DEPARTMENT OF ENERGY e. Name of Project: Bond Falls located at 888 First Street, NE., Room
Hydroelectric Project No. 1864. 2A, Washington, DC 20426, or by calling
Federal Energy Regulatory f. Location: The project is located on (202) 502–8371. This filing may also be
Commission the Ontonagon River in Ontonagon and viewed on the Commission’s Web site at
Gogebic Counties, Michigan and Vilas http://www.ferc.gov using the
[Project No. 12132–001]
County, Wisconsin. ‘‘eLibrary’’ link. Enter the docket
Lake Altoona Water Power Company, g. Filed Pursuant to: Federal Power number excluding the last three digits in
Inc.; Notice of Surrender of Preliminary Act, 16 USC 791(a) 825(r) and 799 and the docket number field to access the
Permit 801. document. You may also register online
h. Applicant Contacts: Terry P. at http://www.ferc.gov/docs-filing/
February 3, 2005. Jensky, 700 N. Adams Street, P.O. Box esubscription.asp to be notified via
Take notice that Lake Altoona Water 19001, Green Bay, WI 54307–9001. email of new filings and issuances
Power Company, Inc., permittee for the Phone: (920) 433–2277. related to this or other pending projects.
proposed Lake Altoona Dam Project, has i. FERC Contact: Any questions on For assistance, call 1–866–208–3676 or
requested that its preliminary permit be this notice should be addressed to Mr. e-mail FERCOnlineSupport@ferc.gov,
terminated. The permit was issued on Robert Fletcher at (202) 502–8901, or e- for TTY, call (202) 502–8659. A copy is
June 5, 2002, and would have expired mail address: robert.fletcher@ferc.gov. also available for inspection and
on May 31, 2005.1 The project would j. Deadline for filing comments and or
reproduction at the address in item (h)
have been located at the existing motions: March 3, 2005.
k. Description of Request: The Bond above.
county-owned dam on the Eau Claire m. Individuals desiring to be included
Falls Project Implementation Team,
River in Eau Claire County, Wisconsin. on the Commission’s mailing list should
which consists of the licensee, Michigan
The permittee filed the request on so indicate by writing to the Secretary
Department of Natural Resources, U.S.
January 25, 2005, and the preliminary of the Commission.
Fish and Wildlife Service, Keweenaw
permit for Project No. 12132 shall n. Comments, Protests, or Motions To
Bay Indian Community, Wisconsin
remain in effect through the thirtieth Intervene—Anyone may submit
Department of Natural Resources, and
day after issuance of this notice unless comments, a protest, or a motion to
the U.S. Forest Service agreed to
that day is a Saturday, Sunday, part-day temporary modifications to the existing intervene in accordance with the
holiday that affects the Commission, or license requirements for articles 401 and requirements of Rules of Practice and
legal holiday as described in section 18 402 during the 2005 season. The Procedure, 18 CFR 385.210, .211, .214.
CFR 385.2007, in which case the licensee requests the following In determining the appropriate action to
effective date is the first business day temporary modification to the reservoir take, the Commission will consider all
following that day. New applications elevation requirements in article 401: protests or other comments filed, but
involving this project site, to the extent Change the June–September End of the only those who file a motion to
provided for under 18 CFR part 4, may Month Target levels to 1295.9 feet mean intervene in accordance with the
be filed on the next business day. sea level (msl) for the month of June (0.2 Commission’s Rules may become a
Magalie R. Salas, feet higher than current requirement); party to the proceeding. Any comments,
Secretary. 1295.7 feet msl for the month of July protests, or motions to intervene must
(same as current requirement); and be received on or before the specified
[FR Doc. E5–547 Filed 2–9–05; 8:45 am]
1295.5 feet msl for the period August– comment date for the particular
BILLING CODE 6717–01–P
September (0.2 feet lower than current application.
requirement). For article 402, the o. Filing and Service of Responsive
DEPARTMENT OF ENERGY licensee proposes a change in the Documents—Any filings must bear in
minimum flow trigger elevations to all capital letters the title
Federal Energy Regulatory match the proposed target elevations: ‘‘COMMENTS’’,
Commission 1295.9 feet msl for the month of June ‘‘RECOMMENDATIONS FOR TERMS
(1295.4 in current license); 1295.7 feet AND CONDITIONS’’, ‘‘PROTEST’’, OR
[Project No. 1864–036] ‘‘MOTION TO INTERVENE’’, as
msl for the month of July; and 1295.5
Upper Peninsula Power Company; feet msl for August 1 through September applicable, and the Project Number of
Notice of Application for Temporary 14. When the Bergland Development the particular application to which the
Amendment of License and Soliciting elevation is greater than the trigger filing refers (p–1864–036). All
Comments, Motions To Intervene, and elevation during the period June documents (original and eight copies)
Protests through September 14, the minimum should be filed with: Magalie R. Salas,
flow requirement for the Bergland Dam Secretary, Federal Energy Regulatory
February 3, 2005. is 50 cubic feet per second (cfs). When Commission, 888 First Street, NE.,
Take notice that the following the Bergland Development is at or below Washington DC 20426. A copy of any
application has been filed with the the trigger elevations during the period motion to intervene must also be served
Commission and is available for public June through September 14, the upon each representative of the
inspection. minimum flow requirement for Applicant specified in the particular
a. Type of Application: Request to Bergland Dam is 30 cfs. After the 2005 application.
temporarily amend the reservoir season, the licensee and other members p. Agency Comments—Federal, State,
elevation requirements of article 401 of the Implementation Team will make and local agencies are invited to file
and 402 of the project license. a decision as to whether additional comments on the described application.
b. Project Number: P–1864–036. changes are needed for the following A copy of the application may be
c. Date Filed: January 6, 2005. year. obtained by agencies directly from the
d. Applicant: Upper Peninsula Power l. Locations of the Application: A Applicant. If an agency does not file
Company. copy of the application is available for comments within the time specified for
inspection and reproduction at the filing comments, it will be presumed to
1 99 FERC ¶ 62,161. Commission’s Public Reference Room, have no comments. One copy of an