DH02 Survey Report

No.

Instrument/
Equipment

Activities
Check for existing: as photo

PI-09303
PT-09303

The pressure gauge PI-09303 is not available.


The transmitter PT-09303 is available:
-

Cable was connected to IJB-9631 (tested from


transmitter to Marshalling cabinet).

Check for existing: installed directly on piping as photo.

TT-09304,

The TT-09304 is not available:


-

Cable shall be connected to IJB-9632 (tested


from JB to Marshalling cabinet).

Site photo / Remarks

TOPAZ LPS E&I Offshore Site Survey Report

The transmitters are available:


3

PT-09305
PT-09308

Cable was connected to IJB-9631 (tested from


transmitter to Marshalling cabinet).

The TT-09304 is available:


4

TT-09302

Cable shall be connected to IJB-9632 (tested


from JB to Marshalling cabinet).

TOPAZ LPS E&I Offshore Site Survey Report

The transmitters are available:


5

PZT-09307

Cable was connected to IJB-9531 (tested from


transmitter to Marshalling cabinet).

TOPAZ LPS E&I Offshore Site Survey Report

The valve is not available:

Cable ZT-09301 connected to IJB-9636 (tested


from cable ending to Marshalling cabinet).

Cable SV-09301A/B connected to IJB-9640


(tested from cable ending to Marshalling
cabinet).

Cable ZSC-09301 connected to IJB-9636 pair


24 (tested from JB to Marshalling cabinet).
Running a new cable.

HCV-09301

TOPAZ LPS E&I Offshore Site Survey Report

The valve is available:

SV-09302

Cable SV-09302 connected to IJB-9542 (tested


from JB to Marshalling cabinet).

Cable ZSC/O-09302 connected to IJB-9536


(tested from JB to Marshalling cabinet).

The valve is available:

SV-09303

Cable SV-09302 connected to IJB-9542 (tested


from JB to Marshalling cabinet).

Cable ZSC/O-09302 connected to IJB-9536


(tested from JB to Marshalling cabinet).

The valve indicator was broken.

TOPAZ LPS E&I Offshore Site Survey Report

SXV-09301
SXV-09302

The WHCP module are available, but the Pressure


gauge for SCSSV in front of module is damaged as
photo.

TOPAZ LPS E&I Offshore Site Survey Report

No.

Instrument/
Equipment

Activities
Check for existing pressure gauges: as
photo

PI-10303
PT-10303
PI-12303
PT-12303

The transmitter PT-10303, PT-12303 shall


be installed:
-

Cable to be connected to IJB-9638


(tested from transmitter to
Marshalling cabinet).

The transmitters shall be installed:


2

TT-10304
TT-12304

Cable shall be connected to IJB9638 (tested from JB to Marshalling


cabinet).

Remarks

TOPAZ LPS E&I Offshore Site Survey Report

PT-10305
PT-10308
PT-12305
PT-12308

The transmitters shall be installed:


-

Cable was connected to IJB-9638


(tested from JB to Marshalling
cabinet).

The new TT cables shall be installed on


the existing tray (big one in photo)
4

TT-10302
TT-12302

Cables shall be connected to IJB9638 (tested from JB to Marshalling


cabinet).

TOPAZ LPS E&I Offshore Site Survey Report

The transmitters shall be installed:


5

PZT-10307
PZT-12307

Cable was connected to IJB-9531


(tested from JB to Marshalling
cabinet).

The valves to be installed:

SV-10302
SV-10303
SV-12302
SV-12303

Cable SV-10302/12302, SV10303/12303 to be connected to


IJB-9539 (tested from JB to
Marshalling cabinet).

Cable ZSC/O-10302/12302,
ZSC/O-10303/12303 to be
connected to IJB-9534 (tested from
JB to Marshalling cabinet).

TOPAZ LPS E&I Offshore Site Survey Report

The valve is not available:

Cable ZT-10301/12301 to be
connected to IJB-9636 (tested from
JB to Marshalling cabinet).

Cable SV-10301A/B, SV-12301A/B


to be connected to IJB-9640 (tested
from JB to Marshalling cabinet).

Cable ZSC-10301 connected to


IJB-9636 pair 22/23 (tested from
JB to Marshalling cabinet). Running
new cables.

HCV-10301

TOPAZ LPS E&I Offshore Site Survey Report

SCSSV-10301
SSV-10301
SSV-10302

The WHCP module are available:

PT-09309/09310/09311
PT-10309/10310/10311
PT-12309/12310/12311

The transmitters are available:

Tubings shall be installed as drawing


WHP-DH2-I-D-7001-602.

Cable was connected to JB-TX


101_TB2 (tested from JB to
Marshalling cabinet).

TOPAZ LPS E&I Offshore Site Survey Report

10

Junction box:
DH2 IJB A- 9531
DH2 IJB A 9636
DH2 IJB A 9638

DH2 IJB A- 9531 Has 13 empty


input
DH2 IJB A- 9638 Has 11 empty
input
DH2 IJB A- 9636 Has 5 empty input

Area of concerns:

The pressure transmitters PT-09303/09305/09307/09308 should be re-calibrated & function test: