33466 Federal Register / Vol. 70, No.

109 / Wednesday, June 8, 2005 / Notices

116.8 miles of dual 42-inch pipeline a motion to intervene in accordance Comment Date: 5 p.m. Eastern Time
connecting with the Creole Trail LNG with the requirements of the on June 23, 2005.
terminal; (2) 46.9 miles of single 42-inch Commission’s Rules of Practice and Linda Mitry,
pipeline extending from the Sabine Pass Procedure (18 CFR 385.214 or 385.211)
LNG terminal, under construction in Deputy Secretary.
and the Regulations under the NGA (18
Cameron Parish, Louisiana, to an [FR Doc. E5–2920 Filed 6–7–05; 8:45 am]
CFR 157.10). A person obtaining party
interconnection with the dual 42-inch status will be placed on the service list BILLING CODE 6717–01–P
pipeline; and (3) a 6.8-mile, 20-inch maintained by the Secretary of the
lateral line extending from the dual 42- Commission and will receive copies of
inch line to the proposed Dominion Gas DEPARTMENT OF ENERGY
all documents filed by the applicant and
Storage facility. The proposed pipeline
by all other parties. A party must submit Federal Energy Regulatory
facilities will run through Cameron,
Calcasieu, Beauregard, Jefferson Davis, 14 copies of filings made in the Commission
Allen, and Acadia Parishes, Louisiana. proceeding with the Commission and
must mail a copy to the applicant and [Docket Nos. RP04–203–000, RP05–105–000
In Docket No. CP05–358–000, Cheniere and RP05–164–000]
Creole Trail requests a blanket to every other party. Only parties to the
certificate under section 7(c) of the NGA proceeding can ask for court review of Equitrans, L.P.; Notice of Informal
and Part 157, Subpart F of the Commission orders in the proceeding. Settlement Conference
Commission’s regulations to perform However, a person does not have to
routine activities in connection with the June 2, 2005.
intervene in order to have comments
future construction, operation and Take notice that an informal
considered. The second way to
maintenance of the proposed pipeline. settlement conference will be held in
participate is by filing with the
In Docket No. CP05–359–000, Cheniere the above-referenced dockets starting at
Secretary of the Commission, as soon as 10 a.m. (EST) on Thursday, June 16 and
Creole Trail requests a blanket possible, an original and two copies of
certificate pursuant to section 7(c) of the 17, 2005 at the Federal Energy
comments in support of or in opposition Regulatory Commission, 888 First
NGA and Part 284, Subpart G of the
to this project. The Commission will Street, NE., Washington, DC 20426, for
Commission’s regulations to provide
consider these comments in the purpose of exploring a possible
open access natural gas transportation
services. determining the appropriate action to be settlement in the above-referenced
These applications are on file with the taken, but the filing of a comment alone proceeding.
Commission and open to public will not serve to make the filer a party Any party, as defined by 18 CFR
inspection. These filings are available to the proceeding. The Commission’s 385.102(c), or any participant as defined
for review at the Commission in the rules require that persons filing by 18 CFR 385.102(b), is invited to
Public Reference Room or may be comments in opposition to the project attend. Persons wishing to become a
viewed on the Commission’s Web site at provide copies of their protests only to party must move to intervene and
http://www.ferc.gov using the the party or parties directly involved in receive intervenor status pursuant to the
‘‘eLibrary’’ link. Enter the docket the protest. Commission’s regulations (18 CFR
number excluding the last three digits in Persons who wish to comment only 385.214).
the docket number field to access the on the environmental review of this
FERC conferences are accessible
document. For assistance, please contact under section 508 of the Rehabilitation
project should submit an original and
FERC Online Support at Act of 1973. For accessibility
FERCOnlineSupport@ferc.gov or toll two copies of their comments to the
accommodations please send an e-mail
free at (866) 208–3676, or for TTY, Secretary of the Commission. to accessibility@ferc.gov or call toll free
contact (202) 502–8659. Environmental commentors will be 866–208–3372 (voice) or 202–208–1659
In Docket No. PF05–8–000, Creole placed on the Commission’s (TTY), or send a FAX to 202–208–2106
Trail LNG and Cheniere Creole Trail environmental mailing list, will receive with the required accommodations.
participated in a pre-filing National copies of the environmental documents, For additional information, please
Environmental Policy Act review of the and will be notified of meetings contact Lorna Hadlock (202 502–8737).
proposed project to identify and resolve associated with the Commission’s
potential landowner and environmental environmental review process. Linda Mitry,
problems before the applications were Environmental commentors will not be Deputy Secretary.
filed. required to serve copies of filed [FR Doc. E5–2925 Filed 6–7–05; 8:45 am]
Any questions regarding these documents on all other parties. BILLING CODE 6717–01–P
applications should be directed to However, the non-party commentors
Patricia Outtrim, Cheniere LNG, Inc., will not receive copies of all documents
717 Texas Avenue, Suite 3100, Houston, filed by other parties or issued by the DEPARTMENT OF ENERGY
Texas 77002, (713) 659–1361 or Lisa Commission (except for the mailing of
Tonery, King & Spalding LLP, 1185 Federal Energy Regulatory
environmental documents issued by the Commission
Avenue of the Americas, New York, NY Commission) and will not have the right
10036, (212) 556–2307. to seek court review of the [Docket No. RP05–361–000]
There are two ways to become
Commission’s final order.
involved in the Commission’s review of Gas Transmission Northwest
this project. First, any person wishing to Comments, protests and interventions
Corporation; Notice of Tariff Filing
obtain legal status by becoming a party may be filed electronically via the
to the proceedings for this project Internet in lieu of paper; see, 18 CFR June 2, 2005.
should, on or before the comment date 385.2001(a)(1)(iii) and the instructions Take notice that on May 31, 2005, Gas
stated below file with the Federal on the Commission’s Web site under the Transmission Northwest (GTN)
Energy Regulatory Commission, 888 ‘‘e-Filing’’ link. The Commission tendered for filing as part of its FERC
First Street, NE., Washington, DC 20426, strongly encourages electronic filings. Gas Tariff, Third Revised Volume No.

VerDate jul<14>2003 18:08 Jun 07, 2005 Jkt 205001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\08JNN1.SGM 08JNN1

Das könnte Ihnen auch gefallen