CLIENT CONSULTANT CONTRACTOR PROJECT:

DOCUMENT NAME :- DESIGN CALCULATION SHEET FOR LIGHTNING PROTECTION


REV -

DOCUMENT NO.

TYPICAL CALCULATION SHEET FOR LIGHTING SYSTEM BELOW 2O MTR HEIGHT OF BUILDING/STRUCTURE
= Fill or Select the yellow colour result will get automatically

1.00 BASIC OF CALCULATION : As per IS :2309-1985


1.01 Average Number of Thunderstroms days in the year

Bellari

22

1.02 Building Dimension -SS-1

LxWXH

43.5

14

Ac

( L X W ) + 2 ( L X H ) + 2 ( W X H ) +( H2)

(43.5 X 14) + 2 ( 43.5 X 12) + 2 ( 14 X 12) + ( X 12 X 12)

1.03 Collection Area

609

1044

12

336

10

452.45

0.4

Ac

1.04 Flash density Mean Value

Ng

1.9

1.05 Probability of being struck

(Ac X Ng ) X 10

2441.45

-6

2441.45 X

0.00464

1.9

-6

1.06 Over all Assesment of Risk & Weighing Factor (Refer Table-1A to 1E from IS : 2309:1989 )
A

Weighting Factor "A" ( Use of Structures)


Office blocks,hotels,block of flat and other residential buildings
other than those included below.

0.4

1.3

0.4

Weighting Factor "D" ( Degree of Isolation)


Structure located in large area of structures or trees of the
same or greater height, for example in a large town or forest

Weighting Factor "C" ( Contents or Consequentials Effects)


Industrial key plants,ancient monuments and historic
buildings,museums, art galleries or other buildings with
specially valuable contents.

1.2

Weighting Factor "B" ( Type Of Construction)


Reinforced concrete with any roof other than metal

Weighting Factor "E" ( Type of Cuntry)


Hill Country

1.07 Overall Multiplication Factor

1.08 Overall Risk Factor

1
AXBXCXDXE

1.2

0.2496

=
=
=

0.4

1.3

Strucke (P) x Oveall multiplication factor


0.00464

X 0.2496

0.00116

0.00

1.09 If Overall risk factor exceeds 0.00001 then Lightning protection is required

Conclusion :-

Overall risk factor is excessed than 0.00001 hence Lightning Protection is Required

2.00 SELECTION OF DOWN CONDUCTOR :


Number of Down conductors should be atleast the smaller of the following.
The Above structure/Building height is

12

Mtrs. Below 20 Meter then

Use the following formula for Down Conductor Calculation


2.01 Number of Down Conductor for Building/Structure

2.02 Number of Down conductor = Number of Earth Pits

Doc. No.EL00012,Rev05

(( W + L ) X 2) / 20

((43.5+14) X 2 ) / 20

Nos.

Nos.

1 OF 1