Agenda
Introduction
Long term trends in the global
cement industry
FLSmidths role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
Positions in FLSmidth:
VP, Head of Project Division EMEA/APAC
Agenda
Introduction
Long term trends in the global
cement industry
FLSmidths role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
mty
160
140
2009E:
25-50 mty
120
Expected
future
average:
100
80
~ 60-75 mty
60
40
20
2009E
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
Geographical distribution of
new global contracted cement kiln capacity
(excl. China)
mty
160
140
120
100
80
60
40
20
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
10
Wet kilns
1892: 1.8x18 m
35 tpd
1967: 7.6x232 m
3500 tpd
Preheater kilns
1970: 6.0x96 m
4000 tpd
Precalciner kilns
1984: 5.0x80 m
5500 tpd
1990: 6.0x96 m
10,000 tpd
2006 : 6.6x93 m
12,000 tpd
11
12
6000
5000
4000
3000
2000
1000
1970
1980
1990
2000
2010
Year
Capital Market Day 2009
13
14
Rapid increase in
alternative fuel
usage during the
past 5 years
60
50
40
- due to focus
on lowering
production costs in
a cement market
with excess
production
capacity
30
20
10
0
1999
2000
2001
2002
2003
2004
2005
15
The trends
To there
16
Agenda
Introduction
Long term trends in the global
cement industry
FLSmidths role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
17
FLSmidth
FLSmidth strengths
strengths
and
and capabilities
capabilities
Feasibility study
Proposal stage and signing of contract
Design and order handling stage
Civil design and construction
Erection, start-up,
Commissioning, handover, guarantees
Production, operation and maintenance of the
plant
18
Feasibility stage
Market
Market size,
size, cement
cement prices,
prices,
investment
investment costs
costs ??
Budget
Budget proposals
proposals
for
for various
various sizes
sizes
19
Leadtime
Leadtime as
as aa conseconsequence
quence of
of requirements
requirements
24 mth
Basic
plant
Adapted
plant
Taylor
made
Capital Market Day 2009
20
FLSmidth
FLSmidth tests
tests the
the
raw
raw materials
materials
R&D and test centre in
Denmark and India
21
Advanced
Advanced process
process design
design
22
FLSmidth
FLSmidth has
has equipment
equipment
for
for the
the entire
entire proces
proces
Electrical equipment
Vendor equipment
23
FLSmidth
FLSmidth offers
offers split-supply
split-supply
3
4
18
7
6
1
40% imported
60% local manufactured
12
24
Typical
Typical cost
cost composition
composition
Buildings
30%
Erection
15%
Transport
5%
Machinery
40%
Supervision
5%
Others
5%
25
Equipment
Different
Different options
options are
are
possible
possible
Construction
Civil design
Erection
26
All
All information
information sources
sources
are
are used
used such
such as
as
Google
Google Earth
Earth etc.
etc.
27
3D
3D layouts
layouts and
and models
models
28
3D
3D layouts
layouts incorporated
incorporated
in
in actual
actual landscape
landscape
29
Quick
Quick order
order start
start
30
AA strong
strong project
project team
team
31
Company
Company size
size and
and
strengths
strengths in
in market
market
Buying
power
Supply chain
Customer
FLSmidth
Vendor
relations
32
World
World wide
wide design
design
33
Integrated
Integrated technical
technical
and
and civil
civil design
design
34
Close
Close co-operation
co-operation with
with
large
large workshops
workshops
35
Shipping
Safe
Safe transport
transport
Odd-size
Odd-size equipment
equipment
or
or in
in containers
containers
36
Experienced
Experienced and
and
skilled
skilled supervisors
supervisors
37
FLSmidth
FLSmidth Institute
Institute
-- good
good training
training programme
programme
38
FLSmidth
FLSmidth has
has aa good
good record
record
for
for reaching
reaching all
all guarantees
guarantees
FLSmidth
39
FLSmidth
FLSmidth offers
offers full
full
operation
operation and
and maintenance
maintenance
40
Agenda
Introduction
Long term trends in the global
cement industry
FLSmidths role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
41
42
100%
Shipping
90%
Manufacture
80%
70%
Procurement
Engineering
50%
40%
Letter of Credit
30%
Down payment
20%
10%
0%
10
th
11
th
12
th
13
th
14
th
15
th
16
th
17
th
18
th
19
th
20
th
21
st
22
nd
23
rd
24
th
25
th
26
th
27
th
28
th
30 29
th
th
(P
AC
)
9t
h
8t
h
7t
h
6t
h
5t
h
4t
h
3r
d
2n
d
-10%
1s
t
Contract
60%
Period of execution
POC
Capital Market Day 2009
Net Sales
CM
SG&A
EBIT
43
100%
Shipping
90%
Manufacture
80%
70%
Procurement
Engineering
50%
40%
Letter of Credit
30%
Down payment
20%
10%
0%
10
th
11
th
12
th
13
th
14
th
15
th
16
th
17
th
18
th
19
th
20
th
21
st
22
nd
23
rd
24
th
25
th
26
th
27
th
28
th
30 29
th
th
(P
AC
)
9t
h
8t
h
7t
h
6t
h
5t
h
4t
h
3r
d
2n
d
-10%
1s
t
Contract
60%
Period of execution
POC
Capital Market Day 2009
Net Sales
CM
SG&A
EBIT
44
45
40%
30%
20%
10%
9t
h
10
th
11
th
12
th
13
th
14
th
15
th
16
th
17
th
18
th
19
th
20
th
21
st
22
nd
23
rd
24
th
25
th
26
th
27
th
28
th
30 2 9
th
th
(P
AC
)
31
st
8t
h
7t
h
6t
h
5t
h
4t
h
3r
d
-10%
2n
d
0%
1s
t
Contract
50%
-20%
Period of Execution
Client payments
Capital Market Day 2009
SG&A payments
Net Cash
46
Put on hold
Initiated work and issue of purchase orders stop
Contract and time schedule is amended
We preserve the right to be compensated for
any additional costs
Some clients are constrained on cash, others are
adjusting priorities
Capital Market Day 2009
47
48
Agenda
Introduction
Long term trends in the global
cement industry
FLSmidths role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
49
50
Project centres
Capital Market Day 2009
Production
Rep. offices
51
52
Filter
Crusher
Filter
Analyzer
Limestone
Sand
Clay
1
Iron
3
Raw meal
silo
4
Storage
Coal mill
4 3
Grate
cooler
Raw mill
Clinker
Silo
Separator
2
Packers
3
Cement
silo
Cement
silo
Cement
silo
Cement mill
Gear unit
Ship unloading
Roller press
Ship loading
53
Holcim
Ste.continue
Genevieve
Cement
kiln sizes
to grow
The worlds first 12,000 tpd single kiln line
ILC preheater
DUOFLEX burner
ATOX mills
OK mills
3-support kiln
MMC Cooler
54
55
Platin
Ash Grove, Moapa
4350Grove
tpd Essroc,
Martinsburg
Ash
foreman
4200 tpd 5000 tpd
Keystone, Bath
Ste. Genevieve3000 tpd
12000 tpdLafarge Joppa
7200 tpd
Rio Grande Pueblo
1800 tpd
Cem. Andorra
2350 tpd
Ozarow 2
7000 tpdHolcim
Ivano-Frankivsk
KarcementKursk Hoang Thach 3
2300
5500
tpdtpd
LSR
Slantsy
Jovein
Akbulak
4100 tpd
3200 Podgorensky
tpd 3500 tpd3300 tpd
Cimsa Eskisehir
5000tpd
tpd
3900
6000
tpd
Madras
Cement
6000
tpd
JP Kutch
CIBA (Orascom)
Aleppo
2100 tpd
Ait Baha
7600
tpd
Abyek
Cement
Kokshe
Cement Ha Long
10000 tpd
1500
tpd Grey 7500Khuzestan,
tpd Gulf Cement
Ramhormoz
CIBA
5500 tpd
5000 tpd
tpd
5500 tpd
Sinai White
2 24500
Arabian
CC,5500
Ramliya
AUCC
tpd
6250
tpd
5000
tpd
ABG
Kutch
Volyn
1300
tpd6000
Sanghi, Kutch
Sinai,
Gabal
tpd
Rabigh
Star
Cement
5000
tpdLebni 2ACC,
ACC
Chanda
10000
tpd
6000
tpd
10000
tpd Adilabad
4200 tpd
7000
6500 tpd
Orient,
7000
tpd
Dalmia
Ain Soukna
EMCC (Orascom) 4000 tpd
Marquesado
3300 tpdMolins
3000 tpd
Tepeaca
10000 tpd
Lappeenranta
4000 tpd
Carribean Cement
50007500
tpd tpd
3250 tpd
Al Takamol
Unicem, Calabar
Argos
4500 tpd
6250 tpd
4500 tpd
3x4500 tpd
Binani 2
6500 tpd
Indocement
700 tpd
Fancesa
750 tpd
CSN
Natal Simuma
2 x OK 39
1500 tpd
Dwaalboom
3300 tpd
Golden Bay
350 tpd
56
North America
>356
Central America
>94
South America
>162
Europe
>674
CIS
>45
Middle East
>55
India
>141
Rest of Asia
Africa
>269
>96
Australia
>25
57
58
59
60
Questions