LEADERSHIP DRIVEN GOLF COURSE ARCHITECTURE

Sand Valley Golf


Pasłek, Poland
Construction Progression
7th Hole: Lake; The Greensite

agolfarchitect.com
agolfarchitect@yahoo.com
sandvalleygolf.blogspot.com
tonyristola.blogspot.com
jari@privacyharbor.com

VISION AND LEADERSHIP ARE INSEPERABLE


For the Record
This project began with an EIGCA architect’s detailed plans, and specifications book. He was scheduled to make
the industry standard infrequent “site-visits” during construction. The golf course builder was selected on the
strength of their previous golf course construction work.

For 10-months, the builder was permitted to repeat one fundamental construction error after another, and 11-
months after ground breaking I was brought in and the project started anew. Before the restart, the entire
property was photo documented, and an 11-page status report identified 14-holes of construction
mismanagement. Two seasoned engineers confirmed my analysis.

The grading, greens and strategy plans of the previous architect were disposed of, as were the construction
specifications for greens, tees, and bunkers. The previous architect’s generic construction specifications were
replaced with those tailored to this specific property, and the valuable opportunities available.

Construction errors noted at the start of the photo sequences represent the state of the project upon my arrival,
and “My Starting Point”. What evolved is the product of 5,500 hours on-site, personally leading and sculpting the
transformation of the landscape.

Near the completion of the project, the owner made this persuasive statement in the book Golf Architecture, A
Worldwide Perspective Vol. 5 (2009), about the value the architect leading construction on a daily basis brings:

Specifically, (the owner of Sand Valley) clearly sees how daily involvement by the architect is a tremendous driving force, especially in an
emerging golf nation and continent where golf course builders are a scarcity. He believes an architect leading construction daily provides
“something really valuable for product quality” because continual assessment and improvement of strategic value and the creation of
special details makes “stuff look just stunning, yet does not cost all that much to build; details just not possible on a turn key project”.

Rescuing Sand Valley, A Lesson for Investors


Golf Architecture, A Worldwide Perspective Vol. 5, 2009.
www.fullswinggolf.com.au

If you have any questions, please contact me at agolfarchitect@yahoo.com and please visit the daily blog of the
project, the first daily blog of a golf course under construction at www.sandvalleygolf.blogspot.com
Red Dots indicate where photos were taken
This map was drawn long before the hole was built, is conceptual, and a number of changes are visible.
The greenside bunker is smaller and doesn’t cut between green 7 & 16, the fairway bunker (Lone Dune) is further down the fairway, bunkers behind the
green have been added, the green is larger and angled differently, the lake form is different… to list the most obvious.
My Starting Point: This greensite and entrance was largely undisturbed by the previous builder.
The tan colored section of bank in the distance is another interesting story.
Topsoil has been stripped, sand driven in for the subgrade.
Green and surrounds shaped, with the exception of the greenside bunkers.
Bunker fronting the green has been cut, with the material used for the subgrade of 16 green to its immediate right.
Closer.
Green rolls and bunker are more visible.
From the right edge of the fairway. This fairway, combined with the 6th is well over 130 yards wide.
Greensite is ringed with topsoil. In the background the Snake Bunker is visible, as is the 18th green atop the plateau.
The challenges of grow-in and seeking bunker forms. This bunker evolved over 4 to 6 weeks.
The first edging pass completed.
Scraped out and refining the forms. Some changes have already taken hold.
Getting ready to sod the smaller bunkers.
Sodded, and the large bunker evolves.
Growing in continues as bunkers come to life.
The Starting Point again, looking from inside the bunker.
The bunker face is been compacted, some of the interior rolls roughed out.
My Buddy Czeciek (Chechek) stands at attention.
Irrigation line is being cut, a rough form of the future bunker marked as The Captain of the Yellow Submarine (in red) looks on.
Irrigation installed.
Dunes grasses transplanted from the river bank are thriving.
From behind the green looking towards the huge expanse of fairway.
Sand Valley Golf & CC by the Numbers

• Total Schedule: 543 days. This includes Saturdays and Sundays.

• Number days I worked: 517

• Number of hours worked per day on average: 11 hours (includes Sat. & Sun.)

• Total Hours: 5500+. My work day started on average at 06:00, and I was usually the last to leave the construction site.

Responsibilities

• Golf Course Design: The golf course was designed in the field on a daily basis. An EIGCA architect began the project, but his
plans were abandoned. The EIGCA architect’s general routing was used though modified.

• Construction Supervisor: The construction team was largely locals.

• Lead shaper: shaping all greens, all fairways and larger scale bunkers.
(Caterpillar D6N & D6R) No “detailed plans” were used to create the greens, hazards or fairway contours. In fact, no grade stakes
were used!

• Daily blog about the construction of the golf course: www.sandvalleygolf.blogspot.com

• Finish work on greens in conjunction with another finishing expert.

• Painting for marketing and promotion

Original: 60cm x 25cm (Acrylic on canvas) For a larger version click on the following link: http://sandvalleygolf.blogspot.com/2008/02/sand-valley-artwork.html

• Marketing material assistance.


The hours worked at Sand Valley are not an exception to the rule, they are the rule. This represents the same effort I have given all my
projects and is the same service all investors receive for your investment of millions. If you were to compare, I spend more time on-site
during construction in five days than most architects spend on-site during the entire project. It is this attention during the most
costly and permanent phase of design… construction… that makes an enormous difference… not the budgets. And, this is
precisely why I only do one project at a time.

42.8% of American golf course architects polled found it difficult to find qualified builders for their projects. In Europe the percentage is
far greater. Sand Valley started with an EIGCA (European Institute of Golf Course Architects) architect’s detailed plans and a golf course
builder hired on the strength of their previous work. I was brought in after 11-months and the project started anew. Virtually everything
the previous builder produced was scrapped. All greens, fairways and strategies are the product of my daily involvement and bulldozer
blade. No plans were used, only my vision of how to take a costly mess and turn it into a winning jewel for the owners.

Daily involvement speeds the effort and eliminates opportunities for error because communication between architect and builder is daily,
virtually instantaneous and based on days, weeks and months of constant observation and thought. Being present to answer questions
from the constructors immediately and not during a rare “site-visit” days or weeks later after “work completed according to plan” and has
to be redone saves time, money and increases quality significantly. For example, when a feature is under construction or the irrigation
designer shows up, I’m there at their sides answering questions before works begins and as it is being achieved, thereby attaining the
desired result... or something even better than envisioned. The owner of Sand Valley, quoted below, reveals the advantages of the
architect leading construction vs. the “typical” hit-and-run method. Having experienced both methods in action, he knows the vast
differences!

Specifically, he clearly sees how daily involvement by the architect is a tremendous driving force, especially in an emerging golf nation
and continent where golf course builders are a scarcity. He believes an architect leading construction daily provides “something really
valuable for product quality” because continual assessment and improvement of strategic value and the creation of special details makes
“stuff look just stunning, yet does not cost all that much to build; details just not possible on a turn key project”.

Golf Architecture, A Worldwide Perspective Vol. 5, 2009.


www.fullswinggolf.com.au
At all of my projects I have either worked with a general contractor, or a crew of workers selected from the local community, saving
bundles of cash since a company claiming to specialize in golf course construction is more expensive than hiring a local crew of qualified
and conscientious operators.

Sand Valley was largely built by people that had no concept of golf… none! The same was done at GC Emstal, where I worked alongside a
conscientious regional general contractor to create a project ranked among the best golf courses in Germany by Golf Digest.
BUND (Bund für die Naturschutz Deutschland) the environmental watchdog group gave this far-reaching endorsement:

Outstanding Integration of a Golf Course Along the Ems River

We admit this: We made a mistake. What stands now is a golf course which fits in excellent harmony with the landscape of the Ems
River valley. What stood one year before was an area of 50 desolate hectares dominated by intensively cultivated cornfields. Within a
few short months this was transformed into a project which is now a model for the integration of a sports park in a protected area.
My service does not stop with the end of construction.

The reason this is such a far reaching endorsement? When golf is in question, one usually expects the direct opposite response from
BUND. They actually buy land to stop golf projects!

The best golf courses are the product of a cooperative effort between the architect and owner/superintendent to ensure the course is set
up and matures as the architect envisioned. Great courses are a labor of love, and greatness is unlikely if the designer, owner and
superintendent play only the opening round together and never see one another again. For these reasons, my services do not stop at the
end of construction. They continue for the life of the project.

For each golf course I design, I write a book documenting its architecture, construction and maintenance practices. It becomes a
comprehensive short and long term guide for the members, guests, etc., but most importantly for the superintendent and board
members. This work provides a historical record that assists in the continuing evolvement of the project, with the goal of ensuring the
design intent is never compromised, that club funds are not misspent on doing and undoing work detrimental to the design.
agolfarchitect.com
Leadership Driven Architecture
...Because Vision and Leadership are Inseparable
Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1 909.581.0080
Design and construction are not separate jobs, but different parts of the same job

Feel Free To Distribute This Information


Provided the content and links remain intact, without
editing, and that proper credit and attributions are made to
the author and his website, you may and are encouraged to
freely distribute this document in part or as a whole.
Translations are also encouraged, and any such translations
of this material can be sent to the author’s email address
above.

Otherwise, no part of this publication may be reproduced or


transmitted in any form or by any means, electronic or
mechanical. Any unauthorized use, sharing, reproduction, or
distribution of parts herein is strictly prohibited.

Copyright © 2010