Sie sind auf Seite 1von 1

Federal Register / Vol. 70, No.

123 / Tuesday, June 28, 2005 / Notices 37095

DEPARTMENT OF DEFENSE of all project benefits. The project is 6. Availability of Draft EIS. The Corps
currently being operated at a reduced intends to issue the Draft EIS in the
Department of the Army; Corps of capacity to deal with the risk until a spring of 2006. The Corps will
Engineers permanent solution is implemented to announce availability of the draft in the
address the dam safety concern. Federal Register and other media, and
Intent to Prepare a Draft Environmental 2. Proposed Action and Alternatives. will provide the public, organizations,
Impact Statement for the Success Dam The Corps’ tentatively preferred and agencies with an opportunity to
Seismic Remediation Project, CA alternative is to construct a new roller submit comments, which will be
AGENCY: Department of the Army, U.S. compacted concrete (RCC) dam addressed in the Final EIS.
Army Corps of Engineers, DoD. immediately downstream of the existing Dated: June 13, 2005.
ACTION: Notice of intent. earthen dam. In addition to the no- Ronald N. Light,
action alternative, other alternatives to
SUMMARY: Pursuant to the National
Colonel, Corps of Engineers, District Engineer.
be evaluated include a new earthen
Environmental Policy Act of 1969, as [FR Doc. 05–12704 Filed 6–27–05; 8:45 am]
embarkment dam immediately
amended, the U.S. Army Corps of downstream of the existing dam, and BILLING CODE 3710–EZ–M
Engineers, Sacramento District (Corps), modifications to the existing dam
intends to prepare a Draft consisting of upstream jet grout with
Environmental Impact Statement (EIS) removal and replacement of the DEPARTMENT OF ENERGY
for the Federal action to remediate downstream foundation. The proposed
seismic dam safety concerns at the Lake Office of Energy Efficiency and
RCC dam alternative would not provide
Success Project located on the Tule Renewable Energy
any additional storage capacity beyond
River, near Porterville, CA. The the existing dam. However, additional
proposed action is being conducted Biomass Research and Development
storage for flood protection and Technical Advisory Committee
through the Corps’ Dam Safety irrigation water would be provided
Assurance Program for the evaluation of under the separately authorized dam AGENCY: Department of Energy.
existing dams. spillway raise project. Construction of ACTION: Notice of open meeting.
ADDRESSES: Submit questions or the spillway raise project may be
comments regarding the subject dam integrated into the construction of the SUMMARY: This notice announces an
safety project to Mr. Matt Davis, U.S. dam safety project. The exact nature and open meeting of the Biomass Research
Army Corps of Engineers, 1325 J. Street, extent of alternatives will be determined and Development Technical Advisory
Sacramento, CA 95814–2922, fax (916) based on public and agency input Committee under the Biomass Research
557–7856, or e-mail: during the scoping period and and Development Act of 2000. The
Matthew.G.Davis@usace.army.mil. preparation of the Draft EIS. Federal Advisory Committee Act (Pub.
Requests to be placed on a mailing list 3. Issues to be Addressed. The Draft L. 92–463, 86 Stat. 770) requires that
for this project should also be sent to EIS will address environmental issues agencies publish these notices in the
this address. concerning the proposed action. Issues Federal Register to allow for public
FOR FURTHER INFORMATION CONTACT: Mr. will be identified based on public input participation. This notice announces the
Matt Davis, (916) 557–6708. during the scoping period and during meeting of the Biomass Research and
preparation of the Draft EIS. Issues Development Technical Advisory
SUPPLEMENTARY INFORMATION: 1.
identified initially as potentially Committee.
Background Information. Based on
current engineering knowledge, the significant include: hydrology, DATES: July 19, 2005; 8:30 a.m.
Corps has determined that Success Dam biological resources, recreation, land ADDRESSES: Washington Marriott, 1221
near Porterville, CA, in Tulare County, use, visual quality, traffic safety, 22nd Street, NW., Washington, DC.
has a fairly high likelihood of failure in cultural resources, noise, and air FOR FURTHER INFORMATION CONTACT: Neil
the event of an earthquake. All studies quality. Rossmeissl, Designated Federal Officer
that have been conducted show that the 4. Public Involvement. The Corps will for the Committee, Office of Energy
dam is likely to fail under relatively low hold a public scoping meeting to receive Efficiency and Renewable Energy, U.S.
levels of earthquake shaking. The public comments and to solicit input Department of Energy, 1000
estimated probability of a damaging regarding environmental issues of Independence Avenue, SW.,
earthquake that would breach or overtop concern to the public and the Washington, DC 20585; (202) 586–7766.
the dam in its current condition is 1 in alternatives that should be addressed in SUPPLEMENTARY INFORMATION: Purpose of
285. Historical records indicate that at the Draft EIS. The public scoping Meeting: To provide advice and
least three times between 1857 and meeting place, data and time will be guidance that promotes research and
1952, earthquakes shook the future advertised in the Draft EIS. The public development leading to the production
Success Dam site sufficiently that the scoping meeting place, date and time of biobased industrial products.
current dam would have been seriously will be advertised in advance in local Tentative Agenda: Agenda will
damaged with a likely release of the newspapers, and meeting include discussions on the following:
reservoir had the dam been present. announcement letters will be sent to • Reevaluation of Vision targets
However, no such earthquakes have interested parties. Written comments • Evaluation of Committee
occurred in the 44 years since the dam may also be submitted via mail and accomplishments
was built. Given the potential for should be directed to Mr. Matt Davis • Development of recommendations
seismicity at and near the Success Dam, (see ADDRESSES). to incoming Committee members
along with the characteristics of the 5. Cooperating Agencies. Federal Public Participation: In keeping with
materials comprising the dam and its agencies interested in participating as a procedures, members of the public are
foundation, remediation work is Cooperating Agency are requested to welcome to observe the business of the
required to prevent loss of life, submit a letter of intent to Colonel Biomass Research and Development
extensive downstream damage, Ronald N. Light, District Engineer (see Technical Advisory Committee. To
functional loss of the project, and loss ADDRESSES). attend the meeting and/or to make oral

VerDate jul<14>2003 16:46 Jun 27, 2005 Jkt 205001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\28JNN1.SGM 28JNN1