5998 Federal Register / Vol. 70, No.

23 / Friday, February 4, 2005 / Notices

preparation of the EA. By this notice, we comments are received in time and included in Appendix 2. If you do not
are also asking Federal, state, and local properly recorded: return this form, you will be removed
agencies with jurisdiction and/or • Send an original and two copies of from our mailing list.
special expertise with respect to your letter to: Magalie R. Salas,
Additional Information
environmental issues to formally Secretary, Federal Energy Regulatory
cooperate with us in the preparation of Commission, 888 First St., NE., Room Additional information about the
the EA. Agencies that would like to 1A, Washington, DC 20426. project is available from the
request cooperating status should follow • Label one copy of the comments for Commission’s Office of External Affairs,
the instructions for filing comments the attention of Gas Branch 1. at 1–866–208–FERC or on the FERC
below. • Reference Docket Number CP03– Internet Web site (http://www.ferc.gov)
Our independent analysis of the 80–001. using the eLibrary link. Click on the
issues will be in the EA. Depending on • Mail your comments so that they eLibrary link, click on ‘‘General Search’’
the comments received during the will be received in Washington, DC on and enter the docket number excluding
scoping process, the EA may be or before March 2, 2005. the last three digits in the Docket
published and mailed to Federal, state, Please note that the Commission Number field. Be sure you have selected
and local agencies, public interest strongly encourages electronic filing of an appropriate date range. For
groups, interested individuals, affected any comments or interventions or assistance, please contact FERC Online
landowners, newspapers, libraries, and protests to this proceeding. See 18 CFR Support at
the Commission’s official service list for 385.2001(a)(1)(iii) and the instructions FERCOnlineSupport@ferc.gov or toll
this proceeding. A comment period will on the Commission’s Web site at free at 1–866–208–3676, or for TYY,
be allotted for review if the EA is http://www.ferc.gov under the ‘‘e- contact (202) 502–8659. The eLibrary
published. We will consider all Filing’’ link and the link to the User’s link also provides access to the texts of
comments on the EA before we make Guide. Before you can file comments, formal documents issued by the
our recommendations to the you will need to create an account Commission, such as orders, notices,
Commission. which can be created on-line. and rulemakings.
Becoming an Intervenor In addition, the Commission now
Currently Identified Environmental offers a free service called eSubscription
Issues In addition to involvement in the EA which allows you to keep track of all
In the EA, we will discuss impacts scoping process, you may want to formal issuances and submittals in
that could occur as a result of the become an official party to the specific dockets. This can reduce the
construction and operation of the proceeding known as an ‘‘intervenor’’. amount of time you spend researching
project. We will also evaluate possible Intervenors play a more formal role in proceedings by automatically providing
alternatives to the proposed project or the process. Among other things, you with notification of these filings,
portions of the project. intervenors have the right to receive document summaries and direct links to
We have already identified several copies of case-related Commission the documents. Go to http://
issues that we think deserve attention documents and filings by other www.ferc.gov/esubscribenow.htm.
based on a preliminary review of the intervenors. Likewise, each intervenor
must send one electronic copy (using Magalie R. Salas,
proposed facilities and the
the Commission’s eFiling system) or 14 Secretary.
environmental information provided by
ESNG. This preliminary list of issues paper copies of its filings to the [FR Doc. E5–450 Filed 2–3–05; 8:45 am]
may be changed based on your Secretary of the Commission and must BILLING CODE 6717–01–P

comments and our analysis. send a copy of its filings to all other
Project-related impact on: parties on the Commission’s service list
for this proceeding. If you want to DEPARTMENT OF ENERGY
• 98 residences/structures within 50
feet of the construction workspace. become an intervenor you must file a
motion to intervene according to Rule Federal Energy Regulatory
• 1.1 acres of wetland. Commission
• 53.8 acres of agricultural land. 214 of the Commission’s Rules of
• Six federally-listed threatened and Practice and Procedure (18 CFR
385.214, see Appendix 2).5 Only [Docket No. CP05–42–000]
endangered species potentially in the
project area. intervenors have the right to seek
rehearing of the Commission’s decision. Tennessee Gas Pipeline Company;
• 28 road crossings. Notice of Intent To Prepare an
Affected landowners and parties with
Public Participation environmental concerns may be granted Environmental Assessment for the
intervenor status upon showing good Proposed Compressor Station 325
You can make a difference by Horsepower Replacement Project and
providing us with your specific cause by stating that they have a clear
and direct interest in this proceeding Request for Comments on
comments or concerns about the project. Environmental Issues
By becoming a commentor, your which would not be adequately
concerns will be addressed in the EA represented by any other parties. You do January 26, 2005.
and considered by the Commission. You not need intervenor status to have your The staff of the Federal Energy
should focus on the potential environmental comments considered. Regulatory Commission (FERC or
environmental effects of the proposal, Environmental Mailing List Commission) will prepare an
alternatives to the proposal (including environmental assessment (EA) on
If you wish to remain on our
alternative locations and routes), and Tennessee Gas Pipeline Company’s
environmental mailing list, please
measures to avoid or lessen (Tennessee) proposed Compressor
return the Information Request Form
environmental impact. The more Station 325 Horsepower Replacement
specific your comments, the more useful 5 Interventions may also be filed electronically via Project. Tennessee’s proposal involves
they will be. Please carefully follow the Internet in lieu of paper. See the previous the replacement of the two existing
these instructions to ensure that your discussion on filing comments electronically. turbines at its Compressor Station 325

VerDate jul<14>2003 18:52 Feb 03, 2005 Jkt 205001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\04FEN1.SGM 04FEN1
Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices 5999

in Sussex County, New Jersey with two Land Requirements for Construction By becoming a commentor, your
new turbines. Compressor Station 325 is located on concerns will be addressed in the EA
This notice announces the opening of a 93.59-acre lot. However, the fenced and considered by the Commission. You
the scoping period that will be used to station yard is 4.92 acres in size and is should focus on the potential
gather environmental input from the served by a paved access road. The environmental effects of the proposal,
public and interested agencies on the private access road would not be alternatives to the proposal, and
project. Please note that the scoping improved, and no temporary access measures to avoid or lessen
period will close on February 25, 2005. roads would be constructed. All environmental impact. The more
This notice is being sent to potentially construction activities would take place specific your comments, the more useful
affected landowners; Federal, State, and within the previously disturbed, they will be. Please carefully follow
local government agencies; elected graveled areas inside the fenced station these instructions to ensure that your
officials; environmental and public yard. No expansion of the fenced station comments are received in time and
interest groups; Native American tribes; yard is proposed. properly recorded:
other interested parties; and local • Send an original and two copies of
The EA Process your letter to: Magalie R. Salas,
libraries and newspapers. This includes
all owners of property within 0.5-mile We 2 are preparing this EA to comply Secretary, Federal Energy Regulatory
of Tennessee’s Compressor Station 325. with the National Environmental Policy Commission, 888 First St., NE., Room
State and local government Act (NEPA) which requires the 1A, Washington, DC 20426.
Commission to take into account the • Label one copy of the comments for
representatives are asked to notify their
environmental impact that could result the attention of Gas Branch 1.
constituents of this planned project and
if it authorizes Tennessee’s proposed • Reference Docket No. CP05–42–
encourage them to comment on their
project. NEPA also requires us to 000.
areas of concern. • Mail your comments so that they
discover and address concerns the
A fact sheet prepared by the FERC public may have about proposals. This will be received in Washington, DC on
entitled ‘‘An Interstate Natural Gas process is referred to as ‘‘scoping.’’ The or before February 25, 2005.
Facility on My Land? What Do I Need main goal of the scoping process is to The Commission strongly encourages
To Know?’’ is available for viewing on focus the analysis in the EA on the electronic filing of any comments or
the FERC Internet Web site (http:// important environmental issues. By this interventions or protests to this
www.ferc.gov). This fact sheet addresses notice, we are requesting public proceeding. See 18 CFR
a number of typically asked questions, comment on the scope of the issues to 385.2001(a)(1)(iii) and the instructions
including how to participate in the address in the EA. All comments on the Commission’s Web site at
Commission’s proceedings. received will be considered during the http://www.ferc.gov under the ‘‘e-
Summary of the Proposed Project preparation of the EA. By this notice, we Filing’’ link and the link to the User’s
are also asking Federal, State, and local Guide. Before you can file comments
Tennessee seeks the authority to agencies with jurisdiction and/or you will need to create a free account
replace the two turbines at its existing special expertise with respect to which can be created on-line.
Compressor Station 325 in order to environmental issues to formally
comply with Reasonably Available Becoming an Intervenor
cooperate with us in the preparation of
Control Technology standards set by the the EA. Agencies that would like to In addition to involvement in the EA
United States Environmental Protection request cooperating status should follow scoping process, you may want to
Agency and the New Jersey Department the instructions for filing comments become an official party to the
of Environmental Protection regarding provided below. proceeding known as an ‘‘intervenor’’.
nitrogen oxide emissions. The EA will present our independent Intervenors play a more formal role in
The existing turbines are both site- analysis of the issues. Depending on the the process. Among other things,
rated at 3,500 horsepower; the comments received during the scoping intervenors have the right to receive
replacements would be site-rated at process, the EA may be published and copies of case-related Commission
4,721 horsepower. Therefore, the mailed to Federal, State, and local documents and filings by other
proposed action would increase the agencies, public interest groups, intervenors. Likewise, each intervenor
total authorized compressor station interested individuals, potentially must send one electronic copy (using
output by 2,442 horsepower and affected landowners, newspapers, the Commission’s eFiling system) or 14
increase pipeline flow capacity by libraries, and the Commission’s official paper copies of its filings to the
18,000 dekatherms per day in the service list for this proceeding. A Secretary of the Commission and must
vicinity of compressor station. comment period will be allotted for send a copy of its filings to all other
Construction of the proposed project review if the EA is published. We will parties on the Commission’s service list
would commence on or about April consider all comments on the EA before for this proceeding. If you want to
2006 and Tennessee would place the we make our recommendations to the become an intervenor you must file a
project in-service in November 2006. Commission. motion to intervene according to Rule
The general location of the project is To ensure your comments are 214 of the Commission’s Rules of
shown in Appendix 1.1 considered, please carefully follow the Practice and Procedure (18 CFR
instructions in the public participation 385.214) (see Appendix 2).3 Only
1 The appendices referenced in this notice are not section below. intervenors have the right to seek
being printed in the Federal Register. Copies of all Public Participation rehearing of the Commission’s decision.
appendices, other than Appendix 1 (maps), are Affected landowners and parties with
available on the Commission’s Web site at the You can make a difference by environmental concerns may be granted
‘‘eLibrary’’ link or from the Commission’s Public providing us with your specific
Reference Room, 888 First Street, NE., Washington, intervenor status upon showing good
DC 20426, or call (202) 502–8371. For instructions comments or concerns about the project.
on connecting to eLibrary refer to the last page of 3 Interventions may also be filed electronically via

this notice. Copies of the appendices were sent to 2 ‘‘We,’’


‘‘us,’’ and ‘‘our’’ refer to the the Internet in lieu of paper. See the previous
all those receiving this notice in the mail. environmental staff of the Office of Energy Projects. discussion on filing comments electronically.

VerDate jul<14>2003 18:52 Feb 03, 2005 Jkt 205001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\04FEN1.SGM 04FEN1
6000 Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices

cause by stating that they have a clear Garfield County, Utah. About 31.74 The PDEA and draft application are
and direct interest in this proceeding acres are located on the Dixie National also available upon the Web site
which would not be adequately Forest. http://www.jonesanddemille.com.
represented by any other parties. You do f. Applicant Contact: John Spendlove, Magalie R. Salas,
not need intervenor status to have your P.E., Jones and DeMille Engineering,
environmental comments considered. Secretary.
1535 South 100 West, Richfield, UT
[FR Doc. E5–422 Filed 2–3–05; 8:45 am]
Additional Information 84710; (435) 896–8266.
BILLING CODE 6717–01–P
g. FERC Contact: Dianne Rodman
Additional information about the
(202) 502–6077, e-mail:
project is available from the
Dianne.rodman@ferc.gov. DEPARTMENT OF ENERGY
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC h. Garkane mailed a copy of the
Internet Web site (http://www.ferc.gov) Preliminary Draft Environmental Federal Energy Regulatory
using the eLibrary link. Click on the Assessment (PDEA) and draft Commission
eLibrary link, click on ‘‘General Search’’ application to interested parties on [Docket No. ER02–2330–029 and ER04–
and enter the docket number excluding January 13, 2005. The PDEA and draft 1255–000]
the last three digits in the Docket application were filed on January 18,
Number field. Be sure you have selected 2005. New England Power Pool and ISO New
an appropriate date range. For i. With this notice we are soliciting England Inc.; Notice of Technical
assistance, please contact FERC Online preliminary terms, conditions, and Conference
Support at FercOnlineSupport@ferc.gov recommendations on the PDEA and
January 28, 2005.
or toll free at 1–866–208–3676, or for draft license application. All comments
on the PDEA and draft license On January 13, 2005 ISO New
TTY, contact (202) 502–8659. The England, Inc. requested that the Federal
eLibrary link also provides access to the application should be sent to the
address above in item (f) with one copy Energy Regulatory Commission convene
texts of formal documents issued by the a technical conference on Friday, March
Commission, such as orders, notices, filed with the Commission at the
following address: Federal Energy 4, 2005, in Boston, Massachusetts, to
and rulemakings. address the prioritization and
In addition, the Commission now Regulatory Commission, Magalie R.
Salas, Secretary, 888 First St., NE., coordination of the interrelated market
offers a free service called eSubscription
Washington, DC 20426. All comments improvements currently being
which allows you to keep track of all
must include the project name and developed and considered by the ISO
formal issuances and submittals in
number, and bear the heading and market participants in New
specific dockets. This can reduce the
‘‘Preliminary Comments,’’ Preliminary England. Specifically, the ISO requests
amount of time you spend researching
Recommendations,’’ ‘‘Preliminary that the Commission facilitate
proceedings by automatically providing
Terms and Conditions,’’ or ‘‘Preliminary discussions regarding the day-ahead
you with notification of these filings,
Prescriptions.’’ Any party interested in load response program (DALRP) and the
document summaries and direct links to
commenting must do so before April 1, special case nodal pricing (SCNP),
the documents. To register for this
2005. including a discussion of how those
service, go to http://www.ferc.gov/
programs fit within the overall market
esubscribenow.htm. j. Comments and preliminary development plan for New England.
Magalie R. Salas, recommendations, terms and To this end, the Commission will host
conditions, and prescriptions may be a technical conference on Friday, March
Secretary.
filed electronically via the Internet in 4, 2005, to address the issues raised by
[FR Doc. E5–428 Filed 2–3–05; 8:45 am]
lieu of paper. See 18 CFR the above described request. The
BILLING CODE 6717–01–P
385.2001(a)(1)(iii) and the instructions conference will be held at the Seaport
on the Commission’s Web site (http:// World Trade Center (Harborview
www.ferc.gov) under the ‘‘e-Filing’’ link. Ballroom), 200 Seaport Boulevard,
DEPARTMENT OF ENERGY
k. With this notice, we are initiating Boston, Massachusetts 02210. The
Federal Energy Regulatory consultation with the State Historic conference is scheduled to begin at 9
Commission Preservation Officer (SHPO), as required a.m. and end at approximately 4 p.m.
by section 106, National Historic (e.s.t.). Commissioners are expected to
Notice of Draft License Application and Preservation Act, and the regulations of attend and participate. An agenda will
Preliminary Draft Environmental the Advisory Council on Historic be forthcoming.
Assessment and Request for Preservation, 36 CFR 800.4. Although registration is not a strict
Preliminary Terms and Conditions l. A copy of the application is requirement, in-person attendees are
January 27, 2005. available for review at the Commission asked to register for the conference on-
Take notice that the following in the Public Reference Room or may be line by close of business on Wednesday,
hydroelectric application has been filed viewed on the Commission’s Web site at March 2, 2005 at http://www.ferc.gov/
with the Commission and is available http://www.ferc.gov using the whats-new/registration/iso-03-04-
for public inspection: ‘‘eLibrary’’ link. Enter the docket form.asp.
a. Type of Application: New major number excluding the last three digits in Transcripts of the conference will be
license. the docket number field to access the immediately available from Ace
b. Project No.: 2219–013. document. For assistance, contact FERC Reporting Company (202–347–3700 or
c. Applicant: Garkane Energy Online Support at 1–800–336–6646) for a fee. They will be
Cooperative, Inc. (Garkane). FERCOnlineSupport@ferc.gov or toll- available for the public on the
d. Name of Project: Boulder Creek free at 1–866–208–3676, or for TTY, Commission’s eLibrary system seven
Hydroelectic Project. (202) 502–8659. A copy is also available calendar days after FERC receives the
e. Location: On Boulder Creek about for inspection and reproduction at the transcript. Additionally, Capitol
6 miles north of the town of Boulder in address in item h above. Connection offers the opportunity for

VerDate jul<14>2003 18:52 Feb 03, 2005 Jkt 205001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\04FEN1.SGM 04FEN1

Das könnte Ihnen auch gefallen