Annexure-A: Permits Required

Table-A.1 Permits required for grid connected FIT Solar plants <=40 MW
#

Name

Issuing Agency

Time

Application Fees (Kshs.)

Within 90 days

None

Prerequisites

Approval for Expression of Interest and Detailed Feasibility


Study
The Ministry of Energy and Petroleum wants to determine how
1

the proposed power plant can be integrated into the national


power development plan and estimate suitability of proposed
power plant location for interconnection including

Ministry of
Energy and

None

Approval for Expression of

Petroleum

interconnection facilities and costs.

Application fee for EIA is

Environment Impact Assessment

National

Ensuring sustainable development and the protection of the

Environment

45 to 90 working

environment

Management

days

Authority

cost with a Minimum of

Interest and Detailed Feasibility

Ksh 10,000 and no

Study

upper capping.

Approval for Change of User


Control of land use and development

Development Permit
Safety of buildings, planning control.

County
Government

County
Government

0.1 % of total project

Negotiate FIT based Power Purchasing Agreement

Kenya Power

60 days

60-90 days

Waiting time - 180


days , Negotiations -

KSh. 200

KSh. 200 for the


application form

None

Environment Impact
Assessment

Approval for Change of User


Environment Impact
Assessment

Approval for Expression of


Interest and Detailed Feasibility

Secure Energy Supply

90 days

Study

Environment Impact
Assessment

Approval for Change of User

Environment Impact

Special Use License: (Applies to power plants and sub


6

stations situated inside KFS land)


To grant access and use rights of KFS lands

Kenya Forest
Service

30 days

None

30 days

None

Assessment

Way Leave Authorization: (Applies to transmission and


distribution lines passing through KFS land)
7

To compensate Kenya Forest Service for the trees that have

Kenya Forest

to be felled for the trans mission lines to gain access to the grid

Service

Environment Impact
Assessment

or consumption areas

Approval for Expression of


Interest and Detailed Feasibility
Study

Assessment

Approval of Power Purchasing Agreement (General: FiT


Based)
8

Evaluating the PPA with respect to fair consumer prices, fair


KW price paid by Kenya Power, and amount of energy
provided (firm)

Environment Impact

Energy
Regulatory

30 days

None

Commission

Approval for Change of User


Development Permit
Negotiate FIT based Power
Purchasing Agreement

Special Use License: (Applies to


power plants and sub stations
situated inside KFS land)

Way Leave Authorization:


(Applies to transmission and
distribution lines passing

through KFS land)

Approval for Expression of


Interest and Detailed Feasibility

Study

Electricity Generation License: General - Non FiT Based

Energy

Compliance with the FiT Policy

Regulatory

Ksh. 10,000 (application

90 days

fee),

Commission

Environment Impact
Assessment

Approval of Power Purchasing


Agreement (General: Non FiT
Based)

Table-A.2 Permits required for grid connected Non FIT Solar plants >40 MW

Name

Issuing

Time

Application Fees (Kshs.)

Prerequisites

Agency
Approval for Expression of Interest and Detailed Feasibility
Study
The Ministry of Energy and Petroleum wants to determine
1

how the proposed power plant can be integrated into the


national power development plan and estimate suitability of
proposed power plant location for interconnection including

Ministry of
Energy and

Within 90 days

None

None

Approval for Expression of Interest

Petroleum

interconnection facilities and costs.

Environment Impact Assessment

National

Ensuring sustainable development and the protection of the

Environment

45 to 90 working

environment

Management

days

Authority

Application fee for EIA is 0.1 % of


total project cost with a Minimum of
Ksh 10,000 and no upper capping.

and Detailed Feasibility Study

Name

Issuing

Time

Application Fees (Kshs.)

Prerequisites

Agency

Approval for Change of User


Control of land use and development

Government

60 days

KSh. 200

60-90 days

KSh. 200 for the application form

30 days

None

Environment Impact Assessment

30 days

None

Environment Impact Assessment

Approval for Expression of Interest

Development Permit
Safety of buildings, planning control.

Special Use License: (Applies to power plants and sub


5

County

stations situated inside KFS land)


To grant access and use rights of KFS lands

County
Government

Environment Impact Assessment

Approval for Change of User


Environment Impact Assessment

Kenya
Forest
Service

Way Leave Authorization: (Applies to transmission and


distribution lines passing through KFS land)
6

To compensate Kenya Forest Service for the trees that have


to be felled for the transmission lines to gain access to the
grid or consumption areas

Negotiate Capacity based Power Purchasing Agreement


Secure Energy Supply

Kenya
Forest
Service

Kenya
Power

Approval of Power Purchasing Agreement (General: Non FiT


8

Based)
Evaluating the PPA with respect to fair consumer prices, fair
KW price paid by Kenya Power, and amount of energy

Waiting time - 180


days , Negotiations -

None

90 days

Energy
Regulatory
Commission

30 days

None

and Detailed Feasibility Study

Environment Impact Assessment

Approval for Expression of Interest


and Detailed Feasibility Study

Environment Impact Assessment


Approval for Change of User

Name

Issuing

Time

Application Fees (Kshs.)

Prerequisites

Agency

provided (firm)

Development Permit
Negotiate Capacity based Power
Purchasing Agreement

Special Use License: (Applies to


power plants and sub stations situated
inside KFS land)

Way Leave Authorization: (Applies to


transmission and distribution lines
passing through KFS land)

Electricity Generation License: General - Non FiT Based

Energy

Compliance with the FiT Policy

Regulatory

Approval for Expression of Interest


and Detailed Feasibility Study

90 days

Ksh. 10,000 (application fee),

Commission

Environment Impact Assessment


Approval of Power Purchasing
Agreement (General: Non FiT Based)

Table A.3 Permits required for off grid FIT Solar plants 0.5 to 10 MW

Name

Issuing Agency

Time

Application Fees (Kshs.)

Prerequisites

Approval for Expression of Interest and


Detailed Feasibility Study
1

The Ministry of Energy and Petroleum wants to

Ministry of Energy and

determine how the proposed power plant can

Petroleum

be integrated into the national power


development plan and estimate suitability of

Within 90 days

None

None

Name

Issuing Agency

Time

Application Fees (Kshs.)

Prerequisites

proposed power plant location for


interconnection including interconnection
facilities and costs.

Environment Impact Assessment


2

Application fee for EIA is 0.1

Ensuring sustainable development and the

National Environment

protection of the environment

Management Authority

45 to 90 working days

% of total project cost with a

Interest and Detailed

Minimum of Ksh 10,000 and

Feasibility Study

no upper capping.

Approval for Change of User


Control of land use and development

County Government

60 days

County Government

60-90 days

KSh. 200 for the application


form

Environment Impact
Assessment

Development Permit
Safety of buildings, planning control.

KSh. 200

Approval for Expression of

Approval for Change of


User

Environment Impact
Assessment

Special Use License: (Applies to power plants


5

and sub stations situated inside KFS land)


To grant access and use rights of KFS lands

Kenya Forest Service

30 days

None

Kenya Forest Service

30 days

None

Environment Impact
Assessment

Way Leave Authorization: (Applies to


transmission and distribution lines passing
6

through KFS land)


To compensate Kenya Forest Service for the
trees that have to be felled for the transmission
lines to gain access to the grid or consumption

Environment Impact
Assessment

Name

Issuing Agency

Time

Application Fees (Kshs.)

Prerequisites

areas

Interest and Detailed

Negotiate FIT based Power Purchasing


7

Agreement
Secure Energy Supply

Approval for Expression of

Kenya Power

Waiting time - 180 days ,


Negotiations - 90 days

Feasibility Study
None

Environment Impact
Assessment

Approval for Change of


User

Approval for Expression of


Interest and Detailed
Feasibility Study

Environment Impact
Assessment

User

Approval of Power Purchasing Agreement

(General: FiT Based)


8

Evaluating the PPA with respect to fair

Energy Regulatory

consumer prices, fair KW price paid by Kenya

Commission

Power, and amount of energy provided (firm)

Approval for Change of

30 days

None

Development Permit
Negotiate FIT based
Power Purchasing
Agreement

Special Use License:


(Applies to power plants
and sub stations situated
inside KFS land)

Way Leave Authorization:


(Applies to transmission
and distribution lines
passing through KFS

Name

Issuing Agency

Time

Application Fees (Kshs.)

Prerequisites
land)

Approval for Expression of


Interest and Detailed

Electricity Generation License: FiT Based 9

Feasibility Study

General

Energy Regulatory

Compliance with the FiT Policy

Commission

90 days

Ksh. 10,000 (application fee),

Environment Impact
Assessment

Approval of Power
Purchasing Agreement
(General: FiT Based)

Electricity Generation, Distribution and/or


10

Interest and Detailed

Supply License
Compliance with Energy Act and Electricity
Licensing Regulations 2010

Approval for Expression of

Energy Regulatory
Commission

Feasibility Study
90 days

Kshs. 10,000

Approval of Power
Purchasing Agreement

Electricity Generation
License

Table A.4 Permits required for off grid Non FIT Solar plants all capacities

Name
Approval for Expression of Interest and Detailed Feasibility

Study
The Ministry of Energy and Petroleum wants to determine how
the proposed power plant can be integrated into the national

Issuing Agency

Time

Application Fees (Kshs.)

Prerequisites

Ministry of
Energy and
Petroleum

Within 90 days

None

None

Name

Issuing Agency

Time

Application Fees (Kshs.)

Prerequisites

power development plan and estimate suitability of proposed


power plant location for interconnection including
interconnection facilities and costs.

Environment Impact Assessment


2

Ensuring sustainable development and the protection of the


environment

Approval for Change of User


3
Control of land use and development

National

Application fee for EIA is 0.1 %


of total project cost with a

Management

days

Minimum of Ksh 10,000 and no

Interest and Detailed

upper capping.

Feasibility Study

Authority

County
Government

County
Safety of buildings, planning control.

Approval for Expression of

45 to 90 working

60 days

KSh. 200

Government

Environment Impact
Assessment

Development Permit
4

Environment

60-90 days

KSh. 200 for the application form

Approval for Change of User


Environment Impact
Assessment

Special Use License: (Applies to power plants and sub stations


5

situated inside KFS land)

Kenya Forest
Service

30 days

None

Assessment

To grant access and use rights of KFS lands

Way Leave Authorization: (Applies to transmission and


6

distribution lines passing through KFS land)


To compensate Kenya Forest Service for the trees that have to

Kenya Forest
Service

Environment Impact

30 days

None

Environment Impact
Assessment

Name

Issuing Agency

Time

Application Fees (Kshs.)

Prerequisites

be felled for the transmission lines to gain access to the grid or


consumption areas

Approval for Expression of


Interest and Detailed

Electricity Generation License: General - Non FiT Based


7

Regulatory
Compliance with the FiT Policy

Feasibility Study

Energy
90 days

Ksh. 10,000 (application fee),

Environment Impact
Assessment

Commission

Approval of Power Purchasing


Agreement (General: Non FiT
Based)

Electricity Generation, Distribution and/or Supply License


8

Interest and Detailed

Energy

Compliance with Energy Act and Electricity Licensing

Regulatory

Regulations 2010

Commission

Approval for Expression of

90 days

Feasibility Study

Kshs. 10,000

Approval of Power Purchasing


Agreement

Electricity Generation License