Beruflich Dokumente
Kultur Dokumente
DESIGN CALCULATION
4.1 ME-1401
EQUIPMENT
Classification
:
:
Section A-A
Section B-B
Plan View
FOUNDATION GEOMETRY:
H1
400.00
=
mm
H2
100.00
mm
H3
100.00
mm
H4
300.00
mm
H5
200.00
mm
H6
300.00
mm
H
L1
600.00
mm
1300.00
mm
L2
1000.00
mm
L3
400.00
mm
L4
400.00
mm
L5
580.00
mm
L6
580.00
mm
L7
200.00
mm
L8
200.00
mm
4000.00
mm
PARAMETERS:
c
=
s
w
Fsslid
=
=
=
=
24.00
kN/m3
18.60
10.00
kN/m
kN/m
0.50
1.50
( coefficient of friction )
( limit of sliding factor of safety )
FSOT
1.50
qallowp
75.00
kPa
qallowt
100.00
kPa
fcu
fy
30.00
460.00
N/mm
N/mm
LOADING DATA:
A. ME-1401-F
Ee(a)
=
49.03
kN
( 5000 kg )
( empty load )
Eo(a)
137.30
kN
( 14000 kg )
( operation load )
ET(a)
117.68
kN
( 12000 kg )
( test load )
( wind load )
( seismic load )
Hw(a)
9.81
kN
( 1000 kg )
He(a)
14.22
kN
( 1450 kg )
h1
2470.00
mm
kN
( 453 kg )
( empty load )
7.85
kN
( 800 kg )
( operation load )
Hw(b)
1.86
kN
( 190 kg )
( wind load )
He(b)
0.83
kN
( 85 kg )
( seismic load )
h2
2000.00
mm
C. SVB
Ee(c)
2.45
kN
( 250 kg )
( empty load )
Eo(c)
3.07
kN
( 313 kg )
Hw(c)
0.37
kN
( 38 kg )
He(c)
0.46
kN
( 47 kg )
h3
1000.00
mm
Note:
a.
b.
c.
Pedestal
:
SUV
L1 L2 (H2 + H3 + H5) c
12.48
kN
Platform
4 L3 L4 (H2 + H3 + H4) c
7.68
kN
ME-1404
4 L5 L6 (H2 + H3 + H6) c
16.15
kN
L7 L8 (H2 + H3 + H5) c
Pedestal
Soil
Pavement
Mat
F F H1 c
Buoyant Force :
0.1034
kN
kN
30.24
kN
153.60
kN
FW1 =
243.97
kN
FW2 =
243.97
kN
0.38
23.44
where :
Ca = 0.12
I = 1.0
R = 2.9
W, where W = Eo
Name
Loading Data
He(a,b,c) (kN)
Eo (kN)
137.30
ME-1401
14.22
7.85
Platform
0.83
3.07
SUV
0.46
Note: Govern Value = max [ He (a,b,c) , V ]
Computed
V (kN)
14.20
0.81
0.32
Govern Value
He
14.22
0.83
0.46
FW2 + Ee
299.89
FSslw
Ryw / Hw
12.45
kN
OK, Safe for Sliding due to earthquake
FW2 + Eo
392.19
FSsle
Rye / He =
12.64
kN
OK, Safe for Sliding due to earthquake
n
1
P1
4
P2
4
P3
4
P4
4
P5
4
P6
4
P7
4
P8
4
P9
1
P10
Note: n
=
Wstruct =
Wpipe =
Wstruc (kN)
3.07
3.07
1.96
7.85
1.96
7.85
7.85
1.96
7.85
1.96
137.30
34.33
137.30
34.33
137.30
34.33
137.30
34.33
n/a
no. of pedestal per structure
weight of operation per pedestal [ Eo / 4 ]
Wped (kN)
=
=
Geometry Information:
X1
X2
X3
X4
X5
X6
Xs[p]
Y1
Y2
Y3
Y4
Y5
Y6
Ys[p]
=
=
=
=
=
=
=
=
=
=
=
=
=
=
At (xo)
xo
At (yo)
yo
0.50
0.75
1.69
1.85
2.95
3.11
2.07
0.59
2.01
2.10
2.64
3.10
3.68
1.90
m
m
m
m
m
m
m
m
m
m
m
m
m
m
=
=
ey
=
=
| [ F /2 ] - x o |
0.13 m
| [ F /2 ] - y o |
0.20 m
Ryw [ (F / 2) - ey ]
OMtw
FSotw
RMw / OMtw
539.80
kN m
=
39.12
kN m
13.80
705.94
kN m
Seismic operation:
RMe
Rye [ (F / 2) - ey ]
OMte
FSote
RMe / OMte
13.80
51.16
kN m
17.16
kN/m2
31.87
kN/m
, where S
=
no uplift zone
qallowp
no uplift zone
12.36
kN/m2
36.66
kN/m2
qallowt
1.86
L3 = b' = hp
400
Lo
H2 +H3 +H4
y
M
F
3.72
1.6 [ P2 = P3 = P4 = P5]
6.21
1.6 [ M + F Lo ]
7.44
kN
kN m
mm
Pu
Lo
500
Le
2.2 Lo
Le
1100 mm
Le / P
2.75 < 10
Therefore column is short.
mm
Mu1
kN
kN m
additional moment
M
F
Pu
k
b'
a
=
=
=
1.00
400 mm
(Le / b')/2000
au
a k hp
0.0015
Mu
Madd
Pu a u
0.009
kN m
Mu
Mu1 + Madd =
7.45
kN m
Lo = H 2 + H 3 + H 4
(reduction factor)
(least col. dimen.)
= 0.0038
T 10 @200
T 10 @200
b' = hp
dx
374
dy
374
Pu / b'hp fcu
0.001
use , = 1.00
increase Mu
hp = b'
- T 12
Mu'
Mu + dx/dy Pu emin ,
Mu'
7.57 kN m
Therefore ;
Pu / b' hp
0.04 MPa
Mu' / b' hp
0.12 MPa
dx / b'
Asc
Ratio,
0.71
Provide,
0.40 %
640.00
<1.0 Ok.
mm
- T 12
As
[(8) (12)] /4
As
904.78
mm
M
F
14.22
L5 = b' = hp
580
Lo
H2 +H3 +H6
Lo
500
Le
2.2 Lo
Le
1100 mm
Le / P
1.90 < 10
Therefore column is short.
35.12
1.6 [ P6 = P7 = P8 = P9]
38.37
1.6 [ M + F Lo ]
67.57
kN
kN m
mm
Pu
mm
Mu1
kN
kN m
additional moment
M
k
b'
a
=
=
=
1.00
580 mm
(Le / b')/2000
au
a k hp
0.0010
Madd
Pu a u
0.038
kN m
Mu
Mu1 + Madd =
67.61
kN m
Pu
Lo = H 2 + H 3 + H 6
Mu
(reduction factor)
(least col. dimen.)
= 0.0018
T 10 @200
T 10 @200
b' = hp
dx
553
dy
553
Pu / b'hp fcu
0.004
use , = 1.00
increase Mu
hp = b'
12
- T 14
Mu'
Mu + dx/dy Pu emin ,
Mu'
68.38
kN m
Therefore ;
Pu / b' hp
0.11 MPa
Mu' / b' hp
0.35 MPa
dx / b'
Provide,
0.40 %
1345.60
<1.0 Ok.
mm
12
- T 14
As
[(12) (14)] /4
As
1847.26
mm
Foundation Geometry:
H2
100.00
mm
H5
200.00
mm
H3
100.00
mm
L1
1300.00
mm
L2
Atprov
4 - T - 12
ny dby
6nx
T - 12
dbx
=
=
=
=
=
=
0.0013 L 1 ( H1 + H2 + H3 )
0.0013 ( 1,300 ) ( 100 + 100 + 200 )
676 mm2
[ nx bdx ]/ 4
[ ( 6 ) ( 12^2 ) / 4 ]
679 mm2
400.00
mm
1.00
m strip
H2
100.00
mm
l1
250.00
mm
H5
H2
H3
H3
100.00
mm
l2
1700.00
mm
H5
200.00
mm
ccb
75.00
mm
4000.00
mm
cct
50.00
H1
mm
L1
1300.00
mm
l1
L1
l1
qe
qe
q - (mat weight)/F
2
27.06
kN/m
(dbt)
(st)
T 16 @200
Mu
2
1.6 qe b (F - L1 - l1 - l2 ) / 2
Mu
12.18
Mu / b d fcu
0.0045
(sb)
T 16 @200
301
mm
1000
mm
Z
Z
=
=
As
=
=
Mu / (0.87 fy Z)
(dbb)
ELEVATION
Asreq
Aprov
148.85
kN m
<
0.156
mm
As FSp = 1.15 As
2
/4 dbb (b/sb + 1)
171.18
mm
1206.37
mm
Ratio: 0.14 OK
F
PLAN
Atprov
0.0013 b H 1
=
=
=
=
[ b /4 ] [ ( db b / sb ) + ( dbt / st ) ]
[ 1000 / 4 ] ( 16^2 / 200 + 16^2 / 200 )
2011
mm2
For development length, the minimum required development length in QAF-DW-140-CIV-0011 (8060S C210-00200)
will be followed. The minimum required development length satisfies the necessary full anchorage length of BS8110,
therefore,development length check will not be carried out.