Sie sind auf Seite 1von 1

16502 Federal Register / Vol. 70, No.

61 / Thursday, March 31, 2005 / Notices

Comments may be filed electronically furnish the name, address, and to nominate themselves as speakers
via the Internet in lieu of paper. The telephone number of the person should do so using this electronic link:
Commission strongly encourages commenting; and (4) otherwise comply http://www.ferc.gov/whats-new/
electronic filings. See 18 CFR with the requirements of 18 CFR registration/coal-05-13-speaker-
385.2001(a)(1)(iii) and the instructions 385.2001 through 385.2005. All form.asp. Such nominations must be
on the Commission’s Web site (http:// comments must set forth their made before the close of business
www.ferc.gov) under the ‘‘e-Filing’’ link. evidentiary basis and otherwise comply Friday, April 1, 2005, so that a final
k. The Project Description: with the requirements of 18 CFR 4.34(b). agenda for the technical conference can
The School Street Project consists of: Agencies may obtain copies of the be drafted and published.
(1) A 1,280-foot-long and 16-foot-high settlement directly from the applicant. Although registration is not a strict
masonry gravity dam; (2) a reservoir A copy of all filings in reference to this requirement, in-person attendees are
with a surface area of approximately 100 application must be accompanied by asked to register for the conference on-
acres and a storage capacity of about 788 proof of service on all persons listed in line by close of business on May 10,
acre-feet; (3) a concrete, chute-type the service list prepared by the 2005 at http://www.ferc.gov/whats-new/
spillway; (4) a 4,400-foot-long, 150-foot- Commission in this proceeding, in registration/coal-05-13-form.asp.
wide, and 14-foot-deep diversion canal; accordance with 18 CFR 4.34(b) and Transcripts of the conference will be
(5) a 170-foot by 78-foot powerhouse 385.2010. immediately available from Ace
located downstream from the dam You may also register online at Reporting Company (202–347–3700 or
containing five generating units with a http://www.ferc.gov/docs-filing/ 1–800–266–6646) for a fee. They will be
combined capacity of 38.8 megawatts esubscription.asp to be notified via available for the public on the
(MW); and (6) appurtenant facilities. email of new filings and issuances Commission’s eLibrary system and on
l. Erie Boulevard Hydropower filed related to this or other pending projects. the calendar page posting for this event
the settlement agreement on March 9, For assistance, contact FERC Online seven calendar days after FERC receives
2005, on behalf of themselves and six Support. the transcript. Additionally, Capitol
parties to resolve, among the signatories, Connection offers the opportunity for
issues related to the pending application Magalie R. Salas,
remote listening of the conference via
for new major license for the School Secretary. Real Audio or a Phone Bridge
Street Hydroelectric Project. The [FR Doc. E5–1428 Filed 3–30–05; 8:45 am] Connection for a fee. Persons interested
settlement includes measures for run-of- BILLING CODE 6717–01–P in making arrangements should contact
river operations, instream flows, aquatic David Reininger or Julia Morelli at
habitat, aesthetic flows, fish protection Capitol Connection (703–933–3100) as
and downstream passage, recreation, DEPARTMENT OF ENERGY soon as possible or visit the Capitol
cultural resources, monitoring and Connection Web site at http://
evaluation, and coordination among the Federal Energy Regulatory
www.capitolconnection.org and click on
parties. The parties request the Commission
‘‘FERC.’’
Commission accept the relevant [Docket No. AD05–3–000] For additional information, please
provisions of the settlement agreement contact Sarah McKinley at 202–502–
in its license orders without material Promoting Regional Transmission 8004, sarah.mckinley@ferc.gov.
modification. Planning and Expansion To Facilitate
n. Copies of the settlement are Fuel Diversity Including Expanded Magalie R. Salas,
available for review in the Public Uses of Coal-Fired Resources; Secretary.
Reference Room at the Commission or Supplemental Notice of Technical [FR Doc. E5–1417 Filed 3–30–05; 8:45 am]
may be viewed on the Commission’s Conference BILLING CODE 6717–01–P
Web site at http://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket March 21, 2005.
number, excluding the last three digits As announced in a Notice of DEPARTMENT OF ENERGY
in the docket number field, to access the Technical Conference issued on
document. For assistance, contact FERC February 16, 2005 in the above Federal Energy Regulatory
Online Support at referenced proceedings, a technical Commission
FERCOnlineSupport@ferc.gov or toll- conference will be held on Friday, May
[Docket Nos. AD05–5–000 and PL03–1–000]
free at 1–866–208–3676, or for TTY, 13, 2005, to identify regional solutions
(202) 502–8659. Copies are also to promoting regional transmission Transmission Independence and
available for inspection and planning, expansion and enhancement Investment and Pricing Policy for
reproduction at the address listed in to facilitate fuel diversity including Efficient Operation and Expansion of
item ‘‘h’’. increased integration of coal-fired the Transmission Grid; Notice of
o. Anyone may submit comments in resources to the transmission grid. The Technical Conference
accordance with the requirements of conference will be held at the
Rules of Practice and Procedure, 18 CFR Charleston Marriott Town Center, 200 March 21, 2005.
385.210, .211, .214. In determining the Lee Street East, Charleston, West Take notice that on April 22, 2005,
appropriate action to take, the Virginia 25301. Take note that the the Federal Energy Regulatory
Commission will consider all comments conference is now scheduled to begin at Commission will hold a technical
filed. Any comments must be received 8:30 a.m. (instead of 9 a.m.) and end at conference to examine impediments to
on or before the specified comment approximately 5 p.m. (EDT). The investment in electric transmission
date. Commissioners will attend and infrastructure and explore potential
All filings must (1) bear in all capital participate. solutions—including the formation of
letters the title ‘‘COMMENTS’’ or A proposed agenda is attached. The new business models as well as
‘‘REPLY COMMENTS;’’ (2) set forth in Commission is now soliciting appropriate ratemaking policies that
the heading the name of the applicant nominations for speakers at the would encourage new investment in
and the project number (P–2539); (3) technical conference. Persons wishing transmission. The technical conference

VerDate jul<14>2003 15:30 Mar 30, 2005 Jkt 205001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\31MRN1.SGM 31MRN1

Das könnte Ihnen auch gefallen