12676 Federal Register / Vol. 70, No.

49 / Tuesday, March 15, 2005 / Notices

DEPARTMENT OF ENERGY • 23 miles of 48-inch-diameter document summaries, and direct links


natural gas pipeline; and to the documents. Go to the
Federal Energy Regulatory • 8 interconnects with existing ‘‘eSubscription’’ link on the FERC
Commission intrastate and interstate pipelines, and Internet Web site.
related meter stations.
[Docket Nos. CP04–37–000, CP04–44–000, The final EIS has been placed in the Linda Mitry,
CP04–45–000, and CP04–46–000] public files of the FERC and is available Deputy Secretary.
for public inspection at: Federal Energy [FR Doc. E5–1083 Filed 3–14–05; 8:45 am]
Corpus Christi LNG, L.P.; Cheniere Regulatory Commission, Public BILLING CODE 6717–01–P
Corpus Christi Pipeline Company; Reference Room, 888 First Street, NE.,
Notice of Availability of the Final Room 2A, Washington, DC 20426, (202)
Environmental Impact Statement for 502–8371. DEPARTMENT OF ENERGY
the Proposed Cheniere Corpus Christi A limited number of copies of the
Lng Project final EIS are available from the Public Federal Energy Regulatory
Reference Room identified above. In Commission
March 7, 2005.
addition, copies of the final EIS have [Docket Nos. CP05–64–000]
The staff of the Federal Energy been mailed to federal, state, and local
Regulatory Commission (FERC or agencies; public interest groups; Florida Gas Transmission Company;
Commission) has prepared a final individuals and affected landowners Notice of Intent To Prepare an
environmental impact statement (EIS) who requested a copy of the final EIS; Environmental Assessment for the
on the liquefied natural gas (LNG) libraries; newspapers, and parties to this Proposed Turkey Point Project and
import terminal and natural gas pipeline proceedings. Request for Comments on
facilities in Nueces and San Patricio In accordance with the Council on Environmental Issues
Counties, Texas proposed by Corpus Environmental Quality’s (CEQ)
Christi LNG, L.P. and Cheniere Corpus regulations implementing NEPA, no March 8, 2005.
Christi Pipeline Company (collectively agency decision on a proposed action The staff of the Federal Energy
referred to as Cheniere) in the above- may be made until 30 days after the U.S. Regulatory Commission (FERC or
referenced dockets. Environmental Protection Agency Commission) will prepare an
The final EIS was prepared to satisfy publishes a notice of availability of a environmental assessment (EA) that will
the requirements of the National final EIS. However, the CEQ regulations discuss the environmental impacts of
Environmental Policy Act (NEPA). The provide an exception to this rule when the Turkey Point Project involving
staff concludes that approval of the an agency decision is subject to a formal abandonment, construction and
proposed project with appropriate internal appeal process which allows operation of facilities by Florida Gas
mitigating measures as recommended, other agencies or the public to make Transmission (FGT) in Miami-Dade
would have limited adverse their views known. In such cases, the County, Florida. These facilities would
environmental impact. The final EIS agency decision may be made at the consist of the construction and
also evaluates alternatives to the same time the notice of the final EIS is operation of a new 17,000 horsepower
proposal, including system alternatives, published, allowing both periods to run Compressor Station, and the installation
alternative sites for the LNG import concurrently. The Commission decision of a 24-inch Tee and Side Valve on the
terminal, and pipeline alternatives. for this proposed action is subject to a existing FGT lateral on the grounds of
Cheniere’s proposed facilities would 30-day rehearing period. the Turkey Point Power Plant owned by
have a nominal output of about 2.6 Additional information about the Florida Power and Light (FPL). The EA
billion cubic feet of imported natural project is available from the will be used by the Commission in its
gas per day to the U.S. market. In order Commission’s Office of External Affairs decisionmaking process to determine
to provide LNG import, storage, and at 1–866–208–FERC or on the FERC whether the project is in the public
pipeline transportation services, Internet Web site (http://www.ferc.gov) convenience and necessity.
Cheniere requests Commission using the ‘‘eLibrary’’ link. Click on the
authorization to construct, install, and ‘‘eLibrary’’ link, click on ‘‘General Summary of the Proposed Project
operate an LNG terminal and natural gas Search’’ and enter the docket number FGT is requesting authorization to
pipeline facilities. excluding the last three digits in the abandon facilities and to construct,
The final EIS addresses the potential Docket Number field. Be sure you have own, and operate facilities consisting of
environmental effects of the selected the appropriate date range. For a new 17,000 horsepower (hp) electric
construction and operation of the assistance, please contact FERC Online Compressor Station No. 22 (CS 22) and
following LNG terminal and natural gas Support at FercOnlineSupport@ferc.gov appurtenant facilities located in Miami-
pipeline facilities in San Patricio and or toll free at 1–866–208–3676, or for Dade County, Florida, on the existing
Nueces Counties, Texas: TTY, contact 1–202–502–8659. The FGT 24-inch Turkey Point Lateral
• A new marine basin and dredged ‘‘eLibrary’’ link on the FERC Internet within the existing Turkey Point Power
maneuvering area in La Quinta Channel Web site also provides access to the Plant owned by FPL. Specifically, FGT
on the northeast shore of Corpus Christi texts of formal documents issued by the plans to:
Bay; Commission, such as orders, notices, • Construct a 1,600-foot extension of
• Two berths and unloading facilities and rule makings. the existing 18-inch mainline at
for LNG carrier ships, and a third dock In addition, the Commission now approximate milepost (MP) 907.7 to the
for tugs and line boats; offers a free service called eSubscription proposed Compressor Station 22, and
• Three LNG storage tanks, each with which allows you to keep track of all back to the 18-inch mainline tie in;
a nominal working volume of formal issuances and submittals in • Abandon approximately 50 feet of
approximately 160,000 cubic meters specific dockets. This can reduce the the existing 18-inch mainline at MP
(1,006,400 barrels equivalent); amount of time you spend researching 907.7 near the intersection of NW., 72nd
• LNG vaporization and processing proceedings by automatically providing Avenue (Milam Dairy Road) and NW.,
equipment; you with notification of these filings, 64th Street;

VerDate jul<14>2003 15:31 Mar 14, 2005 Jkt 205001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1
Federal Register / Vol. 70, No. 49 / Tuesday, March 15, 2005 / Notices 12677

• Construct Compressor Station 22 and local agencies, public interest Please note that we are continuing to
with two 8,500 hp electric driven groups, interested individuals, affected experience delays in mail deliveries
compressors designed for unmanned landowners, newspapers, libraries, and from the U.S. Postal Service. As a result,
operation on the existing FGT 18-inch the Commission’s official service list for we will include all comments that we
mainline located in unincorporated this proceeding. A comment period will receive within a reasonable time frame
Miami-Dade County, Florida on FPL- be allotted for review if the EA is in our environmental analysis of this
owned property located northeast of the published. We will consider all project. However, the Commission
intersection of NW., 72nd Avenue comments on the EA before we make strongly encourages electronic filing of
(Milam Dairy Rd) and NW., 64th Street; our recommendations to the any comments or interventions or
• Install a motor control center, gas Commission. protests to this proceeding. See 18 CFR
after-cooling, an oily water storage tank, In the EA we 2 will discuss impacts 385.2001(a)(1)(iii) and the instructions
facility blowdown, a pipeline liquids that could occur as a result of the on the Commission’s Web site at
storage tank, at the fully fenced construction and operation of the http://www.ferc.gov under the ‘‘e-
Compressor Station 22; and proposed project under these general Filing’’ link and the link to the User’s
• Install a new 24-inch Tee and Side headings: Guide. Before you can file comments
Valve on the existing FGT 24-inch • Geology and soils you will need to create a free account
Turkey Point Lateral at FPL’s new 24- • Land use which can be created on-line.
inch lateral to the FGT system. • Water resources, fisheries, and We might mail the EA for comment.
The location of the proposed site is wetlands If you are interested in receiving it,
shown in Appendix 1.1 • Cultural resources please return the Information Request
Land Requirements for Construction • Vegetation and wildlife (Appendix 4). If you do not return the
• Air quality and noise Information Request, you will be taken
Construction of the proposed facilities • Endangered and threatened species off the mailing list.
would require about 14.68 acres of land. • Reliability and safety
Following construction, about 6.86 acres Becoming an Intervenor
We will also evaluate reasonable
would be maintained as new In addition to involvement in the EA
alternatives to the proposed project or
aboveground facility sites and pipeline scoping process, you may want to
right-of-way. The remaining 0.92 acre of portions of the project, and make
recommendations on how to lessen or become an official party to the
land would be restored and allowed to proceeding known as an ‘‘intervenor.’’
revert to its former use. avoid impacts on the various resource
areas. Intervenors play a more formal role in
The EA Process To ensure your comments are the process. Among other things,
The National Environmental Policy considered, please carefully follow the intervenors have the right to receive
Act (NEPA) requires the Commission to instructions in the public participation copies of case-related Commission
take into account the environmental section below. documents and filings by other
impacts that could result from an action intervenors. Likewise, each intervenor
Public Participation must send one electronic copy (using
whenever it considers the issuance of a
Certificate of Public Convenience and You can make a difference by the Commission’s eFiling system) or 14
Necessity. NEPA also requires us to providing us with your specific paper copies of its filings to the
discover and address concerns the comments or concerns about the project. Secretary of the Commission and must
public may have about proposals. This By becoming a commentor, your send a copy of its filings to all other
process is referred to as ‘‘scoping.’’ The concerns will be addressed in the EA parties on the Commission’s service list
main goal of the scoping process is to and considered by the Commission. You for this proceeding. If you want to
focus the analysis in the EA on the should focus on the potential become an intervenor you must file a
important environmental issues. By this environmental effects of the proposal, motion to intervene according to Rule
Notice of Intent, the Commission staff alternatives to the proposal (including 214 of the Commission’s Rules of
requests public comments on the scope alternative locations and routes), and Practice and Procedure (18 CFR
of the issues to address in the EA. All measures to avoid or lessen 385.214) (see Appendix 2).3 Only
comments received are considered environmental impact. The more intervenors have the right to seek
during the preparation of the EA. State specific your comments, the more useful rehearing of the Commission’s decision.
they will be. Please carefully follow Affected landowners and parties with
and local government representatives
these instructions to ensure that your environmental concerns may be granted
are encouraged to notify their
comments are received in time and intervenor status upon showing good
constituents of this proposed action and
properly recorded: cause by stating that they have a clear
encourage them to comment on their
areas of concern. • Send an original and two copies of and direct interest in this proceeding
Our independent analysis of the your letter to: Magalie R. Salas, which would not be adequately
issues will be in the EA. Depending on Secretary, Federal Energy Regulatory represented by any other parties. You do
the comments received during the Commission, 888 First St., NE., Room not need intervenor status to have your
scoping process, the EA may be 1A, Washington, DC 20426. environmental comments considered.
published and mailed to Federal, state • Label one copy of the comments for Environmental Mailing List
the attention of Gas Branch 3.
1 The appendices referenced in this notice are not • Reference Docket No. CP05–64– An effort is being made to send this
being printed in the Federal Register. Copies of all 000. notice to all individuals, organizations,
appendices, other than Appendix 1 (maps), are • Mail your comments so that they and government entities interested in
available on the Commission’s Web site at the will be received in Washington, DC on and/or potentially affected by the
‘‘eLibrary’’ link or from the Commission’s Public proposed project. This includes all
Reference Room, 888 First Street, N.E., Washington, or before April 8, 2005.
D.C. 20426, or call (202) 502–8371. For instructions landowners who are potential right-of-
on connecting to eLibrary refer to the last page of 2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the

this notice. Copies of the appendices were sent to environmental staff of the Office of Energy Projects 3 Interventions may also be filed electronically.

all those receiving this notice in the mail. (OEP). See previous discussion on electronic filing.

VerDate jul<14>2003 15:31 Mar 14, 2005 Jkt 205001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1
12678 Federal Register / Vol. 70, No. 49 / Tuesday, March 15, 2005 / Notices

way grantors, whose property may be with the Commission and is available may be filed electronically via the
used temporarily for project purposes, for public inspection. Internet in lieu of paper. The
or who own homes within distances a. Type of Application: Subsequent Commission strongly encourages
defined in the Commission’s regulations Licensing. electronic filings. See 18 CFR
of certain aboveground facilities. By this b. Project No.: 7758–004. 385.2001(a)(1)(iii) and the instructions
notice we are also asking governmental c. Date Filed: February 25, 2005. on the Commission’s Web site at
agencies, especially those in Appendix d. Applicant: The City of Holyoke Gas (http://www.ferc.gov) under the ‘‘e-
3, to express their interest in becoming & Electric Department. Filing’’ link.
cooperating agencies for the preparation e. Name of Project: Holyoke No. 4 m. This application is not ready for
of the EA. Hydro Project. environmental analysis at this time.
f. Location: On the Holyoke Canal n. Description of Project: The Holyoke
Additional Information (Connecticut River), Hampden County, No. 4 Project consists of: (a) Two 7-foot-
Additional information about the Massachusetts. The project does not use diameter and 76-foot-long penstocks
project is available from the lands of the United States. drawing water from the first level canal
Commission’s Office of External Affairs, g. Filed Pursuant to: Federal Power of the Holyoke Canal System; (b) a
at 1–866–208–FERC or on the FERC Act 16 U.S.C. 791 (a)–825(r). powerhouse with 2 turbine-generator
Internet Web site (http://www.ferc.gov) h. Applicant Contact: Nancy J. units with a total rated capacity of 760
using the eLibrary link. Click on the Skancke, Law Offices of GKRSE, 1500 K kW in the first floor of a 3-story brick
eLibrary link, click on ‘‘General Search’’ St. NW., Suite 330, Washington, DC building; (c) two 13-foot-wide and 300-
and enter the docket number excluding 20005, (202) 408–5400. foot-long tailraces discharging into the
the last three digits in the Docket i. FERC Contact: Jack Hannula, second level canal; (d) a 4.8-kV, 25-foot-
Number field. Be sure you have selected john.hannula@ferc.gov, (202) 502–8917. long transmission line; (e) the 0.48-kV
an appropriate date range. For j. Cooperating Agencies: We are generator leads; (f) the 0.48/4.8-kV
assistance, please contact FERC Online asking Federal, state, and local agencies transformer; and (g) appurtenant
Support at and Indian tribes with jurisdiction and/ facilities.
FERCOnlineSupport@ferc.gov or toll or special expertise with respect to o. A copy of the application is
free at 1–866–208–3676, or for TTY, environmental issues to cooperate with available for review at the Commission
contact (202) 502–8659. us in the preparation of the in the Public Reference Room or may be
In addition, the Commission now environmental document. Agencies who viewed on the Commission’s Web site at
offers a free service called eSubscription would like to request cooperating status http://www.ferc.gov using the
which allows you to keep track of all should follow the instructions for filing ‘‘eLibrary’’ link. Enter the docket
formal issuances and submittals in comments described in item l. below. number excluding the three digits in the
k. Pursuant to section 4.32(b)(7) of 18 docket number field to access the
specific dockets. This can reduce the
CFR of the Commission’s regulations, if document. For assistance, contact FERC
amount of time you spend researching
any resource agency, Indian tribe, or Online Support at
proceedings by automatically providing
person believes that an additional FERCOnlineSupport@FERC.gov or toll
you with notification of these filings,
scientific study should be conducted in free at 1–866–208–3076 or for TTY,
document summaries and direct links to
order to form an adequate factual basis (202) 502–8659. A copy is also available
the documents. Go to http://
for a complete analysis of the for inspection and reproduction at the
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits application on its merit, the resource address in item h above.
will be posted on the Commission’s agency, Indian tribe, or person must file You may also register online at
calendar located at http://www.ferc.gov/ a request for a study with the http://ferc.gov/docs-filing/
EventCalendar/EventsList.aspx along Commission not later than 60 days from esubscription.asp to be notified via e-
with other related information. the date of filing of the application, and mail of new filings and issuances
serve a copy of the request on the related to this or other pending projects.
Linda Mitry, applicant. For assistance, contact FERC Online
Deputy Secretary. l. Deadline for Filing Additional Support.
[FR Doc. E5–1084 Filed 3–14–05; 8:45 am] Study Requests and Requests for p. With this notice, we are initiating
BILLING CODE 6717–01–P Cooperating Agency Status: April 25, consultation with the Massachusetts
2005. State Historic Preservation Officer
All documents (original and eight (SHPO), as required by section 106,
DEPARTMENT OF ENERGY copies) should be filed with: Magalie R. National Historic Preservation Act, and
Salas, Secretary, Federal Energy the regulations of the Advisory Council
FEDERAL ENERGY REGULATORY Regulatory Commission, 888 First on Historic Preservation, 36, CFR., at
COMMISSION Street, NE., Washington, DC 20426. § 800.4.
The Commission’s Rules of Practice q. Procedural schedule and final
[Project No. 7758–004]
require all intervenors filing documents amendments: The application will be
The City of Holyoke Gas & Electric with the Commission to serve a copy of processed according to the following
Department; Notice of Application that document on each person on the Hydro Licensing Schedule. Revisions to
Tendered for Filing With the official service list for the project. the schedule will be made as
Commission, Soliciting Additional Further, if an intervenor files comments appropriate.
Study Requests and Establishing or documents with the Commission
relating to the merits of an issue that Issue Acceptance or Deficiency Letter:
Procedural Schedule for Relicensing April 2005.
and a Deadline for Submission of Final may affect the responsibilities of a
Issue Scoping Document for Comments:
Amendments particular resource agency, they must May 2005.
also serve a copy of the document on Notice that application is ready for
March 8, 2005. that resource agency. environmental analysis: August 2005.
Take notice that the following Additional study requests and Notice of the availability of the EA:
hydroelectric application has been filed requests for cooperating agency status February 2006.

VerDate jul<14>2003 15:31 Mar 14, 2005 Jkt 205001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1