Federal Register / Vol. 70, No.

12 / Wednesday, January 19, 2005 / Notices 3011

November 30, 2004, in Docket No. Mexico (PNM) submitted for filing two 385.214). Protests will be considered by
ER005–157–000, et al., concerning six separate Certificates of Concurrence the Commission in determining the
service agreements filed by PJM on with respect to the December 19, 2004 appropriate action to be taken, but will
October 29, 2004. filing of the New Mexico Transmission not serve to make protestants parties to
PJM states that copies of the filing Operating Procedures and the associated the proceeding. Any person wishing to
were served on all parties in this First Revised Restated Letter of become a party must file a notice of
proceeding. Understanding, among El Paso Electric intervention or motion to intervene, as
Comment Date: 5 p.m. eastern time on Company (EPE), PNM, Texas-New appropriate. Such notices, motions, or
January 21, 2005. Mexico Power Company (TNMP) and protests must be filed on or before the
Tri State Generation and Transmission comment date. Anyone filing a motion
14. Illinois Power Company
Association, Inc. (Tri-State). to intervene or protest must serve a copy
[Docket No. ER05–173–001] PNM states that copies of the filing of that document on the Applicant and
Take notice that on December 30, have been provided to EPE, TNMP, Tri- all parties to this proceeding.
2004, Illinois Power Company filed a State, the New Mexico Public The Commission encourages
request to withdraw its Notice of Regulation Commission, and the New electronic submission of protests and
Withdrawal filed on December 22, 2004 Mexico Attorney General. interventions in lieu of paper using the
in Docket No. ER05–173–000 and also Comment Date: 5 p.m. eastern time on ‘‘eFiling’’ link at http://www.ferc.gov.
submitted amended tariff sheets which January 21, 2005. Persons unable to file electronically
would permit AmerenIP to sell electric 18. San Diego Gas & Electric Company should submit an original and 14 copies
energy at certain times between January of the protest or intervention to the
[Docket No. ER05–411–000] Federal Energy Regulatory Commission,
1, 2005, and December 31, 2006, at
prices up to a cost-based cap of $30/ Take notice that on December 28, 888 First Street, NE., Washington, DC
MWh, the limited amounts of energy 2004, San Diego Gas & Electric (SDG&E) 20426.
that it purchases in excess of its real- tendered for filing a change in rate for This filing is accessible online at
time energy needs. the Transmission Revenue Balancing http://www.ferc.gov, using the
Comment Date: 5 p.m. eastern time on Account Adjustment and its ‘‘eLibrary’’ link and is available for
January 21, 2005. Transmission Access Charge Balancing review in the Commission’s Public
Account Adjustment as set forth in its Reference Room in Washington, DC.
15. PJM Interconnection, L.L.C. Transmission Owner Tariff. SDG&E There is an ‘‘eSubscription’’ link on the
[Docket No. ER05–206–001] states that the effect of the rate change Web site that enables subscribers to
Take notice that on December 30, is to increase rates for jurisdictional receive e-mail notification when a
2004, PJM Interconnection, L.L.C. (PJM) transmission service utilizing that document is added to a subscribed
filed a substitute Construction Service portion of the California Independent docket(s). For assistance with any FERC
Agreement (CSA) among PJM, FPL System Operator-controlled grid owned Online service, please e-mail
Energy Marcus Hook, L.P. and Delmarva by SDG&E. SDG&E requests an effective FERCOnlineSupport@ferc.gov, or call
Power & Light Company d/b/a Conectiv date of January 1, 2005. (866) 208–3676 (toll free). For TTY, call
Power Delivery superseding the CSA SDG&E states that copies of this filing (202) 502–8659.
filed on November 12, 2004, in Docket were served upon the Public Utilities
Commission of the State of California Magalie R. Salas,
No. ER05–206–000. PJM requests an Secretary.
effective date of October 14, 2004. and on the California Independent
System Operator Corporation. [FR Doc. E5–179 Filed 1–18–05; 8:45 am]
PJM states that copies of the filing
Comment Date: 5 p.m. eastern time on BILLING CODE 6717–01–P
were served on the parties to the
January 18, 2005.
agreement and the state regulatory
commissions with the PJM region. 19. Southwest Power Pool, Inc. DEPARTMENT OF ENERGY
Comment Date: 5 p.m. eastern time on [Docket Nos. RT04–1–008 and ER04–48–008]
January 21, 2005. Federal Energy Regulatory
Take notice that on December 30,
16. Alliant Energy Corporate Services, 2004, Southwest Power Pool, Inc. (SPP) Commission
Inc. filed a timetable detailing the timeframe [Docket No. EF05–5011–000, et al.]
[Docket No. ER05–386–000]
to remove rate pancaking from Schedule
1 of its Open Access Transmission United States Department of Energy, et
Take notice that on December 28, Tariff, pursuant to the Commission’s al.; Electric Rate and Corporate Filings
2004, Interstate Power and Light order issued October 1, 2004, in Docket
Company (Interstate) tendered for filing Nos. RT04–1–001 and ER04–48–001, January 10, 2005.
an Amendment Extending Term of 109 FERC ¶ 61,010. The following filings have been made
Agreement extending the term of a 1980 SPP states that it has served a copy of with the Commission. The filings are
joint use agreement between Interstate the filing on all parties in these listed in ascending order within each
Power and Light Company and Central proceedings and, in addition, states that docket classification.
Iowa Power Cooperative. Interstate a copy of this filing will be posted on 1. United States Department of Energy,
requests an effective date of December the SPP Web site. Western Area Power Administration
31, 2004. Comment Date: 5 p.m. eastern time on
Comment Date: 5 p.m. eastern time on January 21, 2005. [Docket No. EF05–5011–000]
January 18, 2005. Take notice that on November 22,
Standard Paragraph 2004, the Deputy Secretary of the
17. Public Service Company of New
Mexico Any person desiring to intervene or to Department of Energy, by Rate Order
protest this filing must file in No. WAPA–115, did confirm and
[Docket No. ER05–393–001] accordance with Rules 211 and 214 of approve on an interim basis, to be
Take notice that on December 30, the Commission’s Rules of Practice and effective on January 1, 2005, the
2004, Public Service Company of New Procedure (18 CFR 385.211 and Western Area Power Administration

VerDate jul<14>2003 15:11 Jan 18, 2005 Jkt 205001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1
3012 Federal Register / Vol. 70, No. 12 / Wednesday, January 19, 2005 / Notices

Rate Schedules CV–F11, for base 4. Delta Energy Center, LLC PJM states that a copy of this report
resource and first preference power [Docket No. ER03–510–004]
has been served on all parties on the
from the Central Valley Project (CVP), Commission’s service list for this
CPP–1 for custom product power, CV– Take notice that on December 30,
proceeding.
T1 for firm and non-firm point-to-point 2004, Delta Energy Center, LLC (Delta) Comment Date: 5 p.m. eastern time on
transmission service on the CVP submitted substitute revised rate January 24, 2005.
transmission system, CV–NWT3 for schedule sheets to Delta’s Rate Schedule
FERC No. 2 to correct inadvertent errors 8. PJM Interconnection, L.L.C.
network integration transmission
service on the CVP transmission system, contained in Delta’s November 23, 2004, [Docket No. ER05–12–001]
CV–TPT6 for third-party transmission filing in Docket No. ER03–510–003.
Take notice that on December 30,
service, COTP–T1 for firm and Non-firm Delta requests an effective date of
2004, PJM Interconnection, L.L.C. (PJM),
point-to-point transmission service on January 1, 2005.
Delta states that copies of the filing submitted a compliance filing pursuant
the California-Oregon Transmission to Commission’s order issued November
Project, PACI–T1 for firm and Non-firm were served upon the official service list
for this proceeding. 30, 2004 issued in ER05–12–000, 109
point-to-point transmission service on FERC ¶ 61,241. PJM requests an
the Pacific Alternating Current Intertie, Comment Date: 5 p.m. eastern time on
January 21, 2005. effective date of December 1, 2004.
and CV–RFS3, CV–EID3, CV–SPR3, and PJM states that copies of the filing
CV–SUR3 for ancillary services for the 5. Pacific Gas and Electric Company were served on all persons on the
CVP. Rate Order No. WAPA–115 also service list in Docket No. ER05–12–000,
[Docket No. ER03–1091–006]
contains information on the Path 15 as well as all PJM members, and each
Transmission Upgrade. Take notice that on December 30,
2004, Pacific Gas and Electric Company state electric utility regulatory
The formula rates in Rate Schedules commission in the PJM regions.
CV–F11, CPP–1, CV–T1, CV–NWT3, (PG&E) submitted a compliance filing
pursuant to the Commission’s letter Comment Date: 5 p.m. eastern time on
CV–TPT6, COTP–T1, PACI–T1, CV– January 21, 2005.
RFS3, CV–EID3, CV–SPR3, and CV– order issued December 22, 2004 in
SUR3 will be in effect pending the Docket No. ER03–1091–005, 109 FERC 9. American Electric Power Service
Federal Energy Regulatory ¶ 61,336 (2004). Corporation
Commission’s approval of these or of PG&E states that copies of this filing
[Docket No. ER05–394–000]
substitute rates on a final basis, ending were served upon Duke Energy Morro
Bay, LLC, the California Independent Take notice that on December 30,
September 30, 2009.
Comment Date: 5 p.m. eastern time on System Operator Corporation, and the 2004, the American Electric Power
January 31, 2005. California Public Utilities Commission Service Corporation (AEPSC), tendered
(CPUC). for filing an Interconnection and Local
2. Entergy Services, Inc. Comment Date: 5 p.m. eastern time on Delivery Service Agreement between
[Docket No. EL05–52–000] January 21, 2005. AEPSC and Ormet Primary Aluminum
Take notice that on January 3, 2005 Corporation (ORMET) designated as
6. Delmarva Power & Light Company Original Service Agreement No. 568
Entergy Services, Inc., (Entergy) on
behalf of the Entergy Operating [Docket Nos. ER04–509–004 and ER04–1250– under the Operating Companies of the
Companies, filed pursuant to 003] American Electric Power System FERC
Commission Rule 207, 18 CFR 385.207, Take notice that on December 30, Electric Tariff, Third Revised Volume
a Petition for Declaratory Order. Entergy 2004, PJM Interconnection, L.L.C. (PJM) No. 6. AEPSC requests an effective date
states that the Petition requests submitted for filing a response to the of November 1, 2004.
guidance on important issues associated Commission’s November 23, 2004, letter AEPSC states that a copy of the filing
with Entergy’s proposal to establish an order regarding deficiencies in a was served upon ORMET and the Public
Independent Coordinator of compliance filing submitted by Service Commission of Ohio.
Transmission. Delmarva Power & Light Company in Comment Date: 5 p.m. eastern time on
Comment Date: 5 p.m. eastern time on Docket Nos. ER04–509–001 and ER04– January 21, 2005.
February 4, 2005. 1250–003. 10. Central Maine Power Company
PJM states that a copy of the filing has
3. Maine Public Service Company been served by U.S. Mail on all parties [Docket No. ER05–401–000]
[Docket No. ER00–1053–012] on the Commission’s service list for this Please take notice that on January 3,
Take notice that on December 30, proceeding. 2005, Central Maine Power Company
2004, Maine Public Service Company Comment Date: 5 p.m. eastern time on (CMP) submitted the following
(MPS) submitted an amendment to its January 24, 2005. entitlement agreements between CMP
June 15, 2004 informational filing 7. PJM Interconnection, L.L.C. and Constellation Energy Commodities
setting forth the changed open access Group, Inc. (CECG): System Contract
transmission tariff charges effective June [Docket No. ER04–608–002] Entitlement Agreement, FERC Rate
1, 2004, together with back-up Take notice that on January 3, 2005, Schedule No. 202; Waste-to-Energy
materials). PJM Interconnection, L.L.C. (PJM) Entitlement Agreement, FERC Rate
MPS states that copies of this filing submitted for filing a status report of Schedule No. 203; Cogeneration
were served on the parties to the PJM’s stakeholder process regarding Entitlement Agreement, FERC Rate
Settlement Agreement in Docket No. expansion of PJM’s behind the meter Schedule No. 204; Nuclear Entitlement
ER00–1053–000, the Commission Trial generation program to include Agreement, FERC Rate Schedule No.
Staff, the Maine Public Utilities generation associated with municipals’ 205; and Hydroelectric Entitlement
Commission, the Maine Public and cooperatives’ electric distribution Agreement, FERC Rate Schedule No.
Advocate, and current MPS open access systems as required by the 206. CMP requests an effective date of
transmission tariff customers. Commission’s order issued May 6, 2004, March 1, 2005.
Comment Date: 5 p.m. eastern time on in this proceeding, 107 FERC ¶ 61,113, Comment Date: 5 p.m. eastern time on
January 21, 2005. reh’g denied, 108 FERC ¶ 61,302 (2004). January 24, 2005.

VerDate jul<14>2003 15:11 Jan 18, 2005 Jkt 205001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1
Federal Register / Vol. 70, No. 12 / Wednesday, January 19, 2005 / Notices 3013

11. Otter Tail Power Company accordance with Rules 211 and 214 of Schedule 13 of the PJM open access
[Docket No. ER05–408–000]
the Commission’s Rules of Practice and transmission tariff, fully complies with
Procedure (18 CFR 385.211 and the Commission’s November 18, 2004,
Take notice that on January 3, 2005,
385.214). Protests will be considered by order in this proceeding, 109 FERC ¶
Otter Tail Power Company (Otter Tail)
the Commission in determining the 61,168. PJM states that the corrected
submitted proposed amendments to the
appropriate action to be taken, but will sheet has an effective date from May 1,
following agreements between Otter Tail
not serve to make protestants parties to 2004, through November 30, 2004,
and City of Newfolden, City of
the proceeding. Any person wishing to corresponding to the period that
Nielsville, City of Shelly, State of
become a party must file a notice of Schedule 13 was effective.
Minnesota on behalf of State Hospital, PJM states that copies of this filing
intervention or motion to intervene, as
State of North Dakota on behalf of were served upon all persons on the
appropriate. Such notices, motions, or
Grafton State School, State of North service list in this docket, as well as all
protests must be filed on or before the
Dakota on behalf of School of Forestry, PJM members, and each state electric
comment date. Anyone filing a motion
State of North Dakota on behalf of utility regulatory commission in the
to intervene or protest must serve a copy
School of Science, State of North Dakota PJM region.
of that document on the Applicant and
on behalf of School for the Deaf, Fort Comment Date: 5 p.m. eastern time on
all parties to this proceeding.
Totten Indian Agency, Turtle Mountain The Commission encourages January 14, 2005.
Indian Agency, Oakes O&M Center, and electronic submission of protests and
Town of Badger. Otter Tail states that 2. Alpena Power Generation, L.L.C.
interventions in lieu of paper using the
the proposed amendments are intended ‘‘eFiling’’ link at http://www.ferc.gov. [Docket No. ER04–1004–003]
to allow for the reimbursement to Otter Persons unable to file electronically Take notice that on January 5, 2005,
Tail for certain Midwest Independent should submit an original and 14 copies Alpena Power Generation, L.L.C.
Transmission System Operator, Inc. of the protest or intervention to the (Alpena Generation) tendered for filing
costs associated with the load of the Federal Energy Regulatory Commission, an amendment to its July 9, 2004, filing,
Customers. Otter Tail requests an 888 First Street, NE., Washington, DC which was amended on August 27,
effective date of March 1, 2005. 20426.
Comment Date: 5 p.m. eastern time on 2004, and November 5, 2004, in
This filing is accessible online at response to the Commission’s
January 24, 2005. http://www.ferc.gov, using the deficiency letter issued January 4, 2005.
12. Southern California Edison ‘‘eLibrary’’ link and is available for Alpena Generation states that copies
Company review in the Commission’s Public of the filing were served upon the
Reference Room in Washington, DC. public utility’s jurisdictional customers
[Docket No. ER05–410–000]
There is an ‘‘eSubscription’’ link on the and the Michigan Public Service
Take notice that on December 30, Web site that enables subscribers to Commission.
2004, Southern California Edison receive e-mail notification when a Comment Date: 5 p.m. eastern time on
Company (SCE) submitted proposed document is added to a subscribed January 18, 2005.
revisions to SCE’s TO Tariff, FERC docket(s). For assistance with any FERC
Electric Tariff, Second Revised Volume Online service, please e-mail 3. Midwest Independent Transmission
No. 6, Appendix VI, and to certain FERCOnlineSupport@ferc.gov, or call System Operator, Inc.
Existing Transmission Contracts to (866) 208–3676 (toll free). For TTY, call [Docket No. ER05–395–000]
increase SCE’s Reliability Services (202) 502–8659.
Revenue Requirement and Reliability Take notice that on December 30,
Services rates. Magalie R. Salas, 2004, the Midwest Independent
SCE states that copies of the filing Secretary. Transmission System Operator, Inc.
were served upon SCE’s jurisdictional [FR Doc. E5–191 Filed 1–18–05; 8:45 am]
(Midwest ISO) filed an Interconnection
customers, the California Public and Operating Agreement among West
BILLING CODE 6717–01–P
Utilities Commission, the California Pipestone Transmission LLC, Northern
Electricity Oversight Board, the States Power Company d/b/a Xcel
California Independent System DEPARTMENT OF ENERGY Energy and the Midwest ISO. The
Operator, Pacific Gas and Electric Midwest ISO requests an effective date
Company, and the San Diego Gas and Federal Energy Regulatory of December 15, 2004.
Electric Company. Commission The Midwest ISO states that a copy of
Comment Date: 5 p.m. eastern time on the filing was served on the parties to
[Docket No. EL02–111–031, et al.] the Interconnection and Operating
January 21, 2005.
PJM Interconnection, L.L.C., et al.; Agreement.
13. Duke Energy Grays Harbor, LLC Comment Date: 5 p.m. eastern time on
Electric Rate and Corporate Filings
[Docket No. ER05–418–000] January 21, 2005.
Take notice that on December 30, January 6, 2005.
4. MidAmerican Energy Company
2004, Duke Energy Grays Harbor, LLC The following filings have been made
with the Commission. The filings are [Docket No. ER05–396–000]
(Duke Grays Harbor) submitted a Notice
of Cancellation of its FERC Electric listed in ascending order within each Take notice that on December 30,
Tariff, Original Volume No. 1. Duke docket classification. 2004, MidAmerican Energy Company
Grays Harbor requests an effective date (MidAmerican) filed a Network
1. PJM Interconnection, L.L.C.
of December 31, 2004. Integration Transmission Service
Comment Date: 5 p.m. eastern time on [Docket No. EL02–111–031] Agreement and a Network Operating
January 21, 2005. Take notice that on December 30, Agreement between MidAmerican and
2004, PJM Interconnection, L.L.C. (PJM), the Resale Power Group of Iowa (RPGI),
Standard Paragraph submitted a correction to the tariff as agent for the City of Hudson, Iowa.
Any person desiring to intervene or to revisions filed in this proceeding on MidAmerican requests an effective date
protest this filing must file in November 24, 2004, to ensure that of January 1, 2005.

VerDate jul<14>2003 15:11 Jan 18, 2005 Jkt 205001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1