TENDER DOCUMENTS
FINANCIAL BID
VOLUME 2 0F 2
SECTION VII:
FORM OF TENDER
SECTION VIII:
PRICING PREAMBLES
SECTION IX:
PRELIMINARIES
SECTION X:
BILLS OF QUANTITIES
SECTION XI:
DRAWINGS
TENDER DOCUMENT
Bid No. KWS/OT/BF/10/2013-2014
THE DIRECTOR
KENYA WILDLIFE SERVICE
PO. BOX 40241
NAIROBI
July 2013
SECTION VII
FORM OF TENDER
TO:
Director Kenya Wildlife Service_ [Name of Employer) ____________[Date]
_________________________________________________________________________________
____________________________________________________________________
[Name of Contract]
Dear Sir,
1.
2.
3.
4. Unless and until a formal Agreement is prepared and executed this tender
together with your written notification/acceptance thereof, shall constitute a
binding Contract between us.
5. We understand that you are not bound to accept the lowest or any tender you
may receive.
Dated this ____________________ day of _______20________________
Signature __________________in the capacity of___________________
duly
authorized
to
sign
tenders
for
and
on
behalf
of
_____________________________________________[Name
of
contractor)
of___________________________________________[Address of contractor]
Witness; Name______________________________________
Address_____________________________________
Signature___________________________________
2
SECTION VIII
PREAMBLES & PRELIMINARIES
1. The contract shall be for the whole of the works, as described in the bills of quantities
2. The bidder shall fill in prices for all items of works described in the specifications and drawings.
Items for which no price is entered by the bidder shall be deemed to have been covered by
other prices in the bills of quantities.
3. The bidder shall bear all costs associated with preparation and submission of the bids
4. The prices quoted by the bidder shall not be subject to adjustment during performance of the
contract.
5. The preliminary section of the tender document shall be keenly and consistently priced and shall
not be expected to exceed 7.5% of bid sum in any event
6. All prices inserted by the bidder shall be deemed inclusive of all government taxes payable 28
days prior to submission of tender
7. Abbreviations
C.M.
S.M.
L.M.
MM
Kg.
No.
Prs.
B.S.
Ditto
m.s.
a.b.d
SECTION IX PRELIMINARIES
Item
PRELIMINARIES
No.
A.
B.
II)
III)
IV)
Kshs
Description of site
The site of the works is situated in KWS Isiolo Station
The contractor/bidder shall be deemed to have visited the site and
assessed the site conditions, current set up and the nature of ongoing
business within the said premises and any other matters that he may
deem necessary for the execution of works. Any claims arising
therefrom as a result of failure by the bidder to visit the site will not be
considered.
Item
No.
A.
KShs.
B.
Conditions of Contract
The contractors attention is drawn to the text of the said conditions
of contract and he is to allow in his prices for any costs arising
therefrom or in connection therewith.
C.
Government taxes
The tender sum shall be deemed inclusive of all government
taxes payable 30 days prior to submission of tender. The employer
shall comply with all legal provisions requiring deduction and
remittance of such taxes to the Kenya Revenue Authority. No
claims shall be entertained from the contractor for non
compliance with this clause
Measurements
In the event of any discrepancies arising between the Bills of
Quantities and the actual works, the site measurements shall
generally take precedence. However, such discrepancies between
any contract documents shall immediately be referred to the
PROJECT MANAGER in accordance with Clause 22 of the
Conditions of Contract. The discrepancies shall then be treated as
a variation and be dealt with in accordance with Clause 22 of the
said Conditions.
Item
No.
GENERAL PRELIMINARIES
KShs
A.
Sufficiency of tender
The Contractor shall be deemed to have satisfied himself before
tendering as to the correctness and sufficiency of his Tender for
the works and of the rates and prices stated in the priced bills of
quantities which rates and prices shall cover all his obligations
under the contract and all matters and things necessary for the
proper completion and maintenance of the Works.
B.
Site works
The contractor shall allow for among other things the following:-
Item
No.
A.
Existing Property
The Contractor shall take every precaution to avoid damage to all
existing property including hard and soft landscaping, buildings and
access routes. The Contractor will be held responsible for all damage
thereto and shall make good all such damage when directed all at his
own expense. The Contractor shall satisfy himself prior to
commencing the work of the type, location and depth of all existing
services and other works not visible and shall allow for providing all
necessary protection required.
Any damage or disturbance caused shall be reported immediately to
the Engineer and made good at the Contractors expense.
Should it be found necessary to interrupt any service, prior approval of
the method and timing must be obtained in writing from the Engineer.
B.
C.
Hoarding
Contractor shall provide, maintain and clear away on completion
hoarding required for the work areas, access ways and storage areas.
The hoarding shall be 3m high G.C.I, or such other material as may be
approved by the project manager. Advertisements will not be permitted
on the hoarding or any other part of the site.
D.
Item
General preliminaries (CONT)
No.
A.
KShs
Provisional works
All works described as Provisional in these bills of quantities is subject
to re-measurement in order to ascertain actual quantity executed for
which payment will be made
All provisional and other works liable to adjustment under this contract
shall be left uncovered for a reasonable time to allow for all
measurements needed for such adjustment to be taken by the quantity
Surveyor. Immediately the work is ready for measuring, the contractor
shall give notice in writing to the Quantity Surveyor.
If the contractor makes default, in these respects he shall if the Engineer
so directs uncover at his expense the work to enable all measurements
to be taken and afterwards reinstate at his own expense
B.
General specifications
For full description of materials and workmanship, method of execution of
work and notes for pricing, the contractor is referred to the Ministry of
Works General Specifications for Building Works 1976 or any subsequent
revision thereof which is issued as a separate document, and which shall
be followed in all respects unless it conflicts with General preliminaries,
particular preliminaries or other items in these bills of quantities, in which
case the contents of bills of quantities shall prevail.
C.
Prevention of Nuisance
The works and such sections of the site necessary therefore shall be
under the entire care and control of the Contractor during the whole
period of the Contract and he shall take all possible precautions to
prevent any nuisance, inconvenience or injury to the holders or occupiers
of the existing or surrounding properties and to the public generally and
shall at all times keep all paths and roads affected by the Works in a safe
and clear state, safety of all wheeled traffic and pedestrians.
D.
Labour camps
The employer shall allow for erection or maintenance of labour camp on
site, at designated area.
Item
General preliminaries (CONT)
No
A.
KShs
Temporary buildings
The Contractor must provide for all temporary buildings required for the
storage of materials and he must maintain them and clear them away on
completion of the works to the satisfaction of the Engineer. In addition the
contract must provide and furnish a suitable site office, to be used by site
agent and clerk of works in course of contract duration in addition to
hosting site meetings.
B.
Signboard
Allow for providing, erecting, maintaining throughout the course of the
Contract and afterwards clearing away a 2No. Signboards as designed
specified and approved by the Project Manager.
C.
D.
Specialist works
All specialist works shall be carried out by domestic subcontractors sub
contractors with exception of air conditioning system
E.
Laptops
Item
No
A.
Site Office
The Contractor must provide, equip, furnish and maintain a site office to
be jointly shared by clerks of works and site agent and adequate enough
to host a site meeting. Ie to mean an office not measuring less than 40
square metres in floor area , NB: it is the intent of the project team to hold
site meetings in the site office
Copyright
The copyright of these documents is vested in the Quantity Surveyor and
they may not be reproduced in whole or in part without the Quantity
surveyors written permission.
Amount Carried to collection below
Collection
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10 (above)
10
Laptop Computer
spefications (ref pg 9 Item E)
SPECIFICATION
A) Processor/Chipset
b) Memory
c) Hard Disk
d) Display
e) Drive
f) Network
g) Sound System
h) Ports
i) Expansion/Docking
j) Battery
k) Operating System
REQUIREMENT
Intel Core i5
4GB, 1066MHz, DDR3 memory
500GB or more
14.1 inch WXGA high resolution (1024 x 768) TFT
DVDRW drive
RJ 45 connection
integrated stereo, MIDI support, built-in speakers,
2 USB ports, speed 2.0
1 x PC card type II, 2 x memory slots
Lithium-ion or NiMH technology, up to 2.9 hrs standby
Windows 7 Professional (pre-loaded), OS Media
l) Recovery CD
Included
m) Accessories
n) Power
o) Weight
p) Carrying Case
q) Warranty
SECTION X
BILLS OF QUANTITIES
12
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
B.
C.
SM
210
No.
SM
210
CM
205
CM
232
CM
162
CM
25
CM
160
CM
300
July 2013
Item
Kshs.
1 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Disposal of water:
A
Item
Hardcore fillings
B
CM
67
SM
214
SM
111
Murram blinding
D
SM
76
Column bases
SM
21
Foundations in trenches
CM
16
Column bases
CM
11
Stub Columns
CM
Ground beams
CM
12
SM
137
Kg.
3870
Assorted bars
July 2013
Kshs.
2 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
SM
137
Formwork : to
B
SM
52
Ditto:Column bases
SM
42
SM
32
SM
141
LM
52
200 mm Walls
SM
194
SM
LM
129
LM
SM
137
July 2013
Kshs.
3 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Plinths
SM
23
SM
23
SM
72
Plinths
Paving slab surround
Carried to Collection
Collection
From page 01
From page 02
From page 03
From page 04 (above)
July 2013
Kshs.
4 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Beams
CM
B.
Cylidrical columns
CM
Kg
720
Assorted
Formwork to:
D.
SM
116
Ditto columns
SM
11
200 mm Walls
SM
387
100mm Ditto
SM
21
LM
51
Fair raking
LM
24
July 2013
Kshs.
5 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Vents
A.
NO
36
N0
Carried to Collection
Collection
From page 05
From page 06 (above)
July 2013
Kshs.
6 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
B.
230
SM
42
Roof Construction:
The following in sawn cell cured
treated cypress roof trusses; hoisting
and placing 3.0 metres above the
the ground level: Roof trusses fixing
to include approved plates; making
holes and fixing bolts and nuts as per
Engineers detail
C.
LM
140
D.
LM
112
E.
LM
86
F.
LM
142
G.
LM
30
H.
75x50 mm Purlins
LM
307
I.
LM
84
J.
LM
70
LM
K.
July 2013
Kshs.
7 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
LM
76
SM
56
SM
56
LM
56
E.
NO
F.
NO
G.
LM
16
H.
NO
I.
NO
J.
NO
C.
D.
July 2013
Kshs.
8 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Painting generally
Knot, prime, stop and apply one coat
undercoat and twos coat gloss finishing
paint on woodwork
Externally on
A.
LM
76
B.
SM
56
Large pipes
SM
10
D.
SM
14
Carried to collection
Collection
From page 7
From page 8
From page 9 (Above)
July 2013
Kshs.
9 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit
Quantity
LM
26
NO
NO
NO
NO
NO
SM
10
SM
Rate
Kshs.
Cts.
B
C
D
E
F
sets
23
sets
sets
July 2013
Kshs.
10 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
NO.
290
NO.
36
SM
31
SM
31
150x25 mm top
LM
26
LM
26
NO
34
LM
26
Curtain tracks
Brass "I" section track screwed to pelmets
(measured seperately): rollers: end stops:
laps
LM
26
SM
62
LM
26
SM
July 2013
Kshs.
11 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
200x215 mm lintol
LM
26
NO
NO
12
C.
LM
64
LM
64
Ditto quadrant
LM
64
July 2013
Kshs.
12 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Ironmongery
Supply and fix the following to wood
with matching screws
A.
Prs
18
B.
NO
C.
NO
12
D.
NO
12
LM
64
Architraves : ditto
LM
64
Ditto quadrant
LM
64
SM
26
SM
62
LM
64
K.
LM
64
Ditto quadrant
LM
64
July 2013
Kshs.
13 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
SM
20
SM
20
External wallings
SM
102
SM
20
SM
92
SM
102
SM
20
LM
40
Painting
D
External wallings
Plastic ceiling profile (verandah)
July 2013
Kshs.
14 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
A.
SM
137
Floors
SM
140
C.
LM
100
LM
144
LM
144
SM
21
100x25 mm skirting
LM
25
SM
21
LM
116
July 2013
Kshs.
15 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Wall finishes
300x200x6 mm coloured glazed tiles: on
cement and sand backing (m/s) : bedded
in cement mortar (1:4) : pointed in white
cement and sand backing (m/s) : bedded
A.
Walls
SM
82
B.
LM
18
SM
82
LM
61
SM
395
SM
395
SM
20
SM
140
SM
140
Walls: internally
Prepare and apply one undercoat and
two finishing coats hard gloss paint :
on plaster to
Walls
Chimey facings
July 2013
Kshs.
16 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
A
Description
Unit Quantity
NO
LM
178
Rate
Kshs.
Cts.
ceiling linings
SM
140
LM
178
Carried to collection
Collection
From page 15
From page 16
From page 17 (Above)
July 2013
Kshs.
17 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
NO
NO
NO
NO
Concrete worktop
B.
July 2013
Kshs.
18 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
B.
NO
NO
NO
NO
NO
NO
NO
NO
Accessories
E.
F.
G.
H.
July 2013
Kshs.
19 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
NO
Rate
Kshs.
Cts.
Carried to collection
Collection
From page 19
From page 20 (above)
July 2013
Kshs.
20 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
LM
36
LM
24
LM
24
LM
12
LM
12
No.
No.
No.
No.
No.
No.
July 2013
Kshs.
21 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
No.
No.
No.
50 x 40 mm sweep tee
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
40 x 32 mm diameter reducer
No.
No.
No.
No.
NO
Rate
Kshs.
Cts.
Gulley traps
R
July 2013
Kshs.
22 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Manholes/inspection chambers
A
LM
30
item
Carried to collection
Collection
From page 21
From page 22
From page 23 (Above)
July 2013
Kshs.
23 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
15mm diameter
LM
40
B.
20mm ditto
LM
18
C.
25mm ditto
LM
100
15mm bend
No.
20
20mm ditto
No.
10
No.
10
15mm ditto
No.
20mm ditto
No.
No.
20mm ditto
No.
July 2013
Kshs.
24 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
LM
40
NO
NO
No.
No.
Valve chamber
B
July 2013
Kshs.
25 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Testing
Allow for testing of the complete internal
plumbing installation to the
satisfaction of the Engineer and the local
Authority Representative
item
Rate
Kshs.
Cts.
Carried to collection
Collection
From page 24
From page 25
From page 26 (above)
July 2013
Kshs.
26 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Element No. 12
Electrical Works (provisional)
Rates quoted shall be inclusive of supply and
installation includinfg builders work incidental thereto.
Lighting point wired in 3X1.5mm2 single
core PVC cables drawn in 20mm diameter
No.
14
B.
No.
14
C.
No.
10
D.
No.
E.
No.
Single
No.
11
No.
11
1gang 1 way
No.
14
2 gang 2 way
No.
20
July 2013
Kshs.
27 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
A
Description
Unit Quantity
No.
No.
No.
No.
No.
Lm.
20
No.
No.
No.
No.
No.
Item
Item
Rate
Kshs.
Cts.
Carried to collection
Collection
From page 27
From page 28 (Above)
Total carried to Summary
July 2013
Kshs.
28 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Water/CO2: 9 Litres
No.
B.
No.
July 2013
Kshs.
29 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
element
No.
Description
Kshs.
Cts.
From
page
Substructures
Walling
Roof
Windows
11
Doors
13
14
Internal finishes
17
18
sanitary fittings
20
10
Internal Drainage
23
11
internal Plumbing
26
12
Electrical Works
28
13
29
Subtotal
Sub-total multiplied by Six
x6
July 2013
Kshs.
30 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
B.
C.
D.
E.
F.
SM
111
No.
SM
111
SM
91
CM
108
CM
CM
68
CM
40
H.
Disposal of water
I
Item
July 2013
Item
Kshs.
31 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Hardcore fillings
A
SM
78
SM
111
SM
78
SM
40
murram blinding
C
Foundations in trenches
CM
SM
91
Y-8
Kg
67
Y-10
Kg
118
SM
91
SM
27
LM
39
July 2013
Kshs.
32 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
200 mm walls
SM
94
LM
59
SM
91
SM
SM
SM
46
Plinths
Prepare and apply two coats bituminous
paint : on render : to
Plinths
Paving slab surround
Carried to Collection
Collection
From page 31
From page 32
From page 33 (Aobve)
July 2013
Kshs.
33 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Beams
CM
Y-8
Kg
55
C.
Y-12
Kg
160
SM
54
Formwork to:
D.
E.
200 mm Walls
SM
151
F.
150mm Ditto
SM
51
LM
18
H.
LM
22
July 2013
Kshs.
34 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
A.
Description
Unit Quantity
Vents
100 mm Diameter x 300 mm long pvc pipe
sleeve: grouted into walling : mosquito gauze
set into both ends
NO
Rate
Kshs.
Cts.
22
C.
D.
E.
F.
No.
No.
No.
No.
LM
Carried to Collection
Collection
From page 34
From page 35 (above)
July 2013
Kshs.
35 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
LM
12
LM
15
200x215 mm lintol
Supply and fix the following;
Mild steel : one coat red oxide primer
before erection
Composite purpose made steel windows :
fixed to concrete or blockwork with lugs
plugged: ironmongery: bedded and pointed
all round in mastic: burglar proofing:
as per Architects detail's:
C.
NO
D.
NO
E.
NO
F.
NO
SM
12
Glazing
5 mm clear sheet glass and glazing: to
metal with approved putty
G
July 2013
Kshs.
36 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
SM
24
150x25 mm top
LM
11
LM
11
NO
18
LM
11
LM
11
LM
11
SM
Collection
From page 36
From page 37(Above)
July 2013
Kshs.
37 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
200x215 mm lintol
LM
NO
NO
C.
LM
24
E.
LM
24
F.
Ditto quadrant
LM
24
July 2013
Kshs.
38 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Ironmongery
Supply and fix the following to wood
with matching screws
A.
Prs
B.
NO
C.
NO
D.
NO
LM
24
F.
Architraves : ditto
LM
24
G.
Ditto quadrant
LM
24
SM
I.
SM
16
J.
LM
24
K.
LM
24
L.
Ditto quadrant
LM
24
Carried to collection
Collection
From page 38
From page 39 (Above)
Total carried to Summary
July 2013
Kshs.
39 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
B.
SM
134
LM
12
LM
58
D.
LM
58
E.
LM
49
F.
LM
36
G.
LM
10
LM
12
75x50 mm Purlins
LM
120
LM
69
LM
24
July 2013
Kshs.
40 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
LM
49
SM
17
SM
17
LM
24
NO
NO
LM
NO
NO
July 2013
Kshs.
41 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Painting generally
Knot, prime, stop and apply one coat
undercoat and twos coat gloss finishing
paint on woodwork
Externally on
A
LM
49
SM
17
Large pipes
SM
SM
Carried to collection
Collection
From page 40
From page 41
From page 42 (Above)
July 2013
Kshs.
42 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Beams
SM
17
SM
17
SM
49
SM
49
SM
129
Beams
12 mm thick cement sand (1:4) render:
on masonry or blockwork to:
External wallings
Random rubble facing
July 2013
Kshs.
43 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
A.
SM
81
Floors
SM
81
C.
LM
91
LM
78
LM
78
LM
78
SM
11
100x25 mm skirting
LM
10
SM
10
July 2013
Kshs.
44 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Wall finishes
150x150x6 mm white glazed tiles: on
cement and sand backing (m/s) : bedded
in cement mortar (1:4) : pointed in white
cement
A
Walls
SM
19
LM
31
SM
19
SM
144
SM
144
SM
91
SM
91
Walls: internally
Prepare and apply one undercoat and
two finishing coats hard gloss paint :
on plaster to
Walls
Ceiling finishes
General joinery : cypress: pressure
impregnated with tanalith "C" or equal
July 2013
Kshs.
45 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
A
Description
Unit Quantity
NO
LM
86
Rate
Kshs.
Cts.
celotex linings
SM
91
LM
86
Carried to collection
Collection
From page 44
From page 45
From page 46 (Above)
July 2013
Kshs.
46 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
NO
NO
NO
Concrete worktop
B.
C.
July 2013
Kshs.
47 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
B.
NO
NO
NO
NO
NO
NO
NO
NO
Accessories
E.
F.
G.
H.
July 2013
Kshs.
48 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
B.
NO
Plastic Tank
Supply and install 2300 litres capacity
cylindical vertical ''Kentank" model CV -232c:
1550mm diameter 1520mm height: As
manufactured by Kentainers ltd, of P.O BOX
42168 NRB. TEL: (02) 823513-6: Including
fixing inlet and outlet taps in accordance
with manufacturers instructions
No.
No.
D.
item
July 2013
Kshs.
49 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Description
element
Kshs.
Cts.
No.
Substrucures
33
Walling
35
Windows
37
Doors
39
Roof
42
43
Internal finishes
46
47
sanitary fittings
48
10
49
11
250,000
12
300,000
July 2013
50 of 59
Kshs.
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
LM
100
B.
LM
50
LM
150
N0.
20
N0.
12
N0.
12
N0.
July 2013
Kshs.
51 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Septic tank
Septic tank, excavating:disposing of surplus
soil by spreading on site: compacting on site
compacted hardcore filling, in making up
levels: 50mm concrete class 15 blinding:
concrete class 25 in 150mm thick beds and
cover slabs: 200mm thick natural stone walling
and 100mm thick dividers: reinforcement:
formwork: rendered internally with waterproof render : light duty manhole covers
and frames to BS 497: holes in sides
for pipes;internal size
REF drawing No. (50)5342: Capacity 6000 litres:
Twenty persons: 2 Years desludging interval
A
6000x1800x2200mm overall
No.
LM
84
Subsurface drains
Radial arms: excavating: disposing of
soil by spreading on site: 150mm precast
concrete pipe: filling bottom 800mm of trench
with crushed stone, two layers of 500 gauge
polythene sheeting: 200mm thick bed of
approved compacted murram and render
with selected excavated materials
Ref drawing No. (50) 5344
July 2013
Kshs.
52 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Soak pit
(Ref drawing No.(50) 5345)
Excavating pit: disposing of soil by spreading
on site: filling bottom 4500mm of pit with boulders
No.
12
Testing
B
Item
Carried to collection
Collection
From page 51
From page 52
From page 53 (above)
July 2013
53 of 59
Kshs.
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
A.
LM
150
Disposal of water
B.
Item
Pipe work
Medium grade galvanised steel pipes and
fittings: to BS 1387: complete with
screwed couplings in the running length
C.
LM
25
LM
100
LM
25
No.
No.
No.
NO
24
July 2013
Kshs.
54 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
Valve chamber
A
NO
No.
No.
Item
75,000
Testing
E
Item
Carried to collection
Collection
From page 54
From page 55 (Above)
Total Amount to Summary- External Works
July 2013
55 of 59
Kshs.
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
LM
100
LM
100
No.
LM
100
No.
50
100
No
Sum
Sum
July 2013
56 of 59
Kshs.
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Kshs.
Cts.
July 2013
Foul Drainage
53
Water Reticulation
55
56
KShs
57 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Unit Quantity
Rate
Kshs.
Cts.
sum
Sum
300,000
sum
Sum
July 2013
350,000
58 of 59
Kshs.
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
Item
No.
Description
Kshs.
Cts.
GRAND SUMMARY
From page
Preliminaries
10
32 of 59
Wardens house
50 of 59
External Works
57 of 59
58 of 59
Subtotal
Add 7% Contigencies
July 2013
Kshs.
59 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
60 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
61 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
62 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
63 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
64 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
65 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
66 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
67 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
68 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
69 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
70 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
71 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
72 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
73 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
74 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
75 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
76 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
77 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
78 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
79 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
80 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
81 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
82 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
83 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
84 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
85 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
86 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
87 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
88 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
89 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
90 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
91 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
92 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
93 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
94 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
95 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
96 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
97 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
98 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
99 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
100 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
101 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
102 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
103 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
104 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
105 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
106 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
107 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
108 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014
Isiolo Station
July 2013
109 of 59
Bills of Quantities
KWS/OT/BF/10/2013-2014