Beruflich Dokumente
Kultur Dokumente
Installation Preparation
Part Number: PTR11-34070 NOTE: Part number of this accessory may not be
the same as the part number shown.
Kit Contents General Applicability
Item # Quantity Reqd. Description ALL 2007MY TUNDRA TRUCKS
1 1 Rear Sway Bar
Recommended Sequence of Application
2 2 End Links
Item # Accessory
3 1 Hardware Bag
1 Genuine Hitch
4 1 Installation Instructions
2 TRD Dual Exhaust
3 TRD Rear Sway Bar
Hardware Bag Contents
Item # Quantity Reqd. Description *Mandatory
1 2 Upper End Link Bolts – M14 x Vehicle Service Parts (may be required for reassembly)
1.5 x 120
Item # Quantity Reqd. Description
2 6 Upper End Link Washers
1
3 2 Upper End Link Frame Spacers
4 2 Upper End Link Auxiliary
Washers(For Vehicles without Legend
Hitch)
5 2 Lower End Link Bolts – M12 x STOP: Damage to the vehicle may occur. Do not
1.5 x 70 proceed until process has been complied with.
6 2 Lower End Link Nylock Nuts OPERATOR SAFETY: Use caution to avoid risk of
7 2 U-Bolts injury.
8 2 Saddle Brackets CAUTION: A process that must be carefully observed
9 4 U-Bolt ½ USS Washers in order to reduce the risk of damage to the
accessory/vehicle and to ensure a quality installation.
10 4 U-Bolt ½ - 20 Nylock Nuts
11 2 Rear Sway Bar Bushings TOOLS & EQUIPMENT: Used in Figures calls out the
specific tools and equipment recommended for this
12 2 Rear Sway Bar Bushing process.
Brackets
REVISION MARK: This mark highlights a change in
13 2 Bushing Lubricant installation with respect to previous issue.
Conflicts
None
Recommended Tools
Personal & Vehicle Notes
Protection
Vehicle Protection Seat/Floor Covers
Safety Glasses
1. Pre-installation Preparation
(a) Use Seat & Floor Protectors to avoid damage
to surfaces.
STOP
(b) Firmly apply parking brake.
STOP (c) Put transmission in “P”(Automatic)
(d) Lift vehicle.
REMOVE BOLT
End Links are correctly oriented & Verify end links are oriented with white dot
installed. indicating TOP