5984 Federal Register / Vol. 70, No.

23 / Friday, February 4, 2005 / Notices

5. Identification of the Manufacturers of All approved negotiated rate agreement that market-based rate authority, with an
Other Basic Models applies to service on its pipeline system. accompanying tariff. The proposed tariff
Variable refrigerant flow multi split air Any person desiring to intervene or to provides for wholesale sales of energy,
conditioner and heat pump systems are protest this filing must file in capacity and ancillary services at
proposed in the United States by Mitsubishi accordance with Rules 211 and 214 of market-based rates. CSFBE also
Electric and Electronics USA Inc. and the Commission’s Rules of Practice and
Samsung Electronics Company, Ltd. requested waiver of various Commission
However, their application is almost
Procedure (18 CFR 385.211 and regulations. In particular, CSFBE
exclusively for commercial or industrial uses 385.214). Protests will be considered by requested that the Commission grant
and not for residential use. Our ‘‘Airstage’’, the Commission in determining the blanket approval under 18 CFR part 34
compact, economical and comfortable air- appropriate action to be taken, but will of all future issuances of securities and
conditioning and heat pump systems, are not serve to make protestants parties to
developed especially for residential and assumptions of liability by CSFBE.
the proceeding. Any person wishing to
commercial uses. become a party must file a notice of On January 25, 2005, the Commission
As far as we know, Samsung Electronics granted the request for blanket approval
intervention or motion to intervene, as
Company, Ltd might offer residential type. under part 34, subject to the following:
appropriate. Such notices, motions, or
6. Alternate Test Procedures protests must be filed in accordance Any person desiring to be heard or to
As we mentioned in (1) of item 3, two or with the provisions of Section 154.210 protest the blanket approval of
three indoor units whose total capacity of the Commission’s regulations (18 CFR issuances of securities or assumptions of
match capacity of outdoor unit may be used 154.210). Anyone filing an intervention
for testing, but will not entirely represent the liability by CSFBE should file a motion
or protest must serve a copy of that to intervene or protest with the Federal
true energy consumption characteristics.
Thus, there are no alternative test procedures
document on the Applicant. Anyone Energy Regulatory Commission, 888
known to us that could evaluate these filing an intervention or protest on or First Street, NE., Washington, DC 20426,
products in a representative manner. before the intervention or protest date
in accordance with Rules 211 and 214
need not serve motions to intervene or
Conclusion of the Commission’s Rules of Practice
protests on persons other than the
We seek a waiver of current test procedures and Procedure. 18 CFR 385.211, 385.214
Applicant.
established in 10 CFR 430.23(m) Central Air The Commission encourages (2004).
Conditioners and 10 CFR 430.27 Appendix M Notice is hereby given that the
to Subpart B Uniform Test Method for
electronic submission of protests and
Measuring the Energy Consumption of interventions in lieu of paper using the deadline for filing motions to intervene
Central Air Conditioners for residential uses ‘‘eFiling’’ link at http://www.ferc.gov. or protest, is February 24, 2005.
and ARI 210/240 (1989) and ARI 210/240 Persons unable to file electronically Absent a request to be heard in
(1994) for commercial uses, because the should submit an original and 14 copies opposition by the deadline above,
current test procedures evaluate the basic of the protest or intervention to the
models in a manner so unrepresentative of CSFBE is authorized to issue securities
Federal Energy Regulatory Commission,
their true energy consumption characteristics and assume obligations or liabilities as
888 First Street, NE., Washington, DC
as to provided materially inaccurate a guarantor, indorser, surety, or
comparative data and would like you to grant
20426.
This filing is accessible on-line at otherwise in respect of any security of
a waiver from existing test procedures until another person; provided that such
a representative test procedure is developed http://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for issuance or assumption is for some
and approved by you.
We will work with stakeholders, U.S. review in the Commission’s Public lawful object within the corporate
Department of Energy, Air-Conditioning & Reference Room in Washington, DC. purposes of CSFBE, compatible with the
Refrigeration Institute and others, through There is an ‘‘eSubscription’’ link on the public interest, and is reasonably
the process of developing test procedures Web site that enables subscribers to necessary or appropriate for such
suitable for products using variable purposes.
receive e-mail notification when a
refrigerant flow systems.
document is added to a subscribed The Commission reserves the right to
[FR Doc. 05–2184 Filed 2–3–05; 8:45 am] docket(s). For assistance with any FERC require a further showing that neither
BILLING CODE 6450–01–P Online service, please e-mail public nor private interests will be
FERCOnlineSupport@ferc.gov, or call adversely affected by continued
(866) 208–3676 (toll free). For TTY, call approval of CSFBE’s issuances of
DEPARTMENT OF ENERGY (202) 502–8659. securities or assumptions of liability.
Federal Energy Regulatory Magalie R. Salas, Copies of the full text of the
Commission Secretary. Commission’s Order are available from
[Docket No. RP05–159–000] [FR Doc. E5–427 Filed 2–3–05; 8:45 am] the Commission’s Public Reference
BILLING CODE 6717–01–P Room, 888 First Street, NE.,
Cheyenne Plains Gas Pipeline Washington, DC 20426. The Order may
Company, LLC; Notice of Proposed also be viewed on the Commission’s
Changes in FERC Gas Tariff DEPARTMENT OF ENERGY Web site at http://www.ferc.gov, using
the eLibrary link. Enter the docket
January 27, 2005. Federal Energy Regulatory
Take notice that on January 24, 2005, Commission number excluding the last three digits in
Cheyenne Plains Gas Pipeline Company, the docket number filed to access the
[Docket Nos. ER05–325–000] document. Comments, protests, and
LLC (Cheyenne Plains) tendered for
filing a revised firm Transportation interventions may be filed electronically
Credit Suisse First Boston Energy,
Service Agreement with Oneok Energy via the Internet in lieu of paper. See 18
LLC; Notice of Issuance of Order
Services Company, L.P. to become CFR 385.2001(a)(1)(iii) and the
effective January 24, 2005. January 27, 2005. instructions on the Commission’s Web
Cheyenne Plains states that the Credit Suisse First Boston Energy, site under the ‘‘e-Filing’’ link. The
revised FTSA updates a previously LLC (CSFBE) filed an application for

VerDate jul<14>2003 18:52 Feb 03, 2005 Jkt 205001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\04FEN1.SGM 04FEN1
Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices 5985

Commission strongly encourages the Commission’s Public Reference http://www.ferc.gov. Persons unable to
electronic filings. Room, 888 First Street, NE., file electronically should submit an
Washington, DC 20426. original and 14 copies of the protest to
Magalie R. Salas,
The Order may also be viewed on the the Federal Energy Regulatory
Secretary. Commission’s Web site at http:// Commission, 888 First Street, NE.,
[FR Doc. E5–421 Filed 2–3–05; 8:45 am] www.ferc.gov, using the eLibrary link. Washington, DC 20426.
BILLING CODE 6717–01–P Enter the docket number excluding the This filing is accessible on-line at
last three digits in the docket number http://www.ferc.gov, using the
filed to access the document. ‘‘eLibrary’’ link and is available for
DEPARTMENT OF ENERGY Comments, protests, and interventions review in the Commission’s Public
may be filed electronically via the Reference Room in Washington, DC.
Federal Energy Regulatory
Internet in lieu of paper. See 18 CFR There is an ‘‘eSubscription’’ link on the
Commission
385.2001(a)(1)(iii) and the instructions Web site that enables subscribers to
[Docket No. ER05–222–000] on the Commission’s Web site under the receive e-mail notification when a
‘‘e-Filing’’ link. The Commission document is added to a subscribed
Diablo Winds, LLC; Notice of Issuance strongly encourages electronic filings. docket(s). For assistance with any FERC
of Order Online service, please e-mail
Magalie R. Salas,
January 27, 2005. Secretary.
FERCOnlineSupport@ferc.gov, or call
Diablo Winds, LLC (Diablo) filed an (866) 208–3676 (toll free). For TTY, call
[FR Doc. E5–420 Filed 2–3–05; 8:45 am]
application for market-based rate (202) 502–8659.
BILLING CODE 6717–01–P
authority, with an accompanying tariff. Magalie R. Salas,
The proposed tariff provides for
Secretary.
wholesale sales of energy, capacity and DEPARTMENT OF ENERGY [FR Doc. E5–424 Filed 2–3–05; 8:45 am]
ancillary services at market-based rates.
BILLING CODE 6717–01–P
Diablo also requested waiver of various Federal Energy Regulatory
Commission regulations. In particular, Commission
Diablo requested that the Commission
[Docket No. RP04–110–004] DEPARTMENT OF ENERGY
grant blanket approval under 18 CFR
part 34 of all future issuances of El Paso Natural Gas Company; Notice Federal Energy Regulatory
securities and assumptions of liability of Compliance Filing Commission
by Diablo.
On January 21, 2005, the Commission January 27, 2005. [Docket No. RP05–160–000]
granted the request for blanket approval Take notice that on January 21, 2005,
under part 34, subject to the following: El Paso tendered for filing as part of its El Paso Natural Gas Company; Notice
Any person desiring to be heard or to FERC Gas Tariff, Second Revised of Proposed Changes in FERC Gas
protest the blanket approval of Volume No. 1A, the following tariff Tariff
issuances of securities or assumptions of sheets to become effective March 1 January 28, 2005.
liability by Diablo should file a motion 2005: Take notice that on January 25, 2005,
to intervene or protest with the Federal
Third Revised Sheet No. 287A, El Paso Natural Gas Company (El Paso)
Energy Regulatory Commission, 888 Third Revised Sheet No. 354. tendered for filing as part of its FERC
First Street, NE., Washington, DC 20426,
El Paso states that the tariff sheets Gas Tariff, Second Revised Volume No.
in accordance with Rules 211 and 214
comply with the Commission’s 1A, Original Sheet No. 290B, to become
of the Commission’s Rules of Practice
December 22 Order addressing El Paso’s effective February 24, 2005.
and Procedure. 18 CFR 385.211, 385.214
proposed procedures for re-designating El Paso states that the tariff sheet
(2004).
Notice is hereby given that the primary point rights. specifies a timeline for the sale of
deadline for filing motions to intervene El Paso states that copies of the filing available firm capacity.
or protest, is February 22, 2005. were served on parties on the official Any person desiring to intervene or to
Absent a request to be heard in service list in the above-captioned protest this filing must file in
opposition by the deadline above, proceeding. accordance with Rules 211 and 214 of
Diablo is authorized to issue securities Any person desiring to protest this the Commission’s Rules of Practice and
and assume obligations or liabilities as filing must file in accordance with Rule Procedure (18 CFR 385.211 and
a guarantor, indorser, surety, or 211 of the Commission’s Rules of 385.214). Protests will be considered by
otherwise in respect of any security of Practice and Procedure (18 CFR the Commission in determining the
another person; provided that such 385.211). Protests to this filing will be appropriate action to be taken, but will
issuance or assumption is for some considered by the Commission in not serve to make protestants parties to
lawful object within the corporate determining the appropriate action to be the proceeding. Any person wishing to
purposes of Diablo, compatible with the taken, but will not serve to make become a party must file a notice of
public interest, and is reasonably protestants parties to the proceeding. intervention or motion to intervene, as
necessary or appropriate for such Such protests must be filed in appropriate. Such notices, motions, or
purposes. accordance with the provisions of protests must be filed in accordance
The Commission reserves the right to Section 154.210 of the Commission’s with the provisions of § 154.210 of the
require a further showing that neither regulations (18 CFR 154.210). Anyone Commission’s regulations (18 CFR
public nor private interests will be filing a protest must serve a copy of that 154.210). Anyone filing an intervention
adversely affected by continued document on all the parties to the or protest must serve a copy of that
approval of Diablo’s issuances of proceeding. document on the Applicant. Anyone
securities or assumptions of liability. The Commission encourages filing an intervention or protest on or
Copies of the full text of the electronic submission of protests in lieu before the intervention or protest date
Commission’s Order are available from of paper using the ‘‘eFiling’’ link at need not serve motions to intervene or

VerDate jul<14>2003 18:52 Feb 03, 2005 Jkt 205001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\04FEN1.SGM 04FEN1