INSPECTION ACTIVITIES
REFERENCE
DOCUMENTS/STANDARD
INSPECTION POINTS
W
H
SIGNATURE
CONSTRUCTION DRAWINGS
1.1 Manufacturing Drawings
2-a
2-b
PROJECT
PRODUCT
ITEM
ASME SEC IX
ASME SEC IX
ASME SEC IX
Approved Drawings
Approved WPS
A
W
A
A : AJC INSPECTION
W : WITNESS BY NRL
H : HOLD POINT
Rev. 0
DATE : 8-May-2015
PAGE 1 OF 2
INSPECTION DOCUMENTS
INSPECTION ACTIVITIES
Nozzel Oriention
5.1 Marking & Dimension
5.2 Fitup & Alignment & Welding
SADDLES, REPAD & NAME PLATE BRACKET
6.1
REFERENCE
DOCUMENTS/STANDARD
Approved Drawings
Approved Drawings
Approved Drawings
Fit up and welding of saddles, reinforcement pads Approved Drawings / ASME Sec. VIII Div. 1 /
and name plate bracket with shell
ASME Sec. IX
A
A
A
A
INSPECTION POINTS
W
H
W
W
H
W
NDT EXAMINATION
NDT Examination as per Scope, DPT, Visual
Examination and spot RT of welds
7.1
100% DPT of all weld seams
10% RT of LS and CS of each weld seam
PROJECT
PRODUCT
ITEM
PRESSURE TESTING
8.1 Hydro pressure testing of vessel
8.2 Pneumatic testing of all reinforcement pads
10
FINAL INSPECTION
10.1 Over All Inspection
10.2 Delivery to Site
W
A
11
A : AJC INSPECTION
W : WITNESS BY NRL
H : HOLD POINT
NERY LIMITED
ssel Hydrobon
V-5
CTION POINTS
SIGNATURE
Rev. 0
DATE : 8-May-2015
PAGE 2 OF 2
INSPECTION DOCUMENTS
As Per Client Requirement
ECTION
BY NRL
NT
1)
2)
3)
4)
5)