REPLACE INEFFICIENT LUMINAIRES WITH


ENERGY EFFICIENT LED @ ZUHOOR COURT
& YASMEEN COURT

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

DHAHRAN

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

UTILITIES AND TECHNICAL SUPPORT DEPARTMENT


TECHNICAL SUPPORT DIVISION
MAINTENANCE ENGINEERING SUPPORT UNIT
ENGINEERING SERVICES GROUP
TELEPHONE NO. 878-7519/876-3271

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

1
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

PART I

GENERAL REQUIREMENTS

PART II

SCOPE OF WORK

REV
NO.

DATE

JO/EWO

DESCRIPTION

This Project shall be carried out in accordance with all relevant Sections of the General
Requirements, Scope of Work, Drawings, Standards, Specifications and any other
documents referred to therein:

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

2
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS
ENGG CERT

SAUDI ARABIAN OIL COMPANY

PART I: GENERAL REQUIREMENTS


(GSOC- LUMP SUM)

JO/EWO

This Project shall be carried out in accordance with and subject to the
Terms and Conditions of the General Service Order Contract

DATE

TABLE OF CONTENTS

GENERAL

DISCIPLINE
ENGINEER

2.0

BID SUBMISSION

BOS
8-31-14

3.0

MATERIALS

4.0

CODES and STANDARDS

REV
NO.

1.0

DATE:
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

3
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS
DESCRIPTION

ENGG CERT

SAUDI ARABIAN OIL COMPANY

GENERAL
1.1

All WORK shall be performed in good workmanship and safely manner in


accordance with SAUDI ARAMCO Construction Safety Manual and in relevant
General Instructions and SAUDI ARAMCO Standards.

1.2

All WORK shall be executed in strict accordance with the Scope of Work and all
relevant Drawing(s).

1.3

All WORK shown on the Drawing(s) and not included in the Scope of Work shall
be deemed to be included in the WORK.

1.4

All WORK included in the Scope of Work and not shown on the Drawing(s) shall
be included in the WORK.

1.5

Any conflict between the Scope of Work and the Drawing(s) shall be referred
immediately to the SAUDI ARAMCO Project Engineer.

1.6

CONTRACTOR is held responsible to complete the project conforming in all


respects to the details and requirements of this Scope of Work as shown in the
Drawings and all applicable Saudi ARAMCO Codes and Standards.

JO/EWO

DESCRIPTION

ENGG CERT

1.0

DATE

2.0

BID SUBMISSION

REV
NO.

2.1
DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

3.0

GCA
9-1-14

MATERIALS
3.1

All materials supplied by the CONTRACTOR shall be supplied from a source


approved by Saudi ARAMCO and meet all relevant Saudi ARAMCO Standards
and Specifications.

3.2

CONTRACTOR shall submit, prior to procurement, samples of proposed


materials to be used; materials shall be submitted together with the
manufacturer's technical data and installation manual, for the study and approval
of the Saudi ARAMCO Project Engineer.

3.3

CONTRACTOR shall supply all temporary and expendable materials required to


perform the work.

3.4

Materials will be taken to site only as required and will not be stockpiled at the
site.

3.5

CONTRACTOR shall plan availability of all materials in advance. CONTRACTOR


shall be responsible for any delays caused due to lack of availability of
CONTRACTOR supplied materials in accordance with the General Service
Contract.

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

CONTRACTOR shall submit a Lump Sum Bid to supply all labor, permanent,
temporary and expendable materials and equipment including spare parts
required for the completion of the works as shown on the Bid Drawings and /or
described in the Scope of Work.

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

4
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

ENGG CERT

4.0

CODES AND STANDARDS


4.1

CONTRACTOR shall do all WORKS in accordance to applicable Sections of all


latest editions (or editions as stated in the Saudi ARAMCO Engineering
Standard) of the following Codes and Standards:-

DESCRIPTION

STANDARDS: SAUDI ARABIAN


MOC

MINISTRY OF COMMUNICATION

SASO

SAUDI ARABIAN STANDARDS ASSOCIATION

SSD

SAUDI SECURITY DIRECTIVES

REV
NO.

DATE

JO/EWO

STANDARDS: SAUDI ARAMCO

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

GI

SAUDI ARAMCO GENERAL INSTRUCTION

OIM

OPERATIONS INSTRUCTION MANUAL

RTFS

RAS TANURA REFINERY STANDARDS

SACSM

SAUDI ARAMCO CONSTRUCTION SAFETY


MANUAL

SAES

SAUDI ARAMCO ENGINEERING STANDARDS

SAEP

SAUDI
ARAMCO
PROCEDURES

SAMSS

SAUDI
ARAMCO
SPECIFICATIONS

SASC

SAUDI ARAMCO SANITARY CODE

SASD

SAUDI ARAMCO STANDARD DRAWINGS

ESS
8-26-14
DATE:

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

(DCC) NO. _____________________

CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

EDSD
VERIFICATION

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

SMM
8-26-14

7-Sep-14

MATERIALS

SYSTEM

CODES OF PRACTICE

OPERATIONS

DATE:

ENGINEERING

IBC

INTERNATIONAL BUILDING CODE.

IFC

INTERNATIONAL FIRE CODE.

UMC

UNIFORM MECHANICAL CODE.

UPC

UNIFORM PLUMBING CODE.

NESC

NATIONAL ELECTRICAL SAFETY CODE.

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

5
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

AA

ALUMINUM ASSOCIATION

AABC

ASSOCIATED AIR BALANCE COUNCIL

AAMA

ARCHITECTURAL
ALUMINUM
MANUFACTURERS ASSOCIATION

AASHTO

AMERICAN
HIGHWAY
OFFICIALS

AATCC

AMERICAN
COUNCIL

ACI

AMERICAN CONCRETE INSTITUTE

ACRI

AIR-CONDITIONING
INSTITUTE

ADA

AMERICAN DISABILITY ACT

ADC

AIR DIFFUSION COUNCIL

AEIC

ASSOCIATION OF EDISON ILLUMINATION


COMPANIES

AHA

AMERICAN HARDBOARD ASSOCIATION

AI

ASPHALT INSTITUTE

AISC

AMERICAN
INSTITUTE
CONSTRUCTION

AISI

AMERICAN IRON AND STEEL INSTITUTE

ALSC

AMERICAN
ASSOCIATION

AMCA

AIR MOVEMENT CONTROL ASSOCIATION

ANSI

AMERICAN
INSTITUTE

APA

AMERICAN PLYWOOD ASSOCIATION

API

AMERICAN PETROLEUM INSTITUTE

ARI

AIR-CONDITIONING
INSTITUTE

REV
NO.

DATE

JO/EWO

DESCRIPTION

ENGG CERT

STANDARDS: INDUSTRIALS

DISCIPLINE
ENGINEER

BOS
8-31-14

DATE:
PROJECT
ENGINEER

DATE:

GCA
9-1-14

ASSOCIATION
OF
STATE
AND
TRANSPORTATION
ASSOCIATION

AND

TEST

CARPET

REFRIGERATION

OF

STEEL

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

BY:

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

SMM
8-26-14
DATE:

SCOPE OF WORK

LUMBER

NATIONAL

REFRIGERATION

DRAWING NO.

.DOC
M15

TOWN SITE DEVELOPMENT


2:54 PM

AND

STANDARDS

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

DHAHRAN

STANDARDS

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

6
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

AMERICAN
ASSOCIATION

DISCIPLINE
ENGINEER

ASME

AMERICAN SOCIETY
ENGINEERS

ASHRAE

AMERICAN
SOCIETY
OF
HEATING
REFRIGERATION AND AIR CONDITIONING
ENGINEERS

ASTM

AMERICAN SOCIETY FOR TESTING AND


MATERIALS

AWI

AMERICAN WOOD INSTITUTE

AWPA

AMERICAN
WOOD
ASSOCIATION

AWS

AMERICAN WELDING SOCIETY

AWWA

AMERICAN WATER WORKS ASSOCIATION

BHMA

BUILDERS HARDWARE
ASSOCIATION

CISCA

CEILINGS
AND
INTERIOR
CONTRACTORS ASSOCIATION

CLFMI

CHAIN LINK
INSTITUTE

CRSI

CONCRETE
INSTITUTE

DHI

DOOR HARDWARE INSTITUTE

EIA

ELECTRICAL INDUSTRIES INSTITUTE

EIMA

EXTERIOR INSULATION MANUFACTURERS


ASSOCIATION

FM

FM GLOBAL

FGMA

FLAT GLASS MARKETING ASSOCIATION

FS

FEDERAL SPECIFICATION

GA

GYPSUM ASSOCIATION

ICC

INTERNATIONAL CODE COUNCIL

BOS
8-31-14

DATE:
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

SOFTWOOD

LUMBER

OF

MECHANICAL

PRESERVATIVES

FENCE

MANUFACTURERS
SYSTEMS

MANUFACTURERS

REINFORCING

STANDARDS

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

7
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

ASLA

REV
NO.

DATE

JO/EWO

DESCRIPTION

ENGG CERT

SAUDI ARABIAN OIL COMPANY

INSULATED
ASSOCIATION

CABLE

ENGINEERS

IEEE

INSTITUTE
OF
ELECTRICAL
ELECTRONICS ENGINEERS

IEC

INTERNATIONAL
COMMISSION

IES

ILLUMINATING ENGINEERING SOCIETY

IMIAC

INTERNATIONAL MASONRY INDUSTRY ALLWEATHER COUNCIL

ISA

INSTRUMENT SOCIETY OF AMERICA

LSGA

LAMINATORS SAFETY GLASS ASSOCIATION

MFMA

METAL
FRAMING
ASSOCIATION

NCCA

NATIONAL COIL COATERS ASSOCIATION

NEBB

NATIONAL
BUREAU

NEC

NATIONAL ELECTRICAL CODE

NECA

NATIONAL
ELECTRICAL
ASSOCIATION

NEMA

NATIONAL ELECTRIC
ASSOCIATION

NETA

INTERNATIONAL
ASSOCIATION

NFPA

NATIONAL FIRE PROTECTION ASSOCIATION

NRCA

NATIONAL
ROOFING
ASSOCIATION

NTMA

NATIONAL TILE AND MARBLE ASSOCIATION

OSHA

OCCUPATIONAL
AGENCY

PDI

PLUMBING AND DRAINAGE INSTITUTE

PEI

PORCELAIN ENAMEL INSTITUTE

RCSC

RESEARCH COUNCIL
CONNECTIONS

AND

ELECTROTECHNICAL

MANUFACTURERS

ENVIRONMENTAL

BALANCING

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

ELECTRICAL

TESTING

CONTRACTORS

SAFETY

ON

AND

HEALTH

STRUCTURAL

DRAWING NO.

.DOC
M15

TOWN SITE DEVELOPMENT


2:54 PM

MANUFACTURERS

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

DHAHRAN

CONTRACTORS

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

8
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

ICEA

REV
NO.

DATE

JO/EWO

DESCRIPTION

ENGG CERT

SAUDI ARABIAN OIL COMPANY

STEEL DECK INSTITUTE

SIGMA

SEALED
INSULATED
MANUFACTURERS ASSOCIATION

SMACNA

SHEET METAL AND AIR CONDITIONING


CONTRACTORS NATIONAL ASSOCIATION

SSPC

STEEL STRUCTURES PAINTING INSTITUTE

TCA

TILE COUNCIL OF AMERICA

UL

UNDERWRITERS LABORATORY

WWPA

WESTERN WOOD PRODUCTS ASSOCIATION

GLASS

In an event of conflict or inconsistencies between those specified Codes and


Standards, Saudi ARAMCO Codes and Standards will take precedence or will
prevail.

DATE

JO/EWO

4.2

SDI

REV
NO.

- END OF GENERAL REQUIREMENTS DISCIPLINE


ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

9
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS
DESCRIPTION

ENGG CERT

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

PART II: SCOPE OF WORK

REV
NO.

DATE

JO/EWO

TABLE OF CONTENTS

DISCIPLINE
ENGINEER

BOS
8-31-14

DATE:
PROJECT
ENGINEER

DATE:

1.0

INTRODUCTION

2.0

PROJECT SUMMARY

3.0

SPECIFIC REQUIREMENTS

4.0

WORK DESCRIPTION

5.0

DRAWINGS

6.0

TECHNICAL REQUIREMENTS

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

10
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS
ENGG CERT

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

1.0

1.1

This Scope of Work must be read in conjunction with the drawings as listed in
Section 5.1.1 of this Scope of Work.

1.2

It is the intent of this Scope of Work to generally describe only the major
components of the work. It shall not be construed to be an itemized listing of
each element of the WORK or procedure for the construction of the entire
project. All works shown on the drawings listed in Paragraph 5.0 shall be
performed though not specifically described herein.

1.3

Unless otherwise stated all materials to be used in this project shall be as


described in Section 6.0 Technical Requirements of this Scope of Work and
subject to approval by the Saudi ARAMCO Project Engineer and UD/TSD
Engineer/Designer.

PROJECT SUMMARY
2.1

This Scope of Work describes the proposed modification & improvement of lights
in Zuhoor Court & Yasmeen Court.

2.2

The WORK shall include but not limited to the following


2.2.1

Removal of existing and construction of new reinforce concrete


pedestal/foundation for lighting posts.

2.2.2

Provision of new pole post and LED pole lighting luminaires.

REV
NO.

DATE

JO/EWO

2.0

INTRODUCTION

DISCIPLINE
ENGINEER

BOS
8-31-14

3.0

DATE:
PROJECT
ENGINEER

DATE:

SPECIFIC REQUIREMENTS
3.1

GCA
9-1-14

CERTIFIED

NAA
DATE:

The facility will be in operation throughout the duration of the WORK; thus,
WORK will be done with minimal interruptions, which will be agreed by the Saudi
ARAMCO Project Engineer and CONTRACTOR during the project kick-off
meeting.

9-7-14

CONSTRUCTION
AGENCY

3.1.1

Saudi ARAMCO Project Engineer shall coordinate with the Proponent


to establish sequence of the WORK, schedule of WORK and/or working
time.

3.1.2

CONTRACTOR shall meet with the Saudi ARAMCO Project Engineer


to establish an overall schedule for construction and to facilitate the
required arrangements with least amount of disruption to the Proponent.

ESS
8-26-14
DATE:
OPERATIONS

CONTROL NUMBER

SMM
8-26-14

7-Sep-14

DATE:

14U187-187

(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

BY:

3.2

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

Safety Requirements
Without limiting the generality of the application of the SAUDI ARAMCO
Construction Safety Manual (CSM) and other SAUDI ARAMCO Safety
Standards, the Safety Requirements shall include but not necessarily be
limited to the following as applicable:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

11
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

The CONTRACTOR and all CONTRACTOR employees, agents and


subcontractors shall comply at all times with all applicable safety, health
and environmental regulations and all SAUDI ARAMCO General
Instruction (G.I.s), and other related rules and regulations. Specifically,
CONTRACTOR shall comply with the provision of the SAUDI ARAMCO
Construction Safety Manual (CSM), Saudi ARAMCO Safety Handbook,
all other such related requirements and any other successor manual
that replace these. In case of conflicting requirements, the most
stringent requirement shall apply. CONTRACTOR shall also take or
cause to be taken any additional measures under the direction of the
Company Representative to prevent the injury or death of any person,
or damage to the environment during CONTRACTORs performance of
the WORK. Supervisory personnel or other qualified staff shall be
present at the WORK Site while any WORK is in progress. SAUDI
ARAMCO reserves the right to monitor and inspect any WORK site,
laydown yard, fabrication yard, clinic, camp and dining facility (On or
Saudi ARAMCO property) for compliance with the above references
Safety, Health and Environmental Requirements. SAUDI ARAMCO
reserves the right to reject, remove from site, or have CONTRACTOR
destroy any tools or equipment found to be defective or of substandard
quality. Homemade, including shop-made, tools are strictly
prohibited. CONTRACTOR shall be responsible to identify and address
all potential safety, health and environmental issues in accordance with
Saudi ARAMCO Safety Management Guide for Contractor Pre-job
Safety Explanation Meetings Checklist (Loss Prevention Guide 07-0032007).

3.2.2

SAUDI ARAMCO Responsibility

REV
NO.

DATE

JO/EWO

DESCRIPTION

ENGG CERT

3.2.1

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

3.2.2.1

Saudi ARAMCO Project Engineer in coordination with the


Proponent Organization shall communicate general and sitesafety standards and information to the CONTRACTOR,
either during Job Explanation (Job X) meetings with potential
bidders or at Kick-off meeting with the CONTRACTOR
before beginning on-site work activities.

3.2.2.2

Immediately following the above meeting, SAUDI ARAMCO


Project Engineer shall conduct joint hazard identification tour
with the CONTRACTOR with the participation of SAUDI
ARAMCO Proponent Organization (SAPO), Loss Prevention
Department (LPD), Environmental Protection Department
and other SAUDI ARAMCO agencies as required.

3.2.2.3

SAUDI ARAMCO Project Engineer and the SAPO shall


ensure that all safety requirements are strictly enforced.

3.2.2.4

A full audit shall be undertaken by DHALPD and


Environmental Health to establish hazardous materials
present in the facility prior to commencement of any work.

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

12
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

ENGG CERT

3.2.2.5

DESCRIPTION

3.2.3

SAUDI ARAMCO Project Engineer and Saudi ARAMCO


Safety Coordinator(s) are responsible for informing
CONTRACTOR of Safety Infractions and requirements for
remedial actions and disciplinary actions.

CONTRACTOR Responsibility
3.2.3.1

CONTRACTOR has overall responsibility for a full time


safety in and out of the Work Site in accordance to the
applicable requirements of the SAUDI ARAMCO CSM,
Volume 1 - Contractor Safety Administrative Requirements
(CSAR) and Volume 2 - Work Site Safety Manual (WSSM).

3.2.3.2

Site Safety Staff

JO/EWO

CONTRACTOR shall provide full time and qualified site


safety staff in accordance to the requirements of Volume
I Paragraph 4.5 of the SAUDI ARAMCO CSM or as
otherwise required by the SAUDI ARAMCO Project
Engineer during Job Explanation Meeting.
Safety Meetings
A.

CONTRACTOR shall conduct daily pre job (toolbox)


craft safety meetings with their personnel to address
job-specific safety issues prior to beginning a different
work activity, which shall also include a review of the
applicable section of the approved HIP.

B.

CONTRACTOR shall conduct weekly safety meetings


in the native language(s) of the personnel. The safety
meeting shall be no shorter than 15 minutes and shall
cover, but not limited to, work hazards and related job
procedures as well as a review/update of the HIP.

C.

Safety meeting shall be documented with records


maintained and shall be made available for review by
the SAUDI ARAMCO project Engineer upon request.

REV
NO.

DATE

3.2.3.3

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:

3.2.3.4

OPERATIONS

CONTRACTOR shall provide all required Safety Harness


and proper PPE that meets SAUDI ARAMCO specification to
its employees in accordance with Volume I Paragraph 4.8
and Volume II Paragraph 3.0 of the SAUDI ARAMCO CSM.

BY:

3.2.3.5

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

Personnel Protective Equipment (PPE)

Work Permit
A.

CONTRACTOR shall obtain and complete all required


Work Permits in accordance with Volume I Paragraph
4.12 and Volume II, Part I Paragraph 4. of the SAUDI
ARAMCO CSM as per the minimum guidelines and
responsibilities set forth in SAUDI ARAMCO General

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

13
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

Instruction manual, GI 2.100 Work Permit System.

ENGG CERT

B.

DATE

JO/EWO

DESCRIPTION

3.2.3.6

REV
NO.

3.2.3.7

Jobsite Safety Logbook (JSL)


A.

CONTRACTOR shall provide hardbound JSL at site for


safety comments from Saudi ARAMCO Safety
Coordinators and LPD Safety Representatives and
Proponent Organization Representatives.

B.

Copy of minutes of safety meeting and toolbox


meetings should be attached to the JSL for inspection.

C.

CONTRACTOR is subject to the requirements of G.I.


5.002 Loss Prevention Policy Implementation.

Work During Hot Weather (Heat Stress)


A.

CONTRACTOR management is responsible for


managing their employees work so as to avoid and
prevent heat-related illnesses.

B.

Heat Stress management shall be the responsibility of


the CONTRACTOR thus CONTRACTOR shall conduct
a thorough heat stress evaluation to identify task and
conditions that present a potential heat stress hazard,
and subsequently develop and implement a heat stress
management program in accordance with Volume I
Paragraph 4.17 of the SAUDI ARAMCO CSM.

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:

3.2.3.8

CONTRACTOR Work Permit Receiver shall have a


valid SAUDI ARAMCO Receiver Certificate issued by
Loss Prevention indicating and duly signed by the
SAPO division head/superintendent. Receiver(s) with
signed certificate from other organization/facility shall
not be used at different organization unless the
responsible SAPO superintendent signs a reissued
certificate that reflects the new organization.

Hazard Identification Plan (HIP)

OPERATIONS

BY:

A.

Before start of any Work Site activities, CONTRACTOR


shall submit Job Specific Hazard Identification Plan
(HIP) to SAUDI ARAMCO Project Engineer for review
and subsequent approval by appropriate SAUDI
ARAMCO Agencies. The HIP shall be developed and
approved in accordance with Volume I Paragraph 6.0
of the SAUDI ARAMCO CSM and shall address all
requirements as per joint hazard identification tour
described in Paragraph 3.2.2.2 above.

B.

CONTRACTOR shall implement and adhere to the

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

14
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

specific HIP.

ENGG CERT

C.

DESCRIPTION

3.2.3.9

CONTRACTOR shall change or amend the HIP


accordingly when conditions change, new hazards are
introduced and/or the scope of work changes.

Medical
A.

CONTRACTOR shall provide medical care for its


personnel in accordance to the requirements of
Volume I Paragraph 9.0 of the SAUDI ARAMCO CSM
and the SAUDI ARAMCO Minimum Medical Standards
Requirements (MMSR) Manual.

B.

CONTRACTOR shall provide First Aid at the Work Site


which is the immediate help provided to injured or
seriously ill personnel prior to arrival of professional
medical assistance.

REV
NO.

DATE

JO/EWO

CONTRACTOR shall provide and maintain


adequate First Aid supplies for its personnel per
SAUDI ARAMCO General Instructions Manual, GI
150.002 Heart Saver First Aid with CPR and AED
Training.
o

CONTRACTOR shall provide at least one 10


unit First Aid kit/cabinet and one 36-unit First
Aid kit/cabinet if fewer than 50 people are at
Work Site and 50 people or more are at the
Work Site respectively of required content per
MMRS Manual, Attachments 23 and 24.

CONTRACTOR shall assign First Aid


attendant(s) to be responsible for each First Aid
kit/cabinet and to ensure there is sufficient
stock of all supplies at all times.

CONTRACTOR shall post signs/notices near


each First Aid kit/cabinet stating the following:-

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

a. Name of person in charge of the First Aid


kit/cabinet.

CONTROL NUMBER

SMM
8-26-14

7-Sep-14

DATE:

14U187-187

(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

BY:

b. Hospital where injured/ill personnel are to


be transported.

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

c. Telephone number(s) of doctor(s) or first aid


attendant(s).
d. Emergency telephone numbers.

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

15
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

ENGG CERT

3.2.3.10

Safety Barriers and Project Signs

JO/EWO

DESCRIPTION

A.

DATE

CONTRACTOR shall provide adequate number of


personnel at the Work Site who are trained and
certified in First Aid and BLS, including those in
charge of First Aid supplies.

REV
NO.

B.
DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

Before proceeding with the WORK, CONTRACTOR


shall erect temporary barricades and warning tapes for
protection and the safety of the general public
throughout construction period, as required. Remove
same upon completion of the project or as directed by
the Saudi ARAMCO Project Engineer.

As and when required by the Work Site conditions,


CONTRACTOR shall erect temporary fence
(obscured) with lockable pedestrian and vehicle
gates around the construction site.

Barricades shall be clearly marked with flagging.


Barricades shall have protective lighting, when
necessary.

CONTRACTOR shall prepare and post a sign, in


Arabic and English at the Work Site, minimum of 1.2m
(4) X 2.4m (8) (or as agreed with the SAUDI
ARAMCO Project Engineer), and at a minimum the
following information shall be shown:

SAPO name

GCA
9-1-14

Project title

CERTIFIED

Budget Item (BI), work order

CONTRACTOR name, address and telephone


number

SAPO and CONTRACTOR Representative name


and telephone numbers

DATE:

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

3.2.3.11

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

Fire Protection and Preventions


A.

CONTRACTOR shall provide appropriate and


adequate firefighting equipment (portable fire
extinguisher(s), hoses or appropriate water storage).

B.

CONTRACTOR designated site personnel shall be


trained in the use of firefighting equipment to be used
in the Work Site.

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

16
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

ENGG CERT

3.2.3.12

Housekeeping

DESCRIPTION

A.

CONTRACTOR shall dispose all construction


debris or solid waste generated during this project
in approved landfill in accordance to the
requirements of SAUDI ARAMCO Engineering
Standard, SAES-S-007. Collection, storage and
disposal of all nonhazardous and hazardous waste
shall be in accordance with SAUDI ARAMCO
General Instructions, GI 430.001. All Class II and
Class III waste as per SAES 007 are to be
disposed of to the nearest approved SAUDI
ARAMCO Landfill Area.

B.

CONTRACTOR shall ensure that trash and debris


are properly collected and disposed of daily.
Provide adequate amount of trash receptacles in
the Work Site.

C.

Refuse trash and garbage shall only be disposed


of at approved site designated by SAUDI
ARAMCO or local municipality.

REV
NO.

DATE

JO/EWO

Required SAP EH&S Waste Manifest shall be


prepared, completed and approved prior to any
hazardous waste disposal at either an authorized
Company or approved CONTRACTOR disposal
site (land disposal, land treatment or incinerators).

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

3.2.3.13

Excavations and Shoring

9-7-14

CONSTRUCTION
AGENCY

A.

Minimum safety requirements for excavations,


trenching and shoring shall be in accordance with the
minimum requirements specified in Volume II, Part II
Paragraph 1 of the SAUDI ARAMCO CSM and SAUDI
ARAMCO
DeskTop
Standards,
CSE-116.06
Excavation and Trenching Safety Standards.

B.

Excavation Planning

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

Prior to start of any work, CONTRACTOR shall


evaluate the required excavation in accordance
with the requirements of Volume II, Part II
Paragraph 1.3.1 of the SAUDI ARAMCO CSM.
o

SCOPE OF WORK

Evaluation

done

by

DRAWING NO.

.DOC
M15

TOWN SITE DEVELOPMENT


2:54 PM

be

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

DHAHRAN

shall

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

competent
SHT.NO.

REV.NO.

17
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

SAUDI ARAMCO Project Engineer shall properly


complete the pre-excavation checklist and to
ensure that it is made available upon request.

CONTRACTOR shall provide excavation plan as


developed by a civil/structural engineer for
excavation greater than 2.4 meters (8 feet) deep in
Type B or C soil and for excavation greater than 6
meters (20 feet) deep, regardless of soil type as per
Volume II, Part II Paragraph 1.3.4 of the SAUDI
ARAMCO CSM.
o

Excavation plan for 6m deep excavation shall


be reviewed and approved by SAUDI ARAMCO
Consulting Services Department (CSD).

If and when a plan is required and shoring is


used the plan shall:

JO/EWO

DESCRIPTION

ENGG CERT

personnel who have the proper training and


experience.

DATE

a. Describe the materials and shoring system


to be used.

REV
NO.

b. Indicate whether or not any shoring


components will remain after filling or
backfilling.

DISCIPLINE
ENGINEER

BOS

c. Provide plans, sketches and/or details along


with calculations.

DATE: 8-31-14
PROJECT
ENGINEER

DATE:

d. Indicate the sequence and method of


shoring installation or removal.

GCA
9-1-14

CERTIFIED

NAA
DATE:

C.

9-7-14

CONSTRUCTION
AGENCY

Permit

SAUDI ARAMCO work permit as per SAUDI


ARAMCO General Instructions, GI 2.100 shall be
obtained before any excavation work is started.

The work permit shall incorporate excavation safety


provisions and the pre excavation checklist.

Confined space entry permit shall likewise be


obtained to enter excavations equal to or greater
than 1.2 meters (4 feet) deep.

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

D.
(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

Underground Utilities and Installations

Before excavation activities begin, SAUDI


ARAMCO Project Engineer in coordination with

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

18
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

JO/EWO

DESCRIPTION

ENGG CERT

SAUDI ARAMCO organizations, such as Utilities.


Communications, POD, Pipelines, etc., shall
confirm and mark locations of SAUDI ARAMCO
and
non-SAUDI
ARAMCO
underground
utilities/installations
(pipes,
cables,
vessels,
structures, etc.) that are in the area of the proposed
excavation.

DATE

E.

Mechanical excavators shall not be used until


underground utilities are exposed by hand digging.

Mechanical excavators shall not be used within 3


meters (10 feet) of underground utilities or
installations.

Excavation
foundation.

Provide approved brace or shoring to all


underground utilities, duct banks, sidewalks, etc.,
that could be undermined by an excavation.

REV
NO.
DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

F.

BY:

Water removal (dewatering)

Shoring to protect cave-in

existing

Provide diversion ditches, dikes or other suitable


means for natural drainage of surface water to
avoid water from entering the excavation and to
provide adequate drainage of the area adjacent to
the excavation.

Unless an excavation is made entirely in stable


rock or excavation is less than 1.5 meters,
CONTRACTOR shall provide proper protection
system against side wall cave-in in accordance to
the requirements of Volume II, Part II Paragraph
1.7 of the SAUDI ARAMCO CSM, including but not
limited to the following as applicable:-

Sloping System

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

DRAWING NO.

.DOC
M15

TOWN SITE DEVELOPMENT


2:54 PM

under

CONTRACTOR shall not work in excavations


where there is pooled water, or in excavations in
which water is accumulating, unless adequate
precautions have been taken to protect personnel.
Precautions shall include but not necessarily be
limited to the following:

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

DHAHRAN

permitted

Protection Against Sidewall Cave-In

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

not

Dewatering

DATE:

is

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

19
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

G.

Benching System

Shoring System

Sheeting System

Shield system

Entry and Exit

DESCRIPTION

CONTRACTOR shall provide stairway, ladders,


ramps or other safe means of egress for
excavations that are 1.2 meters (4 feet) or more in
depth in accordance to the minimum requirements
of Volume II, Part II Paragraph 1.8 of the SAUDI
ARAMCO CSM.

REV
NO.
DISCIPLINE
ENGINEER

Personnel shall not be in or near an excavation


where they could be struck by operating heavy
equipment (e.g., track hoes, rock breakers, and
backhoes). Personnel shall not be within the
operating radius of the equipment.

Personnel shall not be in an excavation where they


could be exposed to a possible cave-in, such as
could be caused by equipment operating or passing
by.

Personnel shall not be within a distance less than


the depth of the excavation from the edge where
equipment is located.

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

H.

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:

Emergency Response

OPERATIONS

CONTROL NUMBER

SMM
8-26-14

7-Sep-14

CONTRACTOR
shall
provide
appropriate
emergency
rescue
equipment
(breathing
apparatus, full body harness and lifeline, basket
stretcher) during excavation work as applicable.

Edge Protection, Markers and Fixed Lighting

DATE:

14U187-187

(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

BY:

I.

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

Ladders shall conform to the requirements


specified in Volume II, Part II, Paragraph 3. of
the CSM.

DATE

JO/EWO

CONTRACTOR shall provide edge protections,


markers and fixed lighting as necessary in
accordance to the applicable requirements of
Volume II, Part II Paragraph 1.11 of the SAUDI
ARAMCO CSM.

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

20
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS
ENGG CERT

SAUDI ARABIAN OIL COMPANY

Roads, Streets and Sidewalks

Excavation work on or near roads, streets and


sidewalks shall meet the requirements of SAUDI
ARAMCO General Instructions GI 1021.000 Street
and Road Closure: Excavations, Reinstatement
and Traffic Control.

Trenches in roads, streets and sidewalks shall be


completely covered with properly designed steel
plates where traffic flow needs to be maintained
over the trench.
o

Such trenches shall be properly shored as


described in Paragraph 3.2.3.13.F above.

The trench cover plate thickness shall be


selected based on the width of the trench,
grade of steel and weight of heaviest expected
traffic (e.g., fire truck, fully loaded tractor, and
trailer truck). Refer to Figures 1.17 to 1.20 for
typical cover plates for road trenches and
Figure 1.21 for sidewalk protection of Volume II,
Part II Paragraph 1. of the SAUDI ARAMCO
CSM.

REV
NO.

DATE

JO/EWO

DESCRIPTION

ENGG CERT

J.

3.2.3.14

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

Scaffolding

GCA
9-1-14

CONTRACTOR shall provide and install tubular metal


personnel access scaffolding as required.
o

Safe design, erection, supervision, inspection, use,


tagging, alteration and dismantling of scaffolding
shall be in strict accordance with the requirements of
Saudi ARAMCO General Instruction, G.I 8.001
Safety Requirements for Scaffolds, Scaffold Safety
Handbook by Saudi ARAMCO Loss Prevention
Department and Volume II, Part II Paragraph 2. of
the SAUDI ARAMCO CSM.

All scaffolds shall be erected, altered and dismantled


only under the direction of on-site scaffold supervisor.
The scaffold supervisor shall have the full authority
over his scaffold craftsmen and must be present at
the job site during their work and provide effective
supervision of all scaffolding work under his
responsibility. He shall not just show up at the end of
the job to sign the scaffold tag. Only trained and
experienced scaffold craftsmen shall be used for
erecting, altering and dismantling the scaffolds.

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

21
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

ENGG CERT

3.2.3.15

Asbestos

DESCRIPTION

3.2.3.16

Hazardous Materials

REV
NO.

DATE

JO/EWO

All WORK shown in the drawings listed in Paragraph 5.0 hereinafter but not
described or specified in this Scope of Work and vice versa shall be considered
part of the WORK.

3.4

Before doing any WORK, CONTRACTOR shall verify all measurements at the
construction area for their accuracy. No extra charge or compensation will be
allowed on account of differences in actual dimensions and measurements.

3.5

Prior to demolition, reconfirm which items and structures are to be removed and
which materials are to be salvaged and reused. All materials identified for
salvage shall be carefully protected and stored as directed by the SAUDI
ARAMCO Project Engineer.

3.6

Remove entirely all existing miscellaneous items or articles which obviously


interfere with the work. It is the CONTRACTORs responsibility to carefully
remove any items or obstacles to facilitate the WORK. CONTRACTOR shall
reinstate all such items following completion of the WORK to match existing,
including any finishing, to the satisfaction of the SAUDI ARAMCO Project
Engineer.

3.7

All areas in the vicinity of WORK shall be protected from damage. Any item that
is damaged or marred as a direct or indirect result of the WORK shall be restored
to its original state by the CONTRACTOR. Any items which cannot be removed
shall be protected against the effects of the work and any water damage or
mechanical defect.

BOS

DATE:

CONTRACTOR shall comply with all requirements of


SAUDI ARAMCO G.I. 150.100 Hazardous Materials
Communication Program, where work is executed
involving Hazardous Materials. Additionally, safe use,
handling, storage and disposal of such materials shall be
in accordance with Volume 2, Part I, Chapter 10 of the
CSM.

3.3
DISCIPLINE
ENGINEER

DATE: 8-31-14
PROJECT
ENGINEER

CONTRACTOR shall comply with all requirements of


SAUDI ARAMCO G.I. 150.001 - Asbestos Regulation,
where work is executed involving asbestos. The
CONTRACTOR shall notify SAUDI ARAMCO Industrial
Hygiene (Workplace Environment Division) for review
and comment on demolition and packing, asbestos
hazard plans and recommendations for personal
protective equipment and SAUDI ARAMCO Land and
Groundwater
Protection
Unit
(Environmental
Engineering Division) for disposal recommendations, two
weeks prior to any demolition involving asbestos
containing structures.

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

22
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

4.0

3.8

Keep the area of WORK clean and orderly at all times, as directed and to the
satisfaction of the SAUDI ARAMCO Project Engineer.

3.9

No WORK shall be considered complete unless inspected and approved by the


SAUDI ARAMCO Project Engineer in conformance with the drawing(s), Scope of
Work and all Saudi ARAMCO Codes, Standards and Specifications.

3.10

Upon completion of WORK, cart away all unused materials, containers, debris,
etc., as directed by the SAUDI ARAMCO Project Engineer.

WORK DESCRIPTION
General:
4.1.1

Verify actual field dimension and conditions on affected areas prior to


construction/installation of electrical equipment/devices relative to the
proposed electrical installation and other related work.

4.1.2

Disconnect/lock-out power supply before any related electrical activities


are carried-out. Power supply isolation shall comply with the
requirements of G. I. 6.012
Isolation, Lock-out, and Use of Hold
Tags.

4.1.3

Any necessary adjustment arising from a discrepancy from the drawing


shall need approval of SAUDI ARAMCO Project Engineer prior to
implement the changes.

4.1.4

All Electrical works shall be done by qualified personnel approved by


SAUDI ARAMCO Project Engineer and in accordance with the latest
edition of NEC, NFPA and SAUDI ARAMCO Standard.

4.1.5

CONTRACTOR shall conduct cable circuit tracings prior to disconnect


and remove lighting posts lights circuits.

4.1.6

Existing LV Direct Buried Power Cable affected shall be protected for


any damages.

4.1.7

Existing Pole Lightings identified to remain shall be protected during the


course of the work. After completion of work test the existing Pole
Lightings to demonstrate proper lighting acceptable to Saudi ARAMCO.

4.1.8

All wiring shall be color coded and properly mark as per SAUDI
ARAMCO Standard.

4.1.9

All works (excavation, trenching, fill, backfill and compaction) shall be


executed in strict compliance with Saudi ARAMCO Engineering
Standards, SAES-A-114.

4.1.10

All service equipment, lighting fixtures, electrical devices, boxes and


metal conduit shall be provided with equipment grounding and bonding
conductor in accordance with SAES-P-111.

REV
NO.

DATE

JO/EWO

4.1

DISCIPLINE
ENGINEER

BOS
8-31-14

DATE:
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

23
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS
ENGG CERT

SAUDI ARABIAN OIL COMPANY

ENGG CERT

Separation of not less than 300 mm (12 in) vertically or 600 mm (24 in)
horizontally must be maintained between buried power and
communication cables.

4.1.12

Lights Poles shall be tag/label with plate marker approved by Saudi


ARAMCO.

4.1.13

Direct buried cable depth burial requirements shall be done in


accordance to standard ARAMCO drawing AD-036874 sheet 001, Rev.
16, index P, Plant 990.

4.1.14

Electrical Panel Board directory shall be updated after completion of


work or prior to turnover to PROPONENT as approved by Saudi
ARAMCO Project Engineer. Provide identification tags on equipment
and devices identifying circuit directory.

4.1.15

Make good all affected surfaces to match existing.

DESCRIPTION
JO/EWO

4.2

Site work: (Zuhoor & Yasmeen court)

DATE

4.2.1

Removal: (Refer to Drawing No. HA-359217 Sheet No. 001-Revision


00).

REV
NO.

CONTRACTOR shall:
4.2.1.1
DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

4.2.2

GCA
9-1-14

CERTIFIED

Trenching and Installation (Refer to Drawing No. HA-359217 Sheet


No. 002 Revision No. 00, HA-359219 Sheet No. 001 Revision No. 00).
4.2.2.1

Excavate to the limits shown on the Drawing. Excavation


work shall consist of cutting through asphalt and concrete
pavement, natural grades as well as removing all solid rocks
necessary to carry out the work.

4.2.2.2

Bottom of excavation shall be continuous, relatively smooth


and free of rocks with cone up to 6 fine sand bedding level,
well compacted and free from any rocks or other debris that
can cause damage to conduits or cable

4.2.2.3

Install new pipe sleeves at walkway crossing.

4.2.2.4

Install/lay new low voltage direct burial cables including


supports and accessories.

4.2.2.5

Apply duxseal on all conduit ends.

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

Remove existing pole lighting fixtures and posts including


concrete base pedestal and other related accessories. LV
Direct Buried Cable to remain and abandon.

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

24
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

4.1.11

SAUDI ARABIAN OIL COMPANY

4.2.2.6

Perform continuity and insulation tests to LV direct buried


cables prior to backfilling. Test result to be submitted to Saudi
ARAMCO Project Engineer and D.P.I.U for review and
evaluation.

4.2.2.7

Backfill trench to existing ground surface level with selected


dry sand bedding and marl fill compacted to maximum
density, restore ground surface affected by the work.

4.2.2.8

Place terra tape marker and red tile directly above the cable
buried with sand.

4.2.2.9

Mark cable route in accordance with SAUDI ARAMCO


Standard Drawing No. AB-036326 or AB-036273, whichever
is applicable.

JO/EWO

4.2.2.10 Existing surface which have been affected by new work shall
be patched repair as required and shall be scribed neatly and
perfectly match.

DATE

4.2.3

New Works: (Refer to Drawing No. HA- 359217 Sheet No. 002
Revision 00, HA-359219 Sheet No. 001 Revision No. 00).

REV
NO.

CONTRACTOR shall:
DISCIPLINE
ENGINEER

4.2.3.1

Install new reinforce concrete pedestal for lighting posts


including anchor rods, stub-ups, supports, fittings and
accessories.

4.2.3.2

Install new light posts including pole arms, pole mounted LED
lighting fixtures with LED driver including cables, fittings and
other related accessories.

4.2.3.3

Install groundings and grounding pits including accessories.

4.2.3.4

Serviced and cleaned existing Lighting control panel and


panelboard.

4.2.3.5

Install/put gravels in the perimeter/surroundings of lighting


post/concrete pole base, dimension & quantity as shown in
the drawings.

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

CONTROL NUMBER

7-Sep-14

DATE:

14U187-187

(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

BY:

4.2.4

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

SMM
8-26-14
DATE:

Termination and Testing


4.2.4.1

Connect/tap the new lighting posts to existing electrical panel


board lighting contactors.

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

25
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS
DESCRIPTION

ENGG CERT

SAUDI ARABIAN OIL COMPANY

ENGG CERT

4.2.4.2

5.0

DRAWINGS
5.1

Project Drawings

DESCRIPTION

5.1.1

JO/EWO

Existing/Demolition Lighting layout

HA-359217

002

00

Proposed Lighting Layout

HA-359219

001

00

Miscellaneous Detail

As Built Drawings
5.2.1

Upon completion of all works, the CONTRACTOR shall submit one set
of As-Built Drawing to the Saudi ARAMCO. These Drawings shall
indicate all deviations from the contract Drawings and shall include
dimensions, quantities, materials and products used in the construction
with vendors name, address and prepared from records kept up on a
daily basis throughout the duration of the project. The As-Built records
shall be subject to examination by the Saudi ARAMCO Project
Engineer.

5.2.2

Any SUBCONTRACTOR performing work under these specifications


and project Drawings shall provide two sets of As-Built marked-up
print-outs to the prime CONTRACTOR periodically as required by the
prime CONTRACTOR.

5.2.3

The mark-ups shall be done in professional manner utilizing red ink

5.2.4

As Built Drawings shall be in an electronic format utilizing Bentley


Micro Station.

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

CONTROL NUMBER

TECHNICAL REQUIREMENTS

7-Sep-14

DATE:

14U187-187

(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

BY:

6.1

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

SMM
8-26-14
DATE:

6.0

Reinforced Concrete
6.1.1

All concrete works shall be done in strict compliance with Saudi


ARAMCO Engineering Standards, SAES-Q-001.

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

DHAHRAN

DRAWING NO.

.DOC
M15

TOWN SITE DEVELOPMENT


2:54 PM

Title

00

BOS

CERTIFIED

Rev.
No.

DATE: 8-31-14
PROJECT
ENGINEER

GCA
9-1-14

Index
No.

001

REV
NO.

DATE

5.2

Sheet
No.

HA-359217

DISCIPLINE
ENGINEER

REVISION
CERTIFICATE
REVISIONCERTIFICATION

Project Title: Replace Inefficient Luminaires with Efficient LED at


Zuhoor and Yasmeen Courts.

Drawing No.

DATE:

Conduct Megger and operational tests (in conformance to


SAES-P-104) upon completion of electrical works. Energize
the system to ensure that requirements are satisfactorily met
in the presence of Saudi ARAMCO Project Engineer.

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

26
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

Concrete shall be supplied by the CONTRACTOR from Saudi


ARAMCO approved plant approved plant. Such plants shall conform to
the provisions of 09-SAMSS-097 using sulfate resistant Portland
cement (Type V). The minimum 28 day design compressive strength
per ASTM C39 shall be 28 MPA (4000 psi). For concrete above grade
use Portland Cement ASTM C150 Type I as defined under ACI 318M,
Chapter 4, Section 4.2 unless noted otherwise on drawings.

6.1.3

Reinforcing steel bars shall conform to 09-SAMSS-106, hot rolled, high


tensile deformed steel with minimum yield strength of 422 Mpa (60.0
ksi).

6.1.4

Bar Cutting and Bending Schedule

DESCRIPTION

ENGG CERT

6.1.2

REV
NO.

DATE

JO/EWO

6.1.4.1

6.1.5

All reinforcements shall be Fusion Bonded Epoxy coated in accordance


with 09-SAMSS-106.

6.1.6

Vapor barriers shall be polyethylene sheets conforming to ASTM E154


having a thickness of 6 mils minimum.

6.1.7

All tie wires shall be plastic or epoxy coated.

6.1.8

Damp proofing shall be asphalt in solvent as per ASTM D-41 and 09


SAMS 60 or coal tar or bitumen coating that conforms to APCS-3 or
APCS-10 of SAES-H-101V; applied to all concrete in direct contact with
soil.

6.1.9

Hot Weather Concreting

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

A.

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:

6.1.10

OPERATIONS

CONTROL NUMBER

SMM
8-26-14

DATE:

14U187-187

(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

BY:

7-Sep-14

Unless otherwise approved, all concreting shall be considered


hot weather concreting, as defined by ACI 305R, and shall be
in accordance with recommended practice of ACI 305R.
Ample water supply and foggers shall be available at all
concrete placement.

Cold Weather Concreting


A.

6.1.11

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

CONTRACTOR shall submit a detailed bar cutting and


bending schedule indicating all the required bar sizes, bar
length, bar splicing, bar bending and bar location for
approval of Saudi ARAMCO Engineer.

Concreting shall be in accordance with recommended practice


of ACI 306R

Curing
A.

Curing and protection of fresh concrete shall start immediately


after final finishing operation. Curing methods shall be in
accordance with ACI-308-92. Concrete shall be protected from
premature drying, temperature extremes and mechanical
injury, for a period of at least 7 days to allow proper hydration
of the Portland cement and hardening of the concrete.

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

27
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

Moisture loss from surfaces adjacent to forms (shutters) shall


be minimized by keeping the forms wet until they can be safely
removed. Concrete shall be kept moist for a minimum of 7
days or until 70% of the specified strength has been achieved,
whichever is longer.

C.

All materials and facilities for curing concrete shall be on hand


and ready for use before the concrete is placed.

D.

Approved methods of curing include the following, refer to


Section 2.3.3 of ACI 308:

DESCRIPTION

ENGG CERT

B.

a. Sheet Materials shall conform to ASTM C 171.


b. Burlap Cloth (or Hessian Sack) made from jute or kenaf
and weighing approximately 305 grams per sq. m (9 oz.
per sq. yd.) for moist curing shall conform to AASHTO
M182 and shall use two layers.

DATE

JO/EWO

c. Water: Shall be sweet water, or acceptable raw water with


less than that 1000 PPM dissolved solids, as per Saudi
ARAMCO Engineering Standard, SAES-Q-001, para. 2.2
Ref: ACI 308

REV
NO.

d. Sand: Wet, clean sand (ACI 308-92 section 2.2.5)


Note: Thirty (30) percent of the strength or more can be lost by

DISCIPLINE
ENGINEER

premature drying out of the concrete. Therefore,


maintain curing for at least the minimum time specified.

BOS
8-31-14

DATE:
PROJECT
ENGINEER

DATE:

6.2

GCA
9-1-14

Clean Sea Stones / Gravels


6.2.1

CERTIFIED

Assorted sizes but not more than 37 mm diameter, color to be selected


by the TSD Designer / Saudi ARAMCO Project Engineer.

NAA
DATE:

6.3

9-7-14

CONSTRUCTION
AGENCY

Electrical Material
6.3.1

ESS
8-26-14
DATE:

6.3.1.1

OPERATIONS

CONTROL NUMBER

SMM
8-26-14

6.3.2
DATE:

14U187-187

(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

BY:

7-Sep-14

Submit Technical / Manufacturers Data of materials


specified in this section for review & approval by the Saudi
ARAMCO Project Engineer.

Conduit: RSC/PVC;
6.3.2.1

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

Submittal

RSC/PVC; Steel Conduit and coupling hot dip galvanized


after cutting and threading, externally coated with 40 mils
NOM TH PVC per National STD. RN1 (Type A-40) American
National Standard Institute (ANSI) STD. C80.1; Underwriter's
Laboratories (UL) listed.

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

28
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

ENGG CERT

6.3.2.2

6.3.3

Wire; 600 V

DESCRIPTION

6.3.3.1

6.3.4.1

Wire; Type THHN-THWN; conduit or raceway applications;


PVC insulation with nylon jacket; copper, concentric,
stranded class C per ASTM B8; heat and oil resistant.

6.3.4.2

Ground Conductor; Bare Wire; Copper; Soft Drawn;


Annealed, Solid.

6.3.4.3

Ground Rod, Copper Jacketed Steel; 5/8 diameter x 8


length, Copperweld or equivalent; shall meet the
requirements of UL 467.

6.3.4.4

Thermoweld. CR-1 Type Molds: Accessories required for


connection of # 6 AWG bare copper wire and Ground rod
5/8 dia. x 8:

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

a.
b.
c.
d.
e.

CERTIFIED

NAA
DATE:

Low-Voltage Power Cable; 1000V; XLPE/PVC insulation;


Flame-retardant PVC jacket; for direct burial, conduit, or duct
application; annealed copper conductor per ASTM B33;
Class B stranding per ASTM B8; 90C dry and 75C wet
max operating temp; conform to UL 44 and UL 1277;
Underwriters Laboratories (UL) listed.

Grounding

REV
NO.

DATE

JO/EWO

6.3.4

TC-8 PVC: Extra strength; direct burial (Type D.B); with one
belled end; for underground installation of electrical and
communication utilities; conforms to National Electric
Manufacturers
Association
(NEMA).
Underwriters
Laboratories (UL) listed.

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:

6.3.4.5

Mold #: M-5799
Price Key: 4
Weld Metal: 45
Handles Clamps: B106
Lead Time: 2

Grounding Pit; Accessories as follows:

OPERATIONS

a.
b.
c.
d.
e.
DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

BY:

7-Sep-14

6.3.5

Pipe: 250mm dia. PVC pipe


Pipe: 1 or 30mm dia. PVC
Plate: Steel, or 6mm
Angle Steel: 50mm x 50mm x 6mm
Bar: Steel, 12mm or dia.

Sealant
6.3.5.1

(DCC) NO. _____________________

CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

SMM
8-26-14
DATE:

Gardner Bender DS-110


1-Pound Duct seal compound.

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

29
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

ENGG CERT

6.3.6

Recommended Manufacturer(s)/ Vendor(s)


A.

Al-Fanar Trading
Tel. No.: 859-3832
Fax No.: 859-3812
Or

DESCRIPTION

B.

Abdul Karim Trading


Tel. No.: 833-7110
Fax No.: 833-8242
Or

C.

Saudi Electric Supply Co. (SESCO)


Tel. No. 882-6739
Fax No.882-5768
Or

JO/EWO

D.

Remal Electric Factory


Tel. No. 812-1266
Fax No. 812-1295
Or

DATE

E.

Saudi ARAMCO Approved Equal

REV
NO.

Note:
DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

6.3.7

GCA
9-1-14

Post & Lighting Fixtures


6.3.7.1

CERTIFIED

NAA
DATE:

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:

6.3.8

OPERATIONS

6.3.8.1

CONTROL NUMBER

National Lighting Co.


Tel. No. 812-2020
Fax No. 812-2250
www.nlc-sa.com

7-Sep-14

DATE:

14U187-187

(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

BY:

Or

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

EDSD
VERIFICATION

REVISION
CERTIFICATE
REVISIONCERTIFICATION

New pole mounted LED Lighting Fixtures with aluminum


extrusion pole, 12 6 long, cast aluminum cabinet with cover
plate, 110-227V, 60Hz. LED lamp 350mA LED driver, IP-66,
3500K color temp., Model: Hi-Glo LED Pedestrian Lighting.

Recommended Manufacturer(s)/ Vendor(s)

SMM
8-26-14
DATE:

00
THIS INDICATES THAT REV. NO.__________

Recommended Products described above is for product


reference
purposes
only.
Other
Manufacturer(s)/Vendor(s) are acceptable but products
to be supplied should be of the same quality as
described or better.

6.3.8.2

SHAIRCO
P.O. Box 9301, Jeddah 21413, Saudi Arabia
Tel. No. 02-6637666 (10 lines)
Fax No. 02-6659424
E-Mail: info@shairco.net
Website: www.shairco.net

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

30
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

Or

ENGG CERT

6.3.8.3

Saudi Lighting Company


Tel. No. 835-5385
Fax No. 835-5383
www.saudilighting.com
Or

DESCRIPTION

6.3.8.4

Hubbell Lighting
Tel. No. 864-678-1000
Fax No.864-678-1065
www.hubbell-ltg.com
www.hubbell lighting.com
Or

6.3.8.5

Abdul Karim Trading


Tel. No. : 03-889-2105
Fax No. : 03-898-5077
Or

JO/EWO

6.3.8.6

Nouran Company Ltd.


Tel. No. 895-1312
Fax No. 898-3161

DATE

Or
Saudi ARAMCO Approved equal

REV
NO.

6.3.8.7

Note: Recommended Products described above is for


product
reference
purposes
only.
Other
Manufacturer(s)/Vendor(s) are acceptable but
products to be supplied should be of the same quality
as described or better.

DISCIPLINE
ENGINEER

BOS
DATE: 8-31-14
PROJECT
ENGINEER

DATE:

GCA
9-1-14

CERTIFIED

NAA
DATE:

---- END OF SCOPE OF WORK----

9-7-14

CONSTRUCTION
AGENCY

ESS
8-26-14
DATE:
OPERATIONS

BY:

DATE:

14U187-187

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

7-Sep-14

(DCC) NO. _____________________

CONTROL NUMBER

SMM
8-26-14

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
CERTIFICATE
REVISIONCERTIFICATION

00
THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

DATE:

SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT

M15

TOWN SITE DEVELOPMENT


DHAHRAN
2:54 PM

DRAWING NO.

.DOC

SAUDI ARABIA

AMMS NO.

HE-359222

XK-0092 SOW (ASR)

SHT.NO.

REV.NO.

31
of
31

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

Das könnte Ihnen auch gefallen