering bus stops, street lighting, medians, parks and road junctions
7.6 Conclusion
This chapter presented analysis of Municipal Budgets for year 2005-06 to 2009-10. The financial
analysis included review of financial statements for last four years, from 2005-06 to 2009-10. The
analysis was carried out in four areas, Revenue Income, Revenue Expenditure, Capital Income and
Capital Expenditure. The analysis was then used to calculate various indicators to assess the
financial health of the Municipality.
The next chapter deals with the City Vision, Sector Goals to achieve the City Vision and Sector
Strategies to meet the Sector Goals. Sectoral strategies also discuss about long term and short term
needs.
92
The vision for Hoshangabad was formulated by stakeholders and IMaCS through a consensus
approach and continued consultations with the community. The consultations revolved around the
citys strengths, current issues, concerns, problems and the areas that need to be focused on to
achieve the desired results.
A workshop was held on February 16 , 2010, to explain the purpose of the CDP, the ownership of the
plan, and the need for establishing or strengthening partnerships to leverage Municipalitys role in
facilitating economic growth and improving quality of life. The officials of other government
departments such as Town & Country Planning, Health, Education, etc who have a stake in the
development of the city were also involved in this workshop. This workshop focused on highlighting
the current status of all the services provided by various Hoshangabad Municipality departments and
the key issues confronting each department.
Municipality officials and other stakeholders together carried out the visioning exercise at this
workshop.
The workshop included a questionnaire survey which aimed at eliciting stakeholders perception of
city, citys infrastructure, major issues and where they want their city to be in the future. This was
followed by the ward-wise detailing of ward-specific problems and potentials that can be harnessed
for the development of ward and city.
93
consultations with stakeholders and review of development plans of other cities, following Mission
Statements are being adopted to achieve the vision.
1. To provide citizens with world-class basic infrastructure facilities
All basic infrastructure facilities, viz. Water Supply, Sewerage & Sanitation, Storm Water
Drainage, Solid Waste Management, Roads & Transportation and Street Lighting & Fire
Fighting, and social infrastructure facilities, viz. Health and Education, should be developed /
upgraded to support the economic and social development of the city.
2. To actualize the citys existing economic potential and generate new opportunities for
the prosperity in all sections of the community.
An economic development plan should be devised for the harnessing of citys economic
potential. It should concentrate on the diversification of economic base of the city so as to
reduce dependence on any particular factor.
3. To uplift the urban poor and bring them at par with other sections of the community
A comprehensive upliftment plan, comprising of provisioning of basic infrastructure and equal
access to social infrastructure, for urban poor should be prepared to address the existing
disparity among the various sections of the community.
4. Institutional Strengthening and Capacity Building
Preparation of an institutional action plan defines roles and responsibilities of various
stakeholder agencies. It would also target at the capacity of various stakeholder agencies in
terms of adequacy of staff and competitiveness for an efficient delivery. The issue of
Motivation to work should be an integral part of this plan.
5. Preparation of Resource Mobilization Plan
Preparation of a financial and operating plan that addresses the resource requirement for
implementation and maintenance of the City Development Plan and Master Plan
proposals.
6. Development of New areas through Town Planning Schemes.
Development of new areas through implementation of Town Planning Schemes. Detailed
development plan has to be prepared for the selected new areas with the guidance of master
plan /land use plan for the city.
These Mission Statements would serve the purposes of aligning/initiating development works with the
formulated vision, guidance during the policy formulations to achieve the goal and framework for the
coordination among the various stakeholder agencies.
94
WATER
SUPPLY
COMPONENTS
2015
2025
2035
Network coverage to
households
100% of the
properties
assessed under
property tax
100% of the
properties
assessed
under
property tax
100% of the
properties
assessed
under
property tax
135
135
135
no
good
15%
no
no
good
15%
80%
yes
If O&M is
contracted to
a private
developer
yes
good
15%
80%
yes
If O&M is
contracted to
a private
developer
no
These areas have been identified on the basis of workshops, consultations and review of best
practices in the sector.
Core Strategy
The planning for source augmentation of water supply has been done considering the demand arising
in year 2035 and make necessary provisions for the same by 2015. The systems and infrastructure
would therefore have to be designed such that the long term needs are addressed and planned for by
2015. The broad strategy therefore would be to identify the projects addressing the future demand in
the short term for which necessary investments will also have to be planned for. In addition to the
improvements to be made to the infrastructural requirements, the stakeholders have also
recommended increasing the Municipal manpower dealing exclusively with the water supply.
Long term and Short term sector interventions required:
The table below presents the broad strategies being proposed to address the gaps identified in the
existing levels:
95
Exhibit 8-1 Water Supply: Long Term and Short Term Interventions
Water supply source requires to be augmented to 30.86MLD
The water storage capacity would also have to be increased keeping in
perspective the long-term requirements.
Sector
Interventions
Required
Expected
Outcome
For meeting the demand arising in 2035, the following sub projects are being recommended and
would have to be executed by the ULB by 2015.
Exhibit 8-2: Projects identified by ULB and Consultant for Water sector
ULBs Suggestion
Project Rationale
Water Supply in the town not adequate to meet the
existing and future demand
Current treatments
chlorination
to
were
restricted
only
96
Authorities/Agencies responsible
Hoshangabad
Nagar
Palika
in
consultation with Councillors and other
stakeholders
Hoshangabad Nagar Palika
97
SEWERAGE
&
SANITATION
Components
Sewer network
coverage to
households
Sewage Treatment
and disposal
arrangements
Sewage Recycling and
reuse
Safe sanitation
facilities (with focus on
Urban poor)
2015
2025
2035
70%
70%
70%
Expand the
capacity by 4.26
MLD
Treated water
could be used for
agricultural
process, not for
drinking use.
Expand the
capacity by 5.18
MLD
Treated water
could be used for
agricultural
process, not for
drinking use.
70% of
households
70% of
households
70% of
households
These areas have been identified on the basis of workshops, consultations and review of best
practices in the sector.
At present, the Hoshangabad Nagar Palika does not have a sewerage system network in the town.
On the basis of both the demandgap assessment of the sewerage network and the consultation
process with the ULB officials and the stakeholders, the need for developing a sewerage network in
the town is evident. Though DPRs have been prepared by Hoshangabad Municipality for 100%
sewerage coverage of town and sewage treatment under NRCP and UIDSSMT, but analyses done by
WSP-SA, consultants working on City Sanitation Plan for Hoshangabad, shows that a 100%
networked sewerage system in the city is not feasible. Hence, to achieve the desired 100% sewerage
coverage, the city should adopt a mixture of technical options (as articulated in the Draft CSP for
Hoshangabad), including:
6. Fully On-site Sanitation: Septic Tanks or Twin Soak Pits
7. Fully Off-site Sanitation: Settled (Small bore) sewerage
8. Part on-site (Septic Tanks or Twin Soak Pits) / Part off-site (Conventional Sewerage)
9. Simplified sewerage with decentralized wastewater treatment
10. Mixed system
Among these options, option 4 i.e. Simplified sewerage with decentralized wastewater treatment
involves maximum capital investment. Hence, for the purpose of City Investment Plan, option 4 has
been taken in the consideration to avoid any budget issues at a later stage. It also has lowest
operation and maintenance cost as compared to other options.
Core Strategy
The lack of a sewerage network in town necessitates the development of a sewerage network which
would efficiently manage the existing and future demand. Similar to planning and designing for water
supply network, the planning for development of sewerage network would have to consider the
demand arising in 2035 and make necessary provisions for the same by 2015. The systems and
City Development Plan Hoshangabad
98
infrastructure would therefore have to be designed such that the long term needs are addressed and
planned for by 2015. The broad strategy therefore should be to identify the projects addressing the
future demand in the areas of sewerage and sanitation which the Nagar Palika would have to take up
in the short run for which necessary investments will also have to be planned for.
Long term and Short term sector interventions required:
The table below presents the broad strategies being proposed to address the gaps identified in the
existing levels:
Exhibit 8-4: Sewerage and Sanitation: Long Term and Short Term Interventions
Laying of underground drainage system of 62km for 2015 and 100 Km by
2035.
Sector
Interventions
Required
Expected
Outcome
For meeting the demand arising in 2035, the following sub projects are being recommended and
would have to be executed by the ULB by 2015.
Exhibit 8-5: Projects identified by ULB and Consultant for Sewerage Sector
ULBs Suggestion
Project Rationale
Sub- Projects
99
Authorities/Agencies responsible
Hoshangabad
Nagar
Palika
in
consultation with Councillors and other
stakeholders
Hoshangabad Nagar Palika
Hoshangabad Nagar Palika
ROADS &
TRAFFIC
MANAGEMENT
Components
2015
New road
formations
42 Km
ROBs/flyovers
Development
of bus and
truck terminus
none
development of bus
stand and transport
nagar
Junctions and
traffic signal
improvements
Regulating traffic
through better
management
Parking
facilities
Parking lots to be
provided at strategic
locations
2025
2035
Further Addition
of 26.35 Km of
roads
none
Further addition
of 35.2 Km of
roads
none
Up gradation to
accommodate
capacity
none
Regulating
traffic through
better
management
Regulating traffic
through better
management
Up gradation of
Parking Lots
100
These areas have been identified on the basis of workshops, consultations and review of best
practices in the sector.
Core Strategy
In the case of the road sector, the broad strategy which the Nagar Palika should follow is one wherein
the existing gaps in this sector and the future requirements would be addressed in terms of two
categories of priority or short term needs and long term needs. Since, Hoshangabad faces a severe
land crunch; we have based our demand assessment for road network on the existing and expected
land usage under transportation. It has been revealed from the Master Plan that transportation
constitute around 2.69% of Hoshangabad area. We have estimated the expected road network in
years 2015, 2025 and 2035 on the basis of area that will be brought under the transportation in
respective years. We have assumed, in line with UDPFI guideline, that area under the transportation
will gradually be increased to 6.66, 8 and 10 % of municipal area in the years 2015, 2025 and 2035
respectively. The suggestions which were put forth in the stakeholder consultation should be clubbed
under the category of short term requirements and the long term requirements should be addressed
by the Nagar Palika in the second phase.
Long term and Short term sector interventions required:
The broad sector interventions to address both the short and long term requirements have been
enlisted below:
Exhibit 8-7: Roads and Street Lights: Long Term and Short Term Interventions
Construction of new roads in areas which are at present earthen. Up-gradation
of roads to CC or BT. 35 km of earthen roads to B.T roads
New roads to cater to missing links and developing areas: total road length
reaching 150 km in 2015 and 208 km by 2035
Sector
Interventions
Required
Expected
Outcome
Following are the projects proposed during the stakeholder consultation and also based on the rapid
urban assessment carried out by the Consultant.
Exhibit 8-8: Projects identified by ULB and Consultant for Roads
Projects
Proposed
ULBs Suggestion
Project Rationale
Consultant
Up gradation of roads to
CC in a few identified wards
Development
spaces
of
Parking
by
Construction of 42 km of
additional roads by 2015, 23.6
Km by 2025 and further 35.2
km by 2035
Up-gradation of roads 34 km
of Earthen roads to BT road
by 2015
Development of Multi-storeyed
Parking at 3 locations.
101
DRAINAGE
Components
Drainage network
2015
Total of 194Km
2025
Total of 224Km
2035
Total of 270Km
Pucca Drains
Further 10 Km
pukka open and
20 Km pukka
closed
Further 15 Km
pukka open
and 30Km
pukka closed
Rehabilitation of
existing primary
nallahs and water
bodies
Desilting of drains to
increase their capacity
100%
100%
none
none
These areas have been identified on the basis of workshops, consultations and review of best
practices in the sector.
102
Core Strategy
In case of storm water drainage, the broad strategy followed would be similar to that proposed in the
case of road sector, wherein the existing gaps in this sector and the future requirements would be
addressed in terms of two categories of priority or short term needs and long term needs. The existing
gaps and the demand arising for the year 2015 may be taken up as priority projects. The suggestions
which had been put forth in the stakeholder consultation would have been clubbed under the category
of short term requirements and the long term requirements (2035) should be addressed by the Nagar
Palika in the second phase.
Long term and Short term sector interventions required:
The broad sector interventions to address both the short and long term requirements have been
enlisted below:
Exhibit 8-10: Storm Water Drainage: Long Term and Short Term Interventions
Cleaning/ desilting of the existing natural drains, this will also include the
removal of encroachments.
Sector
Interventions
Required
Expected
Outcome
Following are the projects proposed during the stakeholder consultation and also based on the rapid
urban assessment carried out by the Consultant.
Exhibit 8-11: Projects identified by ULB and Consultant for Storm Water Drainage
Projects Proposed by
ULBs Suggestion
Consultant
Scheme for laying of storm water drainage network for the town
Project Rationale
According to normative standards, the length of the drains are
assumed at 130% of road length considering all divided roads to have
drains on either side and undivided roads on at least one side.
Likewise the total drain length in the town shall be of about 270 km by
2035. Further the drains in the initial phase shall be open and
subsequently be made closed; hence the investment is towards upgradation annually and for construction of new closed drains. All
existing open drains shall be first upgraded to closed drains and
subsequently new drains shall be constructed.
Prominently, all the road and storm water projects are to be taken up
simultaneously to match the levels of the roads with the drains and
allow draining of rain water from the city.
Storm
Water
Drainage
network for the town of
Hoshangabad
Sub- Projects
Cleaning/desilting
of
natural drains flowing in
the city.
Up gradation of Pucca
open to Pucca closed
by 2015
Construction of new
Pucca closed drains
and Pucca open drains
by 2015
103
Authorities/Agencies responsible
Components
Door-to-door collection system
Source segregation
Improve waste collection
efficiency
Mechanized waste handling
Scientific waste disposal
Solid Waste
Management
2015
door to door
collection
yes
2025
door to door
collection
yes
2035
door to door
collection
yes
100%
100%
100%
yes
yes
yes
yes
7.5 acres site is
available and
further 7.5 acres
is needed
yes
yes
yes
yes
Could be
looked in for
as a viable
option for door
to door
collection to
segregation to
disposal
Could be
looked in for
as a viable
option for
door to door
collection to
segregation
to disposal
Could be looked
in for as a viable
option for door
to door
collection to
segregation to
disposal
104
These areas have been identified on the basis of workshops, consultations and review of best
practices in the sector.
Core Strategy
In order to facilitate improved solid waste management, the Nagar Palika would have to focus on two
aspects- adoption of better practices to ensure proper collection, segregation and disposal of waste
and the second being augmenting the existing infrastructure. The current status of the infrastructure
needs to be improved by increasing the equipments required for effectively handling the waste, and
most importantly developing an adequate sized landfill site. Apart from the focus on augmenting the
resources, the Nagar Palika would be required to train its conservancy staff to carry out the tasks
effectively. Immediate priority needs to be placed on improving the skills of the conservancy staff and
also to increase.
Long term and Short term sector interventions required:
The broad sector interventions to address both the short and long term requirements are listed below:
Exhibit 8-13: Solid Waste Management: Long Term and Short Term Interventions
Promoting door-to-door collection
Sector
Interventions
Required
Expected
Outcome
Following are the projects proposed during the stakeholder consultation and also based on the rapid
urban assessment carried out by the Consultant.
Exhibit 8-14: Projects identified by ULB and Consultant for Solid Waste Management
ULBs Suggestion
Projects Proposed by Consultant
Effective collection of waste
Proper disposal of collected waste
Project Rationale
As per the demand assessment, in 2035,
Hoshangabad city would generate 95 MT of
waste daily. To effectively handle the generated
waste, a pre-emptive action of developing a
proper Solid Waste Management system is
inevitable.
Solid
Waste
Management
Hoshangabad city
system
for
Sub- Projects
Promoting door-to-door collection
Augmenting Collection Infrastructure
Development and augmentation of landfill site
105
consultation
with
106
Components
New Installation
STREET
LIGHTNING
Fire
Fighting
2025
Installation of 591
tube lights, 195
high power lamps
and 2 High mast
lamps
2035
Installation of 879
tube light, 290
high power lamp
and 3 high mast
lamps in addition
to previous
installments.
Would be
included under
O&M
Yes, Additional 35
Km
Installation of
street lights in the
ratio of 75% :
25% of tube light:
halogens
Underground cabling
yes
Energy savings
Installation of
street lights in the
ratio of 75% :
25% of tube light:
halogens
Would be
included under
O&M
Yes, additional 24
Km
Installation of
street lights in the
ratio of 75% :
25% of tube light:
halogens
Yes
Yes
Yes
Yes
Yes
Yes
To be ensured in
close coordination
with state govt
To be ensured in
close coordination
with state govt
To be ensured in
close coordination
with state govt
To be ensured in
close coordination
with state govt
Yes (Options like
energy from
waste, biogas,
solar, etc)
To be ensured in
close coordination
with state govt
To be ensured in
close coordination
with state govt
Yes (Options like
energy from
waste, biogas,
solar, etc)
Up gradation
Power
2015
Installation of
tube light or a
high power lamp
on every 30 m of
road length currently sufficient
installations
Would be
included under
O&M
100 % coverage
Development of
Alternative Power
Sources
Yes (Solar)
These areas have been identified on the basis of workshops, consultations and review of best
practices in the sector.
Core Strategy
Street Lighting:
To achieve the goal of 100 % coverage of road network by street light, a massive augmentation will
have to be undertaken in this sector. A survey of existing roads and street lights should be carried out
to obtain information pertaining to number of street lights, type of street lights, energy consumption
and roads uncovered with street lights. The findings of this survey should then be integrated with the
plan related to the road network. All new roads should be provided with the street lightings with proper
arrangement for the underground cables.
107
Fire Fighting:
To ensure 100% safety against fire, capacity addition in terms of equipment and workforce should be
carried out. The safety of staff should also be of paramount interest and hence, necessary safety
equipment and accessories should be procured. A rapid information system and a fire-station should
be developed to minimize the reaching time to the affected site.
Power:
The primary responsibility of generation and distribution of power lies with MP State Electricity Board.
But, urban local bodies can explore the options of alternate power in order to compensate for the
electricity deficits. Hoshangabad municipality should evaluate the options of generating power from
alternate sources such as Solar, Municipal Waste, Biogas, Agricultural waste, etc. In addition to this,
Hoshangabad municipality should also work in coordination to MP state electricity board to ensure
100 % coverage of city properties.
Long term and Short term sector interventions required:
The table below presents the broad strategies being proposed to address the gaps identified in the
existing levels
Exhibit 8-16 Street Lighting, Fire Fighting and Power: Long Term and Short Term Interventions
Sector
Interventions
Required
Increase in the number of high power and high mast lamps, and installations of
more streetlights w.r.t to roads
Increasing the number of street lights by 788 & 1173 by year 2015 &2035 resp.
Underground cabling: 24 kms by year 2025 and additional 35 kms by year 2035
Feasibility studies for alternate power sources
Expected
Outcome
City wide coverage of road network with energy efficient street lights.
100 % coverage and safety against the fires.
For meeting the demand arising in 2035, the following sub projects are being recommended and
would have to be executed by the ULB by 2015.
Details of Sub-projects to be undertaken:
1. Addition of Streetlights: The Nagar Palika needs to add 788 street lights to match the demand of
2015. By the year 2035, city would require to add around 1173 street lights to provide 100%
coverage of the city road network.
2. Underground Cabling: To cover all street lights with underground cables, city would require to lay
around 24 kms of cable by year 2025 and additional 35 kms by year 2035.
3. Fire Fighting: To ensure a safety against the fire, municipality should procure 1 foam crash
tender, 1 small fire engine, 1 motor fire engine, 1 rescue tender and 1 portable pump in the short
term and 2 foam crash tender, 2 small fire engine, 1 motor fire engine, 2 rescue tender and 2
portable pump in the long term. In addition to the procurement of above items, municipality should
also undertake the construction of fully equipped fire stations.
4. Power: Municipality should carry out feasibility studies to explore the potential of alternate power
sources in Hoshangabad. If found feasible, relevant projects should be undertaken to achieve
self-sufficiency.
108
This section discussed the technical details of the projects proposed as the realization of sector
strategies. The financial details of these projects including amount of investment and its phasing have
been discussed in chapter 9 (City Investment Plan).
Exhibit 8-17 Street Lighting, Fire Fighting and Power: Initiatives to be taken by HNP
Street Lighting and Fire Fighting
Immediate measures to be taken
Authorities/Agencies responsible
Finalising the sub projects to be undertaken
Preparation of DPR for finalised projects
Submission of DPR to funding agency
Immediate measures to be taken
Finalising the sub projects to be undertaken
Preparation of DPR for finalised projects
Submission of DPR to funding agency
Health
Components
Doctors per 1000 population
Beds per 1000 population
Effective implementation of
health programmes and
related services in the slum
areas of the city
Regular checks for water
contamination in all water
bodies of the city
2015
1.5
1
To be carried in
coordination of
Dept. of Health,
GoMP
Yes (Provision to
be made for
necessary
infrastructure)
2025
2
2
To be carried in
coordination of
Dept. of Health,
GoMP
2035
1
3
2
2.6
To be carried in
coordination of
Dept. of Health,
GoMP
Yes
Yes
Core Strategy
For the provision of medical infrastructure, Hoshangabad Municipalitys role is limited to primary level
services. To promote medical facilities, Nagar Palika must provide a conductive environment for other
government agencies and private developers in the form of support infrastructure, incentives, etc.
Future steps towards improvement in health care facilities should be based on certain principles.
There needs to be an emphasis on participatory planning in medical care, quality health care and
client satisfaction and preventive health care measures. Municipality should target the eradication of
preventable diseases by 2015. This may be helped by the supply of good quality drinking water and
sanitation facilities and strict control and supervision of hotels and roadside food vendors. A resolution
As per Health Data from Organization for Economic Co-operation and Development (OECD)
http://www.financialexpress.com/news/indias-patient-hospital-bed-ratio-not-in-pink-of-health/518361/
109
of the mosquito menace will eradicate the slew of health issues. Total vaccination of the population as
per WHO schedules should also be completed by 2015.
To ensure quality medical care to the under-privileged, Nagar Palika should make plans for involving
private doctors by providing them with free space in existing Corporation dispensaries. To achieve
the goals by finalized strategies, we have estimated the number of hospitals and other medical
institutions that would be required in the city. These estimations have been done in accordance to the
UDPFI guidelines.
Details of Projects to be undertaken as the realization of strategies:
1.
General Hospital: As per the UDPFI guidelines, the city need bed capacity of 280 by year 2015
and 430 by 2035. Existing General hospital has around 180 beds which need to be increased to
280 by year 2015. By year 2035, the city would require hospitals providing 430 beds. This can be
either achieved by upgrading the existing facilities or developing new ones.
2.
Nursing Homes: City requires an addition of 10 beds capacity in 2015, 2025 and 2035.
3.
Dispensaries: City would require additional 4 dispensaries to cater to the demand of 2015, and
addition of 3 dispensaries in both 2025 and 2035 each.
As discussed earlier, Municipalitys role in this sector is limited to the provision of providing basic
services and catalyzing involvement of other departments. Availability of land is a necessity in this
sector for which Tehsil office, Hoshangabad should be consulted.
8.6.2 Education
Sector Goal: To achieve a 100% literacy rate with student-friendly educational institutions
Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal
are:
Sector
Education
Components
Literacy Rate
Enrollment in primary
schools
2015
85%
2025
95%
2035
100%
90%
100%
100%
Teacher Student
Ratio
60% of prescribed
Teacher Student
ratio
80% of prescribed
Teacher Student
ratio
100% of prescribed
Teacher Student
ratio
No
Yes
No
Core Strategy
For the provision of educational infrastructure, Hoshangabad Municipalitys role is limited to primary
level services. To promote higher-level education, Nagar Palika must provide a conductive
environment for other government agencies and private developers in the form of support
infrastructure, incentives, etc.
Nagar Palika may encourage public private partnership in primary education for maintenance of
buildings and infrastructure. It should take strong steps to ensure the quality of education in schools
through standardization and performance incentives. To achieve the goals by finalized strategies, we
have estimated the number of schools and other educational institutions that would be required to
achieve a 100% literacy rate. These estimations have been done in accordance to the UDPFI
guidelines.
Details of Projects to be undertaken as the realization of strategies:
110
g)
Schools: This section deals with requirements for various kinds of schools.
Primary Schools: The overarching goal in this sector is to achieve 100% literacy rate in the
city. By year 2015, city would require 56 schools in total i.e. an addition of 8 primary schools,
each of which would accommodate average of 500 students. In the long term, i.e. by year
2035, city would need to add additional 35 primary schools to its fleet.
Secondary Schools: By year 2015, city would require 19 schools in total, an addition of 4
schools, each of which would accommodate around 1000 students. In the long term, i.e. by
year 2035, city would need to additional 11 senior secondary schools.
Integrated Schools with Hostel Facilities: The city need 1 such school to accommodate
around 1000 students.
h) College: City at present has sufficient number of this type of institution to deal with the
existing demand. But keeping future prospects of town in mind, a college with state-of-art
facilities is proposed in the town to accommodate around 1000 students.
As discussed earlier, Municipalitys role in this sector is limited to the provision of providing basic
services and catalyzing involvement of other departments. Availability of land is a necessity in this
sector for which Tehsil office, Hoshangabad should be consulted.
Components
Developed existing
parks
Area coverage under
recreational facilities
Other Social
Infrastructure
Playing facilities
Provision for greenbelts in future
development plans
Sufficient
infrastructure at mela
/exhibition ground
2015
2025
2035
Yes
Yes
Yes
Play grounds
Play grounds
Yes
Yes
Yes
Yes
Yes
Yes
Core Strategy
The core strategy adopted in this sector focuses on the development of socio-cultural facilities which
help in elevating overall quality of life in Hoshangabad City. Some of the key facilities considered
under this approach are community rooms, community hall, library, recreational club, parks, sport
complex, and a swimming pool. Nagar Palika may also encourage public private partnership in this
area for maintenance of buildings and infrastructure.
111
Expected
Outcome
Land acquisition
Up gradation of existing facilities
Improved access to the recreational facilities
Community Hall and Library: 1 community hall and library should be constructed in the
city.
3.
Recreational Club: A recreational club with facilities ranging from basic indoor games and
other social activities should be constructed in the city
4.
Parks: The vacant land in the city should be identified and developed as parks to serve
the dual purpose of increasing the green cover in the city and provide citizens with open
spaces for recreation.
5.
6.
Swimming Pool: A community swimming pool should be developed in the town. This
project can be developed either as a part of sports complex or independently depending on
the feasibility and availability of land.
This section discussed the basic details of the projects proposed as the realization of sector
strategies. The financial details of these projects including amount of investment and its phasing have
been discussed in chapter 9 (City Investment Plan).
Exhibit 8-19 Other Social Infrastructures: Implementation Agencies
Immediate measures to be taken
Authorities/Agencies responsible
112
Components
Security of tenure for urban poor
Inclusion of 100% urban poor population
under social sectors schemes
Pucca housing for urban poor
2015
Yes
2025
Yes
2035
Yes
Yes
Yes
Yes
Yes
Yes
Core Strategy
To address various components, municipality should conduct a comprehensive survey to collect all
information on urban poor. The details pertaining to land ownership shall then be analyzed and
necessary actions should be taken to provide poor with a security of tenure. The findings of the
aforementioned survey shall also be used to include 100 % poor population under social security
schemes.
113
Exhibit 8-20 Local Economy: Long Term and Short Term Interventions
Sector
Interventions
Required
Expected
Outcome
Authorities/Agencies responsible
114
Beautification of Ghats
Ghats are the integral part of citys socio-economic culture. In addition to serving the cultural and
religious purpose, Ghats are also crucial to the economy of Hoshangabad as they attract
maximum number of religious tourists. Hence, efforts should be concentrated on the beautification
of Ghats, improvement in facilities, safety & security and cleanliness.
The city has about 5 km stretch of riverfront which has significant potential to be
developed into an attractive landscaped leisure area. The concept of riverfront development
bank could therefore feature on a riverfront heritage walkway, improvement to bathing
Ghats , developing sanitation facilities, public conveniences and relocation of burial facilities,
embankment wall and landscaping. The project could be structured with grant assistance for
developing the leisure walk.
The riverfront in Hoshangabad could be developed with landscaped garden and walkway as it has
substantial amount of relatively undeveloped land alongside the riverbank. The implementation of
this component could be phased out along with land development component.
Demand analysis of this unique project should be undertaken featuring on willingness to pay for
pay-n-use facilities for parking, leisure walk or garden to the extent feasible. Parking
facilities could be provided which would generate some revenue for meeting the operating costs.
Advertising and limited commercial activities could also be considered to the extent feasible for
meeting the operating costs. Implementation road map needs to be prepared which would phase
out the components and costs to the extent sustainable for the Municipality. Innovative revenue
mobilization strategies and packaging shall be reviewed for structuring on a cost recovery
format to meet the recurring/operation and maintenance costs to the extent feasible.
115
b.
As a measure to promote tourism, few viewpoints can be developed on the banks of river
Narmada to attract tourists and provide citizens with another spot for recreation. It was revealed
during the consultations that Kori Ghat and Raj Ghat offer enormous potential for their
development.
c.
In order to enhance tourism, ropeway trolley has been proposed across river Narmada. The
pilgrims visiting the city during festive seasons will be able to get the scenic view of the river, ghats
and its surrounding areas. This will become an affective source of income generation for Nagar
Palika.
d) Development of Entry Gates
Development of entry gates at four entry points like Bhopal Road, Itarsi Road, Pipariya Road and
Harda Road would give the tourists a taste of rich culture of Hoshangabad. It will also help in
demarcating the Municipal limits.
This section discussed the basic details of the projects proposed as the realization of sector
strategies. The financial details of these projects including amount of investment and its phasing have
been discussed in chapter 9 (City Investment Plan).
8.8.2 Environment
Sector Goal: To accomplish clean, green and safe living environment for all citizens
Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal
are:
1. Pollution Sources; Air, Water, Soil and Noise
2. Demand / Supply side control
These areas have been identified on the basis of workshops, consultations and review of best
practices in the sector.
Core Strategy
For retaining the healthy status of Hoshangabads urban environment, several planning and
conservation initiatives need to be taken. This could be achieved through the proper zoning of
activities, provision for sufficient breathing space in new development and adoption of proper
landscape design practices at the city level. It is also important to promote conservation in the region
consciously. There should be a clear-cut strategy to conserve and protect the physical environment,
including rivers and hills in and around Hoshangabad city. It is important to weigh the environmental
impact of the new programs or development schemes. Lately, a large number of unauthorized layouts
have come up in the city, near to the citys fringes or in fringe areas. It is important to devise a plan,
which can check the growth of these unauthorized developments, especially within the citys
precincts. River conservation should also be explored with the possibilities of reviving it or points of
interest in the city.
Details of Projects to be undertaken as the realization of strategies:
116
1. Air Quality: Periodic monitoring and review is essential to check air quality. To create awareness
amongst user groups, the status of air pollution may be revealed through display systems
instituted at major locations in the city. Suitable plantations or green cover should be provided on
major routes to supplement better air quality.
2. Water Pollution: Efforts/schemes should be designed to check the diversion of sewage flow into
city lakes through appropriately located sewage treatment plants. Considering the issues related
to the demand for treating large amounts of sewage generated in Hoshangabad city,
decentralized sewage treatment is recommended.
3. Water Bodies Conservation: For water body conservation and rejuvenation, proper attention
should be given to existing lakes and water bodies in the city. A comprehensive water body
restoration or revival program in the region is of utmost importance. It is important to draw up
plans for the regeneration of the extinct River Narmada and address issues related to its pollution
through city sewage and other wastes.
4. Ground Water Recharge: With the state government constantly stressing on curbing the
depletion of ground water level, Hoshangabad municipality should take proactive measures in
this direction.
5. Green Spaces: A critical issue that needs to be addressed on the priority basis is the
development of green spaces within the city limits to enhance the overall quality of the
environment.
6. Development of a Regional Plan: To ensure sustainable development with optimum resource
utilization, it may be necessary to develop a regional plan that envisages a balanced relationship
between the main city and surrounding regions. For maintenance of open space, the planning
authority at the regional level should prepare a detailed inventory of the space and explore its
probable multiple uses or forms for recreation and visual pleasure. Possibilities to include the
private sector for maintenance of these areas should be explored.
This section discussed the basic details of the projects proposed as the realization of sector
strategies. The financial details of these projects including amount of investment and its phasing
have been discussed in chapter 9 (City Investment Plan).
Urban
Poor
Components
Access to water
connection
Access to public toilets
and urinal facilities for
all slum households
Access to dustbins
and secondary storage
points
2015
135 lpcd to all
dwellers
100% of
households (1
Community Toilet
per 60 users)
Door to Door
Collection( could
look for a PPP
2025
135 lpcd to all
dwellers
100% of
households (1
Community Toilet
per 60 users)
Door to Door
Collection( could
look for a PPP
2035
135 lpcd to all
dwellers
100% of households
(1 Community Toilet
per 60 users)
Door to Door
Collection( could
look for a PPP
117
Sector
Components
Up gradation of kutcha
roads to PCC roads in
slums
Improved drainage
systems
Adequate street
lighting facilities
Education facilities
Adequate health
facilities
2015
Project for the city)
2025
Project for the city)
2035
Project for the city)
Provision under
IHSDP
Maintenance and
up gradation
Maintenance and up
gradation
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
These areas have been identified on the basis of workshops, consultations and review of best
practices in the sector.
Core Strategy
The following strategies are proposed to address the issues of urban poor and slum development in
Hoshangabad.
Making land available to the poor at affordable prices and ensuring the provision of housing, urban
infrastructure, and transport services on the fringes of the cities, can provide alternatives that would
restrict the formation of new slums. Simple strategies like reservation of land for EWS housing can
ensure the creation of sufficient and affordable housing stock in the city.
Perhaps the most important change needed in managing Hoshangabads slums is fostering a
collaborative partnership between local authorities and communities, with strong support from the
government. Local authorities are the city planners, financiers, and providers of infrastructure
services. Their performance depends on good governance at the city level involving communities
living in informal settlements. This implies working with the urban poor as partners in the city
development process, and not seeing them as obstacles, as is too often the case today. Community
organizations can provide a voice for the urban poor and ensure that their interests are met in slum up
gradation programmes and urban planning.
Strategies for improving security of tenure are central to the improvement of the lives of slum dwellers
and land use in urban areas. This may require reform of tenure and land-use legislation, coupled with
new legislation to prevent forced eviction. In enhancing access to land, it must be ensured that
women have equal access to land tenure and title rights. Improvement of security of tenure requires a
high degree of tailoring to local needs as the ownership of slum lands varies radically in the slum
settlements of Hoshangabad. It would be in the interests of the slum dwellers to ensure that a single
agency works on ensuring tenure rights, irrespective of the owners of the slum sites. It is also
suggested that such decisions should be made by the slum dwellers themselves. For this, their
organizations should be recognized as critical partners on par with local authorities. This could be
facilitated by NGOs, CBOs and other networks of urban poor.
For the planning and implementation of any slum development scheme, it is essential to create an
updated database on the conditions of slum settlements, preferably through GIS and maintain this
updated data.
Wherever possible, community organizations should be supported and allowed to play an active role
in preparing and executing plans for slum up gradation/redevelopment. It is critical to prioritize slums
118
to be considered under slum development schemes through consultation and public opinion.
Information about the scheme should be transparent and communicated through common platforms
to ensure participation from communities as well. While housing quality is a concern, this can be
addressed by training a committee of local people to take up construction contracts or monitor
construction quality.
While planning for redevelopment of slums, Nagar Palika should focus on infrastructure such as
sewers, piped water, and electricity grids. Investments in improved sanitation should receive high
priority to improve the quality of life and reduce the high burden of oral-fecal diseases in informal
settlements caused by widespread open defecation.
Effective hygiene education and awareness-building programs are essential to create demand for
sanitation and to ensure its adequate use by all household members. Other investments required as
part of slum up gradation include investment in storm water drainage, community facilities, local
markets, and street lighting. Health services require investments as well. As mentioned earlier,
nutrition interventions for both the general population and vulnerable groups will reduce morbidity and
mortality among the urban poor. Clinics/health posts need to be more accessible, located where the
needs are the strongest, and open during hours that can accommodate the schedules of the working
poor.
Sound urban planning and standards are also central to averting or mitigating the impact of floods,
landslides and storms. This is particularly true in case of the slum population which is the most
vulnerable. It is essential to create inbuilt disaster prevention and management mechanisms for them
to successfully grapple with both natural and man-made disasters. This could be a part of the city
disaster management plan as well.
Access to credit mechanisms is of particular importance; the poor can incrementally invest in housing,
if they have adequate security of tenure, and this can become an important means of asset
accumulation.
Long term and Short term sector interventions required:
The broad sector interventions to address both the short and long term requirements are listed below:
Exhibit 8-22: Urban Poor: Long Term and Short Term Interventions
Survey to collect the exact data pertaining to existing status of slums
Sector
Interventions
Required
Expected
Outcome
Equitable society
Better infrastructure for the downtrodden
119
2. Water: It has been proposed that all the households will be served through piped water. To
connect all proposed housing units, 11960 m of water supply pipeline and 4 new tube wells will
be needed.
3. Sanitation: A pour flush latrine integrated with each dwelling unit and 147 m of sewer line which
would be integrated with the proposed city sewerage system.
4. Roads: Cement concrete roads of 5474 m are proposed to be constructed to connect all the
housing units and internal roads with the main road. The proposal suggests a 2. 5, 3 and 6 m
wide Cement Concrete roads.
5. Storm Water Drainage: All roads are to be provided with storm water drains that translate into
8790 m of storm water drainage.
6. Street Lights: Around 34 electric poles are to be provided at the sites.
7. Social Amenities: A Vendors platform and Gaushala are proposed under the IHSDP scheme.
Achievement Target
Decentralization of urban functions to local bodies
Establish clarity of roles and responsibilities.
Training to enhance capacity building.
Peoples Participation in Governance
2015
100%
100%
100%
50%
2025
100%
100%
100%
80%
2035
100%
100%
100%
100%
These areas have been identified on the basis of workshops, consultations and review of best
practices in the sector.
Core Strategy:
The decentralization of urban functions to local bodies has increased their responsibilities manifold.
For the prescribed level of service delivery, Hoshangabad municipality should take concerted actions
to augment the capacity, wherever necessary, and enable existing staff to perform efficiently by
providing them with necessary training. E-governance will be very helpful in smoothening various
process & procedures. It will also lead to an expeditious service delivery.
Details of Projects:
1. Computerization: Hoshangabad municipality should initiate the process of computerization in
its administration. Computerization will benefit most of its functions ranging from municipal
accounting to tax management. The introduction of E-Governance will help in smoothening
the processes and improvement in the efficiency.
2. Capacity Building: The procurement of computers should be supplemented by providing
training to the staff.
3. GIS Mapping: A GIS mapping of the city properties will be very helpful in the provision of
efficient services to the citizens. This would also help in keeping a tab on tax evaders.
120
This section discussed the basic details of the projects proposed as the realization of sector
strategies. The financial details of these projects including amount of investment and its phasing have
been discussed in chapter 9 (City Investment Plan).
8.11 Conclusion
This chapter dealt with the city vision, sector goals and sector strategies to achieve sector goals. The
discussion on sector strategies was followed by the identification of interventions required in every
sector. This was followed by the identification of projects and project implementation agencies.
The next chapter deals with the City Investment Plan which provides the details of investment
requirement of city to execute the various identified projects.
121
To achieve the formulated vision of Hoshangabad, a City Investment Plan (CIP) has been prepared
through a comprehensive process of assessment of gaps in physical and social infrastructure sectors.
This assessment has also led to the identification of sector specific strategies, implementation actions
and associated reforms with specific inputs from stakeholders.
The strategies adopted primarily have three dimensions; improving the service delivery by efficiency
measures, improving service delivery by creating infrastructure assets and improving the governance
aspects of Hoshangabad Municipality. This section summarizes the capital investments required for
creating infrastructure assets and various strategic interventions required in the implementation of
such projects; these strategies are both investments oriented and administrative oriented.
122
CIP also includes developmental projects like greenery development, parking spaces, system
modernization etc.
The CIP and forecasted future needs for provision of capital facilities under each identified sector is
presented below. These assets will help Hoshangabad in improving the quality and coverage of
service for the current population as well as accommodate the expected increase in population. In
some of the sectors like source augmentation for water supply, development of landfill site etc, a
planning horizon of 25 years has been considered. Hoshangabad Municipality expects that these
infrastructure assets would not only guarantee services to its citizens, but also signal a proactive
commitment to potential investors.
Questionnaire analysis:
A basic analysis which includes percentage of respondents who have ranked various infrastructure
sectors on a scale of 1 to 9 is given in
Exhibit 9-1.
Exhibit 9-1 suggests that Sewerage, Storm Water Drainage System and Health Infrastructure are
among the most critical problems of Hoshangabad city.
123
Total
Road Network
5.00
15.0
15.0
25.0
20.0
5.00
10.0
5.00
100%
20.0
10.0
25.0
15.0
10.0
5.00
15.0
100%
Availability of water
10.0
5.00
10.0
30.0
5.00
10.0
30.0
100%
Sewerage facility
5.00
35.0
5.00
5.00
15.0
10.0
20.0
5.00
100%
30.0
35.0
10.0
10.0
5.00
10.0
100%
Solid Waste
20.00
10.00
15.00
10.00
5.00
5.00
15.00
20.00
100%
Health Facility
5.00
5.00
25.00
15.00
20.00
10.00
20.00
100%
Education Facility
5.00
5.00
20.00
10.00
15.00
15.00
25.00
5.00
100%
Parks
10.00
10.00
15.00
30.00
35.00
100%
In addition to a preliminary analysis, an overall rank for each sector was derived out of cumulative
perception in terms of its criticality. A decreasing rank order of various infrastructure facilities is given
in Exhibit 9-2. The ranking thus obtained lays down a path for prioritization of development works in the
city. It would try to synchronize the usage of developmental funds with the needs of the city. It should
be kept in mind that Exhibit 9-2 is only an indicator of relative criticality of various sectors/services.
Exhibit 9-2 Ranking of Infrastructure Facilities
Rank
Infrastructure Facility
Sewerage facility
Health Facility
Road Network
Education facility
Availability of water
Parks, Lawns
A detailed analysis was carried out for each sector in order to identify the most critical problem within
each sector. The findings of this analysis will be useful while devising City Investment Plan, Annual
Action Plan and Prioritization of projects within each sector. Exhibit 9-3 lists most critical problems in
the various sectors/services of the city.
Exhibit 9-3 Critical Sectoral Issues
Sector
Water Supply
Supply Hours
Blocked Drains
Transportation
Encroachments
124
As for the social infrastructure, stakeholders were asked to rank their perception on a scale of 1 to 4
with 1 being good, 2 being Satisfactory, 3 being Poor and 4 being Very Poor. Exhibit 9-4 quantifies
the stakeholders perception in terms percentage of responses that allotted every facility a particular
rank.
Exhibit 9-4 indicates that the city in-general suffers from poor social infrastructure which includes
parks, proper markets & parking space, recreational activities, and good education and health care.
Exhibit 9-4 State of Social Infrastructure
Social Infrastructure
Parks
Market
11
Movie Hall
11
Hotel/Restaurants
11
Street Shops
Playground/Stadium
0
0
1
3
12
10
5
4
Above was a brief analysis of the responses received during questionnaire survey. The findings of this
survey were of great assistance during various stages of the study.
125
Rs. Crores
Rs. 275.52
Rs. 129.29
The planning horizon for the projects identified in sectors of urban poor/ slums, system modernization,
city beautification etc which are immediate in nature is 2015 and accordingly the entire identified
investment is proposed for funding by 2015 itself. In case of core service sectors of water supply,
sewerage, drainage, solid waste management, education and health infrastructure 2035 is considered
as the planning horizon and hence only part of the identified investment is proposed for funding by
2015. Hoshangabad will need to plan for the remaining identified investment to be funded beyond
2015. Also, the projects already under preparation by the ULB as indicated in the strategy section will
form a part of the total investment need identified in the CIP. Exhibit 9-6 presents the summary of
sector-wise total investment need and investments for 2015, 2025 & 2035.
Exhibit 9-6 Summary of Capital Investments
Investment Required
S.No
.
Municipal Council of
Hoshangabad
Sectors
A
Water Supply
B
Sewerage and Sanitation
C
Urban Roads, Transport & Traffic
D
Storm Water Drains
E
Street Lighting
F
Solid Waste Management
G
Fire Infrastructure
H
Urban Poor/ Slums' Improvement
I
Health Infrastructure
J
Education Infrastructure
K
Socio-Cultural Facilities
L
Economy
M
Heritage & Tourism
N
Urban Environment
O
Urban Governance
Total Investment Identified
Investment
by 2015
Investment
by 2025
Investment
by 2035
Rs. Lakhs
2,016.86
843.84
2,758.53
2,162.32
57.02
172.44
81.00
517.52
1,726.67
1,540.00
256.00
195.00
462.50
95.00
45.00
12,929.69
Rs. Lakhs
711.54
127.83
1,026.28
429.97
83.01
291.84
1,720.00
1,880.47
116.00
480.00
412.50
47.50
15.00
7,341.95
Rs. Lakhs
941.23
240.15
1,232.00
641.10
123.52
212.75
76.00
920.00
2,473.34
88.00
175.00
100.00
27.50
30.00
7,280.59
Total
Investment
Need
Rs. Lakhs
3,669.63
1,211.82
5,016.81
3,233.39
263.54
677.04
157.00
517.52
4,366.67
5,893.82
460.00
850.00
975.00
170.00
90.00
27,552.23
As can be observed from the table above, a total 46% of the identified investment need is proposed
for funding by 2015. From the perspective of sector priorities, about 55% of the investment required
for water supply will be proposed by year 2015 and Sewerage and Sanitation at 80%. Drains and
roads sectors envisage around 67% and 51% respectively of the identified investment by 2015 while
126
street lighting sector envisage about 22%, 40% is envisaged for health infrastructure and 26% for
education infrastructure of the identified investment by 2015.
Within the total investment proposed for Hoshangabad Municipality, apart from other investments
which include, health, education, community development etc, and maximum share is taken by the
Roads sector at 21 % followed by drain and water supply sector at 17% and 16% respectively.
Sewerage accounts for 8% and solid waste management account for 1% of the investment.
Sector wise details of the City Investment Plan, capital facilities costs, supportive actions and
implementation aspects are discussed in the following sections in detail. Demand-gap assessment
leading to various projects identification has already been done in chapter 6.
Support
Metering System
2011
141
2012
432
2013
572
2014
608
2015
264
127
System
Sustenance
Measures
Action
Measures
Sector Notes
Performance
Monitoring
Indicators
Water Supply
Regularise
unauthorised
connections, Check distribution
leaks and reduce UFW
Improve collections to reach 85%
collection efficiency by 2015
2011
2012
2013
2014
2015
1
2
3
4
5
6
Investment till 15
(Rs. Lakhs)
843.84
135.73
152.74
168.53
320.20
21.95
44.69
2011
2012
2013
2014
2015
49.50
104.55
239.65
232.98
217.15
128
Capital
Facilities
Support
&
System
Sustenance
Measures
Action
Measures
2011
2012
2013
2014
2015
797.40
1,261.13
400.00
300.00
57.02
2815.54
235.23
1,823.05
200.00
206.53
2464.81
1 Roads Up gradation
2 Roads New Formation
4 Parking
5 Development of Bus & Truck Terminus
Street Lighting
Sub Total
Action Plan for Implementation (2015)
Roads, Street lighting and Traffic Management
Investment
2,758.53
up to 2015
(Rs. lakhs)
Street Lights
Rs. 57.2 Lakhs
Capital
Roads Up-gradation
Facilities
New road formation
Roads Widening & Strengthening
Action
Measures
Sector
2011
2012
2013
2014
2015
177.80
481.71
453.65
787.69
857.69
2.85
14.25
14.25
14.25
11.40
129
2,162.32
Capital
Facilities
Support
&
System
Sustenance
Measures
Action
Measures
Sector
Notes
Performance
Monitoring
Indicators
2011
2012
2013
2014
2015
293.01
348.19
528.43
498.74
493.94
130
network being developed and quantum of population addition. Accordingly part of the identified
investment is to be funded by 2015 to cater to the current gaps and meet the immediate
requirements.
Priority needs (2015) / Long term needs (2035)
A sum of Rs. 172 lakhs is the capital cost estimation for the proposed interventions. The proposals
include; Rs. 101 lakhs for development of permanent landfill infrastructure and composting facilities;
Rs. 56 lakhs for acquisition of vehicles for lading and transportation; Rs. 5.9 lakhs for acquisition of
new handcarts to cater the primary waste collection needs; Rs. 7.73 lakhs for new container depot.
Further, the existing dumping site of 7.5 acres will not be sufficient to meet the long term needs.
Hoshangabad Municipality will need to plan beyond 2015 for further augmentation of system through
continuous development of landfill and compost infrastructure at the landfill site to cater to long term
needs of 2035.
Action Plan for Implementation (2015)
Solid Waste Management
Investment
up to 2015
Rs. 172 Lakhs
(Rs. lakhs)
Capital
Facilities
Support
&
System
Sustenance
Measures
Other
actions/
Measures
2011
2012
2013
2014
2015
12.10
44.64
56.84
56.84
2.03
131
Health Infrastructure
Investment
2035
(Rs. Lakhs)
2,640.00
1
2
3
1,600.00
100.00
26.67
2,400.00
200.00
40.00
Sector/ Component
General Hospital
Nursing Home
Dispensary
till
2011
2012
2013
2014
2015
515.33
345.33
345.33
345.33
175.33
General Hospital
Nursing Home
Dispensary
Investment Up to
2015(Rs. lakhs)
Capital Facilities
Action Measures
Sector Notes
1,726.67
132
Education Infrastructure
1
2
3
4
520.00
520.00
200.00
300.00
2,303.95
1,492.64
257.23
300.00
Sector/ Component
Primary
Secondary
Integrated without Hostel
College
Action Measures
1,540.00
2011
2012
2013
2014
2015
154.00
231.00
385.00
385.00
385.00
Primary
Secondary
College
Development of New Schools at all level
Community Rooms
Community hall And Library
Recreational Club
Parks
Sports Complex (5000 Capacity)
Swimming Pool
60.00
50.00
6.00
100.00
40.00
140.00
50.00
14.00
256.00
2011
2012
2013
2014
2015
37.40
68.40
73.20
62.00
15.00
133
Socio-Cultural Facilities
2011
2012
2013
2014
2015
Capital
Facilities
Community Rooms
Parks
Swimming Pool
Recreational Club
Action
Measures
Sector Notes
Investment
2035
(Rs. Lakhs)
655.00
40.00
100.00
160.00
400.00
30.00
25.00
20.00
75.00
till
2011
(Rs. lakhs)
Tasks
Identified
Action
Measures
195.00
16.00
2012
16.00
2013
44.00
2014
56.50
2015
62.50
134
Local Economy
2011
2012
2013
2014
2015
Urban Environment
1 Preservation of Water Bodies
2 Tree Plantation
3 Ground Water Re-charge
75.00
60.00
10.00
25.00
40.00
10.00
25.00
2011
2012
2013
2014
2015
28.50
28.50
19.00
9.50
9.50
Tree Plantation
(Rs. lakhs)
Tasks
Identified
Action
Measures
95.00
135
Entertainment/Recreational Infrastructure
50.00
150.00
462.50
River Front Development
State-of-art Waiting Rooms
2011
2012
2013
2014
2015
41.25
41.25
66.25
148.75
165.00
Tasks related to river conservation should be carried out in tandem with the
River front development
Ancillary tourism potential can be actualized by providing some kind of
recreation alternative to tourists and well managed waiting rooms
Support
&
System
Sustenance
Measures
Other
actions/
Measures
2011
2012
2013
2014
2015
140.96
140.96
140.96
66.05
28.60
136
Component
Short Term(2011-2015)
(Rs Lakhs)
Urban Governance
Total(2011-2035)
(Rs Lakhs)
45.0
45.0
1
2
10.00
5.00
15.00
10.00
GIS Mapping
30.00
20.00
11-12
12-13
13-14
14-15
15-16
Identified
Computerization
Training Modules
GIS Mapping
Action
Computerization for improving accountability in the system
Measures
GIS mapping for having a wide database which can be used for improving the
revenue, better planning and implementation
137
Component
Fire Infrastructure
1
Hajmat Van for Chemical Disaster
2
Foam Crash Tender
3
Motor Fire Engine
4
Small Fire Engine
5
Rescue Tender
6
Portable Pump
7
Fire Entry Suit
8
Communication wireless set
Short Term(2011-2015)
(Rs Lakhs)
81.00
20.00
20.00
20.00
10.00
5.00
1.00
5.00
Total(2011-2035)
(Rs Lakhs)
76.00
20.00
20.00
20.00
10.00
5.00
1.00
-
138
Risk assessment:
Even if the ULB has a revenue surplus position at present, there could be inconsistencies in future
thus making the project subject to risk of running out of fund.
Ongoing sector development schemes/ programmes
Typically these are state and central sources of financing through which ULBs get fund in the form of
loan and grants. Apart from traditional programmes, this option also includes multilateral sources of
funding which is routed through state level nodal agency.
State schemes
Projects taken up under regular state schemes are generally funded entirely by the state. The funds
are allocated in the state budget and made available to the implementing agency through the state
Urban Development Department (UDD). The ULB can structure its identified projects best suited to
any such ongoing state scheme applicable for a specific sector.
Risk assessment:
Less risk but not likely to get fund for large capital intensive projects
Central schemes
For central schemes, the total funding is generally shared between centre and state or centre, state
and ULB itself. The funding pattern is different for different schemes and could be any combination of
loan, grant and own contribution. Currently, for all small and medium towns, all central schemes are
clubbed under UIDSSMT in which the cost is to be shared between centre, state and ULB in the ratio
of 80:10:10. As UIDSSMT covers all urban infrastructure sectors coming under the purview of the
ULB and the major portions of cost are shared by the centre and state, this could be a better option
for the ULB for structuring large capital intensive projects.
Risk assessment:
Low risk as Govt. supported programme. However, ULBs has to make arrangement for own
contribution as well as repay loan over specified period. Thus has to assure a source for that.
Borrowing
Pooled finance
Pooled finance is a form of market borrowing. It is a financial instrument for tapping capital market to
finance small city infrastructure projects. Like an independent financial entity, the Nagar Palika can
issue bond to raise money from market. The municipal bond has to be rated by a credit rating agency
and then issued in the market. However, ULBs has to have a strong financial position to raise money
by this instrument.
Risk assessment:
1. This instrument is prone to market risk
2. ULB has to maintain consistently good financial position and credibility
Financial institution borrowing
For ULBs, borrowing from financial institutions has been generally from Govt. supported financial
institutions like HUDCO, LIC etc. For, Hoshangabad, the ULB can borrow money from these financial
institutions.
139
Risk assessment:
1. Low risk as supported by Govt
2. The fund is focused towards urban development
3. Disbursement could be conditional
Public Private Partnership
This instrument seeks to have contribution from a private party in developing a facility and/or
operating a facility. There are various standard form of contract that could be entered into between
the public body (ULB) and the private party depending on the conditions best suited for a particular
project. Typically, the private party would operate the facility over a certain period of tie after
developing in with some user charges and then hand it over to the public body
Risk assessment:
1. Risk of opposition to user charges for basic public amenities
2. ULB has to have thorough monitoring over project development as well as operation period
by private party
Other capital sources
These are some other Govt. capital sources, which are not dedicated to urban development but could
be tapped for this purpose. For example funds from Member of Parliament Local Area Development
(MPLAD), MLALAD, and Central Finance Commission Grants etc. These cannot be considered as
regular sources of funds but can be tapped for one time investment by ULBs depending on availability
and local situation.
Risk assessment:
1. Highly uncertain as long as not committed
2. Most likely to be one time contribution, not a consistent source
140
Sector
Water Supply
Rs 3670 Lakhs
a) UIDSSMT Scheme
b) Multilateral Financing
c) ULBs own revenues
d) Capital Sources (MPLAD funds, MLALAD funds, centre
commission grants)
The Nagar Palika can effectively plan and structure its water
supply augmentation project such that, funding for the same may
be received under UIDSSMT. The typical project financing for the
UIDSSMT funded projects is 80:10:10, wherein 80% cost are to be
borne by the Centre and the remaining 20% to be borne equally by
the State government and the ULB.
Multilateral Financing/Capital The Nagar Palika may also look at receiving funds from multilateral
agencies. The mix of grant, loan and own sources would have to
Sources
be worked out between the Nagar Palika and the funding agency
once the detailed project report is approved. The Nagar Palika
may also look at options of receiving funds under MPLAD or
MLALAD funds.
Funding under UIDSSMT
Sewerage
Given the scale of the project and the extent of capital investment which would be required for
commissioning of the Sewerage Scheme, the project financing options available to the Nagar Palika
are limited. The total capital investment for improving water supply in the town has been estimated at
Rs 1212 Lakhs, of which Rs 971.67 Lakhs would have to be planned for and invested by 2015. Of the
varied funding options available to the Nagar Palika, the probable sources which may be pursued are
the following:
Funding from on-going sector development schemes or programmes: The Nagar Palika can
structure its project such that it can receive funding under state schemes aimed at urban
development. Currently for small and medium town infrastructure development, the centrally funded
Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) is under
progress. This option appears to be the most viable especially in the light of the unstable financial
situation of the ULB; it would be forced to rely heavily on grants.
Proposed Project Title
Sector
Sewerage
Rs 1212 Lakhs
141
Sector
Project Financing
Options
a) UIDSSMT Scheme
b) Multilateral Financing
c) ULBs own revenues
d) Capital Sources (MPLAD funds, MLALAD funds, centre commission
grants)
Funding under
UIDSSMT
Multilateral
Financing/Capital
Sources
The Nagar Palika can effectively plan and structure its water supply
augmentation project such that, funding for the same may be received
under UIDSSMT. The typical project financing for the UIDSSMT funded
projects is 80:10:10, wherein 80% cost are to be borne by the Centre
and the remaining 20% to be borne equally by the State government
and the ULB.
The Nagar Palika may also look at receiving funds from multilateral
agencies. The mix of grant, loan and own sources would have to be
worked out between the Nagar Palika and the funding agency once the
detailed project report is approved. The Nagar Palika may also look at
142
The Nagar Palika can look at its own revenue resources for
construction of the cycle stand.
Sector
Rs 3233 Lakhs
Project
Options
b) Multilateral Financing
Funding under UIDSSMT The Nagar Palika can effectively plan and structure its water supply
augmentation project such that, funding for the same may be received
under UIDSSMT. The typical project financing for the UIDSSMT funded
projects is 80:10:10, wherein 80% cost are to be borne by the Centre
and the remaining 20% to be borne equally by the State government
and the ULB.
Multilateral
Financing/Capital
Sources
The Nagar Palika may also look at receiving funds from multilateral
agencies. The mix of grant, loan and own sources would have to be
worked out between the Nagar Palika and the funding agency once the
detailed project report is approved. The Nagar Palika may also look at
options of receiving funds under MPLAD or MLALAD funds.
143
Sector
Rs 677 Lakhs
Project
Options
th
UIDSSMT Scheme
g) Multilateral Financing
h) ULBs own revenues
i)
Funding under UIDSSMT The Nagar Palika can effectively plan and structure its water supply
augmentation project such that, funding for the same may be received
under UIDSSMT. The typical project financing for the UIDSSMT funded
projects is 80:10:10, wherein 80% cost are to be borne by the Centre
and the remaining 20% to be borne equally by the State government
and the ULB.
Multilateral
Financing/Capital
Sources
The Nagar Palika may also look at receiving funds from multilateral
agencies. The mix of grant, loan and own sources would have to be
worked out between the Nagar Palika and the funding agency once the
detailed project report is approved. The Nagar Palika may also look at
options of receiving funds under MPLAD or MLALAD funds.
The Nagar Palika can look at its own revenue resources for purchase of
the handcarts and also for land acquisition.
PPP
Sector
Rs 518 Lakhs
Project
Options
IHSDP Scheme
Financing
144
Other Amenities
For regular upkeep of the parks and ponds, development of night shelters and for maintenance of
Hospital facility, HNPP may further explore PPP as an option for developmental works. The viability of
the same would have to be worked out by the Nagar Palika with suitable PPP structure to attract
private participation. The construction of a new Municipal office building should also be carried out by
use of the internal revenue of the Nagar Palika.
145
Revision of the Unit Area Value at certain levels, which would lead to revision in
Annual letting Value (applicable for Hoshangabad Nagar Palika )
146
Revision of Water charges at specific intervals. Though the revision in water tariff
should be done on annual basis to recover 100% of the O&M cost. However, annual
revision is not a general practice in all the ULBs across the state, so revision after
every five years is envisaged for projections.
147
Head
Assumptions
Assumption for assessment of Hoshangabad Nagar Palika s sustainability
Income Items
Growth in revenue income
Actual average growth with a minimum 8% and maximum of
12% (based on last five years trend)
Property Tax: Propose to introduce from FY 2008-09
Annual growth in Assessment
3.43% per annum
Increase in Assessments due to 2,065 properties
Survey/ PT Reforms
Initial Revision in 2011-12
100% of the existing
Revision of Tax
25% every five years
Collection Performance
85% or current average whichever is higher by 2015
Income Items- Water Supply
Annual growth in Water Connection
Regularisation
of
unaccounted
connections
Coverage
Initial revision in water tariffs
Next Revisions in water tariffs
Initial revision new Connection fee
Future revision new Connection fee
Collection Performance
Income Items- Sewerage
Coverage
Sewerage Charge
Initial revision - new Connection fee
Future revision - new Connection fee
Collection Performance
148
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
Yes
No
No
No
No
Yes
No
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
149
The impact of the different scenario on the investment sustainability of Hoshangabad Nagar Palika is
shown below in Exhibit 10-3.
Exhibit 10-3 Impact of reforms and grants on investment capacity
Mode of Funding
Source
158.96
119.29
96.63
65.23
80.52
70.65
2.42
7.45
% of Total
Investment
100
100
67.5
88
3
9
From the above analysis, it is very clear that ULB alone even with the grant support under UIDSSMT
scheme and reforms will not be able to implement 100% of the projects identified under the City
Investment Plan (CIP). But they can substantially increase their sustainable capacity with these
reforms. So, it is recommended that ULB along the support from UADD, GoMP should try to develop
few projects at PPP model and additional grant support from GoMP.
It is also recommended that on the same lines of the National Urban Information System (NUIS)
programme for strengthening of information system at Municipal Corporation level, GoMP should also
provide support to all the local bodies in Madhya Pradesh, which are not covered in the mentioned
programme.
150
1
201112
2
201213
3
4
2013201414
15
Projection
5
201516
6
201617
7
201718
8
201819
9
201920
10
202021
11
939
815
1,602
1,516
1
35
96
1,084
963
2,408
2,353
2
106
151
1,248
1,199
3,005
3,043
4
204
114
1,423
1,423
3,600
3,620
14
324
94
1,654
1,646
3,578
3,566
21
436
106
1,899
1,784
2,057
1,942
22
458
220
2,086
1,940
2,168
2,021
28
481
367
2,281
2,107
2,368
2,194
32
505
541
2,495
2,285
2,588
2,377
32
530
752
2,732
2,479
2,831
2,578
32
557
124
121
49
115
146
175
211
253
85
54
(37)
(20)
12
115
146
175
211
253
96
151
114
94
106
220
367
541
752
1,005
186.22
63.51
14.08
1.02
1.38
6.25
6.19
6.44
7.56
8.87
78%
80%
81%
83%
85%
86%
86%
87%
87%
88%
10.6 Conclusion
This chapter discussed the Investment sustainability of Hoshangabad Municipality. The discussion on
assumptions for various financial projections was followed by detailing of investment capacity of ULB.
The investment capacity was analyzed for four scenarios; Base case, PT improvements & Sector
Reforms, UIDSSMT Grants & Reforms and Debt Funding & Reforms. The investment capacity
analysis was followed by a discussion on the fund requirement of the city.
The next chapter deals with the urban reforms. The chapter discussed the objective and status of
various reforms mandated under UIDSSMT.
151
11 Urban Reforms
11.1 Introduction
In recent times, several initiatives have been taken by GoI and GoMP to a) improve infrastructural
facilities and help create durable public assets and quality oriented services in cities &towns, b)
enhance public-private-partnership in infrastructural development and, c) promote planned integrated
development of towns and cities. A key aspect in achieving the fore mentioned goals is improvement
in Urban Governance and Service Delivery. The underlying objective of most of the recent initiatives
is to make ULBs financially sound and enable them to undertake new projects.
The main thrust of the revised strategy of urban renewal is to ensure improvement in urban
governance so that Urban Local Bodies (ULBs) and para-statal agencies become financially sound
with enhanced credit rating and ability to access market capital for undertaking new programmes and
expansion of services. In this improved environment, public-private participation models for
provisioning of various services would also become feasible.
Among various schemes aimed at the urban renewal, the most important schemes are Jawaharlal
Nehru National Urban Renewal Mission (JNNURM) and Urban infrastructure Development Scheme
for Small & Medium Towns (UIDSSMT). Whereas JNNURM has its own selection criteria for the cities
which can receive funding under it, UIDSSMT expands the ambit of beneficiaries to cover all
cities/towns as per 2001 census excepting cities/towns covered under JNNURM.
UIDSSMT aims at improvement in urban infrastructure in towns and cities in a planned manner. To
achieve this objective, State Governments, Urban Local Bodies and para-statal agencies are required
to accept implementation of an agenda of reforms as funding under UIDSSMT has been linked with
the ULBs performance towards the implementation of anticipated reforms.
The proposed reforms at various level of governance have been categorized into:
1. Mandatory Reforms at the level of the State Government,
2. Mandatory Reforms at the level of the Urban Local Body
3. Optional Reforms at level of the State Government/Urban Local Body
152
2. In addition to incorporation of schedule 12 in the state municipal act, all the functions that
were required to be transferred to ULB has been transferred by MP state government to
ULBs.
3. The SFC has been constituted and recommendations have been submitted by the same.
Timeline for Reforms
All the reforms which were applicable under this section have been carried out.
153
Current Status
The ULCRA has been repealed in the year 2000.
Timeline for Reforms
All the reforms under this section have been carried out.
154
Reform
1
2
3
Yes
80%
70%
100%
100%
155
11.3.2 E-Governance
Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in E-Governance, with the
objective of having a transparent administration, quick service delivery, effective MIS, and general
improvement in the service delivery link.
Current Status
Till now, none of the services has been covered by e-governance applications. The applications which
were proposed to bring under e-governance are registration of births & deaths, public grievance
redressal, payment of property tax and bills of other utilities, municipal accounting, works
management system, etc.
Timeline for Reforms
To achieve the objectives of this reform, city would be required to bring many of its services and
procedures under the ambit of e-governance. As the first step, city should procure equipments
required for various applications by year 2011-12, which should be followed by the capacity building
exercises aimed at enabling existing staff and recruitment of new staff competent to carry out the
required duties. The city should aim to carry out registration of births & deaths, public grievance
redressal, payment of property tax and bills of other utilities, municipal accounting, and works
management system through computerization by year 2015-16. It is also recommended that
Hoshangabad municipality should adhere to following timelines to achieve the objectives of this
reform by year 2015-16.
SNo
1
2
Reform
Appointment of State-level Technology
Consultant as State Technology Advisor
Finalization of implementation action plan
Property tax
20%
50%
80%
100%
Accounting
25%
50%
75%
100%
25%
50%
75%
100%
40%
100%
30%
30%
70%
100%
30%
100%
156
S. No.
1
2
Type of Consumer
Domestic (1.0 / 0.75 / 0.5) inch
Non Domestic (1.0 / 0.75 / 0.5) inch
Water Charges
80/60/40
100/80/60
Reform
2
3
4
A
B
C
25%
Solid Waste Management
Achievement of targeted service standards for the services
75
75
Water Supply (lpcd)
Sewerage
C
A
Sewerage
50%
75%
100%
75
100
135
80%
85%
90%
NA
70%
70%
Yes
Yes
Yes
157
2
3
4
5
Reform
A resolution between State Government and
ULB on comprehensive policy on providing
basic services to all urban poor
Defining criteria for identification of the urban
poor.
Fresh enumeration based on the above
Decision on the Funds Allocation Percentage
Achievement of actual fund allocation in the
budget
Yes
Yes
Yes
50%
75%
100%
158
Current Status
Currently, Hoshangabad Municipality levies property tax on residential, commercial and industrial
properties and its collection during the year 2007-08 was INR 7.15 lakhs. The property tax is being
calculated on the basis of Unit Area method.
Timeline for Reforms
Considering the low collection efficiency and gap between properties liable to pay property tax and
properties that actually pay, property tax reforms should carried out on the immediate basis to
improve the municipal revenues. It is recommended that Hoshangabad municipality should adhere to
following timelines to achieve the objectives of this reform by year 2015-16.
S.No
1
2
Reform
Yes
50%
100%
20%
40%
75%
100%
Yes
Collection Efficiency
40%
50%
60%
72%
85%
60%
70%
75%
80%
85%
Yes
SNo
Reform
Status
Completed
Completed
To be completed
Work in Progress
To be completed
Completed
Completed
To be completed
159
Structural reforms
To be completed
10
To be completed
160
161
162
2.
IMaCS explained the need for a longterm plan for Hoshangabad and role
of IMaCS, with support from Stakeholders, in preparing the City Development Plan.
3.
The presentation by IMaCS familiarized the stakeholders with the purpose, process, and expected
outcomes of the CDP study. Members were then requested for their views and suggestions in
formulating the City Development Plan with key stress on following areas:
a.
b.
Projects to be undertaken
c.
163
Stakeholders also suggested various prerequisites for the sustainable development and a roadmap
which would help Hoshangabad city achieve its goals.
Sector-wise suggestions from stakeholders are presented in the following table.
Priority
Sector
Suggestions
Narmada River
Protection
Issues:
All drains without proper treatment of sewage and drainage are mixing with
Narmada water
It is usual scenario that the surrounding houses and temples dumping their
waste on the bank of the river and there is no proper waste collection
system established
There are no proper toilet facilities except at one Ghat, which is resulting to
miss use of the surroundings
Suggestions:
Sewage Treatment Plant to be established by diverting all sewers as
immediate measure.
Proper Solid waste collection system has to be taken care by primary
collection of waste on daily basis by educating people throughout the bank
Connecting roads to all ghats has to be widened to make access free of
encroachments and congestions
Proper toilet/rest room facility has to be established with minimal charges
and a guard to force the surroundings for the environmental protection of
the area
II
Sewerage &
Sanitation
Issues:
City, in general is not equipped with the proper Sewerage system.
Solid waste which includes kitchen waste, paper, covers and other raw
materials are dumped on the sewers which are causing of unhygienic
condition at the surroundings.
As sewage system is not properly planned to tackle to the demand of the
households it is usual scenario that sewage is overflowed and situation
worsen in the rainy seasons.
The existing public toilets are not maintained properly and are insufficient to
tackle the demand of floating population.
Suggestions:
All 33 wards has to be covered with underground sewage system by
projecting future needs
Proper treatment facility has to be established to protect the river from
pollution and people from water borne diseases.
Number of public toilets has to be increased especially at all the ghats,
railway station and bus terminus. New public toilets have to be well
planned and designed to tackle the floating population and should consider
the movement of people in the city.
Maintenance has to be taken care to even by collecting nominal charges
164
III
Traffic &
Transportation
IV
Solid Waste
Management
Education
165
VI
Trade &
Commerce
Suggestions:
There is need of more primary schools, vocational schools and technical
institutes to meet demands of the future population.
Ground near Government schools should be properly maintained and strict
actions should be taken against any attempt of encroachments in these
places.
Provision should be made for the donation of land to Education
department.
A Girls College should be planned in the city.
Private schools should be brought under strict regulations to prevent the
exploitation of students. A committee at Municipality level should be formed
to evaluate private schools ability in providing necessary support and
infrastructure to students.
There is no proper vegetable or food grain market serving the city.
Street hawkers are all over the city, who are resulting traffic congestions
and waste.
City is trailing its market potential to serve as a nodal centre to the
surrounding villages
Suggestions:
A designated vegetable, fruit and grain market has to be established in the
city and master plan has to provide space for the facility
Street hawkers have to be regularised by licensing them and allocating
space for the trading.
IMaCS concluded the meeting with a vote of thanks to all the stakeholders.
166
Second and Third Workshop: Sector Analysis, City Vision & Strategy
formulation
This Workshop was organized on 18th February 2010 at Amruta Sabha Kaksh Conference Hall at
Municipality Complex, Hoshangabad.
Persons present
Stakeholder group at the workshop comprised of officials / representatives from elected bodies,
municipality, line departments of state government, community members etc. A list of persons present
in the workshop is given below:1. Mrs. Maya Narolia, President, Hoshangabad Municipal Council
2. Mrs. Ruchi Vardhan, S.P., Hoshangabad
3. Mr. Pramod Soni, Vice-President, Hoshangabad Municipal Council
4. Mr. Abhay Verma, Representative of MLA
5. Mr. Gopal Prasad Khaddar, President, Nagar Mandir Samiti
6. Mr. Ranjana Mukesh Yadav, Council Member, Hoshangabad Municipal Council
7. Mr. Sunil Manware, Council Member, Hoshangabad Municipal Council
8. Mr. Rajesh Machiya, Representative of Council Member
9. Mr. Nisar Khan, Council Member, Hoshangabad Municipal Council
10. Mr. Naveen Rajput, Council Member, Hoshangabad Municipal Council
11. Mr. Tapesh Gour, Council Member, Hoshangabad Municipal Council
12. Mr. Mahesh Prasad Babriya, Council Member, Hoshangabad Municipal Council
13. Mrs. Anju Rani, Council Member, Hoshangabad Municipal Council
14. Mrs. Sima Uikey, Council Member, Hoshangabad Municipal Council
15. Mrs. Uma Shivhare, Council Member, Hoshangabad Municipal Council
16. Mr. Kishan Lal Yadav, Council Member, Hoshangabad Municipal Council
17. Mr. Bayiyaa, Council Member, Hoshangabad Municipal Council
18. Mr. Santosh Upadhyay, Council Member, Hoshangabad Municipal Council
19. Mr. Tej Kumar Gaur, Council Member, Hoshangabad Municipal Council
20. Mr. Anokhelal Rajoria,Council Member, Hoshangabad Municipal Council
21. Mr. Deepsingh Sisodia, Council Member, Hoshangabad Municipal Council
22. Mrs. Lata Madhav, Council Member, Hoshangabad Municipal Council
23. Mr. Sampat Bayiyaa, Council Member, Hoshangabad Municipal Council
24. Mr. Praneshawar, Ex-Council Member, Hoshangabad Municipal Council
25. Mrs. Bhawna Dubey, Principal
26. Mr. Rakesh Rawat,
27. Mr. Raman Verma,
167
Mr. Rawat made an inaugural address in which background to the study was explained which
was followed by a presentation by IMaCS Team.
2.
IMaCS gave a brief presentation of Sector Analysis and City Profile Report. The presentation
was followed by a discussion on City Vision
Plan and Sector Goals. Inputs from
stakeholders on the city vision and sector
goals were supplemented by a Hindi
Questionnaire survey. The objective of
questionnaire survey was to elicit responses
on questions related to overall city
infrastructure and health & service level of
infrastructure facilities.
3.
168
169
In addition to the Questionnaire Survey, several issues ranging from physical, social and economic
infrastructure to the vision of the Hoshangabad city
for the year 2035 were discussed in detail.
Some of the key issues that were discussed in the
workshop are:
Generation of resources
Sewerage and Drainage Management
Traffic
Congestion near the Ghats
By-pass for the city
Improper Cleaning of Natural Drains
Clarifications in the land use plan
Over-utilization of individual septic tanks.
No alternate entertainment and hospitality near the Ghats
Lack of sufficient Public Conveniences near the Ghats
Need of Technical and Professional Education Institutions
Animals should be prevented from wandering on the city roads
Encroachments on the drainage system and city roads
In this workshop in addition to the formulation of the vision and sector goals, selection of strategies
based on their contribution towards achieving the city vision and sector goals were also discussed.
The selection of strategies was followed/ supplemented by prioritization of identified projects and
immediate actions required to achieve the sector goals. This workshop culminated in the
consolidation of city vision, sector goals, strategies, priority actions and projects.
Mr. Rawat, Hoshangabad Municipality, concluded the meeting with a vote of thanks to the Council,
other stakeholders and IMaCSs team.
170
The Stakeholder had given the following suggestions to be included in the final CDP.
1. Broad recommendations for the future extension of Municipal Limits
2. Provision of parking spaces, to reduce traffic related problems in the city especially due to weekly
market on Sunday.
3. Proposal to enhance of tourism by introducing Ropeway trolleys across river Narmada.
4. Optimum use for the Old bus stand, which is lying vacant
IMaCS concluded the meeting with a vote of thanks to all the stakeholders.
171
172
Questionnaire Survey
The Vision stakeholder workshop also involved a questionnaire survey to elicit stakeholders
responses on key issues faced by city and extent of their severity. A questionnaire, provided in this
Annexure, was designed by IMaCS team to gain a comprehensive understanding of city-level and
ward-specific issues encountered by citizens of Hoshangabad. The questionnaire survey tried to
obtain stakeholders vision of city, prioritization of criticality of various urban services and prioritization
of criticality of various components in each sector.
Questionnaire
The questionnaire was divided into two parts; one corresponding to the entire city and the second part
corresponding to the ward specific issues.
In the first part of the questionnaire, questions pertaining to the whole city were included such as
important aspects of the city, economic drivers, physical & social infrastructure, etc. The respondents
were asked to rank the criticality of the issues on a scale of 1 to 9 with 1 being most critical and 9
being the least. The guidelines to decide the criticality included importance of a particular sector in
citys development and existing status of the sector. These sectors were further divided into various
components and respondents were again asked to rank the criticality of these components. This
provided the information corresponding to the adequacy of the supporting infrastructure and facilities
related to these sectors. The sectors included in the questionnaire were: Road network, Road surface
condition, Water Supply, Sewerage facility, Storm water drainage, Solid waste management, Health
facilities, Education facilities, and Greenery and adequacy of open space e.g. adequacy of parks,
lawns in the city etc.
In the second part of the questionnaire, a detailed survey of ward-wise infrastructure facilities was
carried out. The approach and methodology adopted in this part was same as that followed in the first
part of the questionnaire. Each respondent was asked to respond with respect to the ward he/she
belongs to.
The data collected through the questionnaire survey was analyzed to prioritize various
sectors/services of the city according to their criticality. In addition to this, various components of each
sector were also prioritized in order to identify the critical areas of all urban sectors/services. The data
set included40responses for each question of the questionnaire.
Questionnaire analysis:
According to majority of respondents, Hoshangabad city existence and evolution revolves around the
Narmada River, which makes the city holy. Other things which are of significant importance to citys
cultural and socio-economic development are Salkanpur temple, Sethani ghat and Greenery in the
city.
A basic analysis which includes percentage of respondents who have ranked various infrastructure
sectors on a scale of 1 to 9 is given in Table A.A brief study of Table A suggests that Storm Water
Drainage System, Road Surface Condition and Sewerage facility are among the most critical
problems of Hoshangabad city.
Table A Status of Infrastructure Facilities
Rank
Road Network
5%
3
-
15%
4
15%
5
25%
6
20%
7
5%
8
10%
9
5%
173
Rank
20%
10%
25%
15%
10%
5%
15%
Availability of water
10%
5%
10%
30%
5%
10%
30%
Sewerage facility
Storm Water Drainage
5%
30%
35%
35%
5%
10%
5%
10%
15%
5%
10%
-
20%
10%
5%
-
Solid Waste
20%
10%
15%
10%
5%
5%
15%
20%
Health Facility
5%
5%
25%
15%
20%
10%
20%
Education Facility
Parks
5%
-
5%
-
20%
-
10%
10%
15%
10%
15%
15%
25%
30%
5%
35%
In addition to a preliminary analysis, an overall rank for each sector was derived out of cumulative
perception in terms of its criticality. A decreasing rank order of various infrastructure facilities is given
in Table B. The ranking thus obtained lays down a path for prioritization of development works in the
city. It would try to synchronize the usage of developmental funds with the needs of the city. It should
be kept in mind that Table B is only an indicator of relative criticality of various sectors/services.
Table B Ranking of Infrastructure Facilities
Rank
Infrastructure Facility
Sewerage facility
Health Facility
Road Network
Education facility
Availability of water
Parks, Lawns
A detailed analysis was carried out for each sector in order to identify the most critical problem within
each sector. The findings of this analysis will be useful while devising City Investment Plan, Annual
Action Plan and Prioritization of projects within each sector. Table C lists most critical problems in the
various sectors/services of the city.
Table C Critical Sectoral Issues
Sector
Water Supply
Supply Hours
Blocked Drains
Transportation
Encroachments
As for the social infrastructure, stakeholders were asked to rank their perception on a scale of 1 to 4
with 1 being good, 2 being Satisfactory, 3 being Poor and 4 being Very Poor. Table D quantifies the
stakeholders perception in terms percentage of responses that allotted every facility a particular rank.
174
Table D indicates that the city in-general suffers from poor social infrastructure which includes parks,
proper markets & parking space, recreational activities, and good education and health care.
Parks
15%
40%
45%
Market
5%
40%
55%
Movie Hall
5%
60%
35%
Hotel/Restaurants
15%
55%
30%
Street Shops
5%
60%
35%
Playground/Stadium
15%
50%
20%
Above was a brief analysis of the responses received during questionnaire survey. The findings of this
survey would be of great assistance during various stages of the study. The findings have been well
incorporated in this City Vision and Sector Goals Report. The findings of this report will play a key
role during the devising of City Investment Plan and Annual Action Plans. The Vision stakeholder
workshop also involved a questionnaire survey to elicit stakeholders responses on key issues faced
by city and extent of their severity. A questionnaire, provided in this Annexure, was designed by
IMaCS team to gain a comprehensive understanding of city-level and ward-specific issues
encountered by citizens of Hoshangabad. The questionnaire survey tried to obtain stakeholders
vision of city, prioritization of criticality of various urban services and prioritization of criticality of
various components in each sector.
A copy of questionnaire is also attached in this Annexure.
175
176
177
178
179
180
181
182
Financial Projections
Financial Year ------>
2005
-06
2006
-07
2007
-08
2008
-09
2009
-10
Actuals
2012
-13
2013
-14
2014
-15
2015
-16
2016
-17
2017
-18
2018
-19
2019
-20
2020
-21
Projection
69
612
513
820
820
69
680
558
940
1039
-30
752
615
1347
1347
-30
1093
814
2683
2667
-15
754
713
1121
1095
0
0
11
939
815
1602
1516
1
35
96
1084
963
2408
2353
2
106
151
1248
1199
3005
3043
4
204
114
1423
1423
3600
3620
14
324
94
1654
1646
3578
3566
21
436
106
1899
1784
2057
1942
22
458
220
2086
1940
2168
2021
28
481
367
2281
2107
2368
2194
32
505
541
2495
2285
2588
2377
32
530
752
2732
2479
2831
2578
32
557
(334)
98
123
138
279
41
124
121
49
115
146
175
211
253
16
(0)
(100)
16
26
85
54
(37)
(20)
12
115
146
175
211
253
69
69
(30)
(30)
(15)
11
96
151
114
94
106
220
367
541
752
1,00
5
63.5
1
80%
14.0
8
81%
1.02
1.38
6.25
6.19
6.44
7.56
8.87
76%
186.
22
78%
83%
85%
86%
86%
87%
87%
88%
PT Collection Performance
REVENUE ACCOUNT
RECEIPTS
I
Own Sources
Tax Revenue
1 Property Tax
2 Integrated tax
3 Other Taxes
Non Tax
1 Rental Income from Municipal Properties
2 Water Charges
3 Sewerage Charges
4 License and Fees
5 Others
Sub Total Own Revenue
2011
-12
53
352
686
585
569
DSCR
2010
-11
Estim
ate
25
11
1
30
18
3
40
7
5
26
8
5
132
10
8
33
12
5
64
13
5
76
14
6
82
15
6
85
16
7
88
17
7
109
18
8
115
20
8
119
22
9
123
23
10
128
25
10
68
22
139
21
154
24
157
31
359
52
196
34
2
13
142
2
24
237
3
61
296
3
35
265
14
64
638
6
44
329
220
109
0
6
49
467
246
155
0
7
55
559
276
197
19
8
62
664
309
232
47
9
69
774
346
292
94
10
78
932
387
347
128
11
87
1095
434
368
138
12
97
1192
486
384
144
14
109
1286
544
399
150
16
122
1387
610
415
156
17
137
1498
183
II
II
I
260
0
59
1
319
180
35
72
0
288
283
29
75
0
387
311
35
8
0
355
251
24
57
1
333
281
26
61
1
369
315
28
66
1
410
353
30
72
1
456
395
33
77
1
506
443
36
84
1
563
496
38
90
1
625
555
41
97
1
695
622
45
105
1
773
697
48
114
1
860
780
52
123
1
956
27
0
32
0
60
352
23
11
21
0
55
612
37
6
54
0
97
680
32
0
68
0
100
752
50
1
50
0
101
1093
38
4
50
0
92
754
42
4
56
0
103
939
48
5
63
0
115
1084
53
5
70
0
128
1248
60
5
78
0
143
1423
67
6
87
0
160
1654
75
6
98
0
178
1899
84
7
109
0
199
2086
94
7
122
0
223
2281
105
8
136
0
249
2495
118
8
152
0
278
2732
256
24
285
26
292
28
363
43
525
36
448
35
493
34
543
35
651
37
716
35
788
35
867
35
953
36
1049
36
1154
35
1269
35
120
172
197
169
199
188
0
207
35
228
106
251
204
276
324
303
436
334
458
367
481
404
505
444
530
489
557
0
0
0
1
0
2
0
4
0
14
0
21
0
22
0
28
0
32
0
32
0
32
17
22
37
35
49
35
39
43
47
52
57
62
69
75
83
91
425
513
558
615
814
713
815
963
1199
1423
1646
1784
1940
2107
2285
2479
0
0
0
0
0
0
0
0
0
0
0
0
0
8
0
16
0
23
0
121
0
74
0
0
0
0
0
0
0
0
0
0
2
2
39
78
91
126
108
27
28
29
30
Road maintenance
Mid day meal
State finance commission (S.F.C)
Other grants
Sub total Revenue Grants
Total Revenue Receipts
EXPENDITURE
I
Salaries/ Wages & Allowances
II
Administrative Expenses
II
Operation & Maintenance
I
1 Existing O&M
2 New O&M
I
Programme Expenses
V
V Repayment of Loans
1 Existing Loans
2 New Loans
V
Other Miscellaneous expenditure
I
Total Revenue Expenses
C
88
13
49
1
150
CAPITAL ACCOUNT
RECEIPTS
I
Sale of asset
II
Loans
II
Public Contribution
I
I
Income from Connection Fee (Water & Sewerage)
V
V Grants & Contributions
184
1
2
3
4
5
6
7
8
V
I
Special Projects
Basic services
UIDSSMT
IHSDP
Flood relief & NRCP
T.F.C
Other Grants
New Grants
Sub Total Grants
1
108
0
0
15
0
75
0
134
0
0
5
29
24
6
76
0
0
0
58
88
0
146
0
21
299
0
94
0
200
800
250
205
60
38
0
149
0
0
113
32
69
200
192
228
560
1553
363
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
34
0
618
652
0
37
0
1232
1269
0
40
0
1617
1657
0
43
0
1922
1965
0
47
0
1677
1724
0
51
0
0
51
0
55
0
0
55
0
59
0
0
59
0
64
0
0
64
0
69
0
0
69
201
193
230
564
1557
367
663
1323
1757
2177
1924
158
81
87
93
99
118
295
444
672
1796
382
701
1390
1843
2197
1920
158
81
87
93
99
EXPENDITURE
I
CAPEX
V
185
186
Name
Area (Hectare)
Dongarwada
833.19
Khojanpur
857.99
Byawara
697.87
Pawaar Kheda
299.41
Budhwada
371.64
Agra Kala
273.65
Khedla
439.09
Tugaariya
123.97
Patlai Khurd
222.93
10
Kulmadi
577.12
11
Pathaudi
178.17
12
Plaasi
136.89
13
Undrakhedi
225.52
14
Deshmohani
228.38
15
Chandrapura
293.56
16
Jalalabad
173.92
17
Dogri
173.54
18
Malakhedi
562.09
19
Phefartaal
564.94
20
Rasuliya
295.10
21
Kishanpura
209.38
22
Raipur
2272.06
23
Jaasalpur
24
Nimsaadiya
Total
Existing Hoshangabad Town
Grand Total
984.4
1782.36
12777.18
1233.46
14010.64
187
188
Demography
The current Municipal jurisdictional area comprises of nine villages at present namely Khojanpur,
Rasuliya, Jalalabad, Malakhedi, Kishanpura, Dongri, Budhwada, Kulamadi and Phefartaal.
Kishanpura is the only village which is totally inside the municipal area; whereas the other villages
have some part inside the municipal limits. As per Census 2001, Hoshangabad Municipality has a
population of 97,424, which will be increased by additional population of 20,421 from extended area.
For the existing Municipal Area & population the detailed analysis and recommendation are already
discussed in the Chapter 3, 6, and 8 etc. So recommendation in this section will be limited to the
additional area and additional population. It should be read along with the recommendation suggested
for existing areas.
Population Projections
The present growth rate of these villages is very less, therefore while projecting the future population
of this area we have assumed the growth rate as 2.7% which is same as the growth rate of the urban
area in Hoshangabad. As Hoshangabad is growing at a very fast pace due to the growth of various
economic activities in the area therefore it is expected that the surrounding area would also grow at
the same growth rate.
Population Projections for extended area
Year
1991
2001
2011
2015
2021
2025
2031
2035
Population
Projection
17364
20421
26751
29802
32492
38183
43644
47953
As shown above the projected population for the extended area is 47953 for the year 2035. The
infrastructural facilities for the extended area have been proposed for the extended area.
Infrastructural Facilities
Physical Infrastructure
Water Supply: The existing source of water supply in the extended area is tube wells. But
once this area will become part of Hoshangabad Municipality, the water supply will be
administered by Hoshangabad Municipality, which will lead to the source augmented by
additional 6.5 MLD for the above projected population. All the areas will have to connect by
network of ESR & GSRs with distribution network. As the additional villages are very sparsely
populated. We recommend that water supply distribution network should be developed in
phased manner.
Sewerage System: As the extended area is very sparsely populated there is no sewerage
system prevailing in the area. We recommend that septic tanks should be proposed to cater
189
the needs of the existing population; this system can be upgraded as soon as it comes under
the jurisdictions of the municipality.
Solid Waste Management: Currently the extended area does not face any serious problems
related to solid waste management because it is very sparsely populated. As per the 2001
census 5 villages are uninhabited and the land under these villages is majorly under
cultivation, hence there are no problems leading to environmental hazards. The expected
solid waste generation per person in 2035 will be about 12 MT per day. ULB will be
responsible for managing the solid waste in the extended area when it will be included in the
municipal limits.
Roads: At present the connectivity in the extended area is very poor. There is a proposal for
developing a by-pass in the southern part of the extended area. Therefore the ULB should
provide better linkages by connecting the rural areas with the major state and national
highway passing from the city.
Social Infrastructure
Health Facilities: At present the health facilities in the region are very poor. The rural
population has to visit Hoshangabad or even Bhopal for getting Medical facilities. Therefore it
is important to provide medical facilities at different levels in order to reduce the burden from
the medical infrastructure in Hoshangabad. We also recommend that the medical facilities
should be located on major junctions and major roads which can be easily accessible for all
parts of the extended area requirement.
Educational Facilities: The status of educational infrastructure is very similar to the health
infrastructure. There are no schools, colleges catering to the needs of the people. The rural
population generally goes to Hoshangabad and even Bhopal for higher education which
increases the burden on already overburdened cities, therefore it is necessary to provide
educational infrastructure catering to the needs of the extended area.
Proposed land use:
Residential
At present these villages are very sparsely populated, so there is very little chance of development in
the distant areas. We also recommend on the same line of the Master Plan recommendation that
development will be more in surrounding areas of existing Municipal area. The probable residential
area is shown the map below.
Commercial
The present commercial sector of Hoshangabad is currently located in the central city on the major
roads. This leads to the traffic congestion due to excessive parking on the streets. Therefore in order
to reduce the excessive burden from the infrastructure of the core city, major commercial centres
would be located in the extended area
Major interventions
Development of transport nagar in Hoshangabad
Development of Krishi Upaj Mandi, Kirana Mandi and Rajya Anaj Bhandar in the extended
area boundary
Shifting of Kabadi market from its existing location to the outskirts of the city.
190
Industrial
As Hoshangabad has been proposed as a major industrial hub in the development plan, it is important
to delineate industrial clusters in the city. This would help in the regulating the city land use by
avoiding incompatibility between the non-confirming land uses. Considering the growth pattern of the
city towards Pipariya and Harda industries can be clustered on SH 22 and SH 15; this would also help
in regulating better linkages between Hoshangabad and its surrounding areas.
Major interventions
Development of industrial area in Hoshangabad
Shifting of the existing factories from the core city to the proposed industrial area.
Development of small scale industries in the inner city to increase the household income.
Shifting of brick kilns
Recreational
As Hoshangabad has been proposed as an industrial area, hence it is expected to face enormous
pressure on the infrastructure due to increase in population which will cause traffic problems and also
lead to environmental degradation due to industrial pollution. Therefore it is very important to develop
a green belt within the city in order to control the environmental degradation.
Major interventions
Development of 100 m Green belt along Narmada River and 15m green belt along all the
nallahs in the city
Development of buffer zone by tree plantation along the railway line which would also act as a
continuity of open spaces
Stadium and swimming pool for encouraging sport related activities in the city.
Conservation of Adamgarh fort and its surrounding area as per the guidelines of
Archeological Survey of India.
191
192
Disclaimer: The report is based on information collected by IMaCS from sources believed to be
reliable. While all reasonable care has been taken to ensure that the information contained herein is
not untrue or misleading, IMaCS is not responsible for any losses that the client may incur from the
use of this report or its contents. The assessment is based on information that is currently available
and is liable to change. The analysis that follows should not be construed to be a credit rating
assigned by ICRAs Rating Division for any of the companys debt instruments. IMaCS is not a legal
firm and our advice/recommendations should not be construed as legal advice on any issue.
193