Beruflich Dokumente
Kultur Dokumente
635
0.45
D = 4.635
H=
A
F.L
390.369
RL
388.869
1.5
A
D = 4.635
(S+V)surcharge on BB
(S+V)surcharge on CC
(S+V)surcharge on DD
H1 =
8.869
R L 381.500
H2
C
D
L1
0.4
L2
L3
L4
L5
L6
1.800 1.026 0.45 1.026 1.800
= 1.800
R L 379.700
379.300
L7
0.4
12.61
A'
7
390.369
RL
388.869
1.5
3
L9
L8
H5 = 8.869
H=
F.L
3
5
Earthfill
H1 = 8.869
4
5
6
R L 381.500
B'
6
H4 =
1.800
H3 =
1.026 B
7
L10
C'
0.40
1.026
4
R L 381.500
H2
= 1.800
10
379.700
C
11
D'
L1
0.4
L2
L3
L4
L5
1.800 1.026 0.45 1.026
6.902
=P2
=
L6
1.800
L7
0.4
379.300
D
1
H1
A'
H1 = 8.869
L9
= ###
1 in 0
1 in 0
H5 = 8.87
H2 = 379.700
6
5
3
381.500
1.026
H6 = #REF!
B'
1.8
L10
B
10
H3 = 0.40
C'
H4 = #REF!
C
D'
L1
P1
x K1
L2
L3
H1 =
A
L4
8.869
A'
#REF!
###
H5 - H1
#REF!
B'
H6
#REF!
H4
#REF!
H6 - H3
H3
C'
H4 = ###
D
H4
L6
L7
L8
0.000
#REF!
D'
.
47555.50
6
12.61
F.L
A'
7
= 8.869
1.5
R L
388.869
L9
L8
H5
H =
390.369
3
5
Earthfill
H1
4
8.869
5
6
R L
381.500
B'
1.026
6
H4 =
1.800
1.026
R L
H2
L10
H3 =
381.500
4
9
C'
0.40
1.800
10
379.700
C
11
379.300
D'
L1
L2
0.4
1.800
L3
L4
1.026 0.45
L5
L6
L7
1.026
1.800
0.4
L1
0.400
L2
1.800
L3
1.026
L4
0.450
L5
1.026
L6
1.800
L7
0.400
L8
0.159
L9
0.1588
L10
0.0000
w for Section A - A =
w for Section B - B =
L9 + L4 + L8
L10 + L3 + L4
w for Section C - C =
w for Section D - D =
L2 + L3 + L4 + L5 + L6
L1 + L2 + L3 + L4 + L5 + L6 + L7
L5
=
=
0.768
2.502
=
=
6.102
6.902
H
H1
= 1.500
= 8.869
H2
H3
H4
= 1.800
= 0.400
= 1.800
H5
= 8.869
Area
Section A' - A
0.107
0.107
=
0.675
0.675
=
0.107
x 2.3 x 1.00
=
0.2466
Total =
2.046
Moment
Moments about A
.
47555.50
7
0.67 x L9
0.662
0.163
0.384
0.596
0.106
0.026
Total
Section B' - B
0.79
Moments about B
4.472
4.472
=
1.814
18.660
3.991
3.991
=
1.251
11.481
4.472
4.472
=
x 2.3 x 1.00
10.2852
0.684
7.037
7 L3 (H4 - H2)
0.000
0.000
0.000
1.989
0.000
=
0.000
2.50153
0.000
2+5 L4 x H1
=
Total
0.67 x L5
0.0000
29.75
Total
Section C' - C
4.472
4.472
=
3.991
3.991
=
4.472
7 L3 (H4 - H2)
0.000
4.472
=
0.000
1.620
=
1.620
0.0000
3.789
x 2.3 x 1.00 L6 + L5 + L4 + L3 + 0.33L2
4.503
=
4.503
3.7260
=
4.90093
x 2.3 x 1.00 L6 + 0.5(L3 + L4 + L5)
1.620
=
1.620
10.3563
3.051
x 2.3 x 1.00 0.667 x L6
8 0.5 x L2 x H4
9 (L3 + L4 + L5) x H2 =
10 0.5 x L6 x H2
=
Total
3.7260
47.56
Section D' - D
1+4 0.5 x L3 x (H5 - 0.15)
37
Moments about C
37.173
3.051
28.004
2.484
25.550
0.000
18.261
31.595
4.473
=
1.2006
Total
145
Moments about D
=
4.472
4.472
x 2.3
x 1.00 L7 + L6 + L5 + L4 + 0.33L3
41.287
.
47555.50
8
3.991
=
3.991
10.2852
=
4.014
x 2.3 x 1.00 L7 + L6 + L5 + 0.5L4
9.1794
3.451
x 2.3 x 1.00 L7+ L6 + 0.667L5
31.676
2.884
29.664
4.472
=
4.472
7 L3 (H4 - H2)
0.000
=
0.000
10.2852
x 2.3 x 1.00 L7 + L6 + L5 + L4 + 0.5L3
0.000
1.620
=
1.620
0.0000
4.189
x 2.3 x 1.00 L7 + L6 + L5 + L4 + L3 + 0.33L2
19.751
=
4.503
=
3.7260
=
5.30093
x 2.3 x 1.00 L7 + L6 + 0.5(L3 + L4 + L5)
10.3563
=
3.451
35.737
1.620
=
1.6006
5.964
2.761
=
21.910
8 0.5 x L2 x H4
9 (L3 + L4 + L5) x H2 =
4.503
10 0.5 x L6 x H2
1.620
11 (L1 + L2 + L3 + L4 + L5 + L6
+ L7) x H3
=
2.761
Total
54
Total
186
Area
Weight
Area x Density x Length
Section A' - A
1
L8
0.15
0.024
0.107
0.11
=
0.003
=
0.5(H - 0.15)L8
0.5 x L8 x L8 Tan(12.61)
0.003
Total
Section B' - B
H5 x L10
Lever Arm
Moment
Moments about
A
0.688
0.029
0.135
0.004
0.236
Total =
0.000
0.000
=
Moments about
=
= 0.000
12.61
0.118
=
0.000
0.000
=
4.472
4.472
=
L3 x 0.15
0.154
0.154
=
Total
Section C' - C
8.35
0.447
0.000
2.160
17.000
1.989
0.539
Total =
18
Moments about
C
0.17
L2 x H5
0.5 x
.
47555.50
9
15.964
15.964
=
146.147
L2 x H4
1.620
1.620
=
15.688
0.15
0.154
0.154
=
1.026
31.166
L3 x
4.472
4.472
=
12.61
0.893
x 1.8 x 1.00 0.667(L2 + L3) + L4 + L5 + L6
= 8.112
=
1.5720
=
5.161
Total =
40.66
Total =
202
Section D' - D
Moments about
=
D
50.335
7.511
=
6.702
x 1.8 x 1.00 0.5L2 + L3 + L4 + L5 + L6 + L7
157.386
=
1.620
28.097
=
5.602
x 1.8 x 1.00 0.667L2 + L3 + L4 + L5 + L6 + L7
16.828
=
0.154
=
2.8512
=
5.902
x 1.8 x 1.00 0.5L3 +L4 + L5+ L6 + L7
0.2708
4.189
1.134
L1 x (H5 + H4)
4.268
4.268
x 1.8
L2 x H5
15.964
=
15.964
1.620
0.5 x
L2 x H4
0.15
=
=
0.154
x 1.00 0.5L1+ L2 + L3 + L4 + L5 + L6 + L7
L3 x
4.472
4.472
=
34.315
3.755
=
38.507
Total
53.21
Total =
299
.
47555.50
10
=
12.61
tan
(L3/H5)
=
6.60
1
=
0.12
K1 =
=
=
35
0.611
11.67
0.20
Cos ( - )
Cos
28.40
0.774
Sin ( + )
Sin ( - )
Sin
Sin
Cos
46.7
22.39
18.26
=
=
=
0.727
0.381
0.950
Cos
Cos
-6.01
6.60
=
=
0.994
0.987
Cos
Sin
18.26
18.26
Cos ( + )
Cos ( - )
*
*
1 =
Cos
Cos ( + )
Sin ( + )
Cos ( - )
Cos
Cos ( + )
0.774
0.99 x
=
0.937
=
0.937
(L2/H4)
=
=
=
=
2 =
35
0.611
(1 +
0.774
x
0.73
0.95
x
x
0.38
0.99
0.277
0.944
0.542)
0.347
2.377
45.00
0.785
K2 =
11.67
0.20
1 +
0.774
0.937
tan-1
0.95
0.774
2 =
Sin ( + ) Sin ( - )
Cos ( + ) Cos ( - )
ZONE 2
2 =
12.61
1 +
Cos ( - )
Cos
Cos ( + )
1 +
Sin ( + ) Sin ( - )
Cos ( + ) Cos ( - )
*
*
Cos( - )
Cos
-10.00
0.970
Sin( + )
Sin ( - )
Sin
Sin
46.67
22.39
=
=
0.727
0.381
Cos ( + )
Cos ( - )
Cos
Cos
Cos
56.67
32.39
45.00
=
=
=
0.550
0.844
0.500
Cos
Sin
56.67
56.67
Cos
Cos ( + )
Sin ( + )
=
0.50 x
=
0.275
0.970
1 +
0.277
0.73
0.38
0.55
0.84
0.464
=
0.55
0.970
1 +
0.275
0.970
(1 +
0.773)
Horizontal components
=
Zone 3
3 =
=
12.61
35
3 =
3
tan-1
11.67
(L1/0)
=
K3 =
0.970
0.275
3.143
0.0
0.00
Cos ( - )
1.123
0.611
0.204
Cos
Cos ( + )
.
47555.50
11
Sin ( + ) Sin ( - )
1 +
Cos ( + ) Cos ( - )
*
*
*
Cos( - )
Sin ( + )
Cos
Sin
35.00
46.67
=
=
0.671
0.727
Sin ( - )
Cos ( + )
Sin
Cos
22.39
11.67
=
=
0.381
0.979
Cos ( - )
Cos
Cos
Cos
-12.61
0.00
=
=
0.976
1.000
=
1.00 x
=
Cos ( + )
Sin ( + )
Cos 11.67
Sin 11.67
Required for Calculation of vertical and
Horizontal components
5.50
T/m2
B =
0.98
1 +
0.979
0.671
1 +
0.979
0.671
(1 +
0.538)
0.979
0.671
x
2.367
0.277
0.73
0.98
x
x
0.289
0.38
0.98
0.956
0.671
3 m
L =
1.76
6.85
T/m
13.70 T/m2
center line of track
3.425
(h) =
(h) =
(h) =
H + 0.33
H5 + H4 - H2 + 0.33
H4 + H5 + 0.33
=
=
=
1.833
9.202
10.999
(h) =
H3 + H4 + H5 + 0.33
11.40
=
=
1.833
9.202
4.476
3.609
=
=
-2.643
5.593
=
=
10.999
11.399
1.809
1.409
=
=
9.190
9.990
+ 0.33
L - B
2
P1
= (S + V) h1 x Ka
act
B + 2D
Section A-A
P1 =
(S + V) x h1 x K1
at h1
2
26.56
1
2
Say
0.00
4.635
x Sin(26.56)
L - B
x Sin(26.56)
- L3 - L10 + 0.33
3.609
L - B
x Sin(26.56)
- L2 - L3 + 0.33
1.809
L - B
x Sin(26.56)
- L1 - L2 - L3 + 0.33
1.409
L - B
x Sin(26.56)
- L8 + 0.33
4.476
wing
B + 2D
13.70
+ 5.5
3.0 + (2.0 x
0.000
x 0.0
x 0.35
Acts at h1/2 =
4.476)
0.0
.
47555.50
12
0.00
Section B-B
P1a =
=
+ 5.5
3.0 +
3.651
3.609)
(1.80
x (1.8
- 1.8)
x 1.12
(2.0 x
3.609)
(S + V) (h1 - H4) x K1
B + 2D
13.70
+ 5.5 x (9.2
- 1.80)
B + 2D
13.70
+ 5.5
3.0 +
0.000
x (5.6
(2.0 x
- 1.80)
x 0.35
Acts at H5/2 =
8.87
2
K2
Acts at H5/2 =
8.9
4.4345
4.4345
Section C - C
P1a =
=
=
P1b =
3.0 +
7.447
(2.0 x
=
=
3.0 + (2.0 x
5.865
x 1.8
P1b =
=
=
1.809)
8.9
2
13.70
B + 2D
+ 5.5 x (10.0
3.0 +
8.930
(S + V) x H4
B + 2D
13.70
+ 5.5
3.0 + (2.0 x
6.671
x 1.12
Acts at H4/2 =
1.809)
Section D - D
P1a = (S + V) (h1 - H4 - H3)
Acts at H5/2 =
(S + V) x H4 x K2
B + 2D
13.70
+ 5.5
x 0.35
(2.0 x
1.80
K1
- 1.80
- 0.40)
x 0.35
Acts at H5/2 =
1.409)
x 1.12
8.9
2
x K2
x 1.80
1.409)
0.9
Acts at H4/2 =
1.8
2
0.9
4.4345
4.4345
(S + V) x H3
B + 2D
13.70
3.0 +
.
47555.50
13
x K3
+ 5.5
(2.0 x
x 0.40
1.409)
1.80
2
0.9
0.382
wh (h + 2h3) x Ka
acts at h/3
H + L8 x Tan
=
=
H5 + L3 x Tan
(12.6)
(H4 - H2) + (L3 + L10) Tan
=
=
H5 + L3 x Tan
(12.6)
H4 + (L2 + L3) x Tan
=
=
H5 + L3 x Tan
(12.6)
H4 + (L2 + L3) x Tan
h3 =
=
(12.6)
1.536
(12.6)
=
=
9.098
0.000
(12.6) - L3Tan
(12.6)
=
=
9.098
2.203
(12.6) - L3Tan
(12.6)
=
=
9.098
2.203
0.489
(12.6) - L3Tan
Cot
35
1
3
1.428
0.224
h3 for Section A - A
h3 for Section B - B - (I)
=
=
0.106
0.106
x
x
1.54
9.10
=
=
0.16
0.97
=
=
0.106
0.106
x
x
0.00
9.10
=
=
0.00
0.97
=
=
=
0.106
0.106
0.106
x
x
x
2.20
9.10
2.20
=
=
=
0.23
0.97
0.23
0.106
0.49
0.05
=
=
0.106
Tan
12.61
x
PRESSURE DIAGRAM
0.347
x 1.8
1.139
(1.54
+ 2 x
0.16)
A
A
X1
0.347
x 1.8
(9.10
+ 2 x
0.97)
6.748
B
0.347
x 1.8
0.000
(0.00
+ 2 x
X2
X3
X4
0.00)
D
X5
0.347
12.030
x 1.8
(9.10
+ 2 x
0.97)
+ 1.12
x 1.8
(2.20
+ 2 x
0.23)
0.347
x 1.8
(9.10
+ 2 x
0.97)
+ 1.12
x 1.8
0.23)
+ 0.29
x 1.8
(0.49
+ 2 x
0.05)
+ 2 x
12.333
(P2)
=
=
=
Total Pressure at B-B
(P2a)
(P2b)
=
=
=
=
=
(2.20
x X1 x h
x
1.139 x 1.54
0.874
x X2 x (H5 + L3 Tan
x
6.748 x
(8.87
30.699
X2 + X3 x (H4 - H2 + L10 Tan
2
6.748
+ 0.00
x (1.80
- 1.80
(12.6)
+ 1.03 x Tan
(13)
(12.6)
+ 0.00
x Tan
(13)
(P2a)
0.0000
=
=
=
(P2b)
=
=
x X2 x (H5 + L3 Tan
x
6.748 x
(8.87
(12.6)
+ 1.03 x Tan
(13)
30.699
X2 + X4 x (H4 + L2 Tan
2
6.748
+ 12.03 x (1.80
(12.6)
+ 1.80
x Tan
(12.6)
2
=
Total Pressure at D-D
(P2a)
20.6815
x X2 x (H5 + L3 Tan
(12.6)
+ 1.03 x Tan
.
47555.50
14
6.748 x
(8.87
(12.6)
=
=
.
47555.50
15
30.699
X2 + X4 x (H4 + L2 Tan
2
6.748
+ 12.03 x (1.80
(12.6)
+ 1.80
x Tan (12.6)
2
=
(P2c)
=
=
20.6815
X4 + X5 x (H3 + L1 Tan
2
12.030 + 12.33 x (0.40
A - A'
B - B'
C - C'
P1
P1 Vertical (FV1)
x
Sin
x Tan (12.6)
P2
P2 Vertical (FV2)
x
Sin
=
P1a x
0.000
Sin
=
P2a x
0.274
Sin
=
P1a x
0.000
=
Cos P2a x
0.830
Cos
=
P1b x
=
1.144
Sin
=
P2b x
=
9.621
Sin
=
P1b x
=
3.467
=
Cos P2b x
0.000
=
Cos
P2a x
7.072
=
Cos P2b x
29.153
Cos
P1a x
=
P1b x
=
P1a x
=
D - D'
+ 0.40
2
5.9627
SECTION
(12.6)
P1b x
=
P1c x
=
0.000
Sin
2.334
Sin
Sin
4.900
2.798
Sin
Sin
5.574
0.077
P2a x
=
P2b x
=
P2a x
=
P2b x
=
P2c x
=
0.000
Sin
9.621
Sin
17.279
Sin
9.621
Sin
17.279
Sin
1.206
P1a x
=
P1b x
=
P1a x
=
P1b x
=
P1c x
=
3.223
=
P2a x
8.480
=
Cos P2b x
3.666
=
Cos P2c x
Cos
0.374
0.000
Cos
29.153
Cos
11.365
Cos
29.153
Cos
11.365
Cos
5.839
SECTION
A-A
V.F
H.F
(PV1)
(PH1)
0.000
0.000
1.144
B-B
3.467
2
H4 - H2
+
h1 - (H4 - H2)
2
0.75
2.796
L9 + L4
+ L8
0.6882
L5 + L4
2
+ L3
2
1.9886
S.M
O.M
0.000
0.000
2.27516 9.69379
0.000
H4 - H2
2
0.00
2.334
7.072
h1 - H4
2
+ H4
4.900
3.223
H4
2
C-C
2.798
D-D
8.480
5.574
3.666
0.077
0.374
2
H3 +
H4
2
H3
2
L5 + L4 + L3 +
L10
2
2.502
5.49479 L6 + L5 + L4 +
L3
2
3.789
L6 + L5 + L4 + L3 + L2
2
5.20
L7 + L6 + L5 + L4 + L3
6.0948
2
4.19
0.900
H3 + H4 +
h1 - (H4 - H3)
1.30
0.20
L7 + L6 + L5 + L4 + L3 + L2
2
.
47555.50
16
0.000
0.000
8.842
38.86
25.488
2.901
11.722 51.6818
=
5.60
31.222
4.766
0.533
0.075
S.M
O.M
0.196
0.415
20.781
86.2
+ 0.667
0.000
2.502
0.000
L6 + L5 + L4 + 0.667
38.099
L3
=
3.960
99.3
L6 + L5 + L4 + L3
0.667L2
=
5.502
95.072
6.819
+ L4 +
41.947
4.360
150.3
L7 + L6 + L5 + L4 + L3 + L2
=
6.902
L1
SECTION
A-A
Vertical
Horizontal
Force (PV2)
Force (PH2)
0.274
0.830
9.621
29.153
0.000
0.000
H4 - H2
3
9.621
29.153
H5 +
3
H4
17.279
11.365
H4
3
9.621
29.153
17.279
11.365
1.206
5.839
B-B
C-C
D-D
=
H5
3
0.50
L9 + L4 + 0.67L8
0.715
L5 + L4 + 0.67L3
2.160
2.956
0.00
L5 + L4 + L3
L10
=
3.406
0.60
H5 + H4 + H3
3
5.156
L7 + L6 + L5
0.667L3
=
H3 +
1.000
L7 + L6 + L5 + L4 +
101.984
+ 0.67L2
=
5.902
L7 + L6 + L5 + L4 + L3
8.322
+ L2 + L1 = 6.902
H3
H4
3
=
0.13
4.635
4.635
0.45
H=
390.369
RL
388.869
1.5
A
D =
F.L
D=
4.635
(S+V)surcharge on BB
(S+V)surcharge on CC
H1 =
8.869
R L 381.500
(S+V)surcharge on DD
11.36
0.779
4.635
0.45
4.635
F.L
390.369
H=
1.5
ARCHITECTS & CONSULTING
ENGINEERS
D =
A
L 705
388.869
62, MAHAVIR CENTRE,
VASHI, NAVIA
MUMBAI R
400
(S+V)surcharge on CC
H1 =
8.869
R L 381.500
.
47555.50
17
(S+V)surcharge on DD
H2
C
= 1.800
RL
379.700
379.300
L1
L2
0.4
1.800
L3
L4
L5
L6
L7
1.800
0.4
Section A - A:
Section A - A is far away from D.L + L.L distribution line. Hence, Surcharge Load on A - A
Section B - B:
1) Intensity of D.L + L.L
L.L + D.L
B + 2D
2) Length( D.L + L.L ) Surcharge
L5 +
5.50
x
1.026
( 4.635
0.537
L4 +
Intensity
Length
=
=
1.565
0.840
x
T
0.537
0.15 -
0.33
0.33
9
2.233
=
=
- 0.15
8.5
- 0.3 )
2
+
0.537
2
Total Load
0.840
1.876
0.15 )
1.565 T/m
4.635
5) Moment
L3
3.0 +
0.00
4) Lever Arm
13.70
x
Tm
Section C - C:
1) Intensity of D.L + L.L
Lever arm
2.233
L.L + D.L
B + 2D
13.70
3.0 +
L2 + L3
1.800
+
2
5.50
x
4.635
1.565 T/m
4) Lever Arm
5) Moment
L6 +
L5 +
2.337
Intensity
1.565
x
x
3.657
4.933
=
=
=
Section D - D:
Length
2.337
D 0.15 0.33
Batter at earthfill side
.
47555.50
18
=
=
L4 +
- 0.15
9
- 0.3 )
13.70
3.0 +
Total Load
x
3.657
x
Lever arm
4.933
18.039 T m
=
=
L.L + D.L
B + 2D
5.50
4.635
1.565 T/m
=
3) Total load of (D.L+ L.L) surcharge
4) Lever Arm
L7 +
L6 +
2.737
Intensity
Length
=
=
1.565
4.283
x
T
2.737
L5 +
L4 +
0.15 -
0.33
5) Moment
5.533
=
=
=
2.737
2
Lever arm
5.533
Tm
Vertical Load
SUMMARY OF LOADS & BENDING MOMENTS @ SECTION A - A
Sr. No.
Total Load
x
4.283
x
23.696
- 0.15 - 0.33 )
9
Overturning
Stabilising
Horizontal Force
(T)
-
2.046
(T)
(Tm)
0.785
(Tm)
D.LSurcharge +
(Horizontal Force)
D.LSurcharge +
(Vertical Force)
L.L
L.L
Surcharge
0.000
0.000
0.830
0.415
0.000
0.000
0.830
2.555
(m)
m
V
0.236
H =
V =
Surcharge
.
47555.50
19
0.274
0.196
V =
2.555
O =
0.415
S =
1.15
Tonnes
=
O - S
-0.733
0.733
2.555
0.287
0.097
Tm
(Stabilising)
0.768
x
0.768
2
meters
- 0.29
meters
1.000
x 0.768
0.768
m
=
x w x L
6
Direct Stress
x 0.6
=
=
2.555
0.768
Moment
Section Modulus
0.098
3.329
T/m
=
Bending Stress =
x 1.0
0.248
0.248
0.098
Tm.
=
2.521
T/m
.
47555.50
20
2.521
T/m
3.329 0.807
2.52
T/m
2
3
D.LSurcharge +
(Horizontal Force)
D.LSurcharge +
(Vertical Force)
L.L
(T)
29.750
(Tm)
-
(Tm)
37.178
8.348
17.986
3.467
9.694
0.000
29.153
0.000
86.185
0.000
-
1.144
0.000
-
2.275
0.000
9.621
0.000
20.781
Surcharge
0.000
H =
V =
32.62
49.703
(m)
=
m
V
2.502
X
0.000
0.840
V =
49.7
O =
95.9
1.876
S =
80.1
Tonnes
O - S
15.783
15.783
49.703
0.318
Stabilising
Surcharge
L.L
Overturning
Horizontal Force
(T)
Tm
(Overturning)
meters
2
=
2.502
0.318
1.568
meters
2.502
2
Calculation of Base Pressures at Section B - B
Base Area
Section Modulus
Direct Stress
L x w
=
=
1
1.000
x w x L
x 2.502
=
x 6.3
x 1.0
49.703
2.502
1.043
19.869
T/m
=
Bending Stress =
Resultant Stress
Moment
Section Modulus
=
77.950
77.950
1.043
74.741
T/m
74.741
19.869 -54.871
Tm.
74.74
T/m
Overturning
47.558
(T)
(Tm)
145.057
(Tm)
40.661
202.140
-
D.LSurcharge +
(Horizontal Force)
Surcharge
7.072
3.223
38.859
2.901
29.153
11.365
99.304
6.819
D.LSurcharge +
(Vertical Force)
2.334
4.900
L.L
Surcharge
50.81
126.010
(m)
=
m
V
6.102
meters
x w x L
6
3.657
V =
126.0
384.854
126.010
3.054
147.9
(Stabilising)
- 3.05
=
1
Tm
6.102
2
x 6.102
O =
18.039
S =
533
Tonnes
O - S
-384.854
38.099
95.072
8.842
25.488
9.621
17.279
H =
Stabilising
Horizontal Force
(T)
L.L
T/m
Sr. No.
.
47555.50
21
x 37.2
6.102
x 1.0
-0.003
meters
6.205
m
=
126.010
Base Area
=
=
=
Moment
Section Modulus
Resultant Stress
-0.426
0.426
Tm.
=
0.069
20.652 20.584
0.07
T/m
D.LSurcharge +
(Horizontal Force)
D.LSurcharge +
(Vertical Force)
L.L
T/m
6.205
20.652 +
20.721
20.652
6.102
Bending Stress =
.
47555.50
22
Surcharge
Surcharge
Overturning
Stabilising
Horizontal Force
(T)
-
53.908
(T)
53.208
298.505
8.480
51.682
3.666
0.374
29.153
4.766
0.075
150.321
11.365
5.839
(Tm)
185.991
(Tm)
11.365
0.779
2.798
5.574
11.722
31.222
0.077
0.533
T/m
9.621
17.279
H =
V =
(m)
58.88
41.947
101.984
O =
.
47555.50
23
219.0
-484.934
8.322
23.696
S =
703.9
Tm
(Stabilising)
484.934
147.954
=
6.902
meters
1.206
4.283
V =
148.0
147.954
Tonnes
O - S
=
m
V
3.278
6.902
- 3.28
0.173
meters
7.939
21.438
T/m
Section Modulus
L x w
=
=
1
1.000
x 6.902
x w x L
6
Direct Stress
=
1
6
x 47.6
=
=
Moment
pressures)
147.954
25.620
25.620
Section Modulus
=
6.902
Resultant Stress
(Foundation -
x 1.0
147.954
Base Area
Bending Stress =
6.902
x 0.173
Tm.
3.227
T/m
7.939
3.227
T/m
703.92
218.99
21.438 18.211
3.214
3.23
T/m
0.45
x
58.88
148.0
1.131
.
47555.50
24
Hence Unsafe
35
0.611
=
Cos
80.00
0.030
Sin
Sin
Cos
46.67
35.00
33.33
=
=
=
0.727
0.574
0.835
Cos
Cos
45.00
45.00
=
=
0.707
0.500
Cos
Sin
56.67
56.67
Sin ()
0.50 x
0.611
0.20
Cos(
Sin(
Cos
Sin
35.00
46.67
=
=
0.671
0.727
Sin (i
Cos ( - )
Sin
Cos
35.00
-11.7
=
=
0.574
0.979
Cos ( - i)
Cos
Cos
Cos
Cos
0.00
0.00
11.67
=
=
1.000
1.000
Cos ()
Sin ()
=
Kp2 =
11.67
=
Sin 11.67
Required for Calculation of vertical and
0.030
1 - 0.73
0.84
x
x
Sin (i
Cos ( - i)
0.57
0.71
0.417
0.591
0.030
(1 0.030
0.418
x
0.00
0.840)
=
2.832
0.025
0.000
Cos (
Cos cos(q 1 Sin (
Sin (i
Cos ( - )
Cos ( - i)
0.73
0.98
0.57
1.00
0.671
1.00 x
0.98
1 -
0.979
0.671
1 -
0.417
x
x
0.979
=
Horizontal components
0.671
0.979
=
0.979
Designed By : Archana V . Kanwaloo.
0.418
0.84
Sin (
Cos ( - )
0.030
=
=
cos( 1 -
0.418
0.785
Cos (
Cos
Sin(
Sin (i
Cos
Cos ()
Kp1 =
11.67
0.20
Cos(
Cos ( - )
Cos ( - i)
45.00
(1 - 0.653)2
0.671
x
0.121
5.680
=
=
=
x
7.91
=
=
=
ZONE
Passive
Pressure 1
Passive
Pressure 2
kp1 x
Kp2 x
FV2
FV
P2 Sin
=
=
6.765
x (H3) x Cos ()
x
P1 Cos
FH1
P2 Cos
FH2
FH
Tonnes
56.67
4.346
P2 Cos
11.67
0.767
Tonnes
5.113
Tonnes
6.765
2.255 T
3
1
5.113
-1.704 T
of Passive
Earthfill
1.0 x
1.8 x
0.4 x
3
x 1.76
0.5 x
1.0 x
1.8 x
1.8 x
1
3
1.76
0.98
P1 Cos
=
0.98
HORIZONTAL FORCE
(FH)
P1 Sin 56.67
6.607
Tonnes
P2 Sin 11.67
0.158
Tonnes
P1 Sin
=
3.2
x
5.68
x
1.76
x
0.16
0.783 Tonnnes/for full length of Face Wall
FV1
x (H2) x Cos ()
2.83
x
1.76
x
Tonnnes/for full length of Face Wall
.
47555.50
25
4.12
1.267
2.851
4.118
1.373 Tm
1
2
3
Loads due to
H=
pressure
Total
58.88
Vertical Load in
Tonnes
V=
148.0
W=
1.37
FH =
-1.70
FV =
2.3
H =
57.17
V =
151.58
Tonnes
T
0.45
V =
151.6 T
H =
57.17
Factor of Safety
0.45
x
57.17
151.6
1.193
Hence Unsafe
Available friction
Unbalanced Force
1.5 x
=
=
1.5 x 57.17
17.547
1.5
=
against sliding
x H
1.5
1.5 x
57.17
0.45 x
151.6
0.45 x
85.759 T/m
68.212
V
151.6
Design of Shear Key : Design requirements as per IRS code of practice for plain reinforced and prestressed concrete
for general bridge construction 1982
st =
196
N/mm
st =
157
N/mm
c
cbc
v
0.34
=
=
0.26
0.034
276
3c
9.020
9.020
x
x
10.2
0.319
x fc
x fc
x fc
10.2
N/mm
=
=
7.8
1.02
N/mm
N/mm
m =
K =
j =
Modulur ratio
mcbc
mabc + st
1 - K
=
=
1 -
3
R =
cbc.j.k
3 x
10.2
+
9.020
0.319
1.456
10.2
196
0.8935
3
=
10.2
0.894
2
1000
2
b =
276
mm
0.319
D =
.
47555.50
26
0.7
17.50
=
1010.0
mm
T/m
T/m
Unbalanced Force
17.547
1002.7
17.50
.
47555.50
27
17.547
Say
1010.0
1.01
mm
8.861 Tm
B.M
8.861
x 107
Rb
1.456
1000
D = d + Cover +
=
246.7
+
deff. =
330
/2
246.724
75
75
mm
327.724
M
st.j.d
8.86
196
x
2032.04
'
0.89352
mm
249
x bD
0.2
100
At (minimum)
0.2
100
Provide
20
mm Tor bar
Area of bar
20
mm Tor Steel
Spacing =
107
314.00
Say
314.00
x 1000
249
330.0
mm
mm
st
196
N/mm
j
d
=
=
0.89
249
mm
1000
330
mm
=
154.52
mm
2032.04
Provide Tor
20
150.00
10.2
N/mm
196
N/mm
300
mm
660
mm
9.020
B.M =
8.861
10
d =
N mm
D - dc
=
=
20
20
9.02 n
9.02 n
=
=
240.00
dc =
b =
mm
mm
1 Depth of Critical N . A
c
=
n
t
10.2
m (d - n)
n
196
10.2 x
10.2 x
9.02 x
9.02 x
9.02
240.0
240.0
22080
22080
n
(d - n)
-
=
=
10 x
10.2 x
92.00 n +
288.0 n
196.0 n
196.0 n
196.0 n
76.6667 mm
( 76.7 - 60.0)
76.667
c'
10.2 x 16.667
76.667
2.2174
N/mm
=
3 MR
8.861 x
b n c / 2 ( d - n / 3 ) + ( m - 1 ) Ac . c' ( d - dc )
107
1000 x 76.667
+
88611684 =
Ac
=
Spacing
Area
No. of Bars
Spacing
1488.316
83847777.777778
for
=
( 9.02
20
x
1)
+
10.2
x Ac x
240.0
- 76.7
2
2.217 ( 240.0
3
- 60)
3200.87 Ac
mm
mm diameter
of bar
314.29 mm
Ac
Area of one bar
1488.3
314.29
4.736
mm
1000
267.70
say
265
mm
20
4
3.736
Provide
20
mm
dia bar @
265
mm c/c as compression
steel
60
1000
mm
mm
.
47555.50
28
1000 x
c
2
+ (m - 1) x Ac x c'
76.667
10.2
( 9.02
.
47555.50
29
At x t
1)
1488.3
2.217
300 )
2
=
At
At
At
196
196
417466.146
417466.146
196
Spacing
Area
for
=
No. of Bars
20
x
2129.9293
mm diameter
20
=
4
=
2129.9
mm
of bar
314.29 mm
6.777
314.29
Spacing
Provide
20
1000
5.777
mm
173.10
dia bar @
5 Distribution Steel
Distribution steel
=
0.2
170
x bD
say
mm c/c as tensile
0.2
100
100
2/3 of above reinforcement provided on both the faces.
Distribution Steel =
2
x 600
3
Provide
10
Spacing =
steel
(1000
400.00
600
mm
mm
10
Tor @
x 1000
195
mm
c/c
196.250
mm
as distribution steel
mm Tor bar
78.5
400.000
Provide
170.0
Section Considered
Compression in T/m
Tension in T/m
5.850
0.000
At 2 nd Batter Level
94.610
-54.871
At top of bottom
foundation concrete
20.721
0.000
Say
195
mm
Stability check
Factor of Safety against Overturning
3.214
1.131
:
:
=
=
1010
300
mm
mm
Tor
Tor
20
20
mm
mm
@
@
170
265
mm
mm
c /c
c /c
Tor
10
mm
195
mm
c /c
.
47555.50
30