Sie sind auf Seite 1von 2

Federal Register / Vol. 70, No.

66 / Thursday, April 7, 2005 / Notices 17721

Estimated Number of Respondents: will be known as the Mixed Oxide Fuel For the Nuclear Regulatory Commission.
2,300. Fabrication Facility. Brian W. Smith,
Estimated Time Per Response: 15 The Commission has made Acting Branch Chief, Special Projects Branch,
minutes. appropriate findings as required by the Division of Fuel Cycle Safety and Safeguards,
Frequency of Response: On occasion. Office of Nuclear Material Safety and
Atomic Energy Act of 1954, as amended Safeguards.
Estimated Total Annual Burden (the Act), the Commission’s rules and
Hours: 575 hours. [FR Doc. E5–1596 Filed 4–6–05; 8:45 am]
regulations, and by the requirements of
Abstract: NARA uses volunteer BILLING CODE 7590–01–P
Section 102(2)(A) and (C) of the
resources to enhance its services to the
National Environmental Policy Act
public and to further its mission of
(NEPA), as set forth in Construction NUCLEAR REGULATORY
providing ready access to essential
Authorization No. CAMOX–001 (CA). COMMISSION
evidence. Volunteers assist in outreach
and public programs and provide II. Further Information [Docket No. 72–3]
technical and research support for
administrative, archival, library, and The CA is effective as of its date of Notice of Issuance of Renewed
curatorial staff. NARA needs a standard issuance. For further details see Materials License SNM–2502; Progress
way to recruit volunteers and assess the Construction Authorization No. Energy Carolinas, Incorporated; H. B.
qualifications of potential volunteers. CAMOX–001 (ADAMS Accession No. Robinson Steam Electric Plant, Unit 2
The NA Form 6045, Volunteer Service ML050660392) and the Office of Independent Spent Fuel Storage
Application Form, will be used by Nuclear Material Safety and Safeguards’ Installation
members of the public to signal their Final Safety Evaluation Report
interest in being a NARA volunteer and (NUREG–1821) dated March 2005 AGENCY: Nuclear Regulatory
to identify their qualifications for this (ADAMS Accession No. ML050660399). Commission.
work. The Final Safety Evaluation Report ACTION: Notice of issuance of license
relies, in part, on information provided renewal.
Dated: April 1, 2005.
Shelly L. Myers, in the applicant’s construction
FOR FURTHER INFORMATION CONTACT:
Deputy Chief Information Officer.
authorization request dated October 31,
Christopher M. Regan, Senior Project
2002 (as subsequently revised). The
[FR Doc. 05–6899 Filed 4–6–05; 8:45 am] Manager, Spent Fuel Project Office,
results of the staff’s environmental
BILLING CODE 7515–01–P Office of Nuclear Material Safety and
review are contained in NUREG–1767, Safeguards, U.S. Nuclear Regulatory
‘‘Environmental Impact Statement on Commission, Washington, DC 20555.
the Construction and Operation of a Telephone: (301) 415–1179; fax number:
NUCLEAR REGULATORY Proposed Mixed Oxide Fuel Fabrication
COMMISSION (301) 415–8555; e-mail: cmr1@nrc.gov.
Facility at the Savannah River Site,
SUPPLEMENTARY INFORMATION:
[Docket No. 70–3098] South Carolina,’’ dated January 2005
(ML050240233, ML050240250). On I. Introduction
Notice of Issuance of Construction October 25, 2004, the NRC suspended The U.S. Nuclear Regulatory
Authorization to Duke Cogema Stone & public access to the ADAMS online Commission (NRC or the Commission)
Webster, Charlotte, NC library and some other parts of its Web has issued renewed Materials License
site to review documents and remove SNM–2502 to Progress Energy
AGENCY: Nuclear Regulatory any that could reasonably be expected
Commission. Carolinas, Incorporated (PEC) for the
to aid a potential terrorist. Related to receipt, possession, transfer, and storage
ACTION: Notice of issuance of this effort, the NRC is withholding some of spent fuel at the H. B. Robinson
construction authorization. records which are deemed to contain Steam Electric Plant, Unit 2 (HBRSEP),
sensitive information under 10 CFR Independent Spent Fuel Storage
FOR FURTHER INFORMATION CONTACT: 2.390. Publicly available records may be Installation (ISFSI), located in
David Brown, Sr. Project Manager, examined, and/or copied for a fee, at the Darlington County, South Carolina. The
Special Projects Branch, Division of NRC’s Public Document Room, located renewed license authorizes operation of
Fuel Cycle Safety and Safeguards, Office at One White Flint North, Public File the HBRSEP ISFSI in accordance with
of Nuclear Material Safety and Area O1 F21, 11555 Rockville Pike (first the provisions of the renewed license
Safeguards, U.S. Nuclear Regulatory and its Technical Specifications.
floor), Rockville, Maryland. Publicly
Commission, Rockville, MD, 20852.
available records will be accessible
Telephone: (301) 415–5257; fax number: II. Background
electronically from the Agency-wide
(301) 415–5370; e-mail: DDB@nrc.gov. By application dated February 27,
Documents Access and Management
SUPPLEMENTARY INFORMATION: Systems (ADAMS) Public Electronic 2004, PEC requested to renew the
I. Introduction Reading Room, and on the Internet at operating license for the HBRSEP ISFSI.
the NRC Web site, http://www.nrc.gov/ PEC requested the renewal of the
Notice is hereby given that, pursuant original ISFSI license for a renewal
NRC/ADAMS/index.html. Persons who
to 10 CFR 70.23(a)(7) and (b), the period of 20 years, and an exemption for
do not have access to ADAMS or who
Nuclear Regulatory Commission (the an additional 20 years.
encounter problems in accessing the
Commission) has issued Construction
Authorization No. CAMOX–001 to Duke documents located in ADAMS, should III. Finding
Cogema Stone & Webster (the applicant) contact the NRC Public Document Room The application for the renewed
for construction of a plutonium Reference staff by telephone at 1–800– license complies with the standards and
processing and fuel fabrication plant. 397–4209, 301–415–4737, or by e-mail requirements of the Atomic Energy Act
The plant will be located on the to pdr@nrc.gov. of 1954 (the Act) , as amended, and the
Department of Energy’s Savannah River Dated at Rockville, Maryland, this 1st day Commission’s regulations. The
Site near Aiken, South Carolina, and of April, 2005. Commission has made appropriate

VerDate jul<14>2003 18:22 Apr 06, 2005 Jkt 205001 PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 E:\FR\FM\07APN1.SGM 07APN1
17722 Federal Register / Vol. 70, No. 66 / Thursday, April 7, 2005 / Notices

findings as required by the Act and the satisfactory completion by the licensee discussion of anticipated workshop
Commission’s rules and regulations in of all the related ITAAC. This workshop outcomes; assignment of participants
10 CFR Chapter 1, which are set forth is for the NRC to understand into work teams; work team discussion
in the license. In addition, in stakeholder views on why various NRC of and deliberation on construction
accordance with 10 CFR 72.7, the inspection results may or may not be inspection examples for materiality to
Commission has determined that the material to the successful completion of ITAAC; and group discussion of work
exemption is authorized by law and will ITAAC. Being ‘‘material to an ITAAC’’ team results.
not endanger life or property or the means the satisfactory completion of an FOR FURTHER INFORMATION CONTACT:
common defense and security and is ITAAC may be called into question. The Mary Ann M. Ashley, Team Leader,
otherwise in the public interest. Public labels and groupings previously used to Construction Inspection Program,
notice of the proposed action and describe NRC construction inspection Inspection Program Branch, Mail Stop
opportunity for hearing regarding the results may no longer be applicable. The O–7H4, U.S. Nuclear Regulatory
proposed issuance of the renewed NRC believes it should listen to and Commission, Washington DC 20555–
license was published in the Federal understand the views of all stakeholders 0001. Ms. Ashley can be reached at
Register on April 15, 2004 (69 FR before reaching a decision on the need (301) 415–1073 or by e-mail at
20073). for any new groupings and labels to mab@nrc.gov.
FOR FURTHER INFORMATION CONTACT: describe NRC construction inspection
results. The NRC has made the Dated in Rockville, Maryland, this 30th
Supporting documentation is available day of March, 2005.
for inspection at NRC’s Public examples to be discussed during the
workshop available electronically at the For the Nuclear Regulatory Commission.
Electronic Reading Room at: http:// Stuart A. Richards,
www.nrc.gov/reading-rm/ADAMS.html. Commission’s Public Document Room
in Rockville, Maryland or from the Chief, Inspection Program Branch, Division
A copy of the license application, dated of Inspection Program Management, Office
February 27, 2004, and the staff’s Publicly Available Records (PARS)
component Agencywide Document of Nuclear Reactor Regulation.
Environmental Assessment, dated [FR Doc. E5–1598 Filed 4–6–05; 8:45 am]
March 2005, can be found at this site Access and Management System
using the Agency Document And (ADAMS) (Accession ML050870507). BILLING CODE 7590–01–P

Management System (ADAMS) ADAMS can be accessed via the NRC


accession numbers ML040690774 and Web site at http://www.nrc.gov/reading-
rm/adams.html (the public electronic NUCLEAR REGULATORY
ML050700137. COMMISSION
reading room). All participants are
Dated in Rockville, Maryland, this 30th encouraged to review the examples
day of March, 2005. Advisory Committee on Nuclear
For the Nuclear Regulatory Commission. before the workshop and come prepared
Waste; Notice of Meeting
Christopher M. Regan,
to discuss their own points of view.
Some of the potential topics for The Advisory Committee on Nuclear
Senior Project Manager, Licensing Section, discussion could include the following:
Spent Fuel Project Office, Office of Nuclear Waste (ACNW) will hold its 159th
• Various interpretations of the meeting on April 18–19, 2005, Room T–
Material Safety and Safeguards.
examples. 2B3, Two White Flint North, 11545
[FR Doc. E5–1595 Filed 4–6–05; 8:45 am] • The groupings of the examples
BILLING CODE 7590–01–P
Rockville Pike, Rockville, Maryland.
based on materiality to ITAAC The date of this meeting was previously
completion. published in the Federal Register on
• The need for additional examples in
NUCLEAR REGULATORY Wednesday, December 8, 2004 (69 FR
order to capture all possible groupings.
COMMISSION 71084).
• What makes a particular example
material to ITAAC. The schedule for this meeting is as
Workshop To Discuss What Is or Is Not • The possible actions of both the follows:
Material to the Completion of NRC and a licensee for each grouping.
Inspections, Tests, and Acceptance Monday, April 18, 2005
Criteria (ITAAC) Workshop Information 10:30 a.m.–10:40 a.m.: Opening
DATES: May 4, 2005, from 8:30 a.m. to Statement (Open)—The ACNW
AGENCY: Nuclear Regulatory
3:30 p.m. Chairman will make opening
Commission.
Location: U.S. Nuclear Regulatory remarks regarding the conduct of
ACTION: Notice of public workshop.
Commission, Two White Flint North today’s sessions.
SUMMARY: The NRC needs to establish Auditorium on Rockville Pike in 10:40 a.m.–12 noon: Preparation of
the basis for categorizing NRC Rockville, Maryland. All visitors should ACNW Reports (Open)—The
inspection results during new reactor enter through the Two White Flint main Committee will discuss potential
construction under 10 CFR part 52. In entrance. No parking is available at the letter reports on Ground Water
order to meet that goal, the NRC is NRC headquarters. The NRC is located Recharge Model Abstraction and
holding a workshop to explore across from the White Flint Metro Validation, and Time-Period of
stakeholder views on what types of NRC Station on the Red Line. Compliance for a Proposed High-
inspection results could call into Registration: Individuals planning to Level Waste Geologic Repository.
question the completion of the ITAAC attend the workshop are asked to pre- Other potential letter reports may
for a particular certified reactor design. register for the workshop at e-mail be discussed.
SUPPLEMENTARY INFORMATION: address—CIPWorkshop@NRC.gov. 1:30 p.m.–3:30 p.m.: NMSS Division
Please provide the following Directors’ Quarterly Program
The Goal of the Workshop information when pre-registering: Update (Open)—The NMSS
The determination of whether a Name; organization; country; and phone Division Directors will brief the
nuclear plant licensed under 10 CFR number or e-mail address. Committee on recent activities of
part 52 has been built in accordance Agenda: The workshop activities will interest within their respective
with its design is dependent on the consist of an introduction and programs.

VerDate jul<14>2003 18:22 Apr 06, 2005 Jkt 205001 PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 E:\FR\FM\07APN1.SGM 07APN1

Das könnte Ihnen auch gefallen