Clause No
Description
SECTION I
INVITATION FOR BIDS
SECTION II
INSTRUCTIONS TO BIDDERS
INTRODUCTION
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
General
Source of Funds
Scope
Eligible Bidders
Eligible Materials, Equipment and Services
Cost of Bidding
Joint Ventures
Assurance
Site Visit
THE BIDDING DOCUMENTS
0.0
11.0
12.0
13.0
14.0
15.0
16.0
Bidding Documents
Clarification of Bidding Documents
Amendment of Bidding Documents
Language of Bid
Bids Drawings
Cost of Bidding
Right to Reject Incomplete Bids
PREPARATION OF BIDS
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
Submission of Tenders
Copy to be Retained by the Bidder
Currencies of Bid and Payment
Supplementary Information
Supply of Materials
Bid Prices
Documents Establishing the Work's Conformity
to the Bidding Documents.
Bid Security
Period of Validity of Bids and Extension
Earnest Money
Bill of Quantities and Pricing
Taxation
/var/www/apps/conversion/tmp/scratch_4/292102115.doc
31.0
32.0
Prebid Meeting
Format and Signing of Bid
SUBMISSION OF BID
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
47.0
Award of Contract
Performance Security
Acquisition of Land and Relocation of Utilities
Technical Design Alternatives
SECTION III
FORM OF CONTRACT AGREEMENT
SECTION IV
SCOPE OF WORK
SECTION V
BID AND APPENDICES
SECTION VI
WORK SCHEDULE
BILL OF QUANTITIES
/var/www/apps/conversion/tmp/scratch_4/292102115.doc
TABLE OF CONTENTS
Clause No
Description
GENERAL CONDITIONS OF CONTRACT
DEFINITIONS AND INTERPRETATION
2.1
2.2
2.3
2.4
2.5
2.6
3.1
3.2
4.1
5.1
5.2
6.1
6.2
6.3
6.4
6.5
7.1
7.2
7.3
Failure
by
Contractor to Submit
Drawings
Responsibility
Unaffected by
Approval
/var/www/apps/conversion/tmp/scratch_4/292102115.doc
8.1
8.2
9.1
10.1
10.2
10.3
11.1
12.1
12.2
13.1
14.1
14.2
14.3
14.4
15.1
16.1
16.2
17.1
18.1
19.1
19.2
20.1
20.2
20.3
20.4
21.1
21.2
21.3
21.4
22.1
22.2
22.3
23.1
23.2
23.3
24.1
24.2
25.1
25.2
25.3
25.4
26.1
27.1
28.1
28.2
29.1
30.1
30.2
30.3
30.4
31.1
GENERAL OBLIGATIONS
Contractor's General Responsibilities
Site Operations and Methods of Construction
Contract
Agreement
Performance Security
Period of Validity of Performance Security
Claims under Performance Security
Inspection of Site
Sufficiency of Bid
Adverse Physical Obstructions or Conditions
Work to be in Accordance with Contract
Program to be submitted
Revised Program
Cash Flow Estimate to be submitted
Contractor not relieved of Duties or Responsibilities
Contractor's Superintendence
Contractor's Employees
Engineer at Liberty to Object
Setting-out
Boreholes and Exploratory Excavation
Safety, Security and Protection of the Environment
Employer's Responsibilities
Care of Works
Responsibility to Rectify Loss or Damage
Loss or Damage Due to Employer's Risks
Employer's Risks
Insurance of Works and Contractor's Equipment
Scope of Cover
Responsibility for Amounts not recovered
Exclusions
Damage to Persons and Property
Exceptions
Indemnity by Employer
Third Party Insurance (Including Employer's Property)
Minimum Amount of Insurance
Cross Liabilities
Accident or Injury to Workmen
Insurance Against Accident to Workmen
Evidence and Terms of Insurance
Adequacy of Insurance
Remedy on Contractor's Failure to Insure
Compliance with Policy Conditions
Compliance with Statutes Regulations
Fossils
Patent Rights
Royalties
Interference with Traffic and Adjoining Properties
Avoidance of Damage to Roads
Transport of Contractor's Equipment or Temporary Works
Transport of Materials or Plant
Waterborne Traffic
Opportunities for Other Contractors
/var/www/apps/conversion/tmp/scratch_4/292102115.doc
31.2
32.1
33.1
34.1
5.1
36.1
36.2
36.3
36.4
36.5
37.1
37.2
37.3
37.4
37.5
38.1
38.2
39.1
39.2
40.1
40.2
40.3
SUSPENSION
Suspension of Work
Engineer's Determination Following Suspension
Suspension lasting more than 84 Days
41.1
42.1
42.2
42.3
43.1
44.1
44.2
44.3
45.1
46.1
47.1
47.2
48.1
48.2
48.3
48.4
49.1
49.2
49.3
49.4
50.1
DEFECTS LIABILITY
Defects Liability Period
Completion of outstanding work and remedying defects
Cost of Remedying Defects
Contractor's Failure to carry out Instructions
Contractor to Search
ALTERATIONS, ADDITIONS AND OMISSIONS
/var/www/apps/conversion/tmp/scratch_4/292102115.doc
51.1
51.2
52.1
52.2
52.3
52.4
Variations
Instructions for Variations
Variation of Variations
Power of Engineer to Fix Rates
Deleted
Daywork
54.2
54.3
54.4
54.5
54.6
54.7
54.8
55.1
56.1
57.1
57.2
MEASUREMENT
Quantities
Works to be measured
Method of Measurement
Breakdown of Lump Sum Items
58.1
58.2
58.3
PROVISIONAL SUMS
Definition of "Provisional Sum"
Use of Provisional Sums
Production of Vouchers
59.1
59.2
59.3
59.4
NOMINATED SUBCONTRACTORS
Definition of "Nominated "Subcontractors"
Nominated Subcontractor Objection to Nomination
Design Requirements to be Expressly Stated
Payments Nominated Subcontractors
53.1
53.2
53.3
53.4
53.5
54.1
/var/www/apps/conversion/tmp/scratch_4/292102115.doc
59.5
60.1
60.2
60.3
60.4
60.5
60.6
60.7
60.8
60.9
60.10
61.1
62.1
62.2
63.1
63.2
63.3
63.4
64.1
REMEDIES
Default of
Valuation at Date of Termination
Payment after Termination
Assignment of Benefit of Agreement
Urgent Remedial Work
65.1
65.2
65.3
65.4
65.5
65.6
65.7
65.8
SPECIAL RISKS
No Liability
Special Risks
Damage to Works by Special Risks
Projectile, Missile
Increased Costs arising from Special Risks
Outbreak of War
Removal of Contractor's Equipment on Termination
Payment if Contract Terminated
66.1
67.1
SETTLEMENT OF DISPUTES
Engineer's Decision
68.1
68.2
68.3
69.1
69.2
69.3
69.4
69.5
NOTICES
Notice to Contractor
Notice to Employer and Engineer
Change of Address
Default of Employer
Removal of Contractor's Equipment
Payment on Termination
Contractor's Entitlement to Suspend Work
Resumption of Work
71.1
72.1
72.2
72.3
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
37.1
37.2
37.3
37.4
37.5
38.0
Currency Proportions
Currencies of Payment for Provisional Sums
SUPPLEMENTARY CONDITIONS OF CONTRACT
Progress Report.
Attendance in Meetings
Supply of Bitumen and Cement etc.
Electricity Supply
Rate and Prices Inclusive
Provision of Plant
Rates inclusive for all Lead and Lift
Borrow Areas
Time for Completion of Works
Documents not to be Altered or Mutilated
Personal Liability of Public Officials.
Access and Canal Roads
Railway Traffic
Irrigation Flow
Utility Lines
First Aid Facilities
Location of Contractor's Camp
Final Hand-Over
Making Good Damage to Services, Earthquake, Etc.
Returns of Plant, Materials, Etc.
Record of Measurement
Dangerous Materials
Members of Government not Personally Liable
Progress Photographs
As-Built Drawings/Shop Drawings
Safety Precautions
Income Tax
Approved Insurance Companies
Disputes
Variation Orders
Detours/Diversions
As Built Drawings
Contractor's Field Laboratory and Quality Testing
Cross Sections for Measurement
Engineer's Office
Maintenance and Defects
Definition of the "Period of Maintenance"
Execution of Repair Work
Cost of Execution of Repair Work
Remedy of Contractor's Failure to Carry out Works Required
Contractor to Search for Defects
Approval of Donors