Project:
Location:
Engineer(s):
Revision: 0
Structural Steel
Vendor
Descriptio
n
Engineering
Fabrication
Fabrication
4
5
Fabrication
Fabrication
Fabrication
Fabrication
Fabrication
Fabrication
10
Fabrication
11
Fabrication
12
Fabrication
13
Fabrication
14
Fabrication
15
Fabrication
16
Fabrication
17
Fabrication
Characteristics
Acceptance
Criteria
Interva
l
CISC S16.1
Statically Loaded
Structures
CSA W47/W59
Once Or on
Revision
Once
CSA W47/W59
Once
CSA W47/W59
Once
CSA W47/W59
Once
CSA W47/W59
As
Required
CSA W47/W59
Once
CSA W47/W59
Once
CSA W47/W59
Once
CSA W47/W59
As
Required
CSA W47/W59
Daily
CSA W47/W59
Weekly
CSA W47/W59
Vendor QA Std.,
Project Spec.
CSA W47/W59
Vendor QA Std.,
Project Spec.
CSA W47/W59
Statically Loaded
Structures, Project
Spec.
CSA W47/W59,
Project Spec.
CSA W47/W59
Owner Rep.
W
Daily
Daily
As
Required
As
Required
Weekly
Vendor
Owner Rep.
Vendor
Inspector
Date
Owner
Rep.
Date
Structural Steel
Inspection & Test Plan
Standard Format - Sample
Descriptio
n
Coatings
18
Fabrication
20
Fabrication
21
22
19
Final
Inspection
Characteristics
Acceptance
Criteria
Interva
l
NACE / SSPC
Once
NACE / SSPC
Weekly
NACE
Weekly
NACE
Once
Review Non-Conformances
and Verify Closed with
Complete Disposition &
Sign-Off
As-Built Red Line Drawings
NACE / W47/W59
Once
Project Spec.
Once
Project Spec.
Company Certification
Project Spec.
Once
Once
Project Spec.
Once
Project Spec.
Once
Once
Once
Project Spec.
Project Spec.
Project Spec.
Project Spec.
Project Spec.
Non-Conformance Log
Project Spec.
Project Spec.
Once
Once
Once
Once
Once
Project Spec.
Once
Project Spec.
Once
Project Spec.,
NACE, CWB
W47/W59
Once
Vendor
Inspector
Date
Owner
Rep.
Date