Issue
Remarks
Achieve
737 TPD
%
%
%
%
PFAD Product
Contract
Achieve
0.05 % Max
Nil
Nil
1.5 R Max
90 % Min
0.03
0.02
0.04
1.23
83.3
%
%
%
R
%
Utilities Consumption
Parame Contract
Achieve
ter
Steam
94.5 Kg/ton 105.9
Kg/ton
Phospori 1 Kg/ton
0.69 Kg
c
Max
B. E
18 Kg/ton
17.35
Max
Kg/ton
Electrici
7.9
11 Kwh/ton
ty
Kwh/ton
HP
3.67
3.2 Kg/ton
Diesel
Kg/ton
Note : Electricity include cooling tower
Issue to follow up :
1. Bleaching Earth Totalizer in
SCADA not match the actual
usage
B.
Commisioning Result :
Plant Capacity
Parame Contract
ter
Capacit
600 TPD
y
RBDPO Feedstock
Parame Contract
ter
IV
51-53
Super Olein Product
Parame Contract
ter
IV
60
Yield
62 %
(IV)
Yield
62 %
(Act)
IV is achieve
Achieve
558 TPD
Achieve
52.5
Achieve
60.9
63.1
60.1
Issue to follow up :
1. Trane Chiller No.1 was found
break down
2. Crystallizers 3 still not
performing well, apparently
cycle time to achieve final IV is
longer than other crystallizers
3. 15 pcs Filter cloths for
membrane filter was found
torned
4. Side cylinder for Membrane
Press Filter No.1 not closing and
opening in equal speed