Beruflich Dokumente
Kultur Dokumente
Enter ##R430 for soy protein, select Retail for Industry sector, then click on the Select view(s)
icon (
). Click on the Deselect all icon ( ), then select the MRP1,
MRP2, and MRP3 views. Click on the save default values icon (
then click on the enter icon ( ).
),
After selecting the MRP 1, MRP 2 and MRP 3 views and clicking on the enter icon (
following pop-up window will appear:
), the
Enter ##PT, leave Stor. location blank, click on the save default values icon (
), then click on the enter icon ( ), which will produce the following
screen:
Enter 001 for SchedMargin key and 10 for Plnd delivery time, then click on the MRP 3 tab:
Enter 40 for Strategy group, 02 for Availability check and, then click on the save icon (
Repeat this process for SplendaTM (##R440) using the following data:
MRP 1
MRP Type:
MRP Controller:
Lot size:
Fixed lot size
PD
0##
FX
1000
MRP 2
SchedMargin Key:
Plnd delivery time:
001
5
MRP 3
Strategy group
Availability check:
40
02
).
Enter ##S220 for material, select Retail for Industry sector then click on the Select view(s) icon
(
), which will produce the following pop-up window:
Make sure the MRP 1, MRP 2, MRP 3 and Work Scheduling views are selected, then click on
the enter icon ( ), which will produce the following screen:
PD
FX
500
0##
Enter 40 for Strategy group, 02 for Availability check and 1 for Tot. repl. lead time, then click on
the Work scheduling tab:
10
Enter ##S for Production scheduler and 10 for Prod. sched. Profile, then click on the save icon (
).
11
Enter ##F120 for ## NRG-C bars, then select Retail for Industry sector, then click on the Select
view(s) icon (
), which will produce the following screen:
12
Enter ##PT, leave Stor. location blank, then click on the enter icon (
following screen:
13
Enter Enter PD for MRP type, FX for Lot size, 7 for Fixed lot size and 0## for MRP controller.
Click on the MRP 2 tab to produce the following screen:
Enter 1 for In-house production and 001 for SchedMargin key , then click on the MRP 3 tab:
14
Enter 40 for Strategy group, 02 for Availability check and 3 for Tot. repl. lead time, then click on
the Work scheduling tab:
15
Enter ##S for Production scheduler and 10 for Prod. sched. Profile, then click on the save icon (
).
16
17
Enter ##F120 (the material number for the ##NRG-C bar), ##PT for the plant and 1 for BOM
usage (production). Click the enter icon ( ) and the following screen will appear:
18
Enter 7 cases
for base unit
Enter 7 Cases for base unit. We want to tell SAP that a 500 lb. batch of dough will create 7
cases of NRG-C bars (which is our base production quantity). Click on the item overview icon (
) to get back to the General Item Overview screen:
19
Enter L for Item Category, ##S220 (the material number for component ## Dough NRG-C) and
500 for quantity. Click on the save icon ( ) to save the BOM.
20
Enter material ##S220 (material ## Dough NRG-C), plant ##PT and 1 for BOM usage. Click
the enter icon ( ) and the following screen will appear:
21
22
), which will
Enter L for the item category, enter the material number for your material and the quantity from
table above. When you are finished, click on enter icon ( ). Data from the material masters
will be added to the screen:
23
24
Enter ##F120 for material, ##PT for plant, make sure the Group is blank, then click on the enter
icon ( ) and the following screen will appear:
25
Enter 1 for Usage and 4 for Status, then click on the Operations icon (
which will produce the following screen:
),
Enter BAKELINE for Work center, BAKE for Control key, Bake Dough for Description, then
click on the enter icon ( ), which will use your entries for the routing to call up data from the
database:
26
Change the Base Quantity to 7 CS (case), then enter 30 minutes for the setup time and 30
minutes for the machine time. Next, select the line and click on the CompAlloc icon (
), which will produce the following screen:
Select the only component listed (SAP determined the list of components from the BOM) and
then click on the New assignment icon (
), which will bring up the
following pop-up window:
27
):
The only operation on the routing is automatically selected, so click on the enter icon ( ) to
accept this selection, then click on the save icon ( ) to save the routing. You will get a message
like the following:
28
Enter ##S220 for material and ##PT for plant, make sure the Group field is blank, then click on
the enter icon ( ) and the following screen will appear:
29
Enter 1 for Usage and 4 for Status, then click on the Operations icon (
which will produce the following screen:
),
Enter MIXERS for the Workcenter, MIX for the Control Key, and Mix Dough for the
description, then click on the enter icon ( ). Scroll over and enter 500 for the Base Quantity, 30
for Setup time and 30 for Machine time:
30
31
), which
):
The only operation on the routing is automatically selected, so click on the enter icon ( ) to
accept this selection, then click on the save icon ( ) to save the routing. You will get a message
like the following:
32