QA-QC RFI TRACKING
RFI No
Site
Description
SATIP
(Gasket
Act.
No
SAIC /
SATR
SATIP-L410-01
3.4 SAIC-L-2014
SATIP-L350-01
2.3 SAIC-L-2007
Inspection Level
Contractor
Inspection
Aramco
Time
Date
11.00am
20.09.15
SAPID
Geary
QMIS RFI
Log No
RFI Status
Closing
Date
Remarks
Site
SATIP-L-350-01
Description
SATIP
Act. No
SAIC / SATR
ANDR 3003 Pipe and nipples material verification and visual inspection
SATIP-L-350-01
2.1
SAIC-L-2005
SDGM 989
SATIP-L-350-01
2.2
SAIC-L-2006
SATIP-L-350-01
2.3
SAIC-L-2007
SATIP-L-350-01
2.4
SAIC-L-2008
SATIP-L-350-01
2.5
SAIC-L-2009
SATIP-L-350-01
2.8
SAIC-L-2010
SATIP-L-410-01
SATIP-L-410-01
2.1
SAIC-L-2083
SATIP-L-410-01
3.4
SAIC-L-2014
SATIP-L-450-03
SATIP-L-450-03
2.1
SAIC-L-2112
SATIP-L-450-03
3.3
SAIC-L-2113
10
Field Bending
SATIP-L-450-03
3.6
SAIC-L-2114
11
SATIP-L-450-03
3.28
SAIC-L-2014
SATIP-L-450-04
2.1
SAIC-L-2112
SATIP-L-450-04
12
Contractor Aramco
Inspection
Time
Site
Description
SATIP
Act. No
SAIC / SATR
13
SATIP-L-450-04
3.4
SAIC-L-2132
14
Field Bending
SATIP-L-450-04
3.7
SAIC-L-2114
15
Thrust Boring
SATIP-L-450-04
3.13
SAIC-L-2120
16
Pre-Test Punchlisting-PIPELINES
SATIP-L-450-04
3.24
SAIC-L-2139
17
SATIP-L-450-04
3.25
SAIC-L-2017
18
SATIP-L-450-04
3.29
SAIC-L-2014
SATIP-A-004-03
19
SATIP-A-004-03
1.2
SAIC-A-2003
20
SATIP-A-004-03
3.1
SAIC-L-2139
21
SATIP-A-004-03
3.2
SAIC-L-2017
22
SATIP-A-004-03
3.3
SAIC-A-2009
23
SATIP-A-004-03
3.4
SAIC-A-2011
24
SATIP-A-004-03
3.5
SAIC-A-2013
25
SATIP-A-004-03
3.6
SAIC-A-2015
26
SATIP-A-004-03
3.8
SAIC-A-2017
Contractor Aramco
Inspection
Time
spection
Date
SAPID
GAYRE
ADEL BU
ALI
QMIS RFI
Log No
RFI Status
Closing
Date
Remarks
spection
Date
SAPID
QMIS RFI
Log No
RFI Status
Closing
Date
Remarks
Rev 3
COS 06/30
SATIP No.
SATIP-L-3
PROJECT TITLE:
ITEM
NO.
1.0
WBS/BI/JO/NO.
PROJECT PHASE
DOCUMENT REVIEW
TASK / ACTIVITY
QUALITY
PROCEDURE
QUALITY RECORD
SPECIAL PROCESS ITEMS REQUIRE THE BEST QUALITY PRACTICES, CPI & EFFICIENT METHODS
INSTALLATIONS, INCLUDING THOSE FOR NDE, COATINGS, ETC. SEE "NOTICE" IN GENERAL NOT
1.1
SAIC-L-2001
SAIC-L-2001
1.2
SAIC-L-2002
SAIC-L-2002
1.3
SAIC-L-2003
SAIC-L-2003
1.4
SAIC-L-2004
SAIC-L-2004
2.1
SAIC-L-2005
SAIC-L-2005
2.2
SAIC-L-2006
SAIC-L-2006
2.3
SAIC-L-2007
SAIC-L-2007
2.4
SAIC-L-2008
SAIC-L-2008
2.5
SAIC-L-2009
SAIC-L-2009
2.6
See remarks
See remarks
2.7
Spring supports
See remarks
See remarks
2.8
SAIC-L-2010
SAIC-L-2010
2.9
See remarks
See remarks
2.10
Relief Valves
See remarks
See remarks
3.1
SAIC-L-2011
SAIC-L-2011
3.2
See remarks
See remarks
3.3
SAIC-L-2012
SAIC-L-2012
3.4
See remarks
See remarks
2.0
3.0
MATERIAL RECEIVING
INSTALLATION
3.6
Branch connections
a) Integrally reinforced welding
outlets, i.e.: Weld-o-lets, weld boss
c) Reinforced stub-ins
Welding Application for On-Plot Piping
3.7
See remarks
See remarks
3.8
See remarks
See remarks
3.9
See remarks
See remarks
3.10
SAIC-L-2014
SAIC-L-2014
3.11
SAIC-L-2015
SAIC-L-2015
3.12
SAIC-L-2016
SAIC-L-2016
3.13
SAIC-L-2017
SAIC-L-2017
3.14
See remarks
See remarks
3.15
SAIC-L-2018
SAIC-L-2018
3.16
SAIC-L-2019
SAIC-L-2019
3.17
Cathodic Protection
See remarks
See remarks
3.18
SAIC-A-2010
SATR-A-2007
3.19
Pressure testing
See remarks
See remarks
3.20
See remarks
See remarks
3.21
Thermowell Installation
SAIC-L-2020
SAIC-L-2020
3.22
SAIC-L-2021
SAIC-L-2021
3.23
See remarks
See remarks
3.24
Coating Inspection
See remarks
See remarks
3.25
Insulation
See remarks
See remarks
3.26
See remarks
See remarks
4.1
Piping Re-instatement
SAIC-L-2022
SAIC-L-2022
4.2
SA-6133
SA-6133
4.3
Tightness/Leak Test
See remarks
See remarks
3.5
4.0
SAIC-L-2013
SAIC-L-2013
See remarks
See remarks
PRE-COMMISSIONING
GENERAL NOTES
NOTICE (SAEP-1160, Section 9.2): Use of Welding and NDT SAICS 9.2.1 One SAIC per day per activity is required for production welding on a daily or contin
Box on the appropriate SAIC. 9.2.2 Special welding activities such as branch connections, tie-ins, sleeve installation, hot-tap welding, and temperature tie-ins
subcontractors
must
complete
NDTofChecklists
on a daily
basis per
above
butrequire
not as 100
an IR%with
the exception
of the
start ofSite
NDT
activities.Personnel. After this
The first
three
incidents
each Inspection
or testing
activity
listed
participation
by Saudi
Aramco
Inspection
1
Contractors performance.
2
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed
3
organization representative is not present.
Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without th
4
representative in attendance.
5
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibili
Cable tray accessories include bulk mechanical fasteners, splice plates, end plates, drop-out plates, barrier plates, hinged joints, expansion joints, co
6
mechanical fasteners, anchors, threaded rods, fittings, and brackets required to provide full-load-rated supplemental supports. Fire barrier materials
LEGEND
H
Witness Inspection/Test
Surveillance
R
RH
I
COS 06/30/2008
SATIP No.
APPROVED DATE
SATIP-L-350-01
WBS/BI/JO/NO.
DISCIPLINE:
1-Jun-09
MECHANICAL
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR
REMARKS
SAUDI ARAMCO
CPI & EFFICIENT METHODS IN PROCEDURES. ENSURE INSPECTORS & PACKAGES HAVE ALL CHECKLISTS APPLICABLE FOR
"NOTICE" IN GENERAL NOTES.
RH
RH
RH
RH
RH
RH
W
Refer to other applicable SATIP-L-350 series
Refer to other applicable SATIP-L-350 series
W
Refer to SATIP-L-350-08
S
Refer to the SATIP for the applicable NDE method (NDE-UT-01, NDERT-01, NDE-LPT-01 or NDE-MPT-01)
Use SATR-A-2008
Refer to SATIP-L-008-01
H
Refer to SATIP
H
Refer to SATIP-A-004-01 and SATIP-004-02
Refer to SAES-J-600-01
Refer to SATIP-H-002-06 or SATIP-H-100-01
Refer to SATIP-N-001-01 or SATIP-N-001-02
Use SATR-A-2011
H
H*
Refer to SATIP-A-004-05
* Witness by Operations/Commissioning Group
ENERAL NOTES
on welding on a daily or continual basis, e.g., fit-up, in-process, and final inspection. Applicable weld numbers must be entered in the Remarks
lding, and temperature tie-ins will require a separate IR per weld per activity in accordance with the applicable SATIP. 9.2.3 NDT
activities.Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the
spection
Review of Documents
Review and Approval of Documents
100% Contractor Inspection
Rev 3
COS 06/30/2008
SATIP No.
SATIP-L-410-
PROJECT TITLE:
ITEM
NO.
1.0
WBS/BI/JO/NO.
PROJECT PHASE
TASK / ACTIVITY
QUALITY
PROCEDURE
QUALITY
RECORD
SAIC-L-2083
SAIC-L-2083
SAIC-L-2084
SAIC-L-2084
INSPECT
A
DOCUMENT REVIEW
None
2.0
MATERIAL RECEIVING
Material verification & Visual inspection of Piping,
fittings, insulating set/spool & Valves
Material Storage and Preservation
2.1
2.2
3.0
INSTALLATION
3.1
See remarks
See remarks
3.2
Welding Inspection
See remarks
See remarks
3.3
SAIC-L-2015
SAIC-L-2015
3.4
SAIC-L-2014
SAIC-L-2014
3.5
SAIC-L-2085
SAIC-L-2085
3.6
Valve Installation
See remarks
See remarks
3.7
SAIC-L-2086
SAIC-L-2086
3.8
See remarks
See remarks
3.9
Concrete placement
See remarks
See remarks
3.10
SAIC-L-2087
SAIC-L-2087
3.11
Pressure testing
See remarks
See remarks
3.12
SAIC-L-2088
SAIC-L-2088
3.13
Coating
See remarks
See remarks
4.1
Piping Re-instatement
SAIC-L-2089
SAIC-L-2089
4.2
SA-6133
SA-6133
4.3
Tightness test
See Remarks
See Remarks
4.0
1
2
3
4
5
PRE-COMMISSIONING
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this
Contractors performance.
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed
organization representative is not present.
Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without th
representative in attendance.
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibili
LEGEND
H
Witness Inspection/Test
Surveillance
R
RH
I
COS 06/30/2008
SATIP No.
APPROVED DATE
SATIP-L-410-01
DISCIPLINE:
1-Jun-09
WBS/BI/JO/NO.
MECHANICAL
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR
SAUDI ARAMCO
REMARKS
Refer to SATIP-L-350-08
Refer
to SATIP-W-011-01
1)
S. Aramco
to witness thread engagements of the first three threaded
joints prior to seal welding, then random inspection thereafter.
2) S. Aramco to witness the first three insertion and preparation of socket
joints
prior to welding,
then
random
inspection
thereafter..
Use SATR-L-2001
- See
Note
1 (General
Notes)
Refer to SATIP-L-108-01
W
Use SATR-L-2002
Refer to SATIP-J-003-01
Refer to SATIP-Q-001-02
Refer to SATIP-A-004-03
Use SATR-A-2011
H
Refer to SATIP-A-004-05
NERAL NOTES
nspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the
LEGEND
R
RH
I
Review of Documents
Review and Approval of Documents
100% Contractor Inspection
Rev 3
COS 06/30/2008
SATIP No.
SATIP-A-004
PROJECT TITLE:
ITEM
NO.
1.0
WBS/BI/JO/NO.
TASK / ACTIVITY
DOCUMENT REVIEW
QUALITY
PROCEDURE
QUALITY
RECORD
1.1
SAIC-A-2001
SAIC-A-2001
1.2
SAIC-A-2003
SAIC-A-2003
1.3
Re-Instatement Procedure
SAIC-A-2006
SAIC-A-2006
1.4
Lay-Up Procedure
SAIC-A-2007
SAIC-A-2007
1.5
SAIC-L-2001
SAIC-L-2001
SAIC-A-2008
SAIC-A-2008
3.1
SAIC-L-2139
SAIC-L-2139
3.2
SAIC-L-2017
2.0
MAT'L RECV
2.1
3.0
APPLICATION
SAIC-L-2017
3.3
SAIC-A-2009
3.4
SAIC-A-2011
SAIC-A-2011
SAIC-A-2013
SAIC-A-2013
SAIC-A-2015
SAIC-A-2015
3.5
3.6
3.7
3.8
4.0
4.1
SAIC-A-2016
SAIC-A-2017
SAIC-A-2009
SAIC-A-2016
SAIC-A-2017
PIPELINES ONLY
Water Removal from Valve Cavities, Corrosion
Control after Testing
(In-line Tested Valves)
SAIC-L-2041
SAIC-L-2041
4.2
Lay-Up Inspection
SAIC-A-2018
SAIC-A-2018
4.3
SAIC-A-2006
SAIC-A-2006
GENERAL NOTES
1
2
3
4
5
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this
Contractors performance.
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed
representative is not present.
Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without th
in attendance.
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibili
LEGEND
H
Witness Inspection/Test
Surveillance
Review of Documents
RH
COS 06/30/2008
SATIP No.
APPROVED DATE
SATIP-A-004-03
WBS/BI/JO/NO.
DISCIPLINE:
1-Jun-09
MECHANICAL
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR
SAUDI ARAMCO
REMARKS
RES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS
NERAL NOTES
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
Use SATR-A-2001
Follow Detailed Reinstatement Procedure & Close out Plan for Quality.
Perform Punchlisting toward Final MCC in a manner agreed upon with
SA.
nspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the
LEGEND
Review of Documents
Review and Approval of Documents
100% Contractor Inspection
Rev 3
COS 06/30/2008
SATIP No.
SATIP-L-4
PROJECT TITLE:
ITEM
NO.
1.0
WBS/BI/JO/NO.
PROJECT PHASE
TASK / ACTIVITY
CHECKLIST
and/or
TEST RECORD
QUALITY
RECORD
DOCUMENT REVIEW
1.1
1.2
Welder Qualification/Certification
1.3
1.4
SAIC-L-2004
SAIC-L-2004
1.5
SAIC-L-2109
SAIC-L-2109
1.6
SAIC-L-2002
SAIC-L-2002
1.7
SAIC-L-2110
SAIC-L-2110
1.8
See Remarks
See Remarks
1.9
See Remarks
See Remarks
2.1
SAIC-L-2112
SAIC-L-2112
2.2
Valves
SAIC-L-2113
SAIC-L-2113
2.0
3.0
MATERIAL RECEIVING
INSTALLATION
3.1
Shop Fabrication
3.2
3.3
3.4
3.5
3.6
Field Bending
SAIC-L-2114
SAIC-L-2114
3.7
SAIC-L-2115
SAIC-L-2115
3.8
SAIC-L-2116
SAIC-L-2116
3.9
Concrete Placement
3.10
Pile Driving
3.11
Culvert Crossing
SAIC-L-2118
SAIC-L-2118
3.12
Camel/Road Crossing
SAIC-L-2119
SAIC-L-2119
3.13
Thrust Boring
SAIC-L-2120
SAIC-L-2120
3.14
SAIC-L-2121
SAIC-L-2121
3.15
3.16
3.17
SAIC-L-2122
SAIC-L-2122
3.18
SAIC-L-2123
SAIC-L-2123
3.19
3.20
3.21
3.22
3.23
Pre-Test Punchlisting-PIPELINES
SAIC-L-2139
3.24
SAIC-L-2017
3.25
Pressure Testing
a) Strength test
b) Tightness test
3.26
Lay-up
3.27
Cathodic Protection
3.28
SAIC-L-2139
SAIC-L-2017
SATR-A-2009
SATR-A-2009
SAIC-L-2014
SAIC-L-2014
3.29
Pipeline Markers
SAIC-L-2125
SAIC-L-2125
3.30
SAIC-L-2127
SAIC-L-2127
4.1
Caliper/Internal Gauging
SAIC-L-2128
SAIC-L-2128
4.2
SAIC-L-2129
SAIC-L-2129
4.3
SATR-A-6133
SATR-A-6133
4.4
Tightness Testing
4.0
PRE-COMMISSIONING
GENERAL NOTES
1
2
3
4
5
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this
Contractors performance.
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed
Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without th
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibili
LEGEND
Witness Inspection/Test
Surveillance
R
RH
I
COS 06/30/2008
SATIP No.
APPROVED DATE
SATIP-L-450-03
WBS/BI/JO/NO.
DISCIPLINE:
MECHANICAL
1-Jun-09
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR
REMARKS
SAUDI ARAMCO
Refer to SATIP-W-012-01
Refer to SATIP-W-012-01
Refer to SATIP-A-004-03
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
Approval by SAPMT. Interface with Plants shall utilize tie-in point using
Plant Survey & Benchmarks
For Review & Approval by SAPMT per
SAES-L450, Para. 8.1
Refer to SATIP-L-350-08
Refer to SATIP-L-450-01
W
S
Refer to SATIP-W-012-01 & NDE SATIPs as they are referenced
Refer to the SATIP for the applicable NDE Method
S
Refer to SATIP-Q-001-02
Refer to Civil SATIP (to be determined)
Refer to SATIP-J-700-01
Refer to SATIP-L-420-01
Refer to applicable SATIP-H series
Refer to applicable SATIP-H series
H
Use SATR-A-2007
Use SATR-A-2008
Refer to SATIP-A-004-03
Use SATR-L-2009
Use SATR-A-2011
NERAL NOTES
nspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the
hall not be carried out without the QA/QC organization representative in attendance.
LEGEND
R
RH
I
Review of Documents
Review and Approval of Documents
100% Contractor Inspection
Rev 3
COS 06/30/200
SATIP No.
SATIP-L-450
PROJECT TITLE:
ITEM
NO.
1.0
WBS/BI/JO/NO.
PROJECT PHASE
TASK / ACTIVITY
QUALITY
PROCEDURE
QUALITY
RECORD
DOCUMENT REVIEW
1.1
1.2
Welder Qualification/Certification
1.3
1.4
SAIC-L-2004
1.5
SAIC-L-2109
1.6
SAIC-L-2002
1.7
SAIC-L-2110
1.8
See Remarks
1.9
See Remarks
SAIC-L-2112
SAIC-L-2112
SAIC-L-2132
SAIC-L-2132
2.0
MATERIAL RECEIVING
2.1
2.2
3.0
Valves
INSTALLATION
3.1
Shop Fabrication
3.2
3.3
Trenching
a) Sandy areas
b) Rocky Areas
c) Subkha areas
3.4
3.5
Welding
3.6
3.7
Field Bending
SAIC-L-2114
SAIC-L-2114
3.8
SAIC-L-2115
SAIC-L-2115
3.9
3.10
Concrete Placement
3.11
Pile Driving
SAIC-L-2130
SAIC-L-2130
3.12
Road Crossing
3.13
Thrust Boring
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
3.23
3.24
Pre-Test Punchlisting-PIPELINES
SAIC-L-2139
3.25
SAIC-L-2017
3.26
Pressure Testing
a) Strenght test
b) Tightness test
3.27
Lay-up
3.28
Cathodic Protection
3.29
SAIC-L-2120
SAIC-L-2131
SAIC-L-2122
SAIC-L-2123
SAIC-L-2120
SAIC-L-2131
SAIC-L-2122
SAIC-L-2123
SAIC-L-2139
SAIC-L-2017
SATR-A-2009
SATR-A-2009
SAIC-L-2014
SAIC-L-2014
3.30
Pipeline Markers
SAIC-L-2125
SAIC-L-2125
3.31
SAIC-L-2127
SAIC-L-2127
4.1
Caliper/Internal Gauging
SAIC-L-2128
SAIC-L-2128
4.2
SAIC-L-2133
SAIC-L-2133
4.3
4.4
Leak testing
4.0
1
2
3
4
5
PRE-COMMISSIONING
SA Form-6133
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this
Contractors performance.
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed
organization representative is not present.
Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without th
representative in attendance.
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibili
LEGEND
H
Witness Inspection/Test
Surveillance
RH
I
COS 06/30/2008
SATIP No.
APPROVED DATE
SATIP-L-450-04
WBS/BI/JO/NO.
DISCIPLINE:
1-Jun-09
MECHANICAL
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR
REMARKS
SAUDI ARAMCO
Refer to SATIP-W-012-01
Refer to SATIP-W-012-01
Refer to SATIP-A-004-03
Refer to SATIP-L-350-08
Refer to SATIP-L-450-01
Refer to SATIP-L-450-02
S
Refer to SATIP-W-012-01
Refer to the SATIP for the applicable NDE Method
W
Refer to SATIP-Q-001-02
Refer to Civil SATIP (to be determined)
Refer to SATIP-Q-006-02
W
W
Refer to SATIPs P-107-01 & T-911-01
Refer to SATIP-L-450-02
Refer to SATIP-J-600-01
W
Refer to SATIP-J-700-01
Refer to SATIP-L-420-01
Refer to SATIP-H-002-09
Refer to applicable SATIP-H series
Use SATR-A-2007
Use SATR-A-2008
Refer to SATIP-A-004-04
W
Refer to applicable SATIP-X series
Use SATR-L-2001 - See Note 1 of General Notes, plus minimum of 10%
for SA witness
Use SATR-L-2009
Use SATR-A-2011
H
Refer to SATIP-A-004-05
ENERAL NOTES
nspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the
LEGEND
R
Review of Documents
RH
I
Rev 3
COS 06/30/2008
SATIP No.
Welding of Pipelines
SATIP-W-012
PROJECT TITLE:
ITEM
NO.
1.0
WBS/BI/JO/NO.
PROJECT PHASE
DOCUMENT REVIEW
QUALITY
PROCEDURE
TASK / ACTIVITY
QUALITY
RECORD
SPECIAL PROCESS (WELDING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS
1.1
1.2
1.3
SAIC-W-2040
SAIC-W-2040
1.4
SAIC-W-2008
SAIC-W-2008
1.5
SAIC-W-2042
SAIC-W-2042
1.6
SAIC-W-2012
SAIC-W-2012
1.7
SAIC-L-2004
SAIC-L-2004
1.8
See Remarks
See Remarks
1.9
SAIC-W-2055
SAIC-W-2055
2.1
SAIC-W-2044
SAIC-W-2044
2.2
SAIC-W-2045
SAIC-W-2045
2.3
SAIC-L-2010
SAIC-L-2010
3.1
(If
See Remarks
See Remarks
3.2
(If
See Remarks
See Remarks
2.0
3.0
SAIC-W-2038
SAIC-W-2039
SAIC-W-2038
SAIC-W-2039
MATERIAL RECEIVING
INSTALLATION
3.3
See Remarks
See Remarks
3.4
SAIC-W-2046
SAIC-W-2046
3.5
SAIC-W-2047
SAIC-W-2047
3.6
SAIC-W-2057
SAIC-W-2057
3.7
SAIC-W-2048
SAIC-W-2048
3.8
SAIC-W-2048
SAIC-W-2048
3.9
SAIC-W-2048
SAIC-W-2048
3.10
SAIC-W-2054
SAIC-W-2054
3.11
See Remarks
See Remarks
3.12
SAIC-W-2051
SAIC-W-2051
3.13
SAIC-W-2052
SAIC-W-2052
3.14
SAIC-W-2014
SAIC-W-2014
3.15
SAIC-L-2010
SAIC-L-2010
3.16
SAIC-W-2056
SAIC-W-2056
3.17
SAIC-W-2008
SAIC-W-2008
3.18
SAIC-W-2036
SAIC-W-2036
4.0
PRE-COMMISSIONING
*NOTE: SAUDI ARAMCO CONSIDERS PRESSURE TESTING PART OF CONSTRUCTION, NOT A PRE
GENERAL NOTES
NOTICE (SAEP-1160, Section 9.2): Use of Welding and NDT SAICS 9.2.1 One SAIC per day per activity is required for production welding on a daily or contin
Remarks Box on the appropriate SAIC. 9.2.2 Special welding activities such as branch connections, tie-ins, sleeve installation, hot-tap welding, and temperatu
subcontractors
must
complete
NDTofChecklists
on a daily
basis per
above
butrequire
not as 100
an IR%with
the exception
of the
start ofSite
NDT
activities.Personnel.
Inform Company
Ins
The first
three
incidents
each Inspection
or testing
activity
listed
participation
by Saudi
Aramco
Inspection
After this
1
Contractors performance.
2
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed
3
organization representative is not present.
Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without th
4
representative in attendance.
5
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibili
LEGEND
H
Witness Inspection/Test
Surveillance
R
RH
I
COS 06/30/2008
SATIP No.
APPROVED DATE
SATIP-W-012-01
WBS/BI/JO/NO.
DISCIPLINE:
1-Jun-09
MECHANICAL
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR
REMARKS
SAUDI ARAMCO
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
Use SATR-W-2003
Process Control (Procedural Element)
action required for SAIC-W-2039 Att. 2
Welding
QA/QC Mgr
RH
Use SATR-W-2011
witness by SA at each calibration cycle.
Random
Saudi
W/H
W/H
See
NOTICE
S/W
See
NOTICE
Use SATR-W-2007
S. Aramco's responsibilities varies as follows:
a) "S" - Surveillance activity for SA, except welding of stainless steel and
piping in low temp service.
b) "W" - SA inspects & verifies Heat Input at random or routine basis for
low temp service & SS welding.
SEE NOTICE
Use SATR-W-2007
SA
Participates in the selection Process as detailed in NDE Process Control
Procedure.
*Refer to the respective NDE SATIP (SATIP-NDE-UT-01, LPT-01, MPT01, RT-01, etc):
*Per NDE Special Process Control Procedure
W&R
W&R
Use SATR-W-2012
of the General Notes
W&R
Refer to Note
Refer to Note 1
Refer to
Use SAIC-W-2008
Field Eng.
Change Control, Welding Process Control (Repairs) Procedures &
SAEP-1160 reqmts apply
NERAL NOTES
tion welding on a daily or continual basis, e.g., fit-up, in-process, and final inspection. Applicable weld numbers must be entered in the
hot-tap welding, and temperature tie-ins will require a separate IR per weld per activity in accordance with the applicable SATIP. 9.2.3 NDT
Tnspection
activities.Personnel.
Inform Company
Inspection
prior toAramco
the start
of work inmay
anyadjust
new areas.
After this
period, Saudi
Inspection
the levels of Saudi Aramco participation based upon the
LEGEND
R
RH
I
Review of Documents
Review and Approval of Documents
100% Contractor Inspection
Rev 3
COS 06/30
SATIP No.
SATIP-W-0
PROJECT TITLE:
ITEM
NO.
1.0
WBS/BI/JO/NO.
PROJECT PHASE
DOCUMENT REVIEW
QUALITY
PROCEDURE
TASK / ACTIVITY
QUALITY RECORD
SPECIAL PROCESS (WELDING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS
1.1
1.2
1.3
SAIC-W-2002
SAIC-W-2002
1.4
SAIC-W-2008
SAIC-W-2008
1.5
SAIC-W-2003
SAIC-W-2003
1.6
SAIC-W-2012
SAIC-W-2012
1.7
1.8
SAIC-L-2004
SAIC-L-2004
1.9
See Remarks
See Remarks
1.10
SAIC-W-2009
SAIC-W-2009
1.11
See Remarks
See Remarks
1.12
See Remarks
See Remarks
1.13
See Remarks
See Remarks
2.0
MATERIAL RECEIVING
SAIC-W-2001
B) NDE
C) NDE
D)
SAIC-W-2035
SAIC-W-2037
SAIC-W-2001
SAIC-W-2035
SAIC-W-2037
2.1
SAIC-W-2010
SAIC-W-2010
2.2
SAIC-W-2011
SAIC-W-2011
2.3
SAIC-L-2010
SAIC-L-2010
3.1
See Remarks
See Remarks
3.2
See Remarks
See Remarks
3.3
See Remarks
See Remarks
3.4
SAIC-W-2032
SAIC-W-2032
3.5
SAIC-W-2033
SAIC-W-2033
3.6
SAIC-W-2005
SAIC-W-2005
3.7
SAIC-W-2006
SAIC-W-2006
3.8
SAIC-W-2037
SAIC-W-2037
3.9
SAIC-W-2007
SAIC-W-2007
3.10
SAIC-W-2013
SAIC-W-2013
3.11
SAIC-W-2015
SAIC-W-2015
See Remarks
See Remarks
SAIC-W-2016
SAIC-W-2016
SAIC-W-2004
SAIC-W-2004
3.0
3.12
3.13
3.14
INSTALLATION
3.15
SAIC-W-2014
SAIC-W-2014
3.16
SAIC-L-2010
SAIC-L-2010
3.17
4.0
PRE-COMMISSIONING
SAIC-W-2036
*NOTE: SAUDI ARAMCO CONSIDERS PRESSURE TESTING PART OF CONSTRUCTION, NOT A PRE
Final Welding Insp & Documentation (Database
Report, Welding Summary/ Record & Weld Map) per
SAEP-1160
4.1
SAIC-W-2036
SAIC-W-2008
SAIC-W-2008
GENERAL NOTES
NOTICE (SAEP-1160, Section 9.2): Use of Welding and NDT SAICS 9.2.1 One SAIC per day per activity is required for production welding on a daily or conti
Remarks Box on the appropriate SAIC. 9.2.2 Special welding activities such as branch connections, tie-ins, sleeve installation, hot-tap welding, and temperatu
subcontractors
must
complete
NDTofChecklists
on a daily
basis per
above
butrequire
not as 100
an IR%with
the exception
of the
start ofSite
NDT
activities.Personnel.
START OF After
NEWthis
W
The first
three
incidents
each Inspection
or testing
activity
listed
participation
by Saudi
Aramco
Inspection
1
Contractors performance.
2
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed
3
organization representative is not present.
Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without th
4
representative in attendance.
5
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibili
LEGEND
H
Witness Inspection/Test
Surveillance
R
RH
I
COS 06/30/2008
SATIP No.
APPROVED DATE
SATIP-W-011-01
WBS/BI/JO/NO.
DISCIPLINE:
1-Jun-09
MECHANICAL
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR
REMARKS
SAUDI ARAMCO
RH
RH
RH
RH
Includes: Cracks and other weld defects, weld mis- alignments, line realignments due to fab errors, etc
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
SA
RH
Refer to SATIP No: W-015-01 & applicable SATIP-W series (as required)
*Rarely applies to Plant Piping
Refer to SATIP No: W-016-01 *Applies to welds of certain P-No 8
Austenitic SS, P-No 10H or Duplex SS, & P-No 40 & above nickel based
alloys in high temp or severe corrosion service (Review scope)
W/H
W/H
See remarks
& See
NOTICE
S/W
See
Remarks &
NOTICE
Use SATR-W-2007
General Notes below.
W / RH*
W / R*
W&R
See Notice in
SA
*See
W&R
Use SATR-W-2012
Note 1 of the General Notes
W&R
Refer to
Use SAIC-W-2008
Field Eng.
Change Control, Welding Process Control (Repairs) Procedures &
SAEP-1160 reqmts apply
ENERAL NOTES
tion welding on a daily or continual basis, e.g., fit-up, in-process, and final inspection. Applicable weld numbers must be entered in the
hot-tap welding, and temperature tie-ins will require a separate IR per weld per activity in accordance with the applicable SATIP. 9.2.3 NDT
activities.Personnel.
START OF After
NEWthis
WELDING
ACTIVITIES
NEW AREAS
NOTIFICATION.
nspection
period, Saudi
AramcoINInspection
may REQUIRES
adjust the levels
of Saudi Aramco participation based upon the
LEGEND
R
RH
I
Review of Documents
Review and Approval of Documents
100% Contractor Inspection