Sie sind auf Seite 1von 8

TURNKEY CONTRACT FOR CONSTRUCTION OF NEW

PIPELINEFROM GUEBIBA /TB TO CFTP

CAUSE & EFFECT DIAGRAM


CONTRACTOR Document N:

Rev : B01
Page 1 of 8

55282-TPS-CI-XR-AA-001

TURNKEY CONTRACT FOR CONSTRUCTION OF NEW PIPELINE FROM GUEBIBA /TB TO CFTP

CAUSE & EFFECT DIAGRAM

B01

12/10/2015

Issued For Review

R.GA

Y.GH

Y.GH

REV.

DATE

DESCRIPTION

PREPARED BY

VERIFIED BY

APPROVED BY

COMP. APP.

TURNKEY CONTRACT FOR CONSTRUCTION OF


NEW PIPELINEFROM GUEBIBA /TB TO CFTP

CAUSE & EFFECT DIAGRAM


Rev : 00
Page 2 of 8

CONTRACTOR Document N:

55282-TPS-CI-XR-AA-001

INDEX
Sheet
N

DENOMINATION

REVISION

Sheet
N

DENOMINATION

REVISION

Sheet
N

COVER

B01

20

39

INDEX

B01

21

40

LEGEND

B01

22

41

23

42

NOTES & HOLDS

B01

NOTES & HOLDS

B01

GUEBIBA STATION C&E DIAGRAM

B01

24

43

TANK BATTERY STATION C&E DIAGRAM

B01

25

44

CFTP C&E DIAGRAM

B01

26

45

27

46

10

28

47

11

29

48

12

30

49

13

31

50

14

32

51

15

33

52

16

34

53

17

35

54

18

36

55

19

37

56

20

38

57

DENOMINATION

REVISION

TURNKEY CONTRACT FOR CONSTRUCTION OF


NEW PIPELINEFROM GUEBIBA /TB TO CFTP

CAUSE & EFFECT DIAGRAM


Rev : B01
Page 3 of 8

CONTRACTOR Document N:

55282-TPS-CI-XR-AA-001

LEGEND

CR:

: Control Room

ESD:

: Emergency Shutdown

HMI:

: Human Machine Interface

PAS

: Existing Process Control System at Guebiba / Tank Battery / Sidi Litayem Station

RTB

: Remote Trip Button

RSB

: Remote Start Button

LTB

: Local Stop Button

LSB

: Local Start Button

SIS

: Existing Safety Instrumented System at Guebiba Station

SPLC-01

: New Safety Programmable Logic Controller at Sidi Litayem Station

SPLC-02

: New Safety Programmable Logic Controller at Tank Battery Station (HOLD 47)

TURNKEY CONTRACT FOR CONSTRUCTION OF


NEW PIPELINEFROM GUEBIBA /TB TO CFTP

CAUSE & EFFECT DIAGRAM


Rev : B01
Page 4 of 8

CONTRACTOR Document N:

55282-TPS-CI-XR-AA-001

Notes & Holds


NOTES
Nbr
1
2
3

Page
5 of 7
6 of 7
7 of 7

Note Description
Existing instrument
Audible PROCESS ALARM : Discontinious tone
Audible SAFETY ALARM : Continious tone

HOLDS
Nbr
1
2
3
4
5
6
7
8
9

Page
5 of 7
5 of 7
5 of 7
5 of 7
5 of 7
5 of 7
5 of 7
5 of 7
5 of 7

Hold Description
The LSL100 set point will be provided by TPS
The LSL110 set point will be provided by TPS
The LSH100 set point will be provided by TPS
The LSH110 set point will be provided by TPS
The PSH 100 set point will be provided after pump design
The PSL 100 set point will be provided after pump design
The PSH110 set point will be provided after pump design
The PSL 110 set point will be provided after pump design
DPIT-130 set point will be clarified by Petrogas

10

5 of 7

The PSL 101 set point will be provided after control phylosophy clarification

11

5 of 7

The PSH 101 set point will be provided after control phylosophy clarification

12

5 of 7

13
14
15
16
17
18
19
20
21
22
23

6 of 7
6 of 7
6 of 7
6 of 7
6 of 7
6 of 7
6 of 7
6 of 7
6 of 7
6 of 7
6 of 7

TPS shall clarify emergency shutdown philosophy in case of H2S detection


at Guebiba station
LSL 202 set point will be provided by TPS
LSL 203 set point will be provided by TPS
LSH 202 set point will be provided by TPS
LSH 203 set point will be provided by TPS
PSH 202 set point will be provided after pump design
PSL 202 set point will be provided after pump design
PSH 203 set point will be provided after pump design
PSL 203 set point will be provided after pump design
DPIT-141 set point will be clarified by Petrogas
PSH 220 set point will be provided after control phylosophy clarification
PSL 220 set point will be provided after control phylosophy clarification

24

6 of 7

PSH 230 set point will be provided after control phylosophy clarification

25

6 of 7

PSL 230 set point will be provided after control phylosophy clarification

TURNKEY CONTRACT FOR CONSTRUCTION OF


NEW PIPELINEFROM GUEBIBA /TB TO CFTP

CAUSE & EFFECT DIAGRAM


Rev : B01
Page 5 of 8

CONTRACTOR Document N:

55282-TPS-CI-XR-AA-001

Notes & Holds


NOTES

HOLDS
26

6 of 7

27
28
29
30
31
32
33
34
35
36
37

7 of 7
7 of 7
7 of 7
7 of 7
7 of 7
7 of 7
7 of 7
7 of 7
7 of 7
7 of 7
7 of 7

TPS shall clarify emergency shutdown philosophy in case of H2S detection


at Tank Battery station
LSL 305 set point will be provided by TPS
LSL 306 set point will be provided by TPS
LSH 305 set point will be provided by TPS
LSH 306 set point will be provided by TPS
PSH 305 set point will be provided after pump design
PSL 305 set point will be provided after pump design
PSH 306 set point will be provided after pump design
PSL 306 set point will be provided after pump design
DPIT-151 set point will be clarified by Petrogas
PSH 300 set point will be provided after control phylosophy clarification
PSL 300 set point will be provided after control phylosophy clarification

38

7 of 7

PSH 350 set point will be provided after control phylosophy clarification

39

7 of 7

PSL 350 set point will be provided after control phylosophy clarification

40

7 of 7

41
42
43
44
45
46
47
48

5 of 7
5 of 7
6 of 7
7 of 7
7 of 7
6 of 7
5 of 7
3 of 7

TPS shall clarify emergency shutdown philosophy in case of H2S detection


at Sidi Litayem station
TPS to confirm: PAS or SAS
TPS to clarify existing Emmergency Shutdown logic in Guebiba station
TPS to clarify existing Emmergency Shutdown logic in Tank Battery station
TPS to clarify existing Emmergency Shutdown logic in Sidi Litayem station
DPIT-150 set point will be clarified by Petrogas
DPIT-140 set point will be clarified by Petrogas
DPIT-131 set point will be clarified by Petrogas
To be confirmed by TPS and Petrogas

TURNKEY CONTRACT FOR CONSTRUCTION OF NEW PIPELINEFROM GUEBIBA /TB TO CFTP

CAUSE & EFFECT DIAGRAM


Rev : 00

CONTRACTOR Document N:

Page 6 of 8

55282-TPS-CI-XR-AA-001

TAG no.

IDENTIFICATION
AND SERVICE

P&ID

FUNCTION

SYSTEM

SET POINT

Differencial pressure Alarm


in HMI

Differencial pressure Alarm


in HMI

TC oil storage tank Low


level alarm in HMI

TD oil storage tank Low


level alarm in HMI

TC oil storage tank High


level alarm in HMI

TD oil storage tank High


level alarm in HMI

Export pump P-GUE-01


High Discharge Pressure
alarm in HMI

Export pump P-GUE-01 Low


Discharge Pressure alarm in
HMI

Export pump P-GUE-02


High Discharge Pressure
alarm in HMI

Export pump P-GUE-02 Low


Discharge Pressure alarm in
HMI

Guebiba-to-Tank Battery
pipeline High pressure alarm
in HMI

Guebiba-to-Tank Battery
pipeline Low pressure alarm
in HMI

SDV-100 Open position


alarm in HMI

SDV-100 Closed position


alarm in HMI

SDV-101 Open position


alarm in HMI

B2RR-109 Opened position


alarm in HMI

B2RR-109 Closed position


alarm in HMI

B2RR-104 Opened position


alarm in HMI

B2RR-109 Opened position


alarm in HMI

B2RR-109 Closed position


alarm in HMI

20 ppm H2S detection alarm


in HMI

Fire detection alarm in HMI

55282-TPS-PR-XB-AA102

55282-TPS-PR-XB-AA102

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA103

55282-TPS-PR-XB-AA103

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA103

55282-TPS-PR-XB-AA103

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA101

55282-TPS-PR-XB-AA101

DPAH-130

DPAH-131

LAL-100

LAL-110

LAH-100

LAH-110

PAH-100

PAL-100

PAH-110

PAL-110

PAH-101

PAL-101

ZAH-100

ZAL-100

ZAH-101

ZAL-101

ZAH-104

ZAL-104

ZAL-109

ZAH-109

GA10100/101/102

GA20100/101/102

FA-100/101

SIS

SIS

PAS

PAS

PAS

PAS

PAS

SIS

PAS

SIS

SIS

SIS

PAS

PAS

PAS

PAS

PAS

PAS

PAS

PAS

SIS

SIS

SIS

10 ppm H2S detection alarm


in HMI

Alert Operator with Beacon


B-100
SIS

Alert Operator with Siren


S-101
PAS

Alert Operator with Siren


S-100
SIS

Close Shutdown Valve (SDV101)


55282-TPS-PR-XB-AA103
SOV-101
SIS

Close Shutdown Valve (SDV100)


55282-TPS-PR-XB-AA101
SOV-100

PAS

P-GUE-02

SIS

Stop Export Pump P-GUE02

Start Export Pump P-GUE02


PAS

55282-TPS-PR-XB-AA101

Stop Export Pump P-GUE01


P-GUE-01

PAS

TAG No.
SYSTEM

CAUSE

PAS

Start Export Pump P-GUE01


55282-TPS-PR-XB-AA101

IDENTIFICATION AND
SERVICE
P&ID

EFFECT

Guebiba Station Cause & Effect Diagram

NOTES

Guebiba Station
Oil Storage Tanks

PAS
(HOLD 41)
PAS
(HOLD 41)
PAS
(HOLD 41)
PAS
(HOLD 41)

LSL-100

Level Switch

55282-TPS-PR-XB-AA-101

Tank low oil level detection

LSL-110

Level Switch

55282-TPS-PR-XB-AA-101

Tank low oil level detection

LSH-100

Level Switch

55282-TPS-PR-XB-AA-101

Tank high oil level detection

LSH-110

Level Switch

55282-TPS-PR-XB-AA-101

Tank high oil level detection

ZSH-100

Limit Switch

55282-TPS-PR-XB-AA-103

Shutdown Valve status

PAS

100% Valve Opening

ZSL-100

Limit Switch

55282-TPS-PR-XB-AA-103

Shutdown Valve status

PAS

0% Valve Opening

HOLD 1
HOLD 2
HOLD 3
HOLD 4

- NOTE 1
- HOLD 41
- NOTE 1
- HOLD 41
- NOTE 1
- HOLD 41
'NOTE 12
- NOTE
- HOLD 41
'- NOTE 2

X
X
X

X
X
X

Export Pupms

PSH-100

Pressure Switch

55282-TPS-PR-XB-AA-101

High pump discharge pressure detection

PAS

HOLD 5

- NOTE 2

PSL-100

Pressure Switch

55282-TPS-PR-XB-AA-101

Low pump discharge pressure detection

SIS

HOLD 6

- NOTE 3

PSH-110

Pressure Switch

55282-TPS-PR-XB-AA-101

High pump discharge pressure detection

PAS

HOLD 7

- NOTE 2

10

PSL-110

Pressure Switch

55282-TPS-PR-XB-AA-101

Low pump discharge pressure detection

SIS

HOLD 8

- NOTE 3

11

RSB-100

HMI button

Pump remote manual control from the CR

PAS

12

RTB-100

HMI button

Pump remote manual control from the CR

PAS

13

RSB-110

HMI button

Pump remote manual control from the CR

PAS

14

RTB-110

HMI button

Pump remote manual control from the CR

PAS

15

LSB-100

Puch Button

Pump local manual control

16

LTB-100

Puch Button

Pump local manual control

17

LSB-110

Puch Button

Pump local manual control

18

LTB-110

Puch Button

Pump local manual control

19

ZSH-104

Limit Switch

55282-TPS-PR-XB-AA-101

Shutdown Valve status

PAS

100% Valve Opening

20

ZSL-104

Limit Switch

55282-TPS-PR-XB-AA-101

Shutdown Valve status

PAS

0% Valve Opening

21

ZSH-109

Limit Switch

55282-TPS-PR-XB-AA-101

Shutdown Valve status

PAS

100% Valve Opening

22

ZSL-109

Limit Switch

55282-TPS-PR-XB-AA-101

Shutdown Valve status

PAS

0% Valve Opening

23

DPIT-130

24

DPIT-131

X
X

X
X

X
X
X
X
X
X
X
X
X
X
X
X

Metering Skid

Differencial Pressure
Transmitter
Differencial Pressure
Transmitter

55282-TPS-PR-XB-AA-102

Differential Pressure Detection

PAS

HOLD 9

55282-TPS-PR-XB-AA-102

Differential Pressure Detection

PAS

HOLD 47

X
X

Guebiba to Tank Battery Pipeline

25

PSH-101

Pressure Switch

55282-TPS-PR-XB-AA-103

Pipeline high pressure detection

SIS

HOLD 10

- NOTE 3

26

PSL-101

Pressure Switch

55282-TPS-PR-XB-AA-103

Pipeline low pressure detection

SIS

HOLD 11

- NOTE 3

27

ZSH-101

Limit Switch

55282-TPS-PR-XB-AA-103

Shutdown Valve status

PAS

100% Valve Opening

28

ZSL-101

Limit Switch

55282-TPS-PR-XB-AA-103

Shutdown Valve status

PAS

0% Valve Opening

X
X
X
X

F&G detection

29

H2S-100/101/102

H2S detector

H2S detection

SIS

10 ppm

30

H2S-100/101/102

H2S detector

H2S detection

SIS

20 ppm

31

FD-100/101

Flame Detector

Fire Detection

SIS

-Alarm at 10 ppm
- NOTE 3
-Emergency Shutdown at 20 ppm
-HOLD 12
-NOTE 3
-NOTE 3

X
X

X
X

Emergency Shutdown

32

ESD-100

ESD button

Emergency Shutdown

SIS

33

ESD-101

ESD button

Emergency Shutdown

SIS

34

- HOLD 42
-NOTE 3
- HOLD 42
-NOTE 3

TURNKEY CONTRACT FOR CONSTRUCTION OF NEW PIPELINEFROM GUEBIBA /TB TO CFTP

CAUSE & EFFECT DIAGRAM


Rev : 00

CONTRACTOR Document N:

Page 7 of 8

55282-TPS-CI-XR-AA-001

TAG no.

IDENTIFICATION
AND SERVICE

P&ID

FUNCTION

SYSTEM

SET POINT

ZAH-209

ZAL-209

GA10200/201/202/20
3

GA20200/201/202/20
3

FA-200/201

PAS

PAS

SPLC-02

SPLC-02

SPLC-02

55282-TPS-PR-XB-AA-105

55282-TPS-PR-XB-AA-105

Fire detection alarm in HMI

ZAL-203
PAS

55282-TPS-PR-XB-AA-105

20 ppm H2S detection


alarm in HMI
-

ZAH-203
PAS

55282-TPS-PR-XB-AA-107

10 ppm H2S detection


alarm in HMI
-

ZAL-230
PAS

55282-TPS-PR-XB-AA-107

B2RR-209 Open position


alarm in HMI
55282-TPS-PR-XB-AA-105

ZAH-230
PAS

55282-TPS-PR-XB-AA-104

B2RR-209 Closed position


alarm in HMI

ZAL-220
PAS

55282-TPS-PR-XB-AA-104

B2RR-203 Open position


alarm in HMI

ZAH-220
PAS

55282-TPS-PR-XB-AA-105

B2RR-203 Closed position


alarm in HMI

ZAL-202
PAS

55282-TPS-PR-XB-AA-105

SDV-230 Closed position


alarm in HMI

ZAH-202
PAS

SDV-230 Open position


alarm in HMI

PAL-230
SPLC-02

SDV-220 Closed position


alarm in HMI

PAH-230
SPLC-02

SDV-220Open position
alarm in HMI

PAL-220
SPLC-02

SDV-202 Closed position


alarm in HMI

PAH-220
SPLC-02

SDV-202 Open position


alarm in HMI

PAL-203
SPLC-02

Tank Battery-to-CFTP
55282-TPS-PR-XB-AA-107 pipeline Low pressure alarm
in HMI

PAH-203
PAS

Tank Battery-to-CFTP
55282-TPS-PR-XB-AA-107 pipeline High pressure alarm
in HMI

PAL-202
SPLC-02

Guebiba-to-Tank Battery
55282-TPS-PR-XB-AA-104 pipeline Low pressure alarm
in HMI

PAH-202
PAS

Guebiba-to-Tank Battery
55282-TPS-PR-XB-AA-104 pipeline High pressure alarm
in HMI

LAH-203
(existing)
PAS

Export pump P-TB-02 Low


55282-TPS-PR-XB-AA-105 Discharge Pressure alarm in
HMI

55282-TPS-PR-XB-AA-105

LAH-202
(existing)
PAS

Export pump P-TB-02 High


55282-TPS-PR-XB-AA-105 Discharge Pressure alarm in
HMI

55282-TPS-PR-XB-AA-105

LAL-203
(existing)
PAS

Export pump P-TB-01 Low


55282-TPS-PR-XB-AA-105 Discharge Pressure alarm in
HMI

55282-TPS-PR-XB-AA-105

LAL-202
(existing)
PAS

Export pump P-TB-01 High


55282-TPS-PR-XB-AA-105 Discharge Pressure alarm in
HMI

55282-TPS-PR-XB-AA-105

DPAH-141
PAS

T1B oil storage tank High


level alarm in HMI

55282-TPS-PR-XB-AA-106

DPAH-140
PAS

T1A oil storage tank High


level alarm in HMI

55282-TPS-PR-XB-AA-106

B-200
SPLC-02

T1B oil storage tank Low


level alarm in HMI

Differencial pressure Alarm


in HMI

S-201
PAS

T1A oil storage tank Low


level alarm in HMI

Differencial pressure Alarm


in HMI

S-200
SPLC-02

Alert Operator with Beacon

Close Shutdown Valve (SDV


220)
55282-TPS-PR-XB-AA-104
SOV-220
SPLC-02

Alert Operator with Siren

Close Shutdown Valve (SDV


230)
55282-TPS-PR-XB-AA-107
SOV-230
SPLC-02

Alert Operator with Siren

Close Shutdown Valve (SDV


202)
SOV-202
SPLC-02

P-TB-02

55282-TPS-PR-XB-AA-105

Stop Export Pump P-TB-02


PAS

Start Export Pump P-TB-02


PAS

55282-TPS-PR-XB-AA-105

Stop Export Pump P-TB-01


P-TB-01

PAS

SYSTEM

CAUSE

PAS

Start Export Pump P-TB-01


55282-TPS-PR-XB-AA-105

IDENTIFICATION AND
SERVICE
TAG No.

P&ID

EFFECT

Tank Battery Cause & Effect Diagram

NOTES

Tank Battery Station


Oil Storage Tanks

- NOTE 1
- HOLD 41

LSL-202

Level Switch

55282-TPS-PR-XB-105

Tank low oil level detection

PAS

HOLD 13

LSL-203

Level Switch

55282-TPS-PR-XB-105

Tank low oil level detection

PAS

HOLD 14

LSH-202

Level Switch

55282-TPS-PR-XB-105

Tank high oil level detection

PAS

HOLD 15

LSH-203

Level Switch

55282-TPS-PR-XB-105

Tank high oil level detection

PAS

HOLD 16

ZSH-202

Limit Switch

55282-TPS-PR-XB-105

Shutdown Valve status

PAS

100% Valve Opening

ZSL-202

Limit Switch

55282-TPS-PR-XB-105

Shutdown Valve status

PAS

0% Valve Opening

PSH-202

Pressure Switch

55282-TPS-PR-XB-105

High pump discharge pressure detection

PAS

HOLD 17

- NOTE 2

PSL-202

Pressure Switch

55282-TPS-PR-XB-105

Low pump discharge pressure detection

SPLC-02

HOLD 18

- NOTE 3

PSH-203

Pressure Switch

55282-TPS-PR-XB-105

High pump discharge pressure detection

PAS

HOLD 19

- NOTE 2

10

PSL-203

Pressure Switch

55282-TPS-PR-XB-105

Low pump discharge pressure detection

SPLC-02

HOLD 20

- NOTE 3

11

RSB-200

HMI button

Pump remote manual control from the CR

PAS

- NOTE 1
- HOLD 41
- NOTE 1
- HOLD 41
'NOTE 12
- NOTE

X
X
X

- HOLD 41
'- NOTE 2

X
X
X

Export Pupms

12

RTB-200

HMI button

Pump remote manual control from the CR

PAS

13

RSB-210

HMI button

Pump remote manual control from the CR

PAS

14

RTB-210

HMI button

Pump remote manual control from the CR

PAS

15

LSB-200

Puch Button

Pump local manual control

16

LTB-200

Puch Button

Pump local manual control

17

LSB-210

Puch Button

Pump local manual control

18

LTB-210

Puch Button

Pump local manual control

19

ZSH-209

Limit Switch

55282-TPS-PR-XB-105

Shutdown Valve status

PAS

100% Valve Opening

20

ZSL-209

Limit Switch

55282-TPS-PR-XB-105

Shutdown Valve status

PAS

0% Valve Opening

21

ZSH-203

Limit Switch

55282-TPS-PR-XB-105

Shutdown Valve status

PAS

100% Valve Opening

Shutdown Valve status

22

ZSL-203

Limit Switch

55282-TPS-PR-XB-105

23

DPIT-140

Differencial Pressure
Transmitter

55282-TPS-PR-XB-106

24

DPIT-141

Differencial Pressure
Transmitter

55282-TPS-PR-XB-106

25

PSH-220

Pressure Switch

55282-TPS-PR-XB-104

Pipeline high pressure detection

26

PSL-220

Pressure Switch

55282-TPS-PR-XB-104

27

ZSH-220

Limit Switch

28

ZSL-220

Limit Switch

X
X

X
X
X
X
X
X
X
X
X
X
X

PAS

0% Valve Opening

Differential Pressure Detection

PAS

HOLD 46

Differential Pressure Detection

PAS

HOLD 21

SAS

HOLD 22

- NOTE 3

Pipeline low pressure detection

SPLC-02

HOLD 23

- NOTE 3

55282-TPS-PR-XB-104

Shutdown Valve status

PAS

100% Valve Opening

55282-TPS-PR-XB-104

Shutdown Valve status

PAS

0% Valve Opening

Metering Skid

X
X

Guebiba to Tank Battery Pipeline

X
X
X
X

Tank Battery to CFTP Pipeline

29

PSH-230

Pressure Switch

55282-TPS-PR-XB-107

Pipeline high pressure detection

SAS

HOLD 24

- NOTE 3

30

PSL-230

Pressure Switch

55282-TPS-PR-XB-107

Pipeline low pressure detection

SPLC-02

HOLD 25

- NOTE 3

31

ZSH-230

Limit Switch

55282-TPS-PR-XB-107

Shutdown Valve status

PAS

100% Valve Opening

32

ZSL-230

Limit Switch

55282-TPS-PR-XB-107

Shutdown Valve status

PAS

0% Valve Opening

X
X
X
X

F&G detection

33

H2S-200/201/202/203

H2S detector

H2S detection

34

H2S-200/201/202/203

H2S detector

35

FD-200/201

Flame Detector

36

ESD-200

ESD button

Emergency Shutdown

37

ESD-201

ESD button

Emergency Shutdown

SPLC-02

10 ppm

- Alarm at 10 ppm
- Existing Loop (H2S detector to be relocated)
'- NOTE 3

20 ppm

- Emergency Shutdown at 20 ppm


- Existing Loop (H2S detector to be relocated)
- HOLD 26
'- NOTE 3

H2S detection

SPLC-02

Fire Detection

SAS

- NOTE 3

SAS

- HOLD 43
- NOTE 3

SAS

- HOLD 43
- NOTE 3

Emergency Shutdown

TURNKEY CONTRACT FOR CONSTRUCTION OF NEW PIPELINEFROM GUEBIBA /TB TO CFTP

CAUSE & EFFECT DIAGRAM


Rev : 00

CONTRACTOR Document N:

Page 8 of 8

55282-TPS-CI-XR-AA-001

TAG no.

IDENTIFICATION
AND SERVICE

P&ID

FUNCTION

SYSTEM

SET POINT

TANK Battery to CFTP


55282-TPS-PR-XB-AA-108 pipeline Low pressure alarm
in HMI

CFTP to TRAPSA pipeline


High pressure alarm in HMI

SDV-400 Open position


alarm in HMI

SDV-400 Closed position


alarm in HMI

SDV-350 Open position


alarm in HMI

55282-TPS-PR-XB-AA-110

55282-TPS-PR-XB-AA-109

55282-TPS-PR-XB-AA-109

55282-TPS-PR-XB-AA-109

55282-TPS-PR-XB-AA-109

55282-TPS-PR-XB-AA-109

55282-TPS-PR-XB-AA-109

55282-TPS-PR-XB-AA-109 s

SDV-300 Closed position


alarm in HMI

55282-TPS-PR-XB-AA-110

55282-TPS-PR-XB-AA-104

55282-TPS-PR-XB-AA-110

55282-TPS-PR-XB-AA-110

PAL-300

PAH-307

PAL-307

ZAH-329

ZAL-329

ZAH-334

ZAL-334

ZAH-400

ZAL-400

ZAH-300

ZAL-300

ZAH-350

ZAL-350

GA10300/301/302

GA2031/301/302

FA-300/301

SPLC-01

SPLC-01

SPLC-01

PAS

PAS

PAS

PAS

PAS

PAS

PAS

PAS

PAS

PAS

SPLC-01

SPLC-01

SPLC-01

Fire detection alarm in HMI

Tank Battery to CFTP


55282-TPS-PR-XB-AA-108 pipeline High pressure alarm
in HMI
PAH-300
SPLC-01

20 ppm H2S detection alarm


in HMI

Export pump PB Low


55282-TPS-PR-XB-AA-109 Discharge Pressure alarm in
HMI
PAL-305
SPLC-01

10 ppm H2S detection alarm


in HMI

Export pump P-PB


55282-TPS-PR-XB-AA-109 Discharge Pressure alarm in
HMI
PAH-305
PAS

SDV-350 Closed position


alarm in HMI

Export pump PA Low


55282-TPS-PR-XB-AA-109 Discharge Pressure alarm in
HMI
PAL-306
SPLC-01

CFTP to TRAPSA pipeline


Low pressure alarm in HMI

Export pump PA High


55282-TPS-PR-XB-AA-109 Discharge Pressure alarm in
HMI
PAH-306
PAS

TB oil storage tank High


level alarm in HMI
55282-TPS-PR-XB-AA-109
LAH-306
(existing)
PAS

TA oil storage tank High


level alarm in HMI
55282-TPS-PR-XB-AA-109
LAH-305
(existing)
PAS

TB oil storage tank Low


level alarm in HMI
55282-TPS-PR-XB-AA-109
LAL-306
(existing)
PAS

TA oil storage tank Low


level alarm in HMI
55282-TPS-PR-XB-AA-109
LAL-305
(existing)
PAS

Differential pressure
detection in HMI
'55282-TPS-PR-XB-AA-110
DPAH-151
PAS

Differential pressure
detection in HMI
'55282-TPS-PR-XB-AA-110
DPAH-150
PAS

Alert Operator with Beacon


B-300
SPLC-01

Alert Operator with Siren


S-301
PAS

Alert Operator with Siren


S-300
SPLC-01

Close Shutdown Valve (SDV


350)
55282-TPS-PR-XB-AA-104
SOV-350
SPLC-01

Close Shutdown Valve (SDV


400)
55282-TPS-PR-XB-AA-109
SOV-400
SPLC-01

Close Shutdown Valve (SDV


300)
55282-TPS-PR-XB-AA-108
SOV-300

PAS

PB

SPLC-01

Stop Export Pump PB

Start Export Pump PB


PAS

55282-TPS-PR-XB-AA-109

Stop Export Pump PA


PA

PAS

SYSTEM

CAUSE

PAS

Start Export Pump PA


55282-TPS-PR-XB-AA-109

IDENTIFICATION AND
SERVICE
TAG No.

P&ID

EFFECT

CFTP Cause & Effect Diagram

NOTES

Sidi Litayem Station


Oil Storage Tanks

LSL-305

Level Switch

55282-TPS-PR-XB-AA-109

Tank low oil level detection

PAS

HOLD 27

- Existing instrument
- TPS to confirm: PAS or SAS.

LSL-306

Level Switch

55282-TPS-PR-XB-AA-109

Tank low oil level detection

PAS

HOLD 28

- Existing instrument
- TPS to confirm: PAS or SAS

LSH-305

Level Switch

55282-TPS-PR-XB-AA-109

Tank high oil level detection

PAS

HOLD 29

LSH-306

Level Switch

55282-TPS-PR-XB-AA-109

Tank high oil level detection

PAS

HOLD 30

ZSH-400

Limit Switch

55282-TPS-PR-XB-AA-109

Shutdown Valve status

PAS

100% Valve Opening

ZSL-400

Limit Switch

55282-TPS-PR-XB-AA-109

Shutdown Valve status

PAS

0% Valve Opening

- Existing instrument
- TPS to confirm: PAS or SAS
- NOTE 2
- Existing instrument
- TPS to confirm: PAS or SAS
- NOTE 2

X
X

X
X
X

Export Pupms

PSH-306

Pressure Switch

55282-TPS-PR-XB-AA-109

High pump discharge pressure detection

PAS

HOLD 31

- NOTE 2

PSL-306

Pressure Switch

55282-TPS-PR-XB-AA-109

Low pump discharge pressure detection

SPLC-01

HOLD 32

- NOTE 3

PSH-305

Pressure Switch

55282-TPS-PR-XB-AA-109

High pump discharge pressure detection

PAS

HOLD 33

- NOTE 2

10

PSL-305

Pressure Switch

55282-TPS-PR-XB-AA-109

Low pump discharge pressure detection

SPLC-01

HOLD 34

- NOTE 3

11

RSB-300

HMI button

Pump remote manual control from the CR

PAS

12

RTB-300

HMI button

Pump remote manual control from the CR

PAS

13

RSB-310

HMI button

Pump remote manual control from the CR

PAS

14

RTB-310

HMI button

Pump remote manual control from the CR

PAS

15

LSB-300

Puch Button

Pump local manual control

16

LTB-300

Puch Button

Pump local manual control

17

LSB-310

Puch Button

Pump local manual control

18

LTB-310

Puch Button

Pump local manual control

19

ZSL-329

Limit Switch

55282-TPS-PR-XB-105

Shutdown Valve status

PAS

0% Valve Opening

20

ZSH-329

Limit Switch

55282-TPS-PR-XB-105

Shutdown Valve status

PAS

100% Valve Opening

21

ZSL-334

Limit Switch

55282-TPS-PR-XB-105

Shutdown Valve status

PAS

0% Valve Opening

22

ZSH-334

Limit Switch

55282-TPS-PR-XB-105

Shutdown Valve status

PAS

100% Valve Opening

23

DPIT-150

Differencial Pressure
Transmitter

55282-TPS-PR-XB-AA-110

Differential Pressure Indication

PAS

HOLD 35

24

DPIT-151

Differencial Pressure
Transmitter

55282-TPS-PR-XB-AA-110

Differential Pressure Indication

PAS

HOLD 45

X
X

X
X
X
X
X
X
X
X
X
X
X
X

Metering Skid

X
X

Tank Battery to CFTP Pipeline

25

PSH-300

Pressure Switch

55282-TPS-PR-XB-AA-108

Pipeline high pressure detection

SPLC-01

HOLD 36

- NOTE 3

26

PSL-300

Pressure Switch

55282-TPS-PR-XB-AA-108

Pipeline low pressure detection

SPLC-01

HOLD 37

- NOTE 3

27

ZSH-300

Limit Switch

55282-TPS-PR-XB-AA-108

Shutdown Valve status

PAS

100% Valve Opening

28

ZSL-300

Limit Switch

55282-TPS-PR-XB-AA-108

Shutdown Valve status

PAS

0% Valve Opening

X
X
X
X

CFTP to TRAPSA Pipeline

29

PSH-307

Pressure Switch

55282-TPS-PR-XB-AA-110

Pipeline high pressure detection

SPLC-01

HOLD 38

- NOTE 3

30

PSL-307

Pressure Switch

55282-TPS-PR-XB-AA-110

Pipeline low pressure detection

SPLC-01

HOLD 39

- NOTE 3

31

ZSH-350

Limit Switch

55282-TPS-PR-XB-AA-110

Shutdown Valve status

PAS

100% Valve Opening

32

ZSL-350

Limit Switch

55282-TPS-PR-XB-AA-110

Shutdown Valve status

PAS

0% Valve Opening

SPLC-01

10 ppm

- Alarm at 10 ppm
- NOTE 3

20 ppm

- Emergency Shutdown at 20 ppm


- HOLD 40
- NOTE 3

X
X
X
X

F&G detection

33

H2S-300/301/302

H2S detector

34

H2S-300/301/302

H2S detector

35

FD-300/301

Flame Detector

H2S detection

H2S detection

SPLC-01

Fire Detection

SPLC-01

- NOTE 3

Emergency Shutdown

36

ESD-300

ESD button

Emergency Shutdown

SPLC-01

- HOLD 44
- NOTE 3

37

ESD-301

ESD button

Emergency Shutdown

SPLC-01

- HOLD 44
- NOTE 3

X
X

Das könnte Ihnen auch gefallen