Sie sind auf Seite 1von 1

Federal Register / Vol. 70, No.

18 / Friday, January 28, 2005 / Rules and Regulations 4013

DEPARTMENT OF THE TREASURY DEPARTMENT OF HOMELAND and from 7 a.m. to 11 a.m. on Friday,
SECURITY February 11, 2005.
Internal Revenue Service The vertical lift span bridge has a
Coast Guard vertical clearance of 9.0 feet above mean
26 CFR Parts 1 and 602 high water, elevation 1.0 feet Mean Sea
33 CFR Part 117 Level and 11.0 feet above mean low
[TD 9171] water, elevation ¥1.0 Mean Sea Level
[CGD08–05–009]
in the closed-to-navigation position.
Drawbridge Operation Regulations; Navigation at the site of the bridge
RIN 1545–AY87; 1545–BC03
Corpus Christi—Port Aransas consists mainly of oil tankers and tows
New Markets Tax Credit; Correction Channel—Tule Lake, Corpus Christi, with barges. There is no recreational
TX pleasure craft usage at the bridge site.
AGENCY: Internal Revenue Service (IRS), Due to prior experience, as well as
Treasury. AGENCY: Coast Guard, DHS. coordination with waterway users, it
ACTION: Notice of temporary deviation has been determined that this two-day
ACTION: Correction to final regulations. from regulations. partial closure will not have a
significant effect on these vessels. The
SUMMARY: This document contains SUMMARY: The Commander, Eighth bridge normally opens to pass
corrections to final regulations (TD Coast Guard District, has issued a navigation an average of 850 times per
9171), that were published in the temporary deviation from the regulation month. The bridge opens on signal as
Federal Register on Tuesday, December governing the operation of the Tule Lake required by 33 CFR 117.5. The bridge
28, 2004 (69 FR 77625) relating to the Vertical Lift Span Highway and Railroad will not be able to open for emergencies
new markets tax credit under section Bridge across the Corpus Christi—Port during the closure period. Alternate
45D. Aransas Channel, mile 14.0, at Corpus routes are not available.
Christi, Nueces County, TX. This In accordance with 33 CFR 117.35(c),
DATES: This correction is effective
deviation allows the bridge to remain this work will be performed with all due
December 28, 2004.
closed to navigation for four hours on speed in order to return the bridge to
FOR FURTHER INFORMATION CONTACT: Paul two consecutive days. This temporary normal operation as soon as possible.
F. Handleman or Lauren R. Taylor, (202) deviation is necessary for the This deviation from the operating
622–3040 (not a toll-free number). maintenance of the rope sheaves and for regulations is authorized under 33 CFR
SUPPLEMENTARY INFORMATION: the cleaning and lubrication of the haul 117.35.
and counterweight ropes of the Dated: January 18, 2005.
Background drawbridge.
Marcus Redford,
The final regulations (TD 9171) that DATES: This deviation is effective from Bridge Administrator.
are the subject of these corrections are 7 a.m. on Thursday, February 10, 2005 [FR Doc. 05–1559 Filed 1–27–05; 8:45 am]
under section 45D of the Internal through 11 a.m. on Friday, February 11, BILLING CODE 4910–15–P
Revenue Code. 2005.
ADDRESSES: Materials referred to in this
Need for Correction
document are available for inspection or DEPARTMENT OF HOMELAND
As published, TD 9171 contains errors copying at the office of the Eighth Coast SECURITY
that may prove to be misleading and are Guard District, Bridge Administration
in need of clarification. Branch, Hale Boggs Federal Building, Coast Guard
room 1313, 501 Magazine Street, New
Correction of Publication Orleans, Louisiana 70130–3396 between 33 CFR Part 117
■ Accordingly, the publication of the
7 a.m. and 3 p.m., Monday through [CGD08–05–007]
final regulations (TD 9171), that were the Friday, except Federal holidays. The
subject of FR Doc. 04–28325, is corrected telephone number is (504) 589–2965. Drawbridge Operation Regulations;
as follows: The Bridge Administration Branch of Gulf Intracoastal Waterway—Bayou
the Eighth Coast Guard District Boeuf, Amelia, LA
■ 1. On page 77626, column 3, in the
maintains the public docket for this
preamble, last full paragraph under AGENCY: Coast Guard, DHS.
temporary deviation.
paragraph heading ‘‘Qualified Active ACTION: Notice of temporary deviation
FOR FURTHER INFORMATION CONTACT:
Low-Income Community Business’’, is from regulations.
removed. David Frank, Bridge Administration
Branch, telephone (504) 589–2965. SUMMARY: The Commander, Eighth
■ 2. On page 77627, column 1, in the
SUPPLEMENTARY INFORMATION: The Port Coast Guard District, has issued a
preamble under paragraph heading
of Corpus Christi Authority has temporary deviation from the regulation
‘‘Recapture’’, first paragraph, line 21
requested a temporary deviation in governing the operation of the BNSF RR
from the top of the column, the language,
order to perform required maintenance Swing Bridge across Bayou Boeuf, mile
‘‘taxable year will be not treated as a’’ is
on the rope sheaves and for the cleaning 10.2, at Amelia, St. Mary Parish, LA.
corrected to read ‘‘taxable year will not This deviation allows the bridge to
and lubrication of the haul and
be treated as a’’. remain closed to navigation for eight
counterweight ropes of the Tule Lake
Cynthia E. Grigsby, vertical lift span bridge across Corpus hours on February 14, 2005, ten hours
Acting Chief, Publications and Regulations Christi—Port Aransas Channel, mile on February 15, 2005, and eight hours
Branch, Legal Processing Division, Associate 14.0 at Corpus Christi, Nueces County, on February 16, 2005. The deviation is
Chief Counsel, (Procedures and Texas. This temporary deviation will necessary to remove and replace the
Administration). allow the bridge to remain in the closed- motor and transmission of the bridge.
[FR Doc. 05–1551 Filed 1–27–05; 8:45 am] to-navigation position from 7 a.m. to 11 DATES: This deviation is effective from
BILLING CODE 4830–01–P a.m. on Thursday, February 10, 2005 8 a.m. on Monday, February 14, 2005

VerDate jul<14>2003 14:20 Jan 27, 2005 Jkt 205001 PO 00000 Frm 00011 Fmt 4700 Sfmt 4700 E:\FR\FM\28JAR1.SGM 28JAR1

Das könnte Ihnen auch gefallen