Beruflich Dokumente
Kultur Dokumente
1
2
2
KANAKA MAHA LAKSHMI THALLI
THIS BOOK IS DEDICATED TO THE ALMIGHTY, WHO
ALWAYS SHOWERS HER BLESSINGS ON HER
CHILDREN.
3
2007, POME, Gautam_Koppala, All Rights Reserved
PROJECTS AND OPERATIONS
MANAGEMENT EXPOSED
(POME)
Part “QUALITY MANAGEMENT FOR PROJECTS”
A COLLECTION AMELIORATED BY
GAUTAM KOPPALA V.T.
4
2007, POME, Gautam_Koppala, All Rights Reserved
5
2007, POME, Gautam_Koppala, All Rights Reserved
6
6
You are the only person who can revolutionise your life.
You are the only person who can influence your happiness,
your realisation and your success.
You are the only person who can help yourself.
Your life does not change, when your boss changes,
when your friends change, when your parents change,
when your partner changes, when your company changes.
Your life changes when YOU change,
when you go beyond your limiting beliefs,
when you realize that you are the only one responsible for your life.
This checklist is provided as part of the evaluation process for the Quality Assurance Plan. The checklist assists designated
reviewers in determining whether specifications meet criteria established in POME’S Project Development Methodology
(POMEPDM). The objective of the evaluation is to determine whether the document complies with POMEPDM requirements.
Mentioned below is the DOCUMENT REVIEW CHECKLIST. Its purpose is to assure that documents achieve the highest
standards relative to format, consistency, completeness, quality, and presentation.
Submissions must include the following three documents, and must be presented in the following order: (First) Document
Review Checklist, (Second) the Quality Assurance Plan Checklist, and (Third) the Quality Assurance Plan.
The Quality Assurance Plan (QAP) presents a framework for activities, which when followed, will ensure delivery of
quality products and services. The SDM provides the project standards and procedures to be used as the basis for the
QA group’s reviews and audits.
36
Y N
37
Y N
this document.
1. Points of Contact:
6
38
Y N
(e.g., installation coordination,
security, etc.). Include a schedule
for coordination activities.
Y N
39
Y N
• Evaluate Facilities
40
Y N
41
Y N
Process
• Evaluate Non-developmental
Software
42
Y N
• Needs Statement
43
Y N
• QualityAssurance Plan
• Feasibility Study
• Cost/Benefit Analysis
• Risk Analysis
44
Y N
• System/Subsystem Specifications
• Database Specifications
• Program Specifications
45
Y N
46
Y N
• Test Plan
• User’s Manual
• Operations Manual
• Maintenance Manual
47
Y N
• Training Material
48
Y N
50
Y N
51
Y N
• Requirements Review
• Design Review
• Specification Review
Y N
53
Y N
5.0 TESTING
54
Y N
7.0 TOOLS
55
Y N
9.0 TRAINING
56