Sie sind auf Seite 1von 1

8350 Federal Register / Vol. 70, No.

33 / Friday, February 18, 2005 / Notices

Relay Service (FIRS) at 1–800–877– and (3) Core Requirements & Testing to country is prohibited in the absence of
8339. gather information and public input on a Presidential permit issued pursuant to
[FR Doc. E5–663 Filed 2–17–05; 8:45 am]
relevant issues. The information Executive Order (EO) 10485, as
gathered by the working groups was amended by EO 12038.
BILLING CODE 4000–01–P
analyzed at the second meeting of the On December 20, 2004, Sea Breeze
Development Committee January 18 & filed an application with the Office of
19, 2005. Thirty-one resolutions were Fossil Energy (FE) of the Department of
ELECTION ASSISTANCE COMMISSION adopted by the TGDC at the January Energy (DOE) for a Presidential permit
plenary session. The resolutions defined for the construction of a 150-kV electric
Sunshine Act Notice; Meeting transmission line that would cross the
technical work tasks for NIST that will
AGENCY: United States Election assist the TGDC in developing U.S.-Canadian border. Sea Breeze is a
Assistance Commission. recommendations for voluntary voting British Columbia corporation with its
ACTION: Notice of public meeting for the system guidelines. The guidelines are principal place of business in
Technical Guidelines Development due to the Election Assistance Vancouver, British Columbia. Although
Committee. Commission in April 2005. Sea Breeze is the sole applicant for a
FOR FURTHER INFORMATION CONTACT: Presidential permit, Sea Breeze is a joint
DATE & TIME: Wednesday, March 9, Allan Eustis 301–975–5099. If a member venture between Sea Breeze Power
2005, 8:30 am to 5:30 pm. of the public would like to submit Corporation, a publicly traded Canadian
PLACE: National Institute of Standards written comments concerning the corporation, and Boundless Energy,
and Technology, 100 Bureau Drive, Committee’s affairs at any time before or LLC, a limited liability company of the
Building 101, Gaithersburg, Maryland after the meeting, written comments State of Maine.
Sea Breeze proposes to develop a
20899–8900. should be addressed to the contact
direct current transmission
STATUS: This meeting will be open to the person indicated above, or to interconnection between Canada and
public. There is no fee to attend, but, voting@nist.gov.
the United States utilizing High Voltage
due to security requirements, advance Gracia M. Hillman, Direct Current Light technology. The
registration is required. Registration project would originate on Vancouver
Chair, U.S. Election Assistance Commission.
information is available at: https:// Island in the vicinity of Victoria, British
[FR Doc. 05–3306 Filed 2–16–05; 11:59 am]
rproxy.nist.gov/CRS/ Columbia, Canada, cross the Strait of
BILLING CODE 6820–YN–M
conf_ext.cfm?conf_id=1392. Please Juan de Fuca via submarine cable, and
make sure you provide special needs in proceed via terrestrial underground
the space allotted on the registration cable to a converter station to be
form. Also, on the form, leave the DEPARTMENT OF ENERGY
constructed at a substation located in
amount due at 0$. [FE Docket No. PP–299] Port Angeles, Washington, and owned
Note: Advance registration closes March 2, by Bonneville Power Administration.
2005. Application for Presidential Permit; The converter station would convert the
Sea Breeze Pacific Regional direct current back to alternating
SUMMARY: The Technical Guidelines
Transmission System, Inc. current.
Development Committee (the
‘‘Development Committee’’) has AGENCY: Office of Fossil Energy, DOE. The entire length of the proposed
scheduled a plenary meeting for March transmission facilities would be 22
ACTION: Notice of application. miles, consisting of 11⁄2 miles of land-
9, 2005. The Committee was established
SUMMARY: Sea Breeze Pacific Regional based underground cable in Canada, 19
pursuant to 42 U.S.C. 15361, to act in
Transmission System, Inc., (Sea Breeze) miles of submarine cable crossing the
the public interest to assist the
has applied for a Presidential permit to Strait of Juan de Fuca, and 11⁄2 miles of
Executive Director of the Election
construct, operate, maintain, and land-based underground cable inside
Assistance Commission in the
connect a 150,000-volt (150-kV), direct the United States. The project is
development of the voluntary voting
current transmission line across the U.S. intended to transmit up to 550
system guidelines. The Development
border with Canada. megawatts of power in either direction
Committee held its first meeting on July
DATES: Comments, protests, or requests
between the two countries.
9th, 2004 and its second meeting on Since the restructuring of the electric
January 18 and 19, 2005. The purpose to intervene must be submitted on or
power industry began, resulting in the
of the third meeting of the Committee before March 21, 2005.
introduction of different types of
will be to review and approve progress ADDRESSES: Comments, protests, or competitive entities into the
on technical work tasks defined in requests to intervene should be marketplace, DOE has consistently
resolutions adopted at the January addressed as follows: Office of Fossil expressed its policy that cross-border
plenary meeting and to consider further Energy (FE–27), U.S. Department of trade in electric energy should be
resolutions if proposed. The Energy, 1000 Independence Avenue, subject to the same principles of
Committee’s adopted resolutions are SW., Washington, DC 20585 (FAX 202– comparable open access and non-
available for public review at: http:// 297–5736). discrimination that apply to
www.vote.nist.gov/Official%20w- FOR FURTHER INFORMATION CONTACT: Dr. transmission in interstate commerce.
o%20signature.doc. Jerry Pell (Program Office) at 202–586– DOE has stated that policy in export
SUPPLEMENTARY INFORMATION: The 3362, or Michael T. Skinker (Program authorization granted to entities
Technical Guidelines Development Attorney) at 202–586–2793. requesting authority to export over
Committee held their first plenary SUPPLEMENTARY INFORMATION: The international transmission facilities.
meeting for July 9, 2004. At this construction, operation, maintenance, Specifically, DOE expects transmitting
meeting, the Development Committee and connection of facilities at the utilities owning border facilities
agreed to a resolution forming three international border of the United States constructed pursuant to Presidential
working groups: (1) Human Factors & for the transmission of electric energy permits to provide access across the
Privacy; (2) Security & Transparency; between the United States and a foreign border in accordance with the

VerDate jul<14>2003 15:41 Feb 17, 2005 Jkt 205001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\18FEN1.SGM 18FEN1

Das könnte Ihnen auch gefallen