Beruflich Dokumente
Kultur Dokumente
Procedure Form
Section 1, General Site Information
Must be completed after every new installation, de-installation, and service upgrade or downgrade
Country:
Sudan
Other
Engineer/Technician(s) on Site
Company name:
Tech/Eng name 1:
Tech/Eng name 2:
Tech/Eng name 3:
First day on site:
Last day on site:
6-Aug-2015
9-Aug-2015
Antenna:
Position:
Ku
band
band
SCPC TX/RX
VSAT
Other, please describe:
1.2m
Customer Interface:
1.8m
2.4m
RS449
V.35
46
Ka band
Redundant system:
DVB-RCS like
3.8m
RS422
East
Yes
NPM
West
No
PM
Other
Page 1
Acceptance Test
Procedure Form
Terrestrial Line connected to satellite modem:
Yes
No
Type
Antenna
Mount
BUC/HPA
Typical power
LNA/LNB/LNC
Satellite Modem
IRD/Sat Receiver
Interface
UPS
AVS
Others
Software Release
Serial
Mode
Remark
Number
A02968C73
NJT5669F
s
USED
USED
USED
C-BAND
iDirect Evolution
171061
PAT 8215
X3
USED
Looks new
APC
QS1316271616
SURT10000XLI
Comments:
Radio Details
TX Center Freq:
GHz
RX Center Freq:
GHz
TX Gain:
dB
TX Frequency:
Lin.
Hor.
BPSK
Lin. Ver.
QPSK
GHz
RHCP
Sequential
External
Internal
kbps
LHCP
8-PSK
Other:
Reed-
Viterbi
Data rate:
Solomon
Other:
Rate:
RX Frequency:
Lin.
Hor.
Viterbi
BPSK
Lin. Ver.
QSPK
Sequential
GHz
RHCP
Data rate:
kbps
LHCP
8-PSK
Other:
TPC
Rate:
Page 2
Acceptance Test
Procedure Form
RX Clocking:
External
Internal
TX Frequency:
Lin.
Hor.
BPSK
Lin. Ver.
QSPK
Sequential
External
Internal
Carrier ID RX:
RX Modulation:
RX FEC:
RX Clocking:
RHCP
GHz
8-PSK
Solomon
Other:
RX Frequency:
Lin.
Hor.
BPSK
Lin. Ver.
QSPK
RHCP
Internal
Sequential
External
kbps
Other:
Rate:
GHz
Data rate:
kbps
LHCP
8-PSK
Reed-
Viterbi
Data rate:
LHCP
ReedViterbi
RX Polarization:
Other:
Solomon
Other:
Other:
Rate:
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
No fan
7. Is the SLP box (if any) properly installed with all connections secure and wired
according the FIM?
8. Is the feedhorn window intact so that no moisture can collect inside the feed horn?
9. Is the de-ice system (if applicable) properly installed (and tested)
with all connections secure and properly labeled?
No de-ice
Page 3
Acceptance Test
Procedure Form
10. Is the radio (if any), LNB/C, antenna, SLP box (if any), and mount properly grounded
and is the ground cable from antenna mount to ground rod installed securely?
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
21. Are the cables properly secured to the building or other structure so that movement is
prevented during high winds?
Yes
No
Comments:
Yes
No
Yes
No
Yes
No
Yes
No
Comments:
Acceptance Test
Procedure Form
Extension (if any):
Can Modem Dial-out of the country:
Comments
:
Yes
No
Page 5
Acceptance Test
Procedure Form
Section 4, Tests
This section has to be completed after every new installation and upgrade.
TX cable:
dB
RX cable:
dB
TX path:
dB
RX Path:
dB
Comments:
Modem 1:
dBm
Modem 2:
dBm
Modem 1:
dBm
Modem 2:
dBm
dB
Modem 2:
dB
dB
3. Cross-pol isolation:
dB
analyzer
Modem 1:
dB
Span:
MHz
RBW:
Yes
kHz
VBW:
kHz
No
Yes
No
Yes
Yes
Yes
No
No
No
Yes
Both
ms
No
Router
www.google.com
Other: rate:
File transfer
Kbps
No
No
1dB test
Page 6
Acceptance Test
Procedure Form
Yes
No
Comments:
TX-Carrier 1
TX-Carrier 2
dB
RX-Carrier 1
RX-Carrier 2
dB
Page 7
Acceptance Test
Procedure Form
Section 5 Customer Acceptance
Complete this after every new visit
Engineers signature:
Company:
Date:
9-August-2015
Customer name:
Customer signature:
Position in Organization:
Customer Remarks:
Engineers Remarks:
Page 8
Acceptance Test
Procedure Form
Line of site
Mount installation
Right, Left, Front & Rear photos of the Antenna with mount.
Cable path
Earthling point from antenna to ground.
Indoor cabling
Modem lock with Serial No.
Page 9