11008 Federal Register / Vol. 70, No.

43 / Monday, March 7, 2005 / Notices

encourages electronic filings. See 18 (6) a 28-foot-diameter surge tank; (7) a DEPARTMENT OF ENERGY
CFR 385.2001(a)(1)(iii) and the powerhouse containing two generating
instructions on the Commission’s Web units with a total installed capacity of Federal Energy Regulatory
site (http://www.ferc.gov) under the 12,400 kW; (8) a 390-foot-long, 6.6-kV Commission
‘‘eFiling’’ link. The Commission transmission line; and (9) other [Project No. 11858–002]
encourages electronic filings. appurtenances.
k. This application has been accepted, Elsinore Municipal Water District and
but is not ready for environmental m. A copy of the application is on file
with the Commission and is available the Nevada Hydro Company, Inc.;
analysis at this time. Notice of Application Ready for
l. Project Description: The project for public inspection. This filing may
Environmental Analysis and Soliciting
consists of the following four also be viewed on the Web at http://
Comments, Recommendations, Terms
developments: www.ferc.gov using the ‘‘eLibrary’’
and Conditions, and Prescriptions
The High Falls Development consists link—select ‘‘Docket #’’ and follow the
of the following existing facilities: (1) A instructions. For assistance, please February 28, 2005.
63-foot-high, 274-foot-long concrete contact FERC Online Support at Take notice that the following
gravity dam with spillway topped with FERCOnlineSupport@ferc.gov or toll hydroelectric application has been filed
5-foot-high flashboards; (2) a 110-foot- free at (866) 208–3676 or for TTY, with the Commission and is available
long eastern wingwall and a 320-foot- contact (202) 502–8659. A copy is also for public inspection.
long western wingwall; (3) a 46-acre available for inspection and a. Type of Application: Major
reservoir; (4) an 800-foot-long, 19-foot- reproduction at the address in item h unconstructed project.
wide forebay canal; (5) an 11-foot by 12- above. b. Project No.: 11858–002.
foot, 3,581-foot-long tunnel; (6) a 10- c. Date Filed: February 2, 2004.
foot-diameter, 1,280-foot-long penstock; n. You may also register online at d. Applicant: Elsinore Municipal
(7) three 6-foot-diameter, 150-foot-long http://www.ferc.gov.esubscribenow.htm Water District and the Nevada Hydro
penstocks; (8) a 30-foot-diameter surge to be notified via e-mail of new filings Company, Inc.
tank; (9) a powerhouse containing three and issuances related to this or other e. Name of Project: Lake Elsinore
generating units with a total installed pending projects. For assistance, contact Advanced Pumped Storage Project.
capacity of 15,000 kW; (10) a 50-foot- FERC Online Support. f. Location: On Lake Elsinore and San
long, 6.9-kV transmission line; and (11) o. Scoping Process: The Commission Juan Creek, in the Town of Lake
other appurtenances. staff intends to prepare an Elsinore, Riverside County, California.
The Cadyville Development consists The project would occupy Federal
of the following existing facilities: (1) A Environmental Assessment (EA) for the
lands, including lands managed by the
50-foot-high, 237-foot-long concrete Saranac River Hydroelectric Project in
Forest Service (Cleveland National
gravity dam with spillway topped with accordance with the National Forest), Bureau of Land Management,
2.7-foot-high flashboards; (2) a 200-acre Environmental Policy Act. The EA will and the Department of Defense (Camp
reservoir; (3) a 58-foot-long, 20-foot- consider both site-specific and Pendleton).
wide intake; (4) a 10-foot-diameter, cumulative environmental impacts and g. Filed Pursuant to: Federal Power
1,554-foot-long penstock; (5) a reasonable alternatives to the proposed Act 16 U.S.C. 791(a)–825(r).
powerhouse containing three generating action. h. Applicant Contact: Rexford Wait,
units with a total installed capacity of Commission staff does not propose to The Nevada Hydro Company, 2416
5,525 kW; (6) a 110-foot-long, 6.6-kV conduct any on-site scoping meetings at Cades Way, Vista, California 92083,
transmission line; and (7) other this time. Instead, we will solicit (760) 599–0086.
appurtenances. comments, recommendations, i. FERC Contact: Jim Fargo at (202)
The Mill C Development consists of information, and alternatives in the 502–6095; e-mail james.fargo@ferc.gov.
the following existing facilities: (1) A j. Deadline for filing comments,
Scoping Document (SD).
43-foot-high, 202-foot-long stone recommendations, terms and
masonry dam with spillway topped Copies of the SD outlining the subject conditions, and prescriptions is 60 days
with 2-foot-high flashboards; (2) a 7.9- areas to be addressed in the EA were from the issuance of this notice; reply
acre reservoir; (3) a 37-foot-long, 18- distributed to the parties on the comments are due 105 days from the
foot-wide intake; (4) a 11.5-foot to 10- Commission’s mailing list. Copies of the issuance date of this notice.
foot-diameter, 494-foot-long penstock; SD may be viewed on the Web at http:/ All documents (original and eight
(5) a 11.1-foot to 10-foot-diameter, 84- /www.ferc.gov using the ‘‘eLibrary’’ link. copies) should be filed with: Magalie R.
foot-long penstocks; (6) one powerhouse Enter the docket number excluding the Salas, Secretary, Federal Energy
containing two generating units with a last three digits in the docket number Regulatory Commission, 888 First
total installed capacity of 2,250 kW; (7) field to access the document. For Street, NE., Washington, DC 20426.
another powerhouse containing a single assistance, call 1–866–208–3676 or for The Commission’s Rules of Practice
generating unit with an installed TTY, (202) 502–8659. require all intervenors filing documents
capacity of 3,800 kW; (8) a 700-foot- with the Commission to serve a copy of
long, 6.6-kV transmission line; and (9) Magalie R. Salas, that document on each person on the
other appurtenances. Secretary. official service list for the project.
The Kents Falls Development consists [FR Doc. E5–908 Filed 3–4–05; 8:45 am] Further, if an intervenor files comments
of the following existing facilities: (1) A BILLING CODE 6717–01–P or documents with the Commission
59-foot-high, 172-foot-long concrete relating to the merits of an issue that
gravity dam with spillway topped with may affect the responsibilities of a
3.5-foot-high flashboards; (2) a 34-acre particular resource agency, they must
reservoir; (3) a 29-foot-long, 22-foot- also serve a copy of the document on
wide intake; (4) an 11-foot-diameter, that resource agency.
2,652-foot-long penstock; (5) three 6- Comments, recommendations, terms
foot-diameter, 16-foot-long penstocks; and conditions, and prescriptions may

VerDate jul<14>2003 18:15 Mar 04, 2005 Jkt 205001 PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 E:\FR\FM\07MRN1.SGM 07MRN1
Federal Register / Vol. 70, No. 43 / Monday, March 7, 2005 / Notices 11009

be filed electronically via the Internet in accordance with 18 CFR 4.34(b), and All Documents (Original and Eight
lieu of paper. The Commission strongly 385.2010. Copies) Should be Filed With: Magalie
encourages electronic filings. See 18 You may also register online at R. Salas, Secretary, Federal Energy
CFR 385.2001(a)(1)(iii) and the http://www.ferc.gov/docs-filing/ Regulatory Commission, 888 First
instructions on the Commission’s Web esubscription.asp to be notified via e- Street, NE., Washington, DC 20426. The
site (http://www.ferc.gov) under the ‘‘e- mail of new filings and issuances Commission’s Rules of Practice require
Filing’’ link. related to this or other pending projects. all intervenors filing documents with
k. This application has been accepted For assistance, contact FERC Online the Commission to serve a copy of that
and is now ready for environmental Support. document on each person on the official
analysis. n. Public notice of the filing of the service list for the project. Further, if an
l. The proposed project would consist initial development application, which intervenor files comments or documents
of: (1) A new upper reservoir (Morrell has already been given, established the with the Commission relating to the
Canyon) having a 180-foot-high main due date for filing competing merits of an issue that may affect the
dam and a gross storage volume of 5,750 applications or notices of intent. Under responsibilities of a particular resource
feet, at a normal reservoir surface the Commission’s regulations, any agency, they must also serve a copy of
elevation of 2,880 feet above mean sea competing development application the document on that resource agency.
level (msl); (2) a powerhouse with two must be filed in response to and in Motions to intervene and protests may
reversible pump-turbine units with a compliance with public notice of the be filed electronically via the Internet in
total installed capacity of 500 initial development application. No lieu of paper. The Commission strongly
megawatts; (3) the existing Lake competing applications or notices of encourages electronic filing. See 18 CFR
Elsinore to be used as a lower reservoir; intent may be filed in response to this 385.2001(a)(1)(iii) and the instructions
(4) about 30 miles of 500 kV notice. on the Commission’s Web site (http://
transmission line connecting the project www.ferc.gov) under the ‘‘e-Filing’’ link.
Magalie R. Salas, After logging into the e-Filing system,
to an existing transmission line owned Secretary.
by Southern California Edison located select ‘‘Comment on Filing’’ from the
[FR Doc. E5–912 Filed 3–4–05; 8:45 am] Filing Type Selection screen and
north of the proposed project and to an
existing San Diego Gas & Electric
BILLING CODE 6717–01–P continue with the filing process.’’
k. Status: This application has been
Company transmission line located to
accepted for filing but is not ready for
the south. DEPARTMENT OF ENERGY environmental analysis at this time.
m. A copy of the application is l. Description of Project: The existing
available for review at the Commission Federal Energy Regulatory Norway Oakdale Hydroelectric Project
in the Public Reference Room or may be Commission consists of the Norway development
viewed on the Commission’s Web site at and the Oakdale development and has
[Project No. 12514–000]
http://www.ferc.gov using the a combined installed capacity of 16.4
‘‘eLibrary’’ link. Enter the docket Northern Indiana Public Service megawatts (MW). The project produces
number excluding the last three digits in Company; Notice of Application an average annual generation of 65,000
the docket number field to access the Accepted for Filing and Soliciting megawatt-hours (MWh). All power is
document. For assistance, contact FERC Motions To Intervene and Protests dispatched directly into the local grid
Online Support at and is used within the East Central Area
FERCOnlineSupport@ferc.gov or toll- February 28, 2005.
Reliability Coordination Agreement.
free at 1–866–208–3676, or for TTY, Take notice that the following The Norway development includes
(202) 502–8659. A copy is also available hydroelectric application has been filed the following constructed facilities: (1)
for inspection and reproduction at the with the Commission and is available A 915-foot-long dam consisting of a 410-
address in item h above. for public inspection. foot-long, 34-foot-maximum-height
All filings must (1) bear in all capital a. Type of Application: Original major earthfill embankment with a concrete
letters the title ‘‘COMMENTS’’, ‘‘REPLY license. corewall; a 225-foot-long, 29-foot-high
COMMENTS’’, b. Project No.: 12514–000. concrete gravity overflow spillway with
‘‘RECOMMENDATIONS,’’ ‘‘TERMS c. Date Filed: June 28, 2004.
d. Applicant: Northern Indiana Public flashboards; a 120-foot-long, 30-foot-
AND CONDITIONS,’’ or high concrete gated spillway with three
Service Company.
‘‘PRESCRIPTIONS;’’ (2) set forth in the e. Name of Project: Norway and 30-foot wide, 22-foot-high spillway
heading the name of the applicant and Oakdale Hydroelectric Project. gates; a 18-foot-wide, 30-foot-high trash
the project number of the application to f. Location: On the Tippecanoe River sluice housing with one 8-foot-wide, 11-
which the filing responds; (3) furnish in Carroll and White Counties, Indiana. foot-high gate; and a 142-foot-long, 64-
the name, address, and telephone The project does not affect Federal foot-wide powerhouse integral with the
number of the person submitting the lands. dam containing four vertical Francis
filing; and (4) otherwise comply with g. Filed Pursuant to: Federal Power turbines-generating units with a rated
the requirements of 18 CFR 385.2001 Act 16 U.S.C. 791 (a)–825(r). head of 28 feet, total hydraulic capacity
through 385.2005. All comments, h. Applicant Contact: Jerome B. of 3,675 cubic feet per second (cfc) and
recommendations, terms and conditions Weeden, Vice President Generation; a total electric output of 7.2 MW; (2) a
or prescriptions must set forth their Northern Indiana Public Service 10-mile-long, 10-foot average depth,
evidentiary basis and otherwise comply Company; 801 East 86th Avenue; 1,291-acre reservoir; (3) a two-mile-long
with the requirements of 18 CFR 4.34(b). Merrillville, IN 46410; (219) 647–5730. 69,000 volt transmission line; and (4)
Agencies may obtain copies of the i. FERC Contact: Sergiu Serban at appurtenant facilities.
application directly from the applicant. (202) 502–6211, or The Oakdale development includes
Each filing must be accompanied by sergiu.serban@ferc.gov. the following constructed facilities: (1)
proof of service on all persons listed on j. Deadline for Filing Motions to A 1688-foot-long dam consisting of a
the service list prepared by the Intervene and Protests: 60 days from the 126-foot-long, 58-foot-maximum-height
Commission in this proceeding, in date of this notice. east concrete buttress and slab dam

VerDate jul<14>2003 18:15 Mar 04, 2005 Jkt 205001 PO 00000 Frm 00075 Fmt 4703 Sfmt 4703 E:\FR\FM\07MRN1.SGM 07MRN1