Sie sind auf Seite 1von 11

Our Ref :

Date :

HTCC/UEMC/MRT V8/300mm and 250mm Dia. Relocation Pipe Jalan Reko


10 Jan 2015

UEM Construction Sdn Bhd


No. 5A, Jalan 51 / 217
Off Jalan Templer
46050 Petaling Jaya
Selangor, Malaysia
Attn : Mr. Chai Ted Fong / En. Ridzwan / En. Mohd Farid Ahmad Sudari
Dear Sirs,

PROJECT MRT LEMBAH KLANG JAJARAN SUNGAI BULOH - KAJANG

PACKAGE V8: CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND OTHER ASSOCIATED WO
FROM TAMAN MESRA TO KAJANG STATION
(RELOCATION OF 300MM DIA. AND 250MM DIA. WATER PIPE AT JALAN REKO)

QUOTATION (300mm Dia. And 250mm Dia. Water Pipe Relocation At Jalan Reko)

With reference to the above and site visit dated 6 Jan 2015, we are pleased to submit herewith the Quotation fo
kind consideration and acceptance.
Kindly pleased note that the GST is excluded and shall add on accordingly if applicable.

Thank you.

Yours faithfully,
for How Thong Construction & Civil Engineering Sdn. Bhd.

PHANG SIEW YEAN

ND OTHER ASSOCIATED WORKS

ation At Jalan Reko)

bmit herewith the Quotation for your

ly if applicable.

Project :

MRT V8

Subject :

Water Pipe Relocation at Jln Reko

Quotation
ITEM

DESCRIPTION

UNIT

QTY

RATE

Contract Amount

GENERAL NOTES:
i) All quantities are provisional and subject to SYABAS final approved piping
layout drawings, installation method and as-built drawings

ii) The contractor shall be responsible to verify and satisfy itself as to the
accuracy and sufficiency of any information provided by the
Consultant/Main Contractor. The contractor is deemed to have consulted all
relevant Authorities ascertained actual routing of pipe line.

iii) It is the contractor responsibility to obtain all approval from the revalent
authorities for the relocation works
iv) The Contractor shall review and verify the proposed scope of relocation
works with full responsibility to perform the works

v) The Contractor shall be deemed to have fully understood and considered


the Authority Requirements prior to preparation of its offer.

vi) The Contractor shall not in any way be relieved from any obligation
under the contract requirements should any technical information,
engineering data or other information obtained from the main contractor be
incorrect and/or insufficient.

vii) The contractor is advised to visit and examine the sites and its
surroundings and obtain for itself on its own responsibility all information
that may be necessary for preparing the pricing and entering into a contract
for constuction of the works.

PRELIMINARIES

Performance Guarantee/Bond

LS

By Main Con

Insurance of construction plant, materials in transit to site, EAR and


workman compensation.

LS

By Main Con

Mobilization & demobilization of all necessary labour, plants,


equipments and tools for completion of the relocation works including

LS

28,750.00

28,750.00

handling, assembling and removal off the site after completion.


d

Contribution, deposits, Bank Guarantee and other fees required by


the Authorities for the excution of the works including

LS

By Main Con

LS

By Main Con

application/processing fees for work permits


e

To carry out utilities mapping services to determine and verify the


proposed piping route is in order and free from other existing utilities

ei

To carry out piloting on connection and proposed pipe routing

LS

28,750.00

28,750.00

Survey and setting out works and prepare proposed site detailed
drawings in accordance with SYABAS requirements and coordinate
with SYABAS to obtain approval.
Total Carry Forward

LS

By Main Con
57,500.00

Page : 3/11

Project :

MRT V8

Subject :

Water Pipe Relocation at Jln Reko

Quotation
ITEM

DESCRIPTION

UNIT

Total Bring Forward


To provide Road Safety and Traffic management as per Authorities
requirements

Site access to site including working platform, making good and


reinstatement works during execution of the works and clearing the

QTY

RATE

Contract Amount

57,500.00
By Main Con

LS

LS

17,250.00

17,250.00

LS

17,250.00

17,250.00

LS

23,000.00

23,000.00

site to the satisfaction of the Consultant/Authorities


i

SYABAS submission(samples and shop drawings), appoval and


coordination including paying for all connection fees and all other
related fees and liaising with SYABAS for water main shut off
schedule, normalisation of water main and etc.

Allow for over times expenses of the consultant / main contractor /


sub contractor supervision

Allow for factory inspection and witness testing at the place of


LS

Nil

LS

m2

By Main Con

manufacturer's works for SYABAS representatives


l

Defects rectification works during defects liability period

Temporary sheet piling including design submission for approval,


installation, maintenance, extraction and removal from site.
(remeasure quantities)
Total Carry Forward

115,000.00

Page : 4/11

Project :

MRT V8

Subject :

Water Pipe Relocation at Jln Reko

Quotation
ITEM

DESCRIPTION

UNIT

QTY

RATE

115,000.00
0.00
0.00
0.00
0.00

Total Bring Forward


1

300mm and 250mm Dia. PIPE RELOCATION WORKS AT Jalan Reko

TRENCH EXCAVATION
Excavation trench for water pipe including backfilling, dewatering, disposal
of surplus earth material to an approved dump site and compaction.
i) 300mm MS Pipe
ii) 250mm MS Pipe
iii) 50mm Stainless Steel Pipe
iv) 40mm Stainless Steel Pipe
v) 32mm Stainless Steel Pipe
vi) 25mm Stainless Steel Pipe

ei
f

*Note: Resurface Premix By Mill & Pave By


Others

0.00

M
M
M
M
M
M

1,162
1,125
50
50
50
50

38.00
32.00
18.00
16.00
14.00
12.00

44,156.15
36,000.15
900.15
800.15
700.15
600.15

Extra Over for Sand Bedding for


i) 300mm MS Pipe
ii) 250mm MS Pipe

M
M

342
325

22.00
20.00

7,524.15
6,500.15

Extra Over for Road Cutting Using Diamond Cutter


i) 300mm MS Pipe
ii) 250mm MS Pipe

M
M

820
800

25.00
25.00

820.00

i) 300mm MS Pipe
ii) 250mm MS Pipe

M
M

820
800

90.00
85.00

Extra Over for Reinstate Premix Road c/w crusherun and premix at trench
width only
i) 300mm MS Pipe
ii) 250mm MS Pipe

M
M

820
800

110.00
105.00

Extra Over for Night Work

LS

Extra Over for Full Trench Sand Fill Under Existing Road

INSTALLATION OF WATER PIPE

0.00

Supply, deliver and Lay and joint MS and all pipe fittings inclusive of
transportation and handling of pipes, fittings, jointing (all types of pipe joints
and specials), thrust blocks etc to complete
i) 300mm MS Pipe
ii) 250mm MS Pipe
iii) 50mm Stainless Steel Pipe
iv) 40mm Stainless Steel Pipe
v) 32mm Stainless Steel Pipe
vi) 25mm Stainless Steel Pipe

0.00
M
M
M
M
M
M

1,162
1,125
50
50
50
50

310.00
250.00
150.00
120.00
100.00
80.00
0.00
0.00

BENDS
Install and joint MS Bends inclusive of fittings, pipe cutting, jointing (all
types of pipe joints and specials), and all the necessary bolts, nuts, washers
etc to complete
i) 300mm x45 Horizontal Bend
ii) 300mm x90 Horizontal Bend
iii) 250mm x45 Horizontal Bend
iv) 250mm x90 Horizontal Bend

Contract Amount

0.00
Nr
Nr
Nr
Nr

10
6
10
6

1,000.00
1,200.00
900.00
1,000.00

Install and joint DI T inclusive of fittings, pipe cutting, jointing (all types of
pipe joints and specials), and all the necessary bolts, nuts, washers etc to
complete
i) 300mm x 200mm T
ii) 250mm x 200mm T
iii) 250mm x 150mm T
iv) 300mm x 150mm T
v) 150mm x 150mm T

Nr
Nr
Nr
Nr
Nr

1
4
8
10
R.O.

1,600.00
1,400.00
1,200.00
1,400.00
800.00

Supply and install 100mm Dia. Fire Hydrant

Nr.

2,800.00

Page : 5/11

Project :

MRT V8

Subject :

Water Pipe Relocation at Jln Reko

Quotation
ITEM

DESCRIPTION

UNIT

Total Carry Forward

Page : 6/11

QTY

RATE

Contract Amount

Project :

MRT V8

Subject :

Water Pipe Relocation at Jln Reko

Quotation
ITEM

DESCRIPTION

UNIT

RATE

Contract Amount

Total Bring Forward

0.00

MS S Bend SUPPLY BENDS (DOUBLE FLANGED)

0.00

Supply and install MSCL S Bend c/w double flange bends, Double Flange
Short pieces inclusive of fittings, pipe cutting, jointing (all types of pipe joints
and specials), and all the necessary bolts, nuts, washers etc to complete
i) 300mm S Bend
ii) 250mm S Bend

0.00
Nr
Nr

2
2

13,000.00
9,000.00

Supply and install DI Sluice Valve c/w flanges, pipe adaptor fittings, pipe
cutting, jointing (all types of pipe joints and specials), and all the necessary
bolts, nuts, washers etc to complete
i) 300mm Sluice Valve
ii) 250mm Sluice Valve
iii) 200mm Sluice Valve
iv) 150mm Scour Valve

Nr
Nr
Nr
Nr

3
2
3
8

11,000.00
9,000.00
7,000.00
4,000.00

Heacy Duty Precast Valve Chamber (600mm x 600mm)


Supply, deliver, install Precast Valve Chamber

Nr

32

800.00

Nr.

80

100.00

Sluice Valve

MARKER POST
Supply, deliver, fixing at required location as per SYABAS requirements

QTY

TESTING AND STERILISING


Hydrostatic testing, sterilising and flushing for all the pipelines in
accordance with SYABAS requirements and approval including taking water
samples and testing at the approved laboratory

18,000.00

LS

0.00
g

REMOVAL OF ABANDONE PIPE


Excavate, Exposed, Cut Off, Remove, upload and transport away from site
the abandoned pipe

130,000.00

LS

CONNECTION WORKS
Supply all necessary jointing materials, fittings and equipment to carry out
connection works between newly laid pipe and existing pipe at locations as
indicated in the drawings including excavation, shoring, dewatering,
backfilling, compaction, coordinat

Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr

i) 300mm pipes
ii) 250mm pipes
iii) 200mm pipes
iv) 150mm pipes
v) 100mm pipes
vi) 32mm pipes
vi) 25mm pipes
vi) 20mm pipes

2
2
6
11
4
10
10
10

18,000.00
15,000.00
12,000.00
9,000.00
6,000.00
2,000.00
1,800.00
1,600.00

Allow for any other items not included in the foregoing but
required by drawings,specofications, requiremments of all
revant Authorities. Contractor to specified
i)Preliminaries
/
Mob
and
Demob
Supervisor..

ii)
iii)

Site

0.00

Total

Page : 7/11

UNIT
i) 300mm MS Pipe
ii) 250mm MS Pipe
iii) 50mm Stainless Steel Pipe
iv) 40mm Stainless Steel Pipe
v) 32mm Stainless Steel Pipe
vi) 25mm Stainless Steel Pipe

M
M
M
M
M
M

QUANTITY

1,162
1,125
50
50
50
50

ALL-IN

320.93

DES

300mm pipe

EXCN
38

1162

342

PRELIM
1504

EO EXCN SUPPLY/INSTALL
5.00266
310

1162

BEND
10 8.605852

T
1162 13.42513

337.0336