Scenario/Condition 1:
No created tunnel
New E1 service configuration
1. You can see at the CAO table that your Source site is O93 and the destination site is N19.
Right click O93 and choose "NE Config".
CONFIDETIAL
Page 2 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
3. Right click in the blank and select Add. Choose the port to be used, select the >
button, the click Add.
4. Right click the port and choose "Save Selected to Device". Do steps 1 to 4 also for your
Destination Port(in this example, N19).
CONFIDETIAL
Page 3 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
CONFIDETIAL
Page 4 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
For CES Service, it requires dynamic tunnel. Choose dynamic and Dynamis LSP 1:1 protection.
7. Click Source LSR and select the source site on the topology, Click the Sink LSR and check
the destination site on the topology. Check Enable BFD(Bidirectional Forwarding
Detection).
CONFIDETIAL
Page 5 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
CONFIDETIAL
Page 6 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
9. Click the line interconnecting the source site and its next hop router, a box will pop-up
where you will tick the site corresponding to the next hop router until it reaches the
destination.
10. After configuring the main-forward link, configure the main-reverse link(Destination to
CONFIDETIAL
Page 7 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
Source).
11. Under Path 1/Path 2 BFD Properties, Select 10ms for the minimum transmit and received
time.
CONFIDETIAL
Page 8 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
12. We previously configure Source-Dest and Dest Source link. This is now your main route.
Configure again and repeat steps 8 to 11 for the protection route.
13. After tunnel configuration, Right click the created tunnel and select Add IPRAN VC
Circuit. This is to create your Virtual Channel(VC).
CONFIDETIAL
Page 9 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
CONFIDETIAL
Page 10 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
16. Right click at the created VC and select Add IPRAN CES Service.
17. On the drop down list, select the port type(can be PDH E1 or STM 1 port) and the
CONFIDETIAL
Page 11 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
18. Under All Circuits, Right click the tunnel with to be activated and select Deliver Crossconnect of the Selected Path
19. Under PTN Ethernet Service, Right click the E-CES with to be activated and select Deliver
Cross-connect of the Selected Path.
CONFIDETIAL
Page 12 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
20. Under Protection Pair Tab, Right click the Protection with to be activated and select
Deliver Cross-connect of the Protection Group.
21. We need to add LDP protocol to our link every new tunnel creation. Add LDP protocol
mutually.
CONFIDETIAL
Page 13 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
b. Open N19 LDP protocol(NE Config> Protocol config> LDP) ,Click LDP_Item Peer, Right click on
the blank space, then click add.
c. Manually the the O93 Manager Port IP on N19 LDP Protocol Config. Exit on the LDP Item Peer.
Right Click at the created LDP Protocol Item and Click Save Selected to Device.
CONFIDETIAL
Page 14 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
CONFIDETIAL
Page 15 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
CONFIDETIAL
Page 16 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
CONFIDETIAL
Page 17 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
If card has 32 e1, enable the ports first in Card configuration >> Context Config.
To conduct loop testing(set up for example is Site A <> Site B. Go to the E1 card >>
Control Command.
LLB: Local Loopback = enable loop at Site A DDF facing the BER tester(also installed in Site A)
DLB: Device Loopback = enable loop at Site A facing the DDF of Site B(depending on the created
tunnel/trail, where BER tester is installed in Site B).
Select LLB, turn loop ON on the corresponding port and click Play.
CONFIDETIAL
Page 18 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
Notes/Tips:
DLB corresponds to loop at card facing far end device.
Example: C10 DDF : C10 NE <><><>><><> C01 NE : C01 DDF. If FO have a BER tester
at C01 DDF and FO wants to you provide a loop at C10 NE, you have to access C10 and
enable a DLB loop.
On 865/845, you need to enable the e1 ports on card configuration context to also enable
the alarms.
Upon enabling the ports, alarm that will be seen on E1 port is PPI_LOS(Signal Loss alarm
of PDH Physical Interface) and AIS alarm(Alarm Indication Signal). Hard loop on its DDF
must changed the PPI_LOS alarm to only AIS alarm.
i.
CONFIDETIAL
Page 19 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
Scenario/Condition 2:
For the creation of E1 service, if there is available tunnel, just create a VC on that tunnel
before the creation of service.
1.
2.
3.
4.
5.
6.
7.
Configure the PDH interfaces. Right click at the source NE, click NE Config.
Go to Interface Manager >> CES Interface
Right click at the blank space, select Add.
Choose the port(based on CAO), select > button and then click Add.
Right click on the CES port to be activated then Choose Save Selected to Device.
Go to the Destination Site and conduct Steps 1 to 5.
Go to Business Management View, Under All Circuits Tab, Search the Dynamic Tunnel
using the Source NE ID typed on the Search Box. Dynamic Tunnel must be the link from
your Source to the Destination Site.
8. Right Click on the Tunnel, Choose Add IPRAN VC Circuit.
9. Details:
Signaling: Dynamic
Click Next
10. Batch Creation Settings
Lot Size: (Depends on the numbers of E1 service which corresponds to the equal
number of VC that must be created)
Click Completed
11. Go to Business Management View, Choose/Select the VC youve created, Right Click
then Choose Add IPRAN CES Service.
12. On the drop down list, select the port type(can be PDH E1 or STM 1 port) and the
corresponding Source and Sink Port(based on Work Order).
13. Click Completed
14. Under PTN Ethernet Service, Right click the E-CES with to be activated status and select
Deliver Cross-connect of the Selected Path.
15. Check the Port by checking the uptime status at Secure Crt, accessing its NE IP, and
typing the show mpls vc-table command.
Scenario/Condition 3:
CONFIDETIAL
Page 20 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
2. Create VC/Pw.
On Business Management View > Go to IP config > VC config
Check: multiple pw
Signaling: static
Tick the source and Dest site
Next
CONFIDETIAL
Page 21 of 21
SUBJECT
REVISION
PREPARED BY:
DATE
V 1.0
Gilbert T. Lacanlale
Select / choose the middle site(In our example, C15 is our middle site).
Select All.
Tick two static tunnels
1. Source to Middle site
2. Site to destination site (static)
Next, Completed
Deliver the configuration.
Create the E-CES.