1A
i
ii
Dismentling of existing plaster including disposal of refuse as per direction of E/I with in 60m.
Distence (200 fit) [SI. No. 706]
Coolie
Bhisti
per day
per day
1
0.06
No.
No.
@
@
Rs.
Rs.
140.00
175.00
Add 10 % C.P.
140.00
10.94
150.94
15.09
166.03
per day
Add 10 % C.P.
0.75
No.
Rs.
150.00
112.50
11.25
123.75
dismentling of cement concrete or brick or granolithic floor including disposal of refuse as per
direction of E/I within 60m.distance (200fit)[SI. No. 697 lating and 100 sq. ft.]
Beldar
Coolie
per day
per day
0.75
0.75
No.
No.
@
@
Rs.
Rs.
150.00
140.00
Add 10 % C.P.
112.50
105.00
217.50
21.75
239.25
S/F of 4" dia H.C.I. nahani trape with C.P. jali including cost of all material, labour,T&P etc.
required for oroper completion of the work.
No.
Rs.
375.00
each
M.R. Rs.
375.00
ii
H.C.I. Grating
No.
Rs.
40.00
40.00
415.00
56.02
72.00
543.02
48.70
591.72
Analysis of Rates
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
a
i
ii
iii
iv
b
i
ii
iii
iv
v
vi
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
S/F of 100mm dia P.V.C. pipe of 6kg/cm2 working pressure including all fitting as coller, socket,
M.S. clamp,tea etc. fixed to wall by 15 cm. long iron nails & repair of damazed wall surfase
during excution of work complete. [for 30 feet]
Materials
6kg/PVC.pipe100mm dia
PVC.tea 100mm dia
M.S. Clamp
PVC. Band
30
2
5
2
fit
No.
No.
No.
@
@
@
@
Rs.
Rs.
Rs.
Rs.
60.50
160.00
13.00
45.00
Rs.
Rs.
Rs.
Rs.
200.00
250.00
150.00
17.65
Rs.
25.00
a
i
ii
iii
iv
b
i
ii
Rs.
Rs.
Rs.
Rs.
Rs.
1815.00
320.00
65.00
90.00
2290.00
50.00
62.50
150.00
16.41
50.00
Rs.
Rs.
Rs.
Rs.
Rs.
50.00
2668.91
266.89
309.15
3244.95
Labour
Fitter
per day
0.25
No.
@
Mason
per day
0.25
No.
@
Beldar
per day
1.00
No.
@
Carriage & fixing (0.75+0.18)=0.93
@
Cost of cement & sand for repair of damged plaster
solution of fixing pipe
2
No.
@
Add 10 % C.P. on Rs. 2668.91
Add 12.5 % VAT+1 % SAT on Rs. 2290.00
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Total
Total
Materials
15mm dia tube/pipe
10
M.
@
Add 15% for fitting and wastage on Rs. 984.00
lead ,demp,oil etc.
L.S.
cement & sand Grit etc.
L.S.
Rs.
98.40
Rs.
Rs.
225.00
140.00
per M.
M.R. Rs.
Rs.
Rs.
Rs.
Total
Rs.
984.00
147.60
10.00
20.00
1161.60
S.R. Rs.
S.R. Rs.
Total
Rs.
Rs.
Total
Rs.
Rs.
Rs.
Total
Rs.
150.75
93.80
1406.15
14.06
1420.21
142.02
152.76
1714.99
Labour
Plumber
Coolie
Each
Each
0.67
0.67
No.
No.
@
@
Analysis of Rates
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
a
i
ii
iii
iv
b
i
ii
iii
iv
v
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Providing & Laying of 25mm thick cement concrete floor 1:2:4 (1cement: 2coarse sand :
4stone grite 12 mm size) finished even including curing & cost of all material, labour, T&P etc.
required for proper completion of the work. [NBO No.14.69] (for per 10.00sqm)
Materials
Stone grit 12.5mm size
Stone grit 10.00mm size
Coarse sand
Cement
0.166
0.056
0.18
2.04
cum.
cum.
cum.
Bag
@
@
@
@
Rs.
Rs.
Rs.
Rs.
262.28
88.48
212.40
530.40
1093.56
1.08
No.
Rs.
250.00
270.00
1.08
No.
Rs.
150.00
162.00
0.54
0.27
L.S.
No.
No.
@
@
Rs.
Rs.
140.00
175.00
75.60
47.25
50.00
1698.41
25.47
1723.88
172.39
14.03
1910.30
Labour
Mason
Mazdoor
Male/Beldar
Mazdoor
Female/coolie
Bhisti
Sunderies
per day
per day
per day
per day
7
a
i
ii
b
i
ii
iii
iv
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Materials
Coarse sand
Cement
0.18
1.44
cum.
Bag
@
@
Rs.
Rs.
212.40
374.40
586.80
No.
Rs.
250.00
per day
M.R. Rs.
207.50
No.
No.
@
@
Rs.
Rs.
150.00
175.00
124.50
171.50
20.00
1110.30
16.65
1126.95
112.70
1239.65
L.S.
Analysis of Rates
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
8A
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
S/F of 5mm thick china white glezed tiles in flooring or in skiriting or dedo laid with 1:3 cement
and approved coarse sand mortar finishing with white cement slurry jointing and polishing
complete including supply of all material, labour, T&P. etc.required for proper completion of the
work as per direction eng. in charge floor & wall.
Taking area 108 sft.Or 10.03 sqm.(in size of 12"x12")
i
ii
iii
iv
v
vi
vii
viii
Tiles
White Cement
Coarse sand
Cement
Marbal dust
Tiles Layer
Mazdoor Female/coolie
Sunderies
10.75 Dozon
@
1
Bag
@
0.34 cum. @
3.2
Bag
@
160
kg.
@
4
No.
@
2
No.
@
L.S. 1.5 x 17.65
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
414.00
555.00
1180.00
260.00
4.00
250.00
140.00
Total
Total
8B
iii
iv
b
i
iii
iv
v
per dozon
per Bag
per cum.
per Bag
per kg.
per day
per day
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
4450.50
555.00
401.20
832.00
640.00
1000.00
280.00
26.47
8185.17
122.78
8307.95
830.79
600.82
9739.56
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
4050.00
555.00
401.20
832.00
640.00
1000.00
280.00
26.47
7784.67
116.77
7901.44
790.14
546.75
9238.33
13.50 Dozon
@
1
Bag
@
0.34 cum. @
3.2
Bag
@
160
kg.
@
4
No.
@
2
No.
@
L.S. 1.5 x 17.65
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
300.00
555.00
1180.00
260.00
4.00
250.00
140.00
per dozon
per Bag
per cum.
per Bag
per kg.
per day
per day
Total
Total
Total
Analysis of Rates
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
providing and fixing 20mm thick albetta stone flooring over 25mm thick base of cement mortar
1:4 (1 cement :4 coarse sand)laid & jointed with white cement slurry including rubbing &
polishing complete. (for per 20 sqf. Or 1.86 sqm)
Materials
a
i
ii
b
iii
iv
Albeta Stone
Wastge 5 %
25mm thik base of 1:4
Coarse sand
Cement
b
i
ii
iii
iv
Labour
Mason
Beldar
Mazdoor
Bhisti
1.86
sqm.
Rs.
Rs.
Rs.
1999.50
99.98
0.08
0.47
cum.
Bag
@
@
Rs.
Rs.
94.40
122.20
2316.08
0.67
0.67
0.67
0.67
No.
No.
No.
No.
@
@
@
@
Rs.
Rs.
Rs.
Rs.
250.00
150.00
140.00
175.00
167.50
100.50
93.80
117.25
2795.13
41.93
2837.05
283.71
283.43
3404.19
per day
per day
per day
per day
Total
M.R.
M.R.
M.R.
M.R.
10
i
ii
iii
iv
v
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
1
1
1
1
1
No.
No.
Pair
No.
No.
@
@
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
2700.00
130.00
50.00
33.00
137.00
per No.
per No.
per pair
per No.
per No.
Total
Total
S.R.
S.R.
S.R.
S.R.
S.R.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
2700.00
130.00
50.00
33.00
137.00
3050.00
305.00
3355.00
Analysis of Rates
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
11
i
ii
12
i
ii
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
S/F of c.p. bib cock 15mm dia L & K make H/Q including supply of all material, labour,T&P etc.
required for proper completion of the work.
Rs. 850.00
Rs.
850.00
C.P. bib cock
1
No.
@
per No.
S.R.
Rs.
15.00
Fixing charge
Total
Rs.
865.00
Rs.
114.75
Add 12.50 % VAT+1 % SAT on Rs 850.00
Total
Rs.
979.75
Rs.
97.98
Add 10 % C.P.
Total
Rs. 1077.73
No.
Rs.
685.00
Rs.
S.R. Rs.
Total
Rs.
Rs.
Total
Rs.
Rs.
Total
Rs.
per No.
685.00
13.00
698.00
92.47
790.47
79.05
869.52
i
ii
iii
iv
S/F of P.V.C. low level cistern with all internal fitting m.s. Brackets, P.V.C. connection, c.p. angle
valve 15mm dia, brase including supply of all materials labour, T&P required for proper
completion at work.
1
No.
@
Rs. 695.00 per No. S.R. Rs.
695.00
PVC.cistern10 ltr.capicity
1
No.
@
Rs.
45.00 per No. S.R. Rs.
45.00
PVC. Conection
1
Pair
@
Rs. 585.00 per No. S.R. Rs.
585.00
C.P. Angle valve
1
No.
@
Rs. 135.00 per No. S.R. Rs.
135.00
P.V.C.flush pipe 32mm dia
Total
Rs. 1460.00
Rs.
197.10
Add 12.50 % VAT+1 % SAT on Rs 1460.00
Rs.
100.00
Labour Charge(SR)
Rs.
23.00
Sunderies,T&P
L.S.
Total
Rs. 1780.10
Rs.
178.01
Add 10 % C.P. on Rs.
Total
Rs. 1958.11
Analysis of Rates
Say Rs. 1958.00 Per Sqm.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
14
S/F of white glezed earthen work wash hand basin (22" x 16")with double hole including M.S.
brackets,2 no.P.V.C. connection, 2 no. C.P. pillor cock, 2 no. C.P. angle valve ,15mm C.P. cap,
C.P. waste jali,P.V.C. including cost of all material, labour,T&P etc.complete.
i
ii
iii
iv
v
vi
vii
1
1
2
2
2
1
1
No.
pair
No.
No.
No.
No.
No.
@
@
@
@
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
580.00
50.00
45.00
865.00
585.00
58.00
33.00
Total
Add 10 % C.P.
15
i
ii
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
580.00
50.00
90.00
1730.00
1170.00
58.00
33.00
3711.00
500.99
90.00
4301.99
421.10
4723.09
No.
Rs.
850.00
per No.
Rs.
850.00
No.
Rs.
685.00
per No.
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
685.00
1535.00
153.50
207.23
20.00
1915.73
Add 10 % C.P.
Add 12.50 % VAT+1 % SAT on Rs 1535.00
Labour Charge(for fixing)
Total
Say Rs. 1916.00 Per sqm
16
S/F of C.P. towel rail 450 x 20 mm dia rod with C.P. brackets fixed plastic sleers &C.P. screw
couple including cost of all material, labour,T&P etc.complete.
Analysis of Rates
C.P. towel rail 450 x 20mm
1
No.
dia
Add 12.50 % VAT+1 % SAT on Rs 260.00
Labour Charge(for fixing)
Sunderies,T&P
L.S.
Add 10 % C.P. on Rs.
i
ii
Rs.
260.00
per No.
Total
Total
S.R. Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
260.00
35.10
24.00
319.10
31.91
351.01
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
17
i
ii
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
S/F of 600 x 450 mm (24" x 18") size plastic framed/hard board make looking mirror of superior
quality fixed with clips, screw, including cost of all material, labour,T&P etc. complete.
Mirror 600X450(24" x18")
size
hard board 600X450(24"
x18") size
No.
Rs.
600.00
per No.
Rs.
600.00
No.
Rs.
42.00
per No.
Rs.
42.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
642.00
86.67
64.00
792.67
79.27
871.94
Total
Add 12.50 % VAT+1 % SAT on Rs 642.00
Labour Charge
Total
Add 10 % C.P.
18
i
Total
ii
iii
fixing charge
Rs.
95.00
95.00
12.83
Rs.
1.50
Rs.
15.60
Rs.
Rs.
Rs.
124.93
12.49
137.42
L.S.
Total
Add 10 % C.P.
Total
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Analysis of Rates
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
19
S/F of following with fitting including supply of all material, labour, T&P etc. required for proper
completion of the work. (for Europeon W.C. Pan)
i
ii
iii
iv
v
vi
1
No.
@
Rs.
Cost of W.C. Pan
1
No.
@
Rs.
H.C.I. trap
1
No.
@
Rs.
Bake lite seat
1
No.
@
Rs.
P.V.C.flushing pipe
1
No.
@
Rs.
Labour Charge pan& trap
Sundries & T&P
Add 12.50 % VAT+1 % SAT on Rs.1079.00 (pan& trap)
750.00
329.00
495.00
135.00
240.00
per No.
per No.
per No.
per No.
per No.
S.R.
S.R.
S.R.
S.R.
S.R.
Total
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
750.00
329.00
495.00
135.00
240.00
15.00
145.67
2109.67
210.97
2320.63
S/F of following with fitting including supply of all material, labour, T&P etc. required for proper
completion of the work. (for Orrisa W.C. Pan)
i
ii
iii
iv
v
1
No.
@
Rs.
Cost of W.C. Pan
1
No.
@
Rs.
H.C.I. trap
1
No.
@
Rs.
P.V.C.flushing pipe
1
No.
@
Rs.
Labour Charge pan& trap
Sundries & T&P
Add 12.50 % VAT+1 % SAT on Rs.1275.00 (pan& trap)
900.00
375.00
135.00
227.00
per No.
per No.
per No.
per No.
Total
Add 10 % C.P. on Rs.
Total
S.R.
S.R.
S.R.
S.R.
Rs.
Rs.
Rs.
Rs.
Rs.
900.00
375.00
135.00
227.00
15.00
Rs.
Rs.
Rs.
Rs.
172.13
1824.13
182.41
2006.54
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
21
S/F of door fitting as handle, sliding bolt, c.p. tower bolt etc. including cost of material etc.
complete in door shutter's.
For Door size 0.9x2.00=1.80 sqmt.
i
ii
iii
iv
v
vi
C.P. hendle
C.P. sliding bolt(300 mm)
C.P. tower bolt
door stopper
Iron hinger(125 mm)
steel screw,nut & bolt
2
2
2
1
3
No.
No.
No.
No.
No.
@
@
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
L.S.
40.00
145.00
48.00
30.00
14.00
per no.
per no.
per no.
per no.
per no.
M.R.
M.R.
M.R.
M.R.
M.R.
Total
Add 10 % C.P.
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
80.00
290.00
96.00
30.00
42.00
25.00
563.00
56.30
619.30
S/F of 32mm thick sal wood fully panneled door shutters including fixing of wooden cleats,
stopers & adjustment of hinges bolts,looks, hendles & other fiting but excluding their supply
including s/o all material, labour,T&P etc, complete.
Taking Door size-4' x 3' or 3.66x6.75=24.75 sqf.
3
sft.
@
Rs. 1150.00 per sft.
i
ii
Wood required
Wastage 5%
iii
iv
v
vi
vii
Total
@
@
@
@
Rs.
Rs.
Rs.
Rs.
250.00
225.00
150.00
200.00
per day
per day
per day
per day
Total
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
3450.00
172.50
3622.50
489.04
31.25
675.00
150.00
50.00
30.88
5048.67
455.96
5504.63
Rs.
Rs.
344.00
2737.00
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
23
S/F of door fitting as handle, sliding bolt, c.p. tower bolt etc. including cost of material etc.
complete in door shutter's.
For Door size 0.9x2.00=1.80 sqmt.
i
ii
iii
iv
v
vi
C.P. hendle
C.P. sliding bolt(300 mm)
C.P. tower bolt
door stopper
Iron hinger(125 mm)
steel screw,nut & bolt
2
2
2
1
3
No.
No.
No.
No.
No.
@
@
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
L.S.
40.00
145.00
48.00
30.00
14.00
per no.
per no.
per no.
per no.
per no.
M.R.
M.R.
M.R.
M.R.
M.R.
Total
Add 10 % C.P.
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
80.00
290.00
96.00
30.00
42.00
25.00
563.00
56.30
619.30
S/F of 32mm thick sal wood jalli shutters including fixing of wooden cleats,stopers & bolts,
looks, hendles etc. including c/o all material, labour,T&P etc, complete.
Taking Door size-4' x 3' or 3.66x6.75=24.75 sqf.
Wood required
including westage
2.13
sft.
Rs.
Rs.
2449.50
ii
1.68
sft.
Rs.
135.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
226.80
50.00
2726.30
368.05
31.25
675.00
150.00
50.00
30.88
4031.48
366.34
4397.82
Rs.
Rs.
344.00
2256.00
L.S.
@
@
@
@
per sft.
Total
Rs.
Rs.
Rs.
Rs.
250.00
225.00
150.00
200.00
per day
per day
per day
per day
Total
Total
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Analysis of Rates
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
21
i
ii
iii
iv
v
vi
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
S/F of sal wood framed wrought framed including simple moulding in straight work chaukhets
frame including S/O all material, labour,T&P etc. complete. (for 1.6 cft.)
salwood
Wastage
1.6
cft.
Rs.
5%
Total
@
@
@
Rs.
Rs.
Rs.
230.00
225.00
150.00
1.5x17.65
per day
per day
per day
Total
Total
Rs.
Rs.
Rs.
Rs.
M.R. Rs.
M.R. Rs.
M.R. Rs.
Rs.
Rs.
Rs.
Rs.
1812.51
90.62
1903.13
256.92
14.49
112.50
37.50
26.48
2351.02
235.10
2586.13
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Brick work in 1:6 cement and coarse sand of 2.25 F.M. mortar in foundation and plinth
including S/O all material, labour, T&P etc. [for 100 cft.]
Materials
a
i
ii
iii
Labour
1300
0.76
3.75
Nos.
cum.
Bag
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
5200.00
896.80
975.00
7071.80
i
ii
iii
iv
v
vi
Analysis of Rates
Mistri
Mason
Mazdoor
Male/Beldar
Mazdoor
Female/coolie
Bhisti
T&P etc.
0.17
2.00
No.
No.
@
@
Rs.
Rs.
250.00
250.00
per day
per day
Rs.
Rs.
41.67
500.00
2.00
No.
Rs.
150.00
per day
Rs.
300.00
2.00
0.50
per day
(0.75x17.65)
No.
No.
@
@
Rs.
Rs.
146.00
175.00
per day
per day
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
292.00
87.50
13.24
8306.21
124.59
8430.80
843.08
9273.88
per day
per day
per day
per day
Total
Add 1.5 % water charge on Rs.8306.21
Total
Add 10 % C.P. on Rs.
Total
Rs.
250.00
per day
Rs.
250.00
Rs.
146.00
per day
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
146.00
26.47
422.47
6.34
428.81
42.88
471.69
( 1.5 x 17.65 )
Total
Rs.
250.00
per day
Rs.
250.00
Rs.
146.00
per day
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
146.00
396.00
5.94
401.94
40.19
442.13
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
1A
Dismentling of existing plaster including disposal of refuse as per direction of E/I with in 60m.
Distence (200 fit) [SI. No. 706] (for 100 sqft.)
Coolie
per day
No.
Rs.
170.00
170.00
ii
Bhisti
per day
No.
Rs.
175.00
10.94
Total
Add 10 % C.P.
Total
hance rate per Sqm.
199.03
100.00
x10.76
21.42
Rs.
180.94
Rs.
18.09
Rs.
199.03
Rs.
Racking out joints of brick work in cement or lime mortar to a depth of 1 cm. (3/8")including
disposal of refuse as per direction of E/I with in 60m. Distence(200 fit) [SI. No. 707] (for 100 sqft.)
Beldar
per day
No.
Rs.
170.00
127.50
Rs.
12.75
Rs.
140.25
Add 10 % C.P.
Total
140.25
100.00
x10.76
15.09
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 14
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Eartwork in excavation in trenches for foundation and pipes, cables etc. in ordinry soil (Loam
clay or sand) including lift upto 1.5 m. lead upto 50m. And dressing of sides and ramming of
bottem and disposal of surplus excavated earth as directed by the engineer in charge with in a
lead of 50m. (S.I. No. 251a)
Labour
i
Mistri
per day
0.13
No.
Rs.
292.00
36.50
ii
coolie
per day
No.
Rs.
170.00
1190.00
iii
Beldar
per day
No.
Rs.
170.00
1020.00
iv
Black Smith
per day
0.13
No.
Rs.
225.00
28.13
0.75x25
Rs.
18.75
Total
Add 10 % C.P. on Rs.
Total
hance rate per cum
2522.71
28.32
2293.38
Rs.
229.34
Rs.
2522.71
89.08 Rs.
Say Rs. 89.00 Per Cum.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 15
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Providing & Laying of 40mm thick 1:2:4 cement concrete floor with cement approved coarse
sand and 2cm. graded stone grits laid in one layer finished with a flooting coat of neet cement
but without base concrete.(S.I. No. 606) (for per 100sft.)
Materials
a
i
ii
iii
Stone grit
0.37
cum.
Rs.
Coarse sand
Cement
0.18
2.75
cum.
Bag
@
@
Rs.
Rs.
0.125
1.25
No.
No.
@
@
Rs.
Rs.
1
0.75
0.25
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
Rs.
621.60
Rs.
Rs.
Rs.
212.40
838.75
1672.75
292.00
260.00
36.50
325.00
170.00
170.00
175.00
170.00
127.50
43.75
Rs.
Rs.
35.30
738.05
Rs.
Rs.
2410.80
36.16
2446.96
244.70
2691.66
Labour
b
i
ii
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
per day
per day
per day
vii
2x17.65
per day
per day
Total
Total Material + Labour
Add 1.5 % water charge
Add 10 % C.P. on Rs.
Total
2691.66
100.00
x10.76
289.62
Rs.
Rs.
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 16
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Providing & Laying of 25mm thick 1:2:4 cement concrete floor with cement approved coarse
sand and 2cm. graded stone grits finished even i/c curing cost of all material, labour, T&P etc.
required for proper completion of the work. (NBO No. 14.69) (for per 100sft.)
Materials
a
i
ii
iii
Stone grit
0.21
cum.
Rs.
Rs.
352.80
Coarse sand
Cement
0.11
2.03
cum.
Bag
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
129.80
619.15
1101.75
0.125
1.00
No.
No.
@
@
Rs.
Rs.
292.00
260.00
36.50
260.00
0.50
0.50
0.25
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
175.00
85.00
85.00
43.75
Rs.
Rs.
37.50
547.75
Rs.
Rs.
1649.50
24.74
1674.24
167.42
1841.67
Labour
b
i
ii
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
per day
per day
per day
vii
1.5x 25
per day
per day
Total
Total Material + Labour
Add 1.5 % water charge
Add 10 % C.P. on Rs.
Total
1841.67
100.00
x10.76
198.16
Rs.
Rs.
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 17
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Providing & Laying of 25mm thick 1:2:4 cement concrete floor on top of roof with (1cement : 2
coarse sand and 12mm. graded stone grits) finished even including curing complete & cost of
all material, labour, T&P etc. required for proper completion of the work. (NBO No. 14.69) (for
per 10sqmt.)
Materials
a
i
ii
iii
iv
0.166
0.056
0.11
2.03
cum.
cum.
cum.
Bag
@
@
@
@
Rs.
Rs.
Rs.
Rs.
278.88
94.08
129.80
619.15
1121.91
1.08
No.
Rs.
260.00
280.80
1.08
0.54
0.27
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
175.00
183.60
91.80
47.25
Rs.
Rs.
50.00
653.45
Rs.
Rs.
1775.36
26.63
1801.99
180.20
1982.19
Labour
b
ii
iii
iv
v
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
vii
Sunderies L.S.
per day
per day
per day
per day
Total B
Total Material + Labour
Add 1.5 % water charge
Add 10 % C.P. on Rs.
Total
1982.19
10.00
x1
198.22
Rs.
Rs.
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 18
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Providing & Laying cement concrete 1:2:4(1cement: 2 coarse sand : 4 stone grit 20mm. nominal
size) and curing complete, including cost of form work in foundation and floors. (for per 100
cft.) (S.I. No. 279)
Materials
a
i
iii
iv
Stone grit
2.55
Coarse sand
Cement
1.27
18.90
cum.
Rs.
cum. @
Rs.
Bag
@
Rs.
Add 2.5% wastage on sand and cement
Rs.
4284.00
1498.60
5764.50
181.58
11728.68
Labour
b
i
ii
0.10
0.50
No.
No.
@
@
Rs.
Rs.
292.00
260.00
29.20
130.00
per day
per day
4
4
2
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
175.00
680.00
680.00
350.00
per day
0.10
No.
Rs.
225.00
22.50
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
per day
per day
per day
vi
Black Smith
vii
10.50x17.65
Total
Total Material + Labour
Total
15414.07
100.00
x35.31
5442.71
Rs.
Rs.
185.33
2077.03
Rs.
Rs.
13805.71
207.09
14012.79
1401.28
15414.07
Rs.
Rs.
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 19
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
RCC. Work with cement approved coarse sand and 200mm. Gauge approved stone grit in the
proportion of 1:2:4 (1 cement : 6 aggregate) in lintels of door and windows excluding supply of
rainforcement and its bending but including its fixing and binding the same with 24 BWG
binding wire and including necessary centering and suttring etc.d and also including supply of
all materials, labour, T&P etc. required for proper completion of the work.(S.I. No 283 as per 279)
(for per 100 cft.)
Materials
a
i
iii
iv
Stone grit
Coarse sand
Cement
2.55
1.27
18.90
cum.
cum.
@
@
Rs.
Rs.
Bag
@
Rs.
Add 2.5% wastage on sand and cement
5764.50
181.58
11728.68
Labour
b
i
ii
0.10
0.50
No.
No.
@
@
Rs.
Rs.
292.00
260.00
29.20
130.00
per day
per day
4
4
2
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
170.00
680.00
680.00
340.00
per day
0.10
No.
Rs.
225.00
22.50
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
per day
per day
per day
vi
Black Smith
vii
10.50x25
Total
Total Material + Labour
Rs.
4284.00
1498.60
Total
2
25
25
No.@Rs.
No.@Rs.
No.@Rs.
225.00
25
25
Total
hance rate per cum
17387.12
100
x35.31
6139.39
Rs.
Rs.
262.50
2144.20
Rs.
Rs.
Rs.
Rs.
13872.88
208.09
14080.97
1408.10
15489.07
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
15489.07
450.00
625.00
625.00
25.50
172.55
17387.12
Rs.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 20
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
RCC. Work with cement approved coarse sand and 200mm. Gauge approved stone grit in the
proportion of 1:1.5:3 (1 cement : 4.5 aggregate) excluding supply of rainforcement and its
bending but including its fixing and binding the same with 24 BWG binding wire and including
necessary centering and suttring etc.d and also including supply of all materials, labour, T&P
etc. required for proper completion of the work.(S.I. No 283 as per 279) (for per 100 cft.)
Materials
a
i
iii
iv
Stone grit
2.69
Coarse sand
Cement
1.35
23.55
cum.
Rs.
cum. @
Rs.
Bag
@
Rs.
Add 2.5% wastage on sand and cement
1593.00
7182.75
219.39
13514.34
Labour
b
i
ii
0.10
0.50
No.
No.
@
@
Rs.
Rs.
292.00
260.00
29.20
130.00
per day
per day
4
4
2
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
170.00
680.00
680.00
340.00
per day
0.10
No.
Rs.
225.00
22.50
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
per day
per day
per day
vi
Black Smith
vii
10.50x25
Total
Total Material + Labour
Rs.
4519.20
Total
2
25
25
No.@Rs.
No.@Rs.
No.@Rs.
225.00
25
25
Total
hance rate per cum
19380.81
100.00
x35.31
6843.37
Rs.
Rs.
262.50
2144.20
Rs.
Rs.
Rs.
Rs.
15658.54
234.88
15893.42
1589.34
17482.76
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
17482.76
450.00
625.00
625.00
25.50
172.55
19380.81
Rs.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 21
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of 32mm thick flush door commercial quality conforming IS-2202 part-1 (1983) i/c fixing of
wooden cleats & stopper & i/c fixing and adjustment of hinges, bolt, locks, handles, springs and
other fitting but excluding their supply. (A/R) (S.I. No. 470)
i
ii
iii
iv
sutters
Cartage
Carpenter
Beldar
0.093
0.3
0.042
0.023
per sqm.
per sqm.
per sqm.
per sqm.
Total
Total
108.63
1.00
x10.76
1168.86
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
79.05
5.30
10.50
3.91
98.76
9.88
108.63
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 22
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of oxi iron door fitting approved quality as per shedule such as sliding bolt, tower bolt, etc.
i/c supply of all materials, labour, T&P etc. required for proper completion of the work.
( I.S.I.
marked only)
Taking Size 0.90 x 2.10
i
ii
iii
iv
each
Rs.
60.00
each
Rs.
60.00
each
Rs.
21.00
each
Rs.
21.00
each
Rs.
16.00
each
Rs.
16.00
each
Rs.
15.00
each
Total
Rs.
Rs.
Rs.
Rs.
30.00
127.00
12.70
139.70
Total
Say Rs.140.00 Per Each.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 23
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Materials
367
2209
982
2203
b
114
Cement
Carrige of cement
1.07
tons @
Coarse Sand
Carrige of coarse sand
Labour (for measuring, carring, depositing and mixing)
0.75
No.
@
Rs.
Beldar
per day
170.00
101
Bhisti
175.00
0.25
per day
0.07
tons
No.
Rs.
per day
per day
L.S.
Total
Rs.
1525.00
Rs.
1262.60
Rs.
127.50
Rs.
Rs.
Rs.
Rs.
12.25
26.91
13.52
2967.78
Materials
Cement Mortar 1:6
Labour
Mason
per day
Mazdoor/
per day
coolie
Bhisti
per day
Scaffolding & Sunderies
0.172
cum.
Rs.
0.8
No.
Rs.
260.00
per day
0.88
0.99
No.
No.
@
@
Rs.
Rs.
170.00
175.00
L.S.
1170.90
10.00
x1
117.09
Rs.
510.46
M.R. Rs.
208.00
149.60
173.25
12.61
1053.92
10.54
1064.46
106.45
1170.90
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 24
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Materials
367
2209
982
2203
b
114
Cement
Carrige of cement
1.07
tons @
Coarse Sand
Carrige of coarse sand
Labour (for measuring, carring, depositing and mixing)
0.75
No.
@
Rs.
Beldar
per day
170.00
101
Bhisti
175.00
0.51
per day
0.07
tons
No.
Rs.
per day
per day
L.S.
Total
Rs.
3111.00
Rs.
1262.60
Rs.
127.50
Rs.
Rs.
Rs.
Rs.
12.25
26.91
13.52
4553.78
Materials
Cement Mortar 1:3
Labour
Mason
per day
Mazdoor/
per day
coolie
Bhisti
per day
Scaffolding & Sunderies
0.172
cum.
Rs.
0.8
No.
Rs.
260.00
per day
0.88
0.99
No.
No.
@
@
Rs.
Rs.
170.00
175.00
L.S.
1473.97
10.00
x1
147.40
Rs.
783.25
M.R. Rs.
208.00
149.60
173.25
12.61
1326.71
13.27
1339.98
134.00
1473.97
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 25
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Materials
367
2209
982
2203
b
114
Cement
Carrige of cement
1.07
tons @
Coarse Sand
Carrige of coarse sand
Labour (for measuring, carring, depositing and mixing)
0.75
No.
@
Rs.
Beldar
per day
170.00
101
Bhisti
175.00
0.38
per day
0.07
tons
No.
Rs.
per day
per day
L.S.
Total
Rs.
2318.00
Rs.
1262.60
Rs.
127.50
Rs.
Rs.
Rs.
Rs.
12.25
26.91
13.52
3760.78
Materials
Cement Mortar 1:4
Labour
Mason
per day
Mazdoor/
per day
coolie
Bhisti
per day
Scaffolding & Sunderies
0.224
cum.
Rs.
0.94
No.
Rs.
260.00
per day
1.02
1.1
No.
No.
@
@
Rs.
Rs.
170.00
175.00
L.S.
1627.98
10.00
x1
162.80
Rs.
842.41
M.R. Rs.
244.40
173.40
192.50
12.61
1465.32
14.65
1479.98
148.00
1627.98
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 26
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
15mm thick 1:4 cement plaster in single coat on wall with (1 cement:4 coarse sand) finished
even and smooth including cost of all material, labour, T&P. etc.required for proper completion
of the work.(NBO No.-17.59) (for per 10.00sqm)
a
i
ii
b
i
ii
iii
iv
Materials
Cement
Coarse sand
Labour
Mason
per day
Mazdoor/
per day
coolie
Bhisti
per day
Scaffolding & Sunderies
1.44
0.18
cum.
cum.
@
@
Rs.
Rs.
0.83
No.
Rs.
260.00
per day
0.83
0.98
No.
No.
@
@
Rs.
Rs.
170.00
175.00
L.S.
1339.80
10
x1
133.98
Rs.
Rs.
Rs.
439.20
212.40
651.60
M.R. Rs.
215.80
141.10
171.50
20.00
1200.00
18.00
1218.00
121.80
1339.80
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 27
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Mild steel o iron plain work such as rainforcement concrete or rainforced brick work (when not
includind in an over all rates) wrough to required as necessary shape i/c bending for proper
completion of the work and i/c suplly of stel an wastage and over lapping an hooks. (S.I. No.
504) (for 50.80 Kg.)
ii
iii
Labour
Black Smith
per day
Mazdoor/
per day
coolie
T&P & Sunderies
iv
steel
1
1.5
No.
Rs.
225.00
per day
S.R. Rs.
225.00
No.
Rs.
170.00
255.00
10.00
490.00
Rs.
44.00
2235.20
111.76
2346.96
Rs.
Rs.
Rs.
2836.96
283.70
3120.66
L.S. 0.4x 25
50.80
Kg.
Total A+B
Add 10 % C.P. on Rs.
Total
hance rate per Kg.
3120.66
50.80
x1
61.43
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 28
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
providing and fixing angle iron work for haking boundry wall jali expended metal including
cutting & welding in proper size & shape and including suplly of angle etc. wastage &
febricating etc. complete.(as per SI No. 504 & 517) (for 50.80 Kg.)
i
ii
iii
Labour
Black Smith
per day
Mazdoor/
per day
coolie
T&P & Sunderies
steel/angle iron/cutter
1
1.5
No.
Rs.
225.00
per day
S.R. Rs.
225.00
No.
Rs.
170.00
255.00
7.06
487.06
Rs.
43.41
2205.23
220.52
2425.75
Rs.
Rs.
Rs.
2912.81
291.28
3204.09
L.S. 0.4x17.65
50.80
Kg.
Total A+B
Add 10 % C.P. on Rs.
Total
hance rate per Kg.
3204.09
50.80
x1
63.07
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 29
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
1..
As in item No. 303, 305, 307 but in super structure including necessory cutting and moulding of
brick as required and also including hony comb brick work thickness of wall not to be less then
one and half brick thick. ( for 100 cft.) ( SI No. 309 )
Mason
coolie
iii
1
1
per day
per day
No.
No.
@
@
Rs.
Rs.
260.00
170.00
260.00
170.00
Rs.
Rs.
Rs.
26.48
456.48
6.85
463.33
46.33
509.66
1.50 x 17.65
Total
Total
Total
509.66
100.00
x35.31
179.96
Rs.
Rs.
Rs.
2..
Same as item No. 309 (S.I. No. 309) but for wall of one brick work. ( for 100 cft.) ( SI No. 310 )
Mason
coolie
1
1
per day
per day
No.
No.
@
@
x35.31
Rs.
Rs.
260.00
170.00
480.10
100.00
3..
169.52
260.00
170.00
430.00
6.45
436.45
43.65
480.10
Rs.
Mason
coolie
0.5
0.5
per day
per day
No.
No.
@
@
x35.31
Rs.
Rs.
260.00
170.00
240.05
100.00
84.76
130.00
85.00
215.00
3.23
218.23
21.82
240.05
Rs.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 30
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
First class Brick work in 1:4 cement and coarse sand of 2.25 F.M. mortar in foundation and
plinth including S/O all material, labour, T&P etc. required for proper completion of the work.
(for per 100cft.) (S.I. No. 305)
a
i
ii
iii
b
i
ii
iii
iv
v
vi
Materials
Brick class 150
Coarse sand
Cement
1300
0.76
5.25
Nos.
cum.
Bag
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
6370.00
896.80
1601.25
8868.05
0.17
2.00
No.
No.
@
@
Rs.
Rs.
292.00
260.00
per day
per day
Rs.
Rs.
48.67
520.00
2.00
No.
Rs.
170.00
per day
Rs.
340.00
2.00
0.50
per day
(0.75x25.00)
No.
No.
@
@
Rs.
Rs.
170.00
175.00
per day
per day
Rs.
Rs.
Rs.
Rs.
340.00
87.50
18.75
1354.92
Rs.
Rs.
Rs.
Rs.
Rs.
10222.97
153.34
10376.31
1037.63
11413.94
Labour
Mistri
Mason
Mazdoor
Male/Beldar
Mazdoor
Female/coolie
Bhisti
T&P etc.
per day
per day
per day
per day
Total B
Total A+B
Add 1.5 % water charge on Rs.
Total
Add 10 % C.P. on Rs.
hance rate per cum
Total
11413.94
100.00
x35.31
4030.26
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 31
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Brick work in 1:6 cement and coarse sand of 2.25 F.M. mortar in foundation and plinth including
S/O all material, labour, T&P etc. [for 100 cft.]
a
Materials
i
ii
iii
b
i
ii
Labour
iii
iv
v
vi
1300
0.76
3.75
Nos.
cum.
@
@
Rs.
Rs.
Rs.
Rs.
6370.00
896.80
Bag
Rs.
305.00
Rs.
Rs.
1143.75
8410.55
0.17
2.00
No.
No.
@
@
Rs.
Rs.
292.00
260.00
per day
per day
Rs.
Rs.
48.67
520.00
2.00
No.
Rs.
170.00
per day
Rs.
340.00
2.00
0.50
per day
(0.75x25.00)
No.
No.
@
@
Rs.
Rs.
170.00
175.00
per day
per day
Rs.
Rs.
Rs.
Rs.
340.00
87.50
18.75
1354.92
Rs.
Rs.
Rs.
Rs.
Rs.
9765.47
146.48
9911.95
991.19
10903.14
Cement
Mistri
Mason
Mazdoor
Male/Beldar
Mazdoor
Female/coolie
Bhisti
T&P etc.
per day
per day
per day
per day
Bag
Total A
Total B
Total A+B
Add 1.5 % water charge on Rs.8306.21
Total
Add 10 % C.P. on Rs.
Total
10903.14
100.00
x35.31
3849.90
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 32
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Brick work in 1:3 cement and coarse sand of 2.25 F.M. mortar in foundation and plinth including
S/O all material, labour, T&P etc. (SI No.-307) [for 100 cft.]
a
Materials
i
ii
iii
b
i
ii
Labour
iii
iv
v
vi
Cement
Mistri
Mason
Mazdoor
Male/Beldar
Mazdoor
Female/coolie
Bhisti
T&P etc.
per day
per day
per day
1300
0.76
7.5
Nos.
cum.
@
@
Rs.
Rs.
Rs.
Rs.
6370.00
896.80
Bag
Rs.
305.00
Rs.
Rs.
2287.50
9554.30
0.17
2
No.
No.
@
@
Rs.
Rs.
292.00
260.00
per day
per day
Rs.
Rs.
48.67
520.00
No.
Rs.
170.00
per day
Rs.
340.00
No.
No.
@
@
Rs.
Rs.
170.00
175.00
per day
per day
Rs.
Rs.
Rs.
Rs.
340.00
87.50
18.75
1354.92
Rs.
Rs.
Rs.
Rs.
Rs.
10909.22
163.64
11072.85
1107.29
12180.14
per day
2
0.50
per day
(0.75x25.00)
Bag
Total A
Total B
Total A+B
Add 1.5 % water charge on Rs.8306.21
Total
Add 10 % C.P. on Rs.
Total
12180.14
100.00
x35.31
4300.81
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 33
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of white or coloured kajaria tiles in flooring or in skiriting or dedo laid with 1:3 cement and
approved coarse sand mortar finishing with white cement slurry jointing and polishing
complete including supply of all material, labour, T&P. etc.required for proper completion of the
work as per direction eng. in charge floor & wall.( S.I. No. 628)
Taking area 108 sft.Or 10.03 sqm.(in size of 8"x12")
i
ii
iii
iv
v
vi
vii
viii
13.5
1
0.34
3.2
160
4
2
L.S.
Tiles
White Cement
Coarse sand
Cement
Marbal dust
Tiles Layer
Mazdoor Female/coolie
Sunderies
Doz.
Bag
cum.
Bag
kg.
No.
No.
1.5 x
@
@
@
@
@
@
@
25
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
340.50
545.00
1180.00
305.00
4.00
250.00
170.00
Total
Total
Total
per dozon
per Bag
per cum.
per Bag
per kg.
per day
per day
Total
10213.56
10.03
x1
1018.30
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
4596.75
545.00
401.20
976.00
640.00
1000.00
340.00
37.50
8536.45
128.05
8664.50
620.56
9285.06
928.51
10213.56
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 34
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of white or coloured kajaria tiles in flooring or in skiriting or dedo laid with 1:3 cement and
approved coarse sand mortar finishing with white cement slurry jointing and polishing
complete including supply of all material, labour, T&P. etc.required for proper completion of the
work as per direction eng. in charge floor & wall.( S.I. No. 628)
Taking area 108 sft.Or 10.03 sqm.(in size of 12"x12")
i
ii
iii
iv
v
vi
vii
viii
10.75
1
0.34
3.2
160
4
2
L.S.
Tiles
White Cement
Coarse sand
Cement
Marbal dust
Tiles Layer
Mazdoor Female/coolie
Sunderies
Doz.
Bag
cum.
Bag
kg.
No.
No.
1.5 x
@
@
@
@
@
@
@
25
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
450.00
545.00
1180.00
305.00
4.00
250.00
170.00
Total
Total
Total
per dozon
per Bag
per cum.
per Bag
per kg.
per day
per day
Total
10518.11
10.03
x1
1048.67
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
4837.50
545.00
401.20
976.00
640.00
1000.00
340.00
37.50
8777.20
131.66
8908.86
653.06
9561.92
956.19
10518.11
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 35
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
code Providing and fixing 16-18mm. Thick gang show cut mirror polished (premoulded and
prepolished) machine cut for kitchen plateform, vanity counters window sills, facias and similar
location of required size of approved shade, colour and texture laid 20mm. thick base cement
mortar 1:4 (1 cement : 4 coarse sand) with joints treated with white cement mixed with
machining pigment, epoxy touch ups including rubbing, curing moulding and finishing to edge
to give high finish etc. complete at all leveis.
8.2.2 Granite (Black/Any colour other than red).
8.2.2.2 Area of slab over 0.5 Sqm.
mirror polished Lakha red granite=2.00 sqm.+Wastage 5%
0.10sqm.= 2.10 sqm.
7297 Lakha red granite 16-18
mm. Thick slab above
0.50sqm. (including all tax)
Cement mortar 1:4(1
cement : 4 coarse sand)
(rate per item no. 3.9)
0.123
0.114
0.115
9999
9999
2.1
sqm.
Rs.
2.7
2.8
1.3
1.3
cum.
No.
No.
No.
@
@
@
@
Rs.
Rs.
Rs.
Rs.
L.S.
L.S.
Rs.
5460.00
34.04
260.00
170.00
170.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
91.91
728.00
221.00
221.00
173.61
144.67
7040.19
70.40
7110.59
711.06
355.53
8177.18
Total
Total
per cum.
per day
per day
per day
Total
8177.18
x1
4088.59
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 36
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of 100mm dia P.V.C. pipe of 6kg/cm2 working pressure including all fitting as coller, socket,
M.S. clamp,tea etc. fixed to wall by 15 cm. long iron nails & repair of damazed wall surfase
during excution of work complete. [for 30 feet]
a
i
ii
iii
iv
b
i
ii
iii
iv
v
vi
Materials
6kg/PVC.pipe100mm dia
PVC.tea 100mm dia
M.S. Clamp
PVC. Band
30
2
5
2
fit
No.
No.
No.
@
@
@
@
Rs.
Rs.
Rs.
Rs.
60.50
160.00
13.00
45.00
Rs.
Rs.
Rs.
Rs.
200.00
250.00
150.00
17.65
Rs.
25.00
Rs.
Rs.
Rs.
Rs.
Rs.
1815.00
320.00
65.00
90.00
2290.00
50.00
62.50
150.00
16.41
50.00
Rs.
Rs.
Rs.
Rs.
Rs.
50.00
2668.91
266.89
309.15
3244.95
Labour
Fitter
per day
0.25
No.
@
Mason
per day
0.25
No.
@
Beldar
per day
1.00
No.
@
Carriage & fixing (0.75+0.18)=0.93
@
Cost of cement & sand for repair of damged plaster
solution of fixing pipe
2
No.
@
Total
0.00
100.00
Total
x35.31
0.00
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 37
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of 100mm dia H.C.I. pipe of work complete. including supply of all material, labour, T&P.
etc. required for proper completion of the work. S.I. No. 337) (for 17.35 mtr.)
a
i
ii
iii
iv
b
i
ii
iii
Materials
HCI Pipe single socket
1.80 mt. lenth
Add 5% waste
scafolding
Carriage of material
10
No.
Rs.
1344.00
per No.
Rs.
13440.00
Total A
Rs.
Rs.
Rs.
Rs.
672.00
50.00
100.00
14262.00
Rs.
Rs.
Rs.
Rs.
84.00
31.50
124.50
240.00
Total A+B
Rs.
Rs.
Rs.
Rs.
Rs.
14502.00
145.02
14647.02
1464.70
16111.72
L.S.
L.S.
Labour
Fitter
Bandhani
Beldar
per day
per day
per day
0.42
0.21
0.83
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
200.00
150.00
150.00
Total
Total
16111.72
17.35
x1
928.63
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 38
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of 110mm dia P.V.C. pipe for rain water including supply of all material, labour, T&P. etc.
required for proper completion of the work. S.I. No. 730) (for 10 Rm.)
a
i
ii
Materials
PVC pipe
Add 5% waste
10
Rmt.
Rs.
236.50
per Rmt.
Total
Add 10 % C.P.
on Rs.
For fixing of PVC pipe
Total A
10
2966.58
10.00
Rmt.
x1
Rs.
23.50
296.66
per Rmt.
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
2365.00
118.25
2483.25
248.33
2731.58
235.00
2966.58
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 39
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of 15mm dia G.I. pipe B class jindal or equivalent make with G.I. fitting ISI marked and
clamps including cutting walls, floor & making good the same including supply of all material,
labour, T&P. etc.required for proper completion of the work.(NBO. No. 23.1-a) (for 10mtr.)
a
i
ii
iii
iv
b
i
ii
Materials
15mm dia tube/pipe
10
M.
Add 15% for fitting and wastage on Rs.
lead ,demp,oil etc.
cement & sand Grit etc.
Rs.
98.40
Rs.
Rs.
225.00
170.00
per M.
L.S.
L.S.
M.R. Rs.
Rs.
Rs.
Rs.
Total
Rs.
984.00
147.60
10.00
20.00
1161.60
S.R. Rs.
S.R. Rs.
Total
Rs.
Rs.
Total
Rs.
Rs.
Total
Rs.
Rs.
Total
Rs.
150.75
113.90
1426.25
14.26
1440.51
57.62
1498.13
149.81
1647.95
Labour
Plumber
Coolie
Each
Each
0.67
0.67
No.
No.
@
@
x1
1647.95
10.00
164.79
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 40
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
providing and laying of 20mm thick white albetta stone flooring over 25mm thick base of
cement mortar 1:4 (1 cement :4 coarse sand)laid & jointed with white cement slurry including
rubbing & polishing complete. (for per 20 sqf. Or 1.86 sqm)
Materials
a
i
ii
b
iii
iv
Albeta Stone
Wastge 5 %
25mm thik base of 1:4
Coarse sand
Cement
c
i
ii
iii
iv
Labour
Mason
Beldar
Mazdoor
Bhisti
1.86
sqm.
Rs.
Rs.
Rs.
1999.50
99.98
0.08
0.47
cum.
Bag
@
@
Rs.
Rs.
94.40
143.35
2337.23
0.67
0.67
0.67
0.67
No.
No.
No.
No.
@
@
@
@
Rs.
Rs.
Rs.
Rs.
260.00
170.00
170.00
175.00
Rs.
Rs.
Rs.
Rs.
Rs.
174.20
113.90
113.90
117.25
519.25
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
2856.48
42.85
283.43
3182.75
318.28
3501.03
per day
per day
per day
per day
Total B
M.R.
M.R.
M.R.
M.R.
Total A+B
Add 1.5 % water charge on Rs.
Add 13.5 % VAT on Albeta stone
Total
Add 10 % C.P. on Rs.
Total
hance rate per sqm.
3501.03
1.86
x1
1882.27
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 41
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Finishing wall with one coat of water proof cement paint of approved quality on prviously old
treated surface with this paint to give an even hade including supply of all materials, labour
T&P etc. required for proper completion of the work. (S.I. No.-662) (for area 100sq.ft.)
Materials
a
i
Snowcem power
b
i
ii
iii
iv
Labour
Painter
Coolie
Bhisti
Sundries
L.S.
Kg.
Rs.
35.00
per Kg.
Total A
Rs.
Rs.
70.00
70.00
0.20
0.20
0.13
0.25
No.
No.
No.
x
@
@
@
25
Rs.
Rs.
Rs.
250.00
170.00
175.00
per day
per day
per day
Rs.
Rs.
Rs.
Rs.
Rs.
50.00
34.00
21.88
6.25
112.13
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
182.13
2.73
2.80
187.66
18.77
206.42
Total B
Total A+B
Add 1.5 % water charge on Rs.
Vat 4 %
Total
Add 10 % C.P. on Rs.
Total
hance rate per sqm.
206.42
100.00
for two coat rate-
22.00
x10.76
22.21
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 42
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of P.V.C. low level cistern with all internal fitting m.s. Brackets, P.V.C. connection, c.p. angle
valve 15mm dia, brase including supply of all materials labour, T&P required for proper
completion at work.
i
ii
iii
iv
v
vi
PVC.cistern10 ltr.capicity
PVC. Conection 450mm.
Long
C.P. Angle valve
P.V.C.flush pipe 32mm dia
labour for fixing
T&P sunderies etc.
No.
Rs.
695.00
per No.
S.R. Rs.
695.00
1
1
1
1
L.S.
No.
No.
No.
No.
@
@
@
@
Rs.
Rs.
Rs.
Rs.
45.00
422.00
135.00
100.00
per No.
per No.
per No.
per No.
S.R.
S.R.
S.R.
S.R.
45.00
422.00
135.00
100.00
10.00
1407.00
140.70
1547.70
Total
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 43
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of steel kitchen sink with C.P. jali , P.V.C. west pipe ,M.S. brackets etc, including s/o all
material,labour,T&P etc. complete.
i
ii
iii
iv
v
v
1
1
1
1
No.
No.
Pair
No.
@
@
@
@
Rs.
Rs.
Rs.
Rs.
2300.00
130.00
50.00
33.00
per No.
per No.
per pair
per No.
S.R.
S.R.
S.R.
S.R.
Rs.
Rs.
Rs.
Rs.
2300.00
130.00
50.00
33.00
1
1
No.
No.
@
@
Rs.
Rs.
434.00
137.00
per No.
per No.
Total
S.R. Rs.
S.R. Rs.
Rs.
Rs.
Rs.
434.00
137.00
3084.00
308.40
3392.40
Total
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 44
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of 100 x 75mm dia H.C.I. nahani trape with C.P. jali including cost of all material, labour,T&P
etc. required for oroper completion of the work.
i
No.
Rs.
280.00
each
S.R. Rs.
280.00
ii
H.C.I. Grating
No.
Rs.
21.30
each
S.R. Rs.
Total
Rs.
Rs.
Total
Rs.
Rs.
Total
Rs.
21.30
301.30
109.00
410.30
41.03
451.33
Labour charges
Add 10 % C.P.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 45
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
dismentling of cement concrete or brick or granolithic floor including disposal of refuse as per
direction of E/I within 60m.distance (200fit) [SI. No. 697] (taken or 100 sq. ft.]
i
ii
Beldar
Coolie
per day
per day
0.75
0.75
No.
No.
@
@
Rs.
Rs.
170.00
170.00
per day
per day
Total
Add 10 % C.P.
Total
280.50
100.00
x10.76
30.18
Rs.
Rs.
Rs.
Rs.
Rs.
127.50
127.50
255.00
25.50
280.50
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 46
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/f of mosquieto proof jali 24/14 gauge with wood frame 0.05x0.025 including s/o all material,
labour, T&P etc. complete. (for 12sqft.)
a
i
ii
sal wood
3
2
x
x
0.9
=
1.2
=
Total
5.10 x
0.05
Add 10% Wastage
0.0070
c
i
ii
iii
iv
Labour
Carpenter
Beldar
mosquieto proof jali
T&P, sundris L.S.
0.25
0.25
1.30
2.5
cum.
2.70
2.40
5.10
R.M.
R.M.
R.M.
0.025
=
=
No.
@
Rs.
No.
@
Rs.
sqm. @
Rs.
x 17.65
250.00
170.00
135.00
0.0064
0.0006
0.0070
Rs.
Rs.
cum.
280.50
280.50
Rs.
Rs.
Rs.
Rs.
Rs.
62.50
42.50
175.50
44.13
324.63
Rs.
Rs.
Rs.
605.13
60.51
665.64
per day
per day
per sqm.
Total B
Total A+B
665.64
12.00
x10.76
596.86
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 47
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of door fitting as Aluminium handle, sliding bolt, tower bolt etc. including cost of material
etc. complete in door shutter's.
For Door size 0.9x2.00=1.80 sqmt.
i
ii
iii
iv
v
vi
2
2
2
1
3
No.
No.
No.
No.
No.
@
@
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
L.S.
38.50
192.50
44.00
44.00
15.60
S.R.
S.R.
S.R.
S.R.
S.R.
Total
Add 10 % C.P.
hance rate per cum
per no.
per no.
per no.
per no.
per no.
Total
732.38
1.80
x1
406.88
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
77.00
385.00
88.00
44.00
46.80
25.00
665.80
66.58
732.38
Rs.
S/F of door fitting as handle, sliding bolt, c.p. tower bolt etc. including cost of material etc.
complete in door shutter's.
For Door size 0.9x2.00=1.80 sqmt.
i
ii
iii
iv
v
vi
C.P. hendle
C.P. sliding bolt(300 mm)
C.P. tower bolt
door stopper
Iron hinger(125 mm)
steel screw,nut & bolt
2
2
2
1
3
No.
No.
No.
No.
No.
@
@
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
L.S.
40.00
145.00
48.00
30.00
14.00
Total
Add 10 % C.P.
hance rate per sqm.
per no.
per no.
per no.
per no.
per no.
Total
619.30
1.80
x1
344.06
M.R.
M.R.
M.R.
M.R.
M.R.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
80.00
290.00
96.00
30.00
42.00
25.00
563.00
56.30
619.30
Rs.
i
ii
iii
iv
v
vi
vii
Wood required
Wastage 5%
No.
No.
No.
No.
@
@
@
@
Rs.
Rs.
Rs.
Rs.
292.00
225.00
170.00
200.00
Total
per day
per day
per day
per day
Total
5595.47
24.75
x10.76
2432.61
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
3450.00
172.50
3622.50
489.04
36.50
675.00
170.00
50.00
43.75
5086.79
508.68
5595.47
Rs.
Page 48
Analysis of Rates
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 49
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of 32mm thick sal wood fully glazed shutters including fixing of wooden cleats, stopers &
adjustment of hinges bolts,looks, hendles & other fiting but excluding their supply including s/o
all material, labour,T&P etc, complete. (SI No.-412)
ii
iii
i
ii
iii
iv
v
Wood required
including wastege
4mm. Thick glass pannels
12"x8"
1.68
cft.
@
L.S.
Labour
Mistri
Carpenter
Beldar
Glazier
Sundries L.S.
Rs.
485.00
Total
0.13
3.00
1.00
0.20
No.
No.
No.
No.
@
@
@
@
Rs.
Rs.
Rs.
Rs.
292.00
250.00
170.00
200.00
1.75x25.00
per day
per day
per day
per day
Total
per cft.
Total
5659.41
24.75
x10.76
2460.41
Rs.
3239.87
Rs.
Rs.
Rs.
814.80
50.00
4104.67
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
36.50
750.00
170.00
40.00
43.75
5144.92
514.49
5659.41
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 50
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of 32mm thick sal wood framed & jali shutters including supply of wooden cleats, stopers &
adjustment of hinges bolts,looks, hendles & other fiting but excluding their supply including s/o
all material, labour,T&P etc, complete. (SI No.-412)
ii
iii
i
ii
iii
iv
v
0.13
3.00
1.00
0.25
No.
No.
No.
No.
@
@
@
@
Rs.
Rs.
Rs.
Rs.
292.00
250.00
170.00
200.00
1.75x25.00
Total
per day
per day
per day
per day
Total
4113.95
24.75
x10.76
1788.53
Rs.
2412.91
Rs.
Rs.
Rs.
226.80
50.00
2689.71
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
36.50
750.00
170.00
50.00
43.75
3739.96
374.00
4113.95
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 51
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F sal wood framed including simple moulding straight work in chaukhat frame including s/o
all material, labour,T&P etc, complete. (SI No.-401)
i
Sal Wood
i
ii
iii
v
Labour
Carpenter l
Carpenter ll
Beldar
Sundries L.S.
1.6
cft.
0.063
0.50
0.25
No.
No.
No.
size-1.50 cft.
@
Rs. 1132.82 per cft.
Total
@
@
@
Rs.
Rs.
Rs.
250.00
230.00
170.00
1.50 x 25.00
Total
per day
per day
per day
Total
2225.59
1.50
x35.31
52390.35
Rs.
Rs.
1812.51
1812.51
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
15.75
115.00
42.50
37.50
2023.26
202.33
2225.59
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 52
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Finishing wall with 1mm thick Birla Putty of approved brand including supply ith cement primer
to give even shade and papering the surace even and smooth. (D.S.R. No.-13.26) (for area
10sqm.)
a
i
b
i
ii
iv
Materials
5
Birla putty
as recommended by Manufacturer
Labour
0.91
Mason
0.91
Beldar
Sundries
Kg.
Rs.
29.25
per Kg.
Total A
Rs.
Rs.
146.25
146.25
No.
No.
@
@
Rs.
Rs.
260.00
170.00
per day
per day
Rs.
Rs.
Rs.
Rs.
236.60
154.70
83.98
475.28
Rs.
Rs.
Rs.
Rs.
Rs.
621.53
9.32
630.85
63.09
693.94
L.S.
Total B
Total A+B
693.94
10
x1
69.39
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 53
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
P/l 600x600mm size vitrified tiles (ivory or equivalent shad) of approved quality in flooring/
skirtig in the desired pattern laid with ahesive of Bal-Endura (silver star gray or equivalent) o
arage thikness of 1cm. Over exiting floor including curing and filling joints with Bal-Endura or
equivalent make grout and grout sealant, wipe off excess grout with a demp sponge with tiles
cleaner liquid equivalent & finishing with tiles polish including supply of all material, labour,T&P
etc. required for oroper completion of the work as per direction Eng. in Charge. (Take an area
10.04 sqm.)
Materials
i
ii
Vitrified Tiles
5% waste
iii
Ball adhesive silver star gray (20Kg. Bag) rate of application 1cm. Thick volume of 1 bag
of 50Kg.=0.034cum. Hance volume of 1 bag of 20Kg.
=(0.034x20)/50=0.0136cum.
Hance coverage= 0.0136/0.01 = 1.36sqm./bag or 15.06 sft./bag of 20Kg.
Hance for 108sft. = 108/15.06 = 7.017 bag or say 7.20 bags.
10.04
sqm.
Rs.
555.00
per cum.
Total A
iv
v
vi
vii
viii
ix
x
7.20
Bag
Add 10% extra or level uneven surface
Bal-Endura grout 50Kg.
White
Grout sealer (500ml.)
Tiles cleaner liquid
tiles polish
sundries
cartage up to site
Rs.
400.00
per Bag
per Kg.
Kg.
Rs.
400.00
1
1
1
L.S.
L.S.
pack
pack
pack
@
@
@
Rs.
Rs.
Rs.
200
90
220
per pack
per pack
per pack
Total B
Labour
i
ii
iii
Tiles
layer
(Specially
trained
applicator)
per day
No.
Rs.
Rs.
Rs.
Rs.
5572.20
278.61
5850.81
Rs.
Rs.
Rs.
2880.00
288.00
400.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
200.00
90.00
220.00
200.00
150.00
4428.00
250.00
per day
Rs.
1000.00
Mazdoor
per day
2
No.
@
Rs. 170.00
Female/coolie
Add for spacial tools for cutting of tiels etc. as per market rate L.S.
per day
Rs.
Rs.
Rs.
340.00
200.00
1540.00
11818.81
177.28
11996.09
1199.61
1387.64
14583.34
Total C
14583.34
10.04
x1
1452.52
Rs.
Page 54
Analysis of Rates
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 55
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
20mm thick 1:4 water proof cement plaster with (1 cement:4 coarse sand) water proofing
compound as specified finishing even and smooth including cost of all material, labour, T&P.
etc.required for proper completion of the work.(A/R) (for per 10.00sqm)
a
i
ii
iii
b
i
ii
iii
iv
Materials
Cement
coarse sand
water proofing
Labour
Mason
per day
Mazdoor/
per day
coolie
Bhisti
per day
Scaffolding & Sunderies
1.77
0.25
1.77
Bag
cum.
cum.
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
539.85
295.00
106.20
941.05
1.53
No.
Rs.
260.00
per day
Rs.
397.80
1.53
1.48
No.
No.
@
@
Rs.
Rs.
170.00
175.00
per day
per day
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
260.10
259.00
50.00
1907.95
28.62
1936.57
193.66
2130.23
L.S.
Total
2130.23
10
x1
213.02
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 56
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Providing & Laying of 25mm thick 1:1.5:3 cement concrete floor with cement approved coarse
sand and 2cm. graded stone grits finished even i/c curing cost of all material, labour, T&P etc.
required for proper completion of the work. (for per 100sft.)
Materials
a
i
ii
iii
iv
Stone grit
0.44
cum.
Rs.
Water proofing
Coarse sand
Cement
0.72
0.22
2.89
cum.
cum.
Bag
@
@
@
Rs.
Rs.
Rs.
0.125
1.25
No.
No.
@
@
Rs.
Rs.
1
0.75
0.25
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
Rs.
739.20
Rs.
Rs.
Rs.
Rs.
190.80
259.60
881.45
2071.05
292.00
260.00
36.50
325.00
170.00
170.00
175.00
170.00
127.50
43.75
Rs.
Rs.
50.00
752.75
Rs.
Rs.
2823.80
42.36
2866.16
286.62
3152.77
Labour
b
i
ii
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
vii
per day
per day
per day
per day
per day
2 x 25
Total B
Total A+B
Add 1.5 % water charge
Add 10 % C.P. on Rs.
Total
3152.77
100.00
x10.76
339.24
Rs.
Rs.
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 57
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Providing & Laying cement concrete 1:6:12 (1cement: 6 fine sand : 12 graded brick aggregate
40mm. nominal size) and curing complete, including cost of form work in foundation and
floors. (for per 100 cft.) (S.I. No. 273)
Materials
a
i
ii
iii
Brick ballast
2.83
cum.
Rs.
850.00
700.00
305.00
Rs.
2405.50
952.00
1952.00
72.60
5382.10
Labour
b
i
ii
0.13
0.33
No.
No.
@
@
Rs.
Rs.
292.00
260.00
36.50
86.67
per day
per day
3
3
1
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
175.00
510.00
510.00
175.00
per day
0.13
No.
Rs.
225.00
28.13
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
per day
per day
per day
vi
Black Smith
vii
11.00 x 25
Total
Total Material + Labour
275.00
1621.29
Rs.
Rs.
7003.39
105.05
7108.44
710.84
7819.29
Total
Rs.
Rs.
Total
7819.29
100
x35.31
2760.99
Rs.
Rs.
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 58
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Providing & Laying cement concrete 1:5:10 (1cement: 5 fine sand : 12 graded brick aggregate
40mm. nominal size) and curing complete, including cost of form work in foundation and
floors. (for per 100 cft.) (S.I. No. 274)
Materials
a
i
ii
iii
Brick ballast
2.83
cum.
Rs.
850.00
700.00
305.00
Rs.
2405.50
994.00
2440.00
85.85
5925.35
Labour
b
i
ii
0.13
0.33
No.
No.
@
@
Rs.
Rs.
292.00
260.00
36.50
86.67
per day
per day
3
3
1
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
175.00
510.00
510.00
175.00
per day
0.13
No.
Rs.
225.00
28.13
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
per day
per day
per day
vi
Black Smith
vii
11.00 x 25
Total
Total Material + Labour
Total
8425.83
100.00
275.00
1621.29
Rs.
Rs.
7546.64
113.20
7659.84
765.98
8425.83
Total
Rs.
Rs.
x35.31
2975.16
Rs.
Rs.
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 59
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Providing & Laying of cement concrete in foundation & floor 1:4:8 (1cement: 4 fine sand : 8
graded brick aggregate 40mm. nominal size) including curing complete & cost of all material,
labour, T&P etc. required for proper completion of the work. (S.I. No. 275) (for per 100 cft.)
Materials
a
i
ii
iii
850.00
700.00
305.00
Rs.
2405.50
994.00
2836.50
95.76
6331.76
Labour
b
i
ii
0.125
0.33
No.
No.
@
@
Rs.
Rs.
292.00
260.00
36.50
86.67
per day
per day
3
3
1
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
175.00
510.00
510.00
175.00
Black Smith
per day
0.125
No.
Rs.
225.00
28.13
per day
11
No.
Rs.
25.00
275.00
1621.29
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
per day
per day
per day
vi
vii
Total
8879.58
100.00
x35.31
3135.38
Rs.
Rs.
Rs.
Rs.
7953.05
119.30
8072.35
807.23
8879.58
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 60
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Providing & Laying of cement concrete in foundation & floor 1:4:8 (1cement: 4 coarse sand :
stone aggregate 40mm. nominal size) including curing complete & cost of all material, labour,
T&P etc. required for proper completion of the work. (S.I. No. 281) (for per 100 cft.)
Materials
a
i
ii
iii
Rs.
4468.80
1604.80
2989.00
114.85
9177.45
Labour
b
i
ii
0.10
0.50
No.
No.
@
@
Rs.
Rs.
292.00
260.00
29.20
130.00
per day
per day
4
4
2
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
175.00
680.00
680.00
350.00
Black Smith
per day
0.10
No.
Rs.
225.00
22.50
per day
11
No.
Rs.
25.00
275.00
2166.70
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
per day
per day
per day
vi
vii
Total
12665.74
100.00
x35.31
4472.27
Rs.
Rs.
Rs.
Rs.
11344.15
170.16
11514.31
1151.43
12665.74
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 61
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Providing & Laying of cement concrete in foundation & floor 1:2:4 (1cement: 2 coarse sand : 4
graded stone aggregate 40mm. nominal size) including curing complete & cost of all material,
labour, T&P etc. required for proper completion of the work. (S.I. No. 279)
(for per 100 cft.)
Materials
a
i
ii
iii
2.55
cum.
Rs.
coarse sand
1.27
18.9
cum.
Rs.
Cement
Bag
@
Rs.
Add 2.5% wastage on sand and cement
Rs.
4284.00
1498.60
5764.50
181.58
11728.68
Labour
b
i
ii
0.10
0.50
No.
No.
@
@
Rs.
Rs.
292.00
260.00
29.20
130.00
per day
per day
4
4
2
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
175.00
680.00
680.00
350.00
Black Smith
per day
0.10
No.
Rs.
225.00
22.50
per day
11
No.
Rs.
25.00
275.00
2166.70
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
per day
per day
per day
vi
vii
Total
15514.19
100.00
x35.31
5478.06
Rs.
Rs.
Rs.
Rs.
13895.38
208.43
14103.81
1410.38
15514.19
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 62
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Providing & Laying of cement concrete in foundation & floor 1:3:6 (1cement: 3 coarse sand : 6
graded stone aggregate 40mm. nominal size) including curing complete & cost of all material,
labour, T&P etc. required for proper completion of the work. (S.I. No. 280)
(for per 100 cft.)
Materials
a
i
ii
iii
2.6
cum.
Rs.
coarse sand
1.32
12.7
cum.
Rs.
Cement
Bag
@
Rs.
Add 2.5% wastage on sand and cement
4368.00
1557.60
Rs.
3873.50
135.78
9934.88
Labour
b
i
ii
0.10
0.50
No.
No.
@
@
Rs.
Rs.
292.00
260.00
29.20
130.00
per day
per day
4
4
2
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
175.00
680.00
680.00
350.00
Black Smith
per day
0.10
No.
Rs.
225.00
22.50
per day
11
No.
Rs.
25.00
275.00
2166.70
iii
iv
v
Mistri
Mason
Mazdoor
Male/Beldar
coolie
Bhisti
per day
per day
per day
vi
vii
Total
13511.41
100.00
x35.31
4770.88
Rs.
Rs.
Rs.
Rs.
12101.58
181.52
12283.10
1228.31
13511.41
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 63
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Sand filling in plinth incliding supply of necessary quality of sand from a distence not
exceeding 8Km. (5 miles) from the site of work and including watering, dressing etc. rate to
including cost of all material, labour, T&P etc. required for proper completion of the work. (for
per 1000 cuft.)
Materials
28.32
cum.
Rs.
450.00
per cum.
Rs.
12744.00
Rs.
12744.00
510.00
850.00
131.25
8.83
1500.08
Total
Labour
b
iii
iv
v
vii
Mazdoor
Male/Beldar
coolie
Bhisti
T&P etc. L.S.
per day
3
5
0.75
per day
per day
No.
No.
No.
@
@
@
Rs.
Rs.
Rs.
170.00
170.00
175.00
Total
15668.49
1000
x35.31
553.25
Rs.
Rs.
Rs.
14244.08
1424.41
15668.49
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 64
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Clearing jungle including uprooting of rank vegetations grass, bush wood trees and saplings or
girth upto 30 cm. measured at a heigt of 1 meter above ground level & removal or rubbish upto
a distance of 50m. Out side the priphery of area cleared. (Take 100 sqm.)
Labour
i
ii
iii
Mazdoor
per day
Male/Beldar
coolie
per day
T&P, Basket etc. L.S.
1
0.5
No.
No.
@
@
x1
Rs.
Rs.
170.00
170.00
290.21
100
2.90
170.00
85.00
8.83
263.83
26.38
290.21
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 65
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of C.P.showers 100mm dia outlet and 15mm dia including 1 no. C.P. stope cock, 15mm dia
including c/o all materials, labour, T&P etc. required for proper completion of the work.
i
ii
No.
Rs.
850.00
per No.
Rs.
850.00
No.
Rs.
685.00
per No.
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
685.00
1535.00
153.50
207.23
20.00
1915.73
Add 10 % C.P.
Add 12.50 % VAT+1 % SAT on Rs
Labour Charge(for fixing)
Total
Say Rs. 1916.00 Per each
16
i
ii
S/F of C.P. towel rail 450 x 20 mm dia rod with C.P. brackets fixed plastic sleers &C.P. screw
couple including cost of all material, labour,T&P etc.complete.
C.P. towel rail 450 x 20mm
1
No.
dia
Add 12.50 % VAT+1 % SAT on Rs 260.00
Labour Charge(for fixing)
Sunderies,T&P
L.S.
Add 10 % C.P. on Rs.
Rs.
260.00
per No.
Total
Total
S.R. Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
260.00
35.10
24.00
319.10
31.91
351.01
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 66
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of following with fitting including supply of all material, labour, T&P etc. required for proper
completion of the work. (for Europeon W.C. Pan)
i
ii
iii
iv
v
vi
1
1
1
1
1
No.
No.
No.
No.
No.
@
@
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
750.00
375.00
495.00
135.00
173.00
per No.
per No.
per No.
per No.
per No.
Total
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
750.00
375.00
495.00
135.00
173.00
13.00
15.00
1956.00
195.60
2151.60
1
1
1
1
No.
No.
No.
No.
@
@
@
@
Rs.
Rs.
Rs.
Rs.
900.00
375.00
135.00
227.00
per No.
per No.
per No.
per No.
Total
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
900.00
375.00
135.00
227.00
15.00
1652.00
165.20
1817.20
1
1
1
1
1
No.
No.
No.
No.
No.
@
@
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
1720.00
375.00
495.00
135.00
173.00
per No.
per No.
per No.
per No.
per No.
Total
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
1720.00
375.00
495.00
135.00
173.00
13.00
15.00
2926.00
292.60
3218.60
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 67
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
25mm thick Demp proof coarse with cement concrete 1:1.5:3 ( 1cement : 1.5 approved coarse
sand : 3 approved 13mm. graded stone grit) and including water proofing as order by the Eng.in-charge in the proportion as apecified by the manufacturets. (SI No.-261)
(for per 10.76sqmt.)
a
i
ii
iii
iv
b
i
ii
iii
iv
v
Materials
Stone grit
0.212
cum.
Rs.
2.6
0.106
2.3
Kg.
cum.
Bag
@
@
@
Rs.
Rs.
Rs.
0.063
1.50
No.
No.
@
@
Rs.
Rs.
2
0.13
No.
No.
@
@
Rs.
Rs.
Rs.
356.16
Rs.
Rs.
Rs.
Rs.
156.00
125.08
701.50
1338.74
292.00
260.00
18.25
390.00
170.00
175.00
255.00
21.88
Rs.
Rs.
25.00
710.13
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
2048.87
30.73
2079.60
14.25
2093.84
209.38
2303.23
Labour
Mistri
Mason
Mazdoor
Male/Beldar
Bhisti
sundries
per day
per day
per day
per day
1 x 25
Total B
Total A+B
Add 1.5 % water charge
Add 4% Vat on stone grit
Total
Total
2303.23
10.76
x1
214.05
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 68
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
s/f of 20 B.W.G. black iron sheet panelled door and window shutters in 40mm. Thick indian sal
wood frame including s/f of wooden cleats, stops and including fixing adjustment of hinges,
bolts, locks, handles, springs etc.
Materials
sal wood
2.5
cft.
Rs.
ii
12
sft.
lb
per sft.
Total
Say
2832.05
2832.05
lb
lb
lb
lb
19.20
1.92
21.12
21.00
Rs.
Rs.
551.00
551.00
453gm.=1 pond
then 21 pond x 453 gm.= 9.5 Kg.
b
i
ii
iii
9.5
Kg.
Rs.
58.00
per Kg.
Total B
3.000
0.13
No.
No.
@
@
Rs.
Rs.
250.00
292.00
750.00
36.50
No.
Rs.
170.00
170.00
956.50
Labour
Carpenter
Mistri
Mazdoor
Male/Beldar
per day
per day
per day
Total A+B+C
Add 10 % C.P. on Rs.
Total
4773.51
24.75
x10.76
2075.27
Rs.
Rs.
Rs.
4339.55
433.96
4773.51
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 69
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
Supply and fixing reducing Tee 25x25x15 mm. dia complete.
reducing Tee
25x25x15 mm. dia
fixing charge
Sundries, T&P
No.
L.S.
L.S.
Rs.
45.00
per No.
SR
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
45.00
10.00
5.00
60.00
1.80
61.80
6.18
67.98
SR
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
28.91
10.00
5.00
43.91
1.16
45.07
4.51
49.57
Total
Vat 4 % Vat on reducing Tee
Total
Add 10 % C.P. on Rs.
Total
reducing Tee
20x20x15 mm. dia
fixing charge
Sundries, T&P
No.
L.S.
L.S.
Rs.
28.91
per No.
Total
Vat 4 % Vat on reducing Tee
Total
Add 10 % C.P. on Rs.
Total
1
fixing charge
Sundries, T&P
No.
L.S.
L.S.
Rs.
95.00
per No.
Total
Add 10 % C.P. on ferrule
Total
SR
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
95.00
58.00
10.00
163.00
9.50
172.50
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Page 70
Analysis of Rates
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 71
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of 600 x 450 mm (24" x 18") size hard board make looking mirror of superior quality fixed
with clips, screw, including cost of all material, labour,T&P etc. complete.
i
ii
No.
Rs.
600.00
per No.
Rs.
600.00
No.
Rs.
42.00
per No.
Rs.
42.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
642.00
86.67
64.00
792.67
79.27
871.94
Total
Add 12.50 % VAT+1 % SAT on Rs
Labour Charge
Total
Add 10 % C.P.
Total
No.
Rs.
420.00
per No.
Total
Total
Add 10 % C.P.
Total
Rs.
420.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
420.00
56.70
42.00
518.70
51.87
570.57
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 72
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of C.P. shop plate fixed with plastic sleevs and C.P. screws complete fitting including supply
of all material, labour, T&P etc. required for proper completion of the work.
i
ii
iii
fixing charge
No.
Rs.
180.00
per No.
L.S.
L.S.
Total
MR Rs.
180.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
1.50
15.60
197.10
24.30
221.40
22.14
243.54
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 73
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of white glezed earthen work wash hand basin (22" x 16")with double hole including M.S.
brackets,2 no.P.V.C. connection, 2 no. C.P. pillor cock, 2 no. C.P. angle valve ,15mm C.P. cap,
C.P. waste jali,P.V.C. including cost of all material, labour,T&P etc.complete.
i
ii
iii
iv
v
vi
vii
Labour Charge(N.B.U.23.127)
1
1
2
2
2
1
1
No.
pair
No.
No.
No.
No.
No.
@
@
@
@
@
@
@
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
580.00
50.00
45.00
516.00
500.00
58.00
33.00
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
580.00
50.00
90.00
1032.00
1000.00
58.00
33.00
2843.00
No.
Rs.
90.00
per No.
Total
Rs.
Rs.
Rs.
Rs.
90.00
2933.00
293.30
3226.30
Add 10 % C.P.
Total
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 74
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of c.p. consealed stop cock 15mm diaL & K make H/Q including supply of all material,
labour,T&P etc. required for proper completion of the work.
i
ii
No.
Rs.
685.00
per No.
Total
Total
Add 10 % C.P.
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
685.00
13.00
698.00
92.48
790.48
79.05
869.52
No.
Rs.
585.00
per No.
Total
Total
Add 10 % C.P.
Total
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
585.00
13.00
598.00
78.98
676.98
67.70
744.67
i
ii
S/F of c.p. Brass bib cock 15mm dia L & K make H/Q including supply of all material, labour,T&P
etc. required for proper completion of the work.
Rs. 850.00
Rs.
850.00
C.P. Brass bib cock
1
No.
@
per No.
Rs.
15.00
Fixing charge
Total
Rs.
865.00
Rs.
114.75
Add 12.50 % VAT+1 % SAT on Brass bib cock
Total
Rs.
979.75
Rs.
97.98
Add 10 % C.P.
Total
Rs. 1077.73
Say Rs.1077.00 Per each
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 75
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of H.C.I. plain bend 75 mm dia including cost of all material, labour,T&P etc. required for
oroper completion of the work.
i
No.
Rs.
221.00
Labour charges
Add 10 % C.P. on HCI plain bend
each
S.R. Rs.
Rs.
Total
Rs.
Rs.
Total
Rs.
221.00
13.00
234.00
22.10
256.10
No.
Rs.
280.00
Labour charges
Add 10 % C.P. on HCI plain bend
each
S.R. Rs.
Rs.
Total
Rs.
Rs.
Total
Rs.
280.00
13.00
293.00
28.00
321.00
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 76
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F of 15 mm. dia brass gate valve complete including supply of all material, labour, T&P etc.
required for proper completion of the work.
i
ii
Gate Valve
fixing charge
No.
L.S.
Rs.
370.00
per No.
Total
MR Rs.
Rs.
Rs.
Rs.
Rs.
370.00
13.00
383.00
37.00
420.00
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 77
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow
Analysis of Rates
S/F low density polythene seamless one piece moulded tanks and placing in proper position
inccuding all tax (200 lit.).
i
ii
iii
Cartage up to site
add 10% C.P. on tank
i
ii
iii
Fitting
G.I. long screw 15mm dia
Brass ball cock complete
Fixing charge as per SOR
(Chepter 19 item No. 2)
200
L.S.
2.00
1.00
lit.
No.
No.
@
@
Rs.
Rs.
Rs.
4.20
41.00
162.00
per lit.
Rs.
Rs.
840.00
40.00
Total A
Rs.
Rs.
84.00
964.00
per day
per day
Rs.
Rs.
82.00
162.00
Total B
Rs.
Rs.
121.40
365.40
Rs.
1329.40
Total A+B
hance rate per lit.
1329.40
200
x1
6.65
Rs.
Certified that I have personally verified market rate and rates mentioned above are lowest to the
best of my knowledge & belief.
Junior Engineer
Maintenance division No.-1
P.W.D. Lucknow
Assistant Engineer
Maintenance division No.-1
P.W.D. Lucknow
Page 78
Executive Engineer
Maintenance division No.-1
P.W.D. Lucknow