Roving Quality Control System

(Pre-Production Section)
JANUARY 2010
Triumph

PREPRE-PRODUCTION ROVING QC ROLLROLL-OUT IMPLEMENTATION

JANUARY

AREA
Wk 1

Wk 2

Wk 3

FEBRUARY
Wk 4

Wk 5

Wk 6

Wk 8

Wk 9

No Work

Spreading

Wk7

MARCH

Moulding
Cutting
Bow Lace

TRAINING WEEK
1st Day: Orientation of Supervisors (PPSV, QSV, RQC)
2nd Day: Introduction to Pre-Production Operators
Observation/Practice/Familiarisation of RQC

MONTHLY EVALUATION
Consolidation of Rejects recorded in the Roving QC Weekly Analysis

ACTUAL IMPLEMENTATION & CONTINUOUS MONITORING


Triumph Roving QC Weekly Analysis
Roving QC Weekly Summary Report

Triumph

Wk 10

Wk 11

Wk 12

What tools are needed by the Roving


QC?
Green & Red
highlighters

Approved Pattern,
Standards, &
Specifications

Clipboard
Roving QC Daily Sheet

Roving QC Daily
Sheet

MOULDING SPECIRICATION
CUTTING INSTRUCTION
SHEET
CUTTING INSTRUCTION
SHEET

Triumph

Pencil

A good eye !!!!!!!!

What do we need at the Pre-Production ?

Red cone

Green cone
Operators Daily Sheet
OPERATORDAILY SHEET
OPERATORDAILY SHEET

Triumph

How will the Roving QC be


implemented in the PreProduction Section?

Triumph

TRIUMPH ROVING QUALITY CONTROL - WORK INSTRUCTION


(PRE-PRODUCTION)
Equipment:

Pencil
Highlighters Green & Red

Report:

<OPERATOR DAILY SHEET>


<ROVING QC DAILY SHEET>

Frequency:

As Required

Related Parties:

Roving QC, Pre-Production Supervisor, Pre-Production Section


Chief, Pre-Production Assistant, Quality Control Supervisor,
Production Manager

METHOD:
1. At the start of each day, the Roving QC refers to the QC Supervisor to determine
what defects are frequently encountered and in need of close attention.
2. The Roving QC should visit operators as stated for every areas concerned.
3. On the <OPERATOR DAILY SHEET>, the RQC enters Month, Area, and
Operator. On the <ROVING QC DAILY SHEET>, the RQC enters Date,
Day, Area, and Quality Supervisor
4. Roving QC randomly selects samples (number of samples as stated for every
Areas concerned) and checks the work against the Required Specification &
Quality Standards for each area. According to the classification of faults found
(MINOR or MAJOR), Roving QC follows Steps 5, 6, or 7.
5. If NO FAULT is found:
5.1 Roving QC returns the inspected samples to the operator to continue with the
operation.
5.2 Roving QC fills in the appropriate space on the <OPERATOR DAILY
SHEET> with Green highlighter.
5.3 Roving QC fills in each column on the <ROVING QC DAILY SHEET>:
Operation (abbreviation or code), Operator, Quantity Inspected,
Result (check mark)
5.4 Roving QC raises the green cone at the work station and moves on to the next
operator.
6. If MINOR FAULTS are found: (a minor fault can be defined as a fault that if not
given due monitoring, may later on becomes MAJOR fault).
6.1 Roving QC returns the defective pieces to the Operator.
6.1.1 For Spreading Roving QC indicates the defect found in the marker to
serve as warning for the Cutting Quality Supervisor, Operator, PreProduction
6.2 Roving QC fills in the appropriate space on the <OPERATOR DAILY
SHEET> with Green highlighter. Enters relevant defect code and quantity
(e.g., 2/MD) and signs it off. Pre-Production Supervisor also signs off.
Triumph

1.1 Roving QC fills in each column on the <ROVING QC DAILY SHEET>:


Operation abbreviation or code, Style Number, Operator, Quantity
Inspected, Result X, Defect Qty/Code, and Remarks.
1.2 Roving QC raises the Green cone at the work station and moves on to the
next Operator.
2. If MAJOR FAULTS are found: (a major fault can be defined as a fault that will
definitely result in rejection by the customer and likely return).
2.1 Roving QC instantly informs the Pre-Production Supervisor to come to the
operation to determine how to handle the defects and request the operator not
to proceed with the operation unless the problem is resolved.
2.2 Roving QC fills in the appropriate space on the <OPERATOR DAILY
SHEET> with Red highlighter and enters the relevant defect code and
quantity (e.g., 2/MD) and signs it off. Pre-Production Supervisor and Quality
Supervisor also signs off.
2.3 Roving QC fills in each column on the <ROVING QC DAILY SHEET>:
Operation abbreviation or code, Style, Operator, Quantity
Inspected, Result X, Defect Qty/Code, and Remarks.
2.4 Roving QC raises the Red cone at the work station and moves on to the next
operator.
2.5 After the operator had finished checking and repairing, Pre-Production
Supervisor calls on the Roving QC back to the operator.
2.6 Roving QC should follow Step 4.
2.7 If no fault is found, follow Step 5. If minor faults are found, follow Step 6. If
major faults are still found, proceed as follows:
2.8 Roving QC requests the Pre-Production Supervisor to STOP the operator.
This time Pre-Production Supervisor should inform the Pre-Production
Section Chief. Both Pre-Production Supervisor and Pre-Production Section
Chief will decide how to handle and solve the problem.
2.9 Roving QC fills in the appropriate space on the <OPERATOR DAILY
SHEET> with Red highlighter and enters the relevant defect code and
quantity (e.g., 4/MD) and signs it off.
2.10 Pre-Production Supervisor and Pre-Production Section Chief sign off on
the <OPERATOR DAILY SHEET>.
2.11 Roving QC fills in the column Follow-Up on the <ROVING QC
DAILY SHEET>, enter the relevant defect code and quantity
2.12 Roving QC keeps the Red cone at the work station and moves on to the
next operator.
2.13 Roving QC must ensure to check the Operator again after 2 consecutive
Reds.
2.14 Operator will only be allowed to continue with the operation if the Red
cone is immediately replaced by Green cone.
Triumph

No. of Samples to be Inspected


1)

SPREADING

Roving QC Cutting should check ALL finished laid markers/fabric for the day, plus (+) 15 markers (during process of spreading).
2) LAMINATION
Roving QC checks 10% of every commission (on roll form) & 7pieces/bundle (on panel form).
3) CUTTING BANDKNIFE/DYE-CUT
Roving QC should check all parts in a lay (top, middle, and bottom) regardless of size. Check should be made at least twice a day per operator/shift.
4) CUTTING BOW LACE
Roving QC should check all parts in a lay (top, middle, and bottom) regardless of size. Check should be made at least twice a day per operator/shift.
5) CUTTING MOULDED CUPS
Roving QC should check one operator twice per day/shift, 7pcs per bundle (top, middle, & bottom)
6) MOULDING
7pcs/bundle (top-middle-bottom), at least twice a day per operator/shift.
7) FUSING/BONDING
Minimum 10% of every commission, covering all sizes.
8) HEATSEAL
7pcs/bundle, at least twice a day per operator/shift.
9) LABEL PRINTING
Roving QC checks 10% per bundle or box at least twice a day per operator/shift.
10) LABEL PRINTING ON EYE TAPE
RQC checks 10% per bundle at least twice a day per operator/shift.
11) SHOULDER STRAP SEWING
Roving QC should check 7pairs per bundle at least twice a day per operator/shift.

Triumph

What are the Classification of


Defects?

Triumph

CLASSIFICATION OF DEFECTS - PRE-PRODUCTION


Fault Type: A - Major; B - Minor
SF - SPREADING FAULTS
A
A
A
A
A
A
A
A

SF1
SF2
SF3
SF4
SF5
SF6
SF7
SF8

No. of Layers not According to Spec.


Missing Separator for Different Shades
Wrong Spreading Method
Wrong Placement of Marker
Faulty Blocking
Incomplete Size/Size not in Set
Material Not Flat/Uneven
Wrong Material

BK - BANDKNIFE FAULTS/DYE-CUT
A
B
A
B
A
A
B
A
A
A

CT1
CT2
CT3
CT4
CT5
CT6
CT7
CT8
CT9
CT10

Nicks too deep


Uneven Cutting Edge
Out of Cutting Allowance
Fused Cutting Edge
Cutwork not According to Pattern
Wrong Dye-Cut Used
Missing Nick/Missing UV Mark
Wrong Cutting Line
Wrong Size
Folded Fabric

MD - MOULDING FAULTS
A
A
A
A
A
A
A
A
A
A
B
A

MD1
MD2
MD3
MD4
MD5
MD6
MD7
MD8
MD9
MD10
MDPA1
MDPA2

Unbalanced Drawing
Colour Change After Moulding
Loose Diameter/Cup Deepness/Shrinkage
Wrinkles/Puckered/Creased
Stain/Foreign Material/Contamination
Wrong Cutting Line
Wrong Kegel Used
Mould Mark (Ring Mark)
Distorted/Displaced Bustpoint
Too High Temperature (Fabric Became Brittle)
Missing No. of Layers
Wrong Size

BD - BONDING FAULTS
A
A
A
A
A

BD1
BD2
BD3
BD4
BD5

Delamination
Bubbles/Wrinkles
Incorrect Face Side
Colour change after bonding
Non-symmetrical (if in pairs)

HS - HEATSEAL FAULTS
BF - BOWLACE FAULTS
A
A
B

BF1
BF2
BF3

B
B

BF4
BF5

A
A

BF6
BF7

Width Variation & Repeat Length


Wrong Placement of Pattern/One-Way Lay
Missing Ultraviolet Pen for Nicks/
Missing Number of Layers
Uneven Pinning of Materials
Layers too high/
Excessive Bundles (too many)
Incorrect Material
Folded Lace

RM - RAW MATERIAL FAULTS


A
A

RM1
RM2

RM3

RM4

Shade Variation
Scattered Blue/Black Dots, Stain,
Glue Spot
Width Variation/Short Width/
Shrinkage/Repeat Length
Hole/Joining/Run Line/Crease Mark/
Warp Line/Weft Line/Folded Mark/
Snags/Fluffs/Moiree or Water Marks

A
A
A
A
A
B

HS1
HS2
HS3
HS4
HS5
HS6

Delamination/Peeling Off
Incorrect Placement
Incorrect for Colour
Damage on motif
Discolouration after heat pressing
Misplacement of 1-2mm (motif)

SHOULDER STRAP FAULTS A


A
A
A
B
B
A
A
A
A
A
A
A

SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
SS9
SS10
SS11
SS12
SS13

Wrong Width/Length
Wrong Direction (for patterned straps)
Incorrect Material Used (Size & Colour)
Elongation (Too Much/Too Little)
Uneven Cut Edge
Missing Nick/Missing UV Mark
Stitch Density Too Tight/Loose
Sharp Edge After Sewing
Too Wavy/Curved
Cracking Stitch
Incorrect Stitch Used
Style/Colour Mix-Up
Incorrect Bundle Quantity

LM - LAMINATION FAULTS
A
A
A
A
A
A
A

Triumph

LM1
LM2
LM3
LM4
LM5
LM6
LM7

Delamination
Wrong Material Used
Bubbles/Wrinkles
Incorrect Face Side
Foreign Material Inside the Laminated Fabric
Handfeel Too Hard/Harsh
Uneven Edges

LB - LABEL PRINTING FAULT


A
A
A
A
A
A
A
A
B

LB1
LB2
LB3
LB4
LB5
LB6
LB7
LB8
LB9

Unclear Print (Unreadable)


Smudged Print/Stain/Ink
Incorrect Details
Missing Letters/Details
Incorrect Materials Used
Print is Peeling-Off
Incorrect Placement
Mix-Up - style/size/colour
Slight stain/smudge

How will the RQC Pre-Production


System Work?

Triumph

<Operator
Operator Daily Sheet> - Enter Month, Area,
Operator
<Roving
Roving QC Daily Sheet>Sheet Enter
Date, Area, RQC, QC Supervisor

Equipment:
Equipment Pencil, Highlighter (Green
& Red)
Frequency: As Required

Check markers during process


of spreading

NO DEFECT

Inform the spreader to continue


In the Operator Daily Sheet, color
the appropriate cell in Green
In Roving QC Daily Sheet,
Sheet fill the
result in relevant column ()
Raise the Green cone
Move onto the next table

DEFECT

MAJOR FAULT

RAW MATERIAL FAULT

Inform the Pre-Prod Supervisor


of the defect found

Instantly inform the Pre-Prod


Supervisor of the defect found
In the Operator Daily Sheet,
Sheet color
the appropriate cell in Red & indicate
the nature of defect (e.g. RM3). PreProd Supervisor & RQC signs off.

In the Operator Daily Sheet,


Sheet color
the appropriate cell in Red & indicate
the nature of defect (e.g. SF3). PreProd Supervisor & RQC signs off.

In Roving QC Daily Sheet,


Sheet fill the
result in relevant column (x)

In Roving QC Daily Sheet,


Sheet fill the
result in relevant column (x)

Raise the Red cone & move on


to the next table

Raise the Red cone

Pre-Prod Supervisor checks the


Defects found & inform Production
Section Chief & QC Supervisor

Move onto the next table


Pre-Prod Supervisor checks the
lay-out & instruct the spreader to
re-layout
Pre-Prod Supervisor re-checks the
re-laid out fabric/ace and ask
the RQC to check again

Pre-Prod Supervisor instructs the


spreader not to continue, re-roll the
fabric & lay another marker

NO

YES
Defect within
Tolerance (by
QA Manager)

Inform the spreader to continue

Pre-Prod Supervisor calls the RQC


and inform the result

RQC indicates in the marker defect


found to alert RQC in Cutting

In the Operator Daily Sheet,


Sheet color
the appropriate cell in Green

In the Operator Daily Sheet,


Sheet color
the appropriate cell in Green

In Roving QC Daily Sheet,


Sheet fill the
result in relevant column()
& indicate return fabric

ROVING QC PROCEDURE
IN SPREADING (A)

In Roving QC Daily Sheet,


Sheet fill the
result in relevant column ()

Raise the Green cone


Move onto the next table

Triumph

Pre-Prod Supervisor calls the


RQC and inform the result

Checks ALL finished


laid markers/fabric

NO DEFECT
DEFECT
RAW MATERIAL FAULT

MAJOR FAULT

Instantly inform the Cutting


Supervisor of the defect found

In the Operator
Daily Sheet,
Sheet color
the appropriate
cell in Green

Inform the Cutting Supervisor


of the defect found
In the Operator Daily Sheet,
Sheet color
the appropriate cell in Red &
indicate the nature of defect (e.g.
SF3). Cutting Supervisor & RQC
signs off.

In the Operator Daily Sheet,


Sheet color the
appropriate cell in Red and indicate the
nature of defect (e.g. RM1). Pre-Prod
Supervisor & RQC signs off.

In Roving QC Daily
Sheet, fill the result
Sheet
in relevant column
()

In Roving QC Daily Sheet,


Sheet fill the
result in relevant column (x)

In Roving QC Daily Sheet,


Sheet fill the
result in relevant column (x)

Raise the Red cone and move on


to the next table

Raise the Green cone

Raise the Red cone

Cutting Supervisor checks the defects found


and inform Cutting Section Chief & QC Supervisor

Move to the next table

YES

Cutting Supervisor calls the


RQC & inform the result

Defect Within
Tolerance (By QA
Manager)

RQC indicates in the marker


defect found to warn RQC in cutting

Cutting Supervisor instruct


the spreader to stop,
re-roll the fabric & lay another
marker.
Cutting Supervisor calls the
RQC and inform the result

In the Operator Daily Sheet color the


appropriate cell in Green

ROVING QC
PROCEDURE
IN SPREADING (B)

NO

Move on to the next table


Cutting Supervisor checks the
layout & instruct the spreader
to re-layout
Cutting Supervisor re-checks
the re-laid out & ask the RQC
to check again

In the Operators Daily Sheet,


Sheet
color the appropriate cell in Green

In Roving QC Daily Sheet fill the


result in relevant column ()

In the Roving QC Daily Sheet,


Sheet fill
the result in relevant column &
indicate return fabric
Raise the Green cone

Inform the spreader to proceed with blocking


Inform the Spreader to lay next
marker
In the Operator Daily Sheet, color the
appropriate cell in Green
In Roving QC Daily Sheet,
Sheet fill the result
in relevant column ()
Raise the Green cone
Move to the next table

NO

DEFECT

WITH DEFECT

Inform the Cutting Supervisor


of the defect found

Cutting Sup instructs the spreader to remove the affected part (size/
pattern), re-lay another fabric for the particular size affected
In the Operator Daily Sheet,
Sheet indicate the defect code, color
the appropriate cell in Red. Pre-Prod Sup & RQC signs off.
In the Roving QC Daily Sheet,
Sheet fill the result in relevant column (x)
Raise the Red cone
Move onto the next table
Pre-Prod Supervisor checks the re-laid fabric & ask the
RQC to check again

Triumph

<Operator
Operator Daily Sheet> - Enter Month, Area,
Operator
<Roving
Roving QC Daily Sheet>Sheet Enter
Date, Area, RQC, QC Supervisor

Equipment:
Equipment Pencil, Highlighter (Green
& Red)
Frequency: As Required

At the start of each day, refer to the QC Supervisor for styles/cutworks in need of special attention
Review approved/correct pattern, cutting specification,
& any other points agreed in PP Meeting
ALL PARTS/ALL SIZES
FOR NEW STYLES MUST
BE CHECKED

Check cut panels for measurement & balance. Check top, middle, & bottom ply
against the approved pattern.

DEFECT

NO
DEFECT

RAW MATERIAL FAULT

MINOR

Return the cut panels


back into the bundle

RQC instantly inform & return the


defective pieces to Cutting Supervisor

Return the defective pieces back to


the Operator for repair

In the ODS,
ODS color
the appropriate
cell in Green

In Roving QC Daily
Sheet, fill the result
Sheet
in relevant column
()

RQC instantly inform &


return the defective pieces
to Cutting Supervisor

Cutting Supervisor should determine how


to handle the defect & ask the Operator
to check the whole bundle

In the ODS,
ODS enter the relevant
defect code (e.g.CT2/1). Color the
appropriate cell in Green and sign
it off

Cutting Supervisor should


determine how to handle
the defect & ask the
Operator to check the
whole bundle

In the ODS,
ODS color the appropriate cell in
Red and indicate the nature of defect
(e.g. RM4/1). Cutting Supervisor & RQC
signs off.

In Roving QC Daily Sheet,


Sheet fill
the result in relevant column (x)

In RQCRQC-Daily Sheet,
Sheet fill the
result in relevant column (x)

In the ODS,
ODS color the appropriate cell in
Red and indicate the nature of defect
(e.g. CT1/1). Cutting Supervisor & RQC
signs off.

Raise the Red cone and move on


to the next table
Raise the Green cone

Move onto the next operator

In Roving QC Daily Sheet,


Sheet fill the
result in relevant column (x)
NO
Cutting Supervisor calls the
RQC and inform the result
Cutting Sup instructs the Cutter
not to continue & cut another lay

ROVING QC PROCEDURE IN
FABRIC, DIE-CUT, &
BOWLACE CUTTING
Triumph

MAJOR FAULT

Defect Within
Tolerance
(by QA Manager)

YES
Cutting Supervisor calls the
RQC & inform the result
Inform the Cutter to continue

Cutting Supervisor re-checks


the new cutwork & ask the RQC
to check again

RQC indicates in the panels defect


found to alert RQC in Sewing

In the ODS,
ODS color the appropriate
cell in Green

In the ODS,
ODS color the appropriate
cell in Green

In the Roving QC Daily Sheet,


Sheet fill
the result in relevant column &
indicate return fabric

In Roving QC Daily Sheet,


Sheet fill the
result in relevant column ()

Raise the Green cone & move onto the next Cutter

Raise the Red cone and move on


to the next table
If the defect can be repaired, Cutting
Supervisor will call the RQC back as soon
as the Operator is finished with the repair.
If the defect cannot be repaired, Cutting Sup
will ask the Operator to cut another lay,
check the cut pieces, then call the RQC to
check the new cutworks.

<Operator
Operator Daily Sheet> - Enter Month, Area,
Operator
<Roving
Roving QC Daily Sheet>Sheet Enter
Date, Area, RQC, QC Supervisor

Equipment:
Equipment Pencil, Highlighter (Green
& Red)
Frequency: As Required

At the start of each day, refer to the QC Supervisor for cups in need of special attention
Review approved/correct plastic shot, moulding specification, approved
standard, or any other points agreed in PP Meeting
ALL SIZES FOR NEW
STYLE and COLOUR MUST
BE CHECKED

Check top, middle, & bottom of the bundle against the approved plastic shot/standard

DEFECT

MAJOR

RAW MATERIAL DEFECT

NO
DEFECT

RQC instantly inform &


return the defective pieces
to Moulding Supervisor

RQC instantly inform & return the


defective pieces to Moulding Supervisor

Return the moulded cups


back into the bundle

Moulding Supervisor should determine how to


handle the defect & ask the Operator to check
the whole bundle & sort the defect out.

In the ODS,
ODS color the appropriate
cell in Green

Moulding Supervisor should


determine how to handle the defect
& ask the Operator to check the
whole bundle & sort out.

In the ODS,
ODS color the appropriate cell in Red
and indicate the nature of defect (e.g. MD2/5).
Moulding Supervisor & RQC signs off.

In Roving QC Daily Sheet,


Sheet fill
the result in relevant column ()

In the ODS,
ODS color the appropriate
cell in Red and indicate the nature
of defect (e.g. MD1/1). Moulding
Supervisor & RQC signs off.

In Roving QC Daily Sheet,


Sheet fill the
result in relevant column (x)

Move onto the next operator

In RQCRQC-Daily Sheet,
Sheet fill the
result in relevant column (x)

Raise the Red cone and move on


to the next table

Raise the Red cone and move


on to the next operator
Moulding Supervisor ask the Operator
to stop & mould another bundle.

NO

Moulding Supervisor calls the


RQC and inform the result

YES

Moulding Supervisor calls the


RQC and inform the result
Inform the Moulder to continue

Moulding Supervisor re-checks


the new work & ask the RQC
to check again

RQC indicates in the panels defect


found to alert QC in succeeding check

In the ODS,
ODS color the appropriate
cell in Green

MOULDING

Defect Within
Tolerance
(by QA Manager)

In the ODS,
ODS color the appropriate
cell in Green

In the Roving QC Daily Sheet,


Sheet fill the result in
relevant column & indicate replaced cups

In Roving QC Daily Sheet,


Sheet fill the
result in relevant column ()

Raise the Green cone & move onto the next Cutter
Triumph

Moulding Supervisor will


ask the Operator to mould
another bundle, check
the finished piece, then
call the RQC to check
the new works.

<Operator
Operator Daily Sheet> - Enter Month, Area,
Operator
<Roving
Roving QC Daily Sheet>Sheet Enter
Date, Area, RQC, QC Supervisor

Equipment: Pencil, Highlighter


(Green& Red)
Frequency: As Required

At the start of each day, refer to the QC Supervisor for laminated works in need of special attention
PLEASE REFER TO THE RAW
MATERIAL GLOBAL QUALITY
MANUAL (JAN 10) FOR TESTING
REQUIREMENT BEFORE START
OF BULK PRODUCTION

Review approved standard, lamination/bonding specification,


and any other points agreed in PP Meeting
Check 7pcs/bundle or 10%/roll of laminated fabric

DEFECT

NO
DEFECT

RAW MATERIAL DEFECT

Return the laminated


panels back into the bundle

RQC instantly inform & return the


defective pieces to Lamination Supervisor

RQC instantly inform & return


the defective pieces to Lamination/Bonding Supervisor

Lamination Supervisor should determine how to


handle the defect & ask the Operator to check
the whole bundle & sort the defect out.

In the ODS,
ODS color the appropriate
cell in Green
In Roving QC Daily Sheet,
Sheet fill
the result in relevant column ()

MAJOR

In the ODS,
ODS color the appropriate cell in Red
and indicate the nature of defect (e.g. LM1/1 ).
Lamination Supervisor & RQC signs off.

Lam/Bonding Sup should determine


how to handle the defect & ask the
Operator to check the whole bundle
In the ODS,
ODS color the appropriate
cell in Red and indicate the nature
of defect (e.g. LM1/1). Lam/Bonding
Supervisor & RQC signs off.

Move onto the next operator


In Roving QC Daily Sheet,
Sheet fill the
result in relevant column (x)
Raise the Red cone and move on
to the next operator

In RQCRQC-Daily Sheet,
Sheet fill the
result in relevant column (x)
Raise the Red cone and move on
to the next operator

Lam/Bond Supervisor ask the Operator


To stop & process another bundle/roll
Lam/Bond Supervisor calls the
RQC and inform the result
Lam/Bond Supervisor re-checks
the new work & ask the RQC
to check the new works

LAMINATION/
BONDING
Triumph

In the ODS,
ODS color the appropriate
cell in Green
In the Roving QC Daily Sheet,
Sheet fill the result in
relevant column & indicate replaced panel

NO

Defect Within
Tolerance
(by QA Manager)

YES
Lamination Supervisor calls the
RQC and inform the result
Inform the operator to continue
RQC indicates in the panels defect
found to alert QC in succeeding check
In the ODS,
ODS color the appropriate
cell in Green
In Roving QC Daily Sheet,
Sheet fill the
result in relevant column ()

Raise the Green cone & move onto the next Operator

Heatseal Supervisor will ask the


Operator to heat press another bundle,
check the finished piece, then call the
RQC to check the new works.

<Operator
Operator Daily Sheet> - Enter Month, Area,
Operator
<Roving
Roving QC Daily Sheet>Sheet Enter
Date, Area, RQC, QC Supervisor

Equipment: Pencil, Highlighter


(Green& Red)
Frequency: As Required

Review approved sample, heatseal parameters on A/D, correct


placement, and any other points agreed in PP Meeting
Check 7pcs/bundle or 10% per commission

DEFECT

RAW MATERIAL FAULT

NO
DEFECT

MINOR

Return the pieces


back into the bundle

Return the defective pieces back to


the Operator for his/her info

In the ODS,
ODS color the appropriate
cell in Green

In the ODS,
ODS enter the relevant
defect code (e.g.HS5/1). Color the
appropriate cell in Green and sign
it off

In Roving QC Daily Sheet,


Sheet fill
the result in relevant column ()

RQC instantly inform & return the


defective pieces to Heatseal Supervisor
Heatseal Supervisor should determine how to handle
the defect & ask the Operator to check the whole bundle
In the ODS,
ODS color the appropriate cell in Red
and indicate the nature of defect (e.g. HS1/1).
Heatseal Supervisor & RQC signs off.

In Roving QC Daily Sheet,


Sheet fill
the result in relevant column (x)

Move onto the next operator

Raise the Red cone and move on


to the next operator

Heatseal Supervisor instruct


the operator to stop & do
another bundle
Heatseal Supervisor calls the
RQC and inform the result

HEATSEAL
(RHINESTONES,
RUBBERISED
MOTIF, & DIAMONTES)

Heatseal Supervisor re-checks


the new work & ask the RQC
to check again
In the ODS,
ODS color the appropriate
cell in Green

NO

Defect Within
Tolerance
(by QA Manager)

YES

In RQCRQC-Daily Sheet,
Sheet fill the
result in relevant column (x)
Heatseal Supervisor calls the
RQC & inform the result

Raise the Red cone and move on


to the next operator

Inform the Operator to continue

Heatseal Supervisor will ask the


Operator to heat press another bundle,
check the finished piece, then call the
RQC to check the new works.

RQC indicates in the panels defect


found to alert RQC in Sewing
In the ODS,
ODS color the appropriate
cell in Green
In Roving QC Daily Sheet,
Sheet fill the
result in relevant column ()

In the Roving QC Daily Sheet,


Sheet fill
the result in relevant column &
indicate replaced panels

Raise the Green cone & move onto the next Cutter/Sewer
Triumph

Heatseal Supervisor should determine


how to handle the defect & ask the
Operator to check the whole bundle

In the ODS,
ODS color the appropriate
cell in Red and indicate the nature
of defect (e.g. HS1/1). Heatseal
Supervisor & RQC signs off.

In RQCRQC-Daily Sheet,
Sheet fill the
result in relevant column (x)

Raise the Green cone

MAJOR
RQC instantly inform &
return the defective pieces
to Heatseal Supervisor

<Operator
Operator Daily Sheet> - Enter Month, Area,
Operator
<Roving
Roving QC Daily Sheet>Sheet Enter
Date, Area, RQC, QC Supervisor

Equipment: Pencil, Highlighter


(Green& Red)
Frequency: As Required

At the start of each day, refer to the QC Supervisor for styles/straps in need of special attention
Review approved sample, A/D specification - length, material
number, & width plus any other points agreed in PP Meeting
Check cut/sewn straps for measurement, appearance, balance, &
elongation. Check 7pairs per bundle

DEFECT

RAW MATERIAL FAULT

NO
DEFECT

MINOR

Return the sewn/cut


straps back into the
bundle

RQC instantly inform & return the


defective pieces to S/S Supervisor

Return the defective pieces back to


the Operator for repair

In the ODS,
ODS color
the appropriate
cell in Green
In Roving QC Daily
Sheet, fill the result
Sheet
in relevant column
()

In Roving QC Daily Sheet,


Sheet fill the
result in relevant column (x)
Raise the Red cone and move on
to the next table

Raise the Red cone and move on


to the next table

S/S Supervisor instruct


the operator to stop & arrange
for 100% check on all WIP
S/S Supervisor calls the
RQC and inform the result
In the ODS,
ODS color the appropriate
cell in Green

Triumph

In the ODS,
ODS color the appropriate cell in
Red and indicate the nature of defect
(e.g. M1/1). S/S Supervisor & RQC
signs off.

In RQCRQC-Daily Sheet,
Sheet fill the
result in relevant column (x)

Raise the Green cone

SHOULDERSTRAP
CUTTING/SEWING

S/S Supervisor should determine how to


handle the defect & ask the Operator to
check the whole bundle & repair

In the ODS,
ODS color the appropriate cell in
Red and indicate the nature of defect
(e.g. RM3/1). S/S Supervisor & RQC
signs off.

In Roving QC Daily Sheet,


Sheet fill
the result in relevant column (x)

Move onto the next operator

RQC instantly inform &


return the defective pieces
to S/S Supervisor

S/S Supervisor should determine how


to handle the defect & ask the Operator
to check the whole bundle & sort out

In the ODS,
ODS enter the relevant
defect code (e.g.SS6/1). Color the
appropriate cell in Green and sign
it off

In the Roving QC Daily Sheet,


Sheet fill
the result in relevant column &
indicate return elastic/straps

NO

Defect Within
Tolerance
(by QA Manager)

MAJOR FAULT

YES
S/S Supervisor calls the
RQC & inform the result
Inform the Cutter/Sewer to continue
RQC indicates in the straps defect
found to alert RQC in Sewing
In the ODS,
ODS color the appropriate
cell in Green
In Roving QC Daily Sheet,
Sheet fill the
result in relevant column ()

Raise the Green cone & move onto the next Cutter/Sewer

If the defect can be repaired, S/S


Supervisor will call the RQC back as
soon as the Operator finished the
repair.
If the defect cannot be repaired,
S/S Supervisor will ask the Operator to
Cut/sew another lay, check the cut/sewn
pieces, then call the RQC to
check the new cutworks.

<Operator
Operator Daily Sheet> - Enter Month, Area,
Operator
<Roving
Roving QC Daily Sheet>Sheet Enter
Date, Area, RQC, QC Supervisor

Equipment: Pencil, Highlighter


(Green& Red)
Frequency: As Required

At the start of each day, refer to the QC Supervisor for labels in need of special attention
Review required information to be printed on labels from the
approved document provided for printing
Check 10% per commission covering all sizes

DEFECT

NO
DEFECT

MINOR

Return the pieces


back into the bundle

In the ODS,
ODS color the
appropriate cell in Green

In Roving QC Daily Sheet,


Sheet fill
the result in relevant column ()

RAW MATERIAL FAULT

Return the defective pieces back to


the Operator for his/her info

RQC instantly inform & return the


defective pieces to Label Supervisor

In the ODS,
ODS enter the relevant
defect code (e.g.LBL9/1). Color the
appropriate cell in Green and sign
it off

RQC instantly inform &


return the defective labels
to Label Supervisor

Label Supervisor should determine how


to handle the defect & ask the Operator
to check the whole bundle & sort out

In Roving QC Daily Sheet,


Sheet fill
the result in relevant column (x)

In the ODS,
ODS color the appropriate cell in
Red and indicate the nature of defect
(e.g. RM4/1). Label Supervisor & RQC
signs off.

Raise the Green cone

MAJOR FAULT

In RQCRQC-Daily Sheet,
Sheet fill the
result in relevant column (x)

Move onto the next operator

Label Supervisor should


determine how to handle the defect
& ask the Operator to check the
whole bundle & sort out defective qty
In the ODS,
ODS color the appropriate cell in
Red and indicate the nature of defect
(e.g. LB1/1). Label Supervisor & RQC
signs off.
In Roving QC Daily Sheet,
Sheet fill the
result in relevant column (x)

Raise the Red cone and move on


to the next Operator

Raise the Red cone and move on


to the next Operator
Label Supervisor instruct
the operator to stop & arrange
to 100% check all WIP
Label Supervisor calls the
RQC and inform the result
In the ODS,
ODS color the appropriate
cell in Green

LABEL PRINTING/LABEL
PRINTED DIRECTLY ON
THE GARMENT
Triumph

In the Roving QC Daily Sheet,


Sheet fill
the result in relevant column &
indicate return labels

NO

Defect Within
Tolerance
(by QA Manager)

YES
Label Supervisor calls the
RQC & inform the result
Inform the Operator to continue
RQC indicates in the labels defect
found to alert RQC in Sewing
In the ODS,
ODS color the appropriate
cell in Green
In Roving QC Daily Sheet,
Sheet fill the
result in relevant column ()

Raise the Green cone & move onto the next Operator

Label Supervisor will ask the Operator to


print another batch, check the newly
printed pieces, then call the RQC to
check the new labels.

What forms to be used?

Triumph

ROVING QC DAILY SHEET - Pre-Production


TRIUMPH ROVING QC SYSTEM
ROVING QC NAME:
DATE:
AREA:
Style

Commission #

Colour

DAY:

Cup

Material

QC SUPERVISOR:
Entered By QC Clerk:
(For Office Use Only)
Operator's Name

Layers
Inspected

Result
( or X)

Qty of Layer with


Defect/Rejected

Follow-up

Remarks

DEFECT CODE:
SF = SPREADING FAULTS
SF1
SF2
SF3
SF4
SF5
SF6
SF7
SF8

No. of layers not according to spec


Missing separator for different shade material
Wrong spreading method
Wrong placement of marker
Faulty blocking
Incomplete Size/Size not in Set
Material Not Flat/Uneven
Wrong Material

BF = BOWLACE FAULTS
BF1
BF2
BF3
BF4
BF5
BF6
BF7

Width variation & repeat length


Wrong placement of pattern
Missing ultraviolet pen for nicks/Missing no. of layers
Uneven pinning of materials
Layers too high/Excessive bundles (too much)
Incorrect material
Folded lace

BK = BANDKNIFE/DIE-CUT FAULTS
CT1
CT2
CT3
CT4
CT5
CT6
CT7
CT8
CT9
CT10

Nicks too deep


Uneven cutting edge
Out of cutting allowance
Fused cutting edge
Cutwork not according to pattern
Wrong die-cut used
Missing nick/Missing UV mark
Wrong cutting line
Wrong size
Folded fabric

Triumph

MD = MOULDING FAULTS
MD1
MD2
MD3
MD4
MD5
MD6
MD7
MD8
MD9
MD10
MDPA1
MDPA2
LM = LAMINATION FAULTS
LM1
LM2
LM3
LM4
LM5
LM6
LM7

HS = HEATSEAL FAULTS
Unbalanced drawing
HS1
Colour change after moulding
HS2
Loose diameter/Cup deepness/Shrinkage
HS3
Wrinkles/Puckered/Creased
HS4
Stain/Foreign material
HS5
Wrong cutting line
HS6
Wrong kegel used
Kegel mark (Ring mark)/Mould Mark
SS = SHOULDERSTRAP FAULTS
Distorted/Displaced Bustpoint
SS1
Too High Temperature (Fabric Became Brittle)
SS2
Missing number of layers
SS3
Wrong size
SS4
SS5
SS6
Delamination
SS7
Wrong material used
SS8
Bubbles/Wrinkles
SS9
Incorrect face side
SS10
Foreign material inside
SS11
Handfeel too harsh/hard
SS12
Uneven edges
SS13

BD = BONDING FAULTS
BD1
BD2
BD3
BD4
BD5

Delamination
Bubbles/Wrinkles
Incorrect face side
Colour change after bonding
Non-symmetrical (if in pairs)

LB = LABEL PRINTING FAULTS


LB1
LB2
LB3
LB4
LB5
LB6
LB7
LB8
LB9

RM = RAW MATERIAL FAULTS


Delamination/Peeling off
RM1
Shade variation
Incorrect placement
RM2
Scattered blue/Black dots/Stain/Glue spot
Incorrect colour
RM3
Width variation/Short width/Shrinkage/Repeat
Damage on motif
length
Discolouration after heat pressing
RM4
Hole/Joining/Run line/Crease mark/Warp line/
Misplacement of between 1-2mm
Weft line/Folded mark/Snags/Fluffs/
Moiree or water mark
Wrong width or length
Wrong direction (for patterned straps)
Incorrect material used (size & colour)
Elongation (loose/tight)
Uneven cut edge
Missing nick or UV mark
Stitch density too tight/too loose
Sharp edge after stitching
Too wavy/curved
Cracking stitch
Incorrect stitch used
Style/colour mix-up
Incorrect bundle quantity

Unclear print (unreadable)


Smudged print/stain/ink
Incorrect print details
Missing letter/number/detail
Incorrect material used
Print peeling-off
Incorrect placement
Mix-up - style/size/colour
Slight stain/smudge

OPERATOR'S DAILY SHEET - Pre-Production


TRIUMPH ROVING QC SYSTEM
Month:
Date

01

Time

OPERATOR DAILY SHEET (to be kept at the operator's workstation at all times)
Operator:

Area:
02

03

04

05

06

07

08

09

10

11

12

13

14

15

Morning
Roving QC
Pre-Prod Supervisor
Prod Section Chief
QC Supervisor
Remarks:
Afternoon
Roving QC
Pre-Prod Supervisor
Prod Section Chief
QC Supervisor
Remarks:
Night
Roving QC
Pre-Prod Supervisor
Prod Section Chief
QC Supervisor
Remarks:
If operator is on leave, mark "L" in the cell.

Remarks:

Green = all pass


Red = 1 major fault
If Green and no rejections, no signature needed; If Green and some rejection, RQC signs; If Red, RQC, PP Sup, & PS Chief signs; If Red again, immediately PS Chief & QC Supervisor signs.

DEFECT CODE:
SF = SPREADING FAULTS

MD = MOULDING FAULTS

RM = RAW MATERIAL FAULTS

No. of layers not according to spec

MD1

Unbalanced drawing

HS1

Delamination/Peeling off

RM1

Shade variation

Missing separator for different shade material

MD2

Colour change after moulding

HS2

Incorrect placement

RM2

Scattered blue/Black dots/Stain/

SF3

Wrong spreading method

MD3

Loose diameter/Cup deepness/Shrinkage

HS3

Incorrect colour

SF4

Wrong placement of marker

MD4

Wrinkles/Puckered/Creased

HS4

Damage on motif

SF5

Faulty blocking

MD5

Stain/Foreign material

HS5

Discolouration after heat pressing

HS6

Misplacement of between 1-2mm

SF6

Incomplete Size/Size not in Set

MD6

Wrong cutting line

SF7

Material Not Flat/Uneven

MD7

Wrong kegel used

SF8

Wrong Material

MD8

Kegel mark (Ring mark)/Mould Mark

SS1

Wrong width or length

MD10

Too High Temperature (Fabric Became Brittle)

SS2

Wrong direction (for patterned straps)

BF1

Width variation & repeat length

MDPA1

Missing number of layers

SS3

Incorrect material used (size & colour)

Wrong placement of pattern

MDPA2

Wrong size

MD9
BF = BOWLACE FAULTS

BF2

Distorted/Displaced Bustpoint

SS4

Elongation (loose/tight)

Missing ultraviolet pen for nicks/Missing no. of layers

SS5

Uneven cut edge

Uneven pinning of materials

SS6

Missing nick or UV mark

LM = LAMINATION FAULTS

SS7

Stitch density too tight/too loose

BF6

Incorrect material

LM1

Delamination

SS8

Sharp edge after stitching

BF7

Folded lace

LM2

Wrong material used

SS9

Too wavy/curved

LM4

Incorrect face side

SS11

Incorrect stitch used

CT1

Nicks too deep

LM5

Foreign material inside

SS12

Style/colour mix-up

SS13

Incorrect bundle quantity

LM3
BK = BANDKNIFE/DIE-CUT FAULTS

Bubbles/Wrinkles

Uneven cutting edge

LM6

Handfeel too harsh/hard

CT3

Out of cutting allowance

LM7

Uneven edges

CT4

Fused cutting edge

CT2

CT5

Cutwork not according to pattern

SS10

Cracking stitch

LB = LABEL PRINTING FAULTS


BD = BONDING FAULTS

LB1

Unclear print (unreadable)

CT6

Wrong die-cut used

BD1

Delamination

LB2

Smudged print/stain/ink

CT7

Missing nick/Missing UV mark

BD2

Bubbles/Wrinkles

LB3

Incorrect print details

CT8

Wrong cutting line

BD3

Incorrect face side

Width variation/Short width/


Shrinkage/Repeat length

RM4

Hole/Joining/Run line/Crease
mark/Warp line/Weft line/Folded

BF3

Layers too high/Excessive bundles (too much)

Glue spot
RM3

mark/Snags/Fluffs/Moiree

SS = SHOULDERSTRAP FAULTS

BF4
BF5

Triumph

HS = HEATSEAL FAULTS

SF1
SF2

LB4

Missing letter/number/detail

CT9

Wrong size

BD4

Colour change after bonding

LB5

Incorrect material used

CT10

Folded fabric

BD5

Non-symmetrical (if in pairs)

LB6

Print peeling-off

LB7

Incorrect placement

LB8

Mix-up - style/size/colour

LB9

Slight stain/smudge

or water mark

Forms to be used for Evaluation?

Triumph

DAILY CHECKING SUMMARY (EXCEPTIONS) - PRE-PRODUCTION

Week Commencing :

TRIUMPH ROVING QC SYSTEM


Unit:
TRIUMPH FACTORY
Area

SF

MD

CT

Style/Comm Operator's
Total
Number
Checked
Name
11-222/JPN#1
01/2-234
Dan/Ronie
33-444TWN05/6-789
#2 Joe/Max
H55-666 SIN#3
10/1-222
Rick/Alex
#4
Ming/Ken
#5
Nick/Willy
19-777
PRC11/333

H88-999
PRN12/444
16-222
MAL13/555
17-333
THL14/666

Spreading Faults
Bandknife/Die-Cut Faults
SF1 SF2 SF3 SF4 SF5 SF6 SF7 SF8 CT1 CT2 CT3 CT4 CT5 CT6 CT7 CT8 CT9 CT10 BF1

Total
Failed

Bowlace Faults
BF3 BF4 BF5 BF6

BF2

Moulding Faults
MD1 MD2 MD3 MD4 MD5 MD6 MD7 MD8 MD9 MD10MDPA1

BF7

MDPA2

Bonding Faults
Lamination Faults
BD1 BD2 BD3 BD4 BD5 LM1 LM2 LM3 LM4 LM5 LM6 LM7

6
20

1
5

P. Cruz

40

20

40

20

D. Reyes

20

20

L. Inigo

20

M. Bautista

20
60

4
26

4
6

20
0

20

20

20
2

BF/DC

BD

LM

HS

S/S

LB
0

TOTAL FAILED/REASONS

NOTE:

AM

PM

12
13
7
14
4
7
4
13
4

12
14
5
13
5
7
4
14
3

51

20

20

TOTAL NO. OF OPERATORS/AREA

Total number of rounds taken by RQC:

Spreading
Cutting
Bowlace
Moulding
Bonding
Lamination
Heatseal
Shouderstrap
Label

NOTES REGARDING THIS SHEET:


Once the data is entered, the auto filter can be actioned
to allow detail of each area to be viewed individually
MONDAY
"Data"/"Sort"/"Column A" function can be used to
sort the data into numerical production line order
Once sorted, a blank row can then be inserted
after the last row for each production line and the
auto sum function added to columns D to Q to see
the totals by line.

6
15
6
15
2
3
2
14
2

DEFECT CODE:
SF = SPREADING FAULTS
SF1
No. of layers not according to spec
SF2
Missing separator for different shade material
SF3
Wrong spreading method
SF4
Wrong placement of marker
SF5
Faulty blocking
SF6
Incomplete Size/Size not in Set
SF7
Material Not Flat/Uneven
SF8
Wrong Material

RM = RAW MATERIAL FAULTS


RM1
Shade variation
RM2
Scattered blue/black dots/Stain/Glue spot
RM3
Width variation/Short width/Shrinkage/Repeat
length
RM4
Hole/Joining/Run line/Crease mark/Warp line/
Weft line/Folded mark/Fluffs/Moiree

Triumph

BK = BANDKNIFE FAULTS
CT1
Nicks too deep
CT2
Uneven cutting edge
CT3
Out of cutting allowance
CT4
Fused cutting edge
CT5
Cutwork not according to pattern
CT6
Wrong die-cut used
CT7
Missing nick/Missing UV mark
CT8
Wrong cutting line
CT9
Wrong size
CT10
Folded fabric
BF = BOWLACE FAULTS
BF1
Width variation & repeat length
BF2
Wrong placement of pattern (one-way lay)
BF3
Missing ultraviolet pen for nicks/Missing no. of layers
BF4
Uneven pinning of materials
BF5
Layers too high/Bundles too much
BF6
Incorrect material
BF7
Folded lace

MD = MOULDING FAULTS
MD1
Unbalanced drawing
MD2
Colour change after moulding
MD3
Loose diameter/Cup deepness/Shrinkage
MD4
Wrinkles/Puckered/Creased
MD5
Stain/Foreign material/Contamination
MD6
Wrong cutting line
MD7
Wrong kegel used
MD8
Mould mark (Ring mark)
MD9
Distorted/Displaced bustpoint
MD10
Too high temperature (Fabric Became Brittle)
MDPA1
Missing number of layers
MDPA2
Wrong size
BD = BONDING FAULTS
BD1
Delamination
BD2
Bubbles/Wrinkles
BD3
Incorrect face side
BD4
Colour change after bonding
BD5
Non-symmetrical (if in pairs)

WEEKLY SUMMARY OF DEFECTS FOUND


Total Failed Reason

TRIUMPH ROVING QC SYSTEM


FAIL REASON

AREA

Spreading

Bandknife/Dye Cut

Bowlace

Moulding

SF1

SF2

SF3

SF4

SF5

SF6

SF7

SF8

RM1

RM2

RM3

RM4

CT1

CT2

CT3

CT4

CT5

CT6

CT7

CT8

CT9

CT10

RM1

RM2

RM3

RM4

15

22

BF1

BF2

BF3

BF4

BF5

BF6

BF7

RM1

RM2

RM3

RM4

MD6

MD7

MD8

MD9

MD1

MD2

MD3

MD4

MD5

20

LM1

LM2

LM3

LM4

LM5

LM6

LM7

RM1

0
MD10 MD11 MDPA1 MDPA2

RM2

RM3

RM4

RM1

RM2

RM3

RM4

Area

Raw
Materials

Areas
Fault

Raw
Materials
Fault

62

10

1.6%

16.1%

130

37

28.5%

0.0%

#DIV/0!

#DIV/0!

50

25

50.0%

0.0%

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

26.0%

4.1%

Lamination
BD1

BD2

BD3

BD4

BD5

RM1

RM2

RM3

RM4

Bonding
HS1

HS2

HS3

HS4

HS5

HS6

RM1

RM2

RM3

RM4

Heatseal
SS1

SS2

SS3

SS4

SS5

SS6

SS7

SS8

SS9

SS10

SS11

SS12

SS13

RM1

RM2

RM3

RM4

Shoulderstrap
LB1

LB2

LB3

LB4

LB5

LB6

LB7

LB8

Percentage (%)

Total
Checked
Per Area

LB9

RM1

RM2

RM3

RM4

Label Printing

TOTAL FAULTS FOUND IN PRE-PRODUCTION

242

63

10
73

DEFECT CODE:
SF = SPREADING FAULTS
SF1
SF2
SF3
SF4
SF5
SF6
SF7
SF8

No. of layers not according to spec


Missing separator for different shade material
Wrong spreading method
Wrong placement of marker
Faulty blocking
Incomplete Size/Size not in Set
Material Not Flat/Uneven
Wrong Material

BF1
BF2
BF3
BF4
BF5
BF6
BF7

Width variation & repeat length


Wrong placement of pattern
Missing ultraviolet pen for nicks/Missing no. of layers
Uneven pinning of materials
Layers too high/Excessive bundles (too much)
Incorrect material
Folded lace

BF = BOWLACE FAULTS

BK = BANDKNIFE/DIE-CUT FAULTS
CT1
CT2
CT3
CT4
CT5
CT6
CT7
CT8
CT9
CT10

Triumph

Nicks too deep


Uneven cutting edge
Out of cutting allowance
Fused cutting edge
Cutwork not according to pattern
Wrong die-cut used
Missing nick/Missing UV mark
Wrong cutting line
Wrong size
Folded fabric

MD = MOULDING FAULTS
MD1
Unbalanced drawing
MD2
Colour change after moulding
MD3
Loose diameter/Cup deepness/Shrinkage
MD4
Wrinkles/Puckered/Creased
MD5
Stain/Foreign material
MD6
Wrong cutting line
MD7
Wrong kegel used
MD8
Kegel mark (Ring mark)/Mould Mark
MD9
Distorted/Displaced Bustpoint
MD10
Too High Temperature (Fabric Became Brittle)
MDPA1 Missing number of layers
MDPA2 Wrong size
LM = LAMINATION FAULTS
LM1
Delamination
LM2
Wrong material used
LM3
Bubbles/Wrinkles
LM4
Incorrect face side
LM5
Foreign material inside
LM6
Handfeel too harsh/hard
LM7
Uneven edges
BD = BONDING FAULTS
BD1
Delamination
BD2
Bubbles/Wrinkles
BD3
Incorrect face side
BD4
Colour change after bonding
BD5
Non-symmetrical (if in pairs)

HS = HEATSEAL FAULTS
HS1
Delamination/Peeling off
HS2
Incorrect placement
HS3
Incorrect colour
HS4
Damage on motif
HS5
Discolouration after heat pressing
HS6
Misplacement of between 1-2mm
SS = SHOULDERSTRAP FAULTS
SS1
Wrong width or length
SS2
Wrong direction (for patterned straps)
SS3
Incorrect material used (size & colour)
SS4
Elongation (loose/tight)
SS5
Uneven cut edge
SS6
Missing nick or UV mark
SS7
Stitch density too tight/too loose
SS8
Sharp edge after stitching
SS9
Too wavy/curved
SS10
Cracking stitch
SS11
Incorrect stitch used
SS12
Style/colour mix-up
SS13
Incorrect bundle quantity

LB = LABEL PRINTING FAULTS


LB1
Unclear print (unreadable)
LB2
Smudged print/stain/ink
LB3
Incorrect print details
LB4
Missing letter/number/detail
LB5
Incorrect material used
LB6
Print peeling-off
LB7
Incorrect placement
LB8
Mix-up - style/size/colour
LB9
Slight stain/smudge
RM = RAW MATERIAL FAULTS
RM1
Shade variation
RM2
Scattered blue/Black dots/Stain/Glue spot
RM3
Width variation/Short width/Shrinkage/Repeat
length
RM4
Hole/Joining/Run line/Crease mark/Warp line/
Weft line/Folded mark/Snags/Fluffs/
Moiree or water mark

Thank you..

Any Questions ?