Beruflich Dokumente
Kultur Dokumente
COS-ISO-00-OIN/OPS/C&I/006
Rev. No. : 0 September 2005
Approved for
Implementation by ..
E. D. (OS)
Date: ..
Enquiries to: Head of Corp. Operation Services
SL.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
INDEX
Contents
Introduction
Superseded Documents
Boiler: Manual Pushbutton
Boiler: Loss of 220V DC
Boiler: Loss of Unit Critical Supply
Boiler: Drum Level Hi Hi
Boiler: Drum Level LO LO
Boiler: Furnace Pressure Hi Hi
Boiler: Furnace pressure lo lo
Boiler: Air flow < 30%
Boiler: All BFPs Tripped
Boiler: Inadequate Water Wall Circulation
Boiler: All ID Fans Off
Boiler: All FD Fans Off
Boiler: Both Sec. APH Off
Boiler: Less than Fireball and Loss of AC
Boiler: Loss of Fuel
Boiler: Flame Failure
Boiler: Reheater Protection
Turbine: Manual Turbine Trip
Turbine: Axial Shift Negative
Turbine: Axial Shift Positive
Turbine: Lub Oil Pressure Lo lo
Turbine: HP Exhaust Temperature Hi Hi
Turbine: HP Casing Top/Bottom Dt Hi Hi
Turbine: IP Casing Front Top/Bott Dt Hi Hi
Turbine: IP Casing Rear Top/Bott Dt Hi Hi
Turbine: Fire Protection
Turbine: Boiler Trip to Turbine Trip
Turbine: Generator Trip to Turbine
Turbine: PW Flow at Stator Outlet Lo Lo
Turbine: PW Flow at Main Bush Phase U Lo Lo
Turbine: PW Flow at Main Bush Phase V Lo Lo
Turbine: PW Flow at Main Bush Phase W Lo Lo
Turbine: Generator Bush Level Hi Hi
Turbine: Cold Gas Temp Behind Cooler Hi Hi
Turbine: Seal Oil Temp Beh. Cooler temp hi hi
Turbine: PW Temp Beh. Cooler Hi Hi
Turbine: Warm Air Main Exciter Temp Hi Hi
Review
Page No.
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
22
24
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Page - 1
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
INTRODUCTION
Corporate Operation Services has made action plan with individual sites to
achieve zero forced outage. The action plan includes various checks and activities
to be carried out during overhaul. One important activity when the unit comes
back after overhaul or after a major shutdown is checking of protections. Though
this activity is being carried out as a routine, it is felt that protection checking
should be carried out with the involvement of Operation, Maintenance and Field
quality departments and each protection check is done with a well documented
procedure which includes checking healthiness of protection related field devices,
calibration, protection of field devices from dust and water ingress, healthiness of
cable, tightness of termination, working of indicators and recorders in UCB,
power supply, availability of alarm system and printers.
In order to cover all these aspects in protection checking of equipment, Corporate
OS-C&I has prepared a procedure for documenting protection checking of boiler
and main turbine. The following pages contain the suggested format in which
protection checking is to be documented. It is expected that the sites would
prepare such procedures in the given format for protection checking of all
equipments taking into account site specific conditions but encompassing all areas
mentioned above like field conditions, alarm etc. A word of caution: The
enclosed protection checking procedure has been prepared for protection common
to most of the boilers and turbines and in no way replaces station specific
protections nor is a suggestion to include new protections. If the present station
practice is an improvement over the suggested practice in the document, the same
may be continued and Corporate OS be informed. It is once again emphasized
that a holistic approach to protection checking is the idea built into the procedure.
2.0
SUPERSEDED DOCUMENTS
Nil
Page - 2
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
3.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: BOILER MANUAL
PUSHBUTTON TRIP
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
PREREQUISITES:
Purge completed and MFT reset.
if checked
SLNO
ACTIVITY
I
To check manual push button emergency trip to boiler.
REMARK
Push one Boiler trip push button. MFT should not act.
Push the other Boiler trip push button. Now also MFT
should not act.
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 3
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
DATE:
PROTECTION: LOSS OF 220V DC > 2 sec.
No. OF CHANNELS:1
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER READY FOR PROTECTION CHECK AFTER
OVERHAUL
if checked
PREREQUISITES:
Check if fuses are replaced with new ones in both feeders of DC to
FSSS.
Ensure tightness in TBs of DCCSP modules and FSSS end
Ensure new fuses are provided in FSSS panel.
Switch on both 220V DC supplies to FSSS.
Purge completed and MFT reset.
.
SLNO
I
ACTIVITY
REMARK
_______/_____.
_______/_____.
Note down timing set on the timer relay and its tag:
Unit DC failure Timer relay tag:
Time set on the timer relay:
________.
________.
Switch off normal DC feeder FSSS and ensure standby supply takes
over.
Page - 4
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
4
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 5
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
5.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: LOSS OF UNIT CRITICAL
SUPPLY > 2 sec.
No. OF CHANNELS:1
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER READY FOR PROTECTION CHECK AFTER
OVERHAUL
PREREQUISITES:
115V AC supply (Normal and standby) off and wiring tightness checked at FSSS
panel Terminal blocks for both supplies.
Old fuses replaced with new fuses in ACCSP and FSSS panels and old fuses
destroyed
AC supplies made ON and voltage measured at FSSS panel.
if checked
_____V AC.
ACTIVITY
To check MFT on failure of Unit critical supply which consists of Unit
logic voltage and unit critical interrogation scan voltages, which scans
all MFT input contacts.
REMARK
Note down feeder numbers and fuse ratings in BMCC for both normal
and standby AC supplies:
Feeder for Normal AC to ACCSP/ fuse:
Feeder for Standby AC to ACCSP/ fuse:
_______/_____.
_______/_____.
Note down timing set on the timer relay and its tag:
Unit AC failure Timer relay tag:
Time set on the timer relay:
________.
________.
Page - 6
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
6
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 7
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
6.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: DRUM LEVEL HI HI.
No. OF CHANNELS: 2
MODE OF PROTECTION: 2OUT OF 3.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
PREREQUISITES:
Drum level transmitter and transmitters calibrated.
Transmitters installed after calibration and cable connection and
termination at panel end checked.
Gland holes sealed and instrument covers fixed with gaskets, O rings etc to
prevent water and dust ingress..
All root valves and isolation valves in instrument enclosures opened and
transmitters charged.
Fuses for transmitters replaced with new ones.
Protection related cables meggered.
If Hydrastep is used, then defective electrodes replaced and system
charged.
Purge completed and MFT reset.
SLNO
ACTIVITY
if checked
REMARK
Page - 8
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
I
_______ mm WCL
_______ mm WCL
____________/_____.
____________/_____.
____ Sec.
DRUM LVL:______
H.STEP :______
___ Sec.
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 9
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
7.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: DRUM LEVEL LO LO.
No. OF CHANNELS: 2
PREREQUISITES:
Drum level transmitter and transmitters calibrated.
Transmitters installed after calibration and cable connection and
termination at panel end checked.
Gland holes sealed and instrument covers fixed with gaskets, O rings etc to
prevent water and dust ingress..
All root valves and isolation valves in instrument enclosures opened and
transmitters charged.
Fuses for transmitters replaced with new ones.
Protection related cables meggered.
If Hydrastep is used, then defective electrodes replaced and system
charged.
Purge completed and MFT reset.
if checked
SLNO
REMARK
ACTIVITY
To check drum level hi-hi protection:
ALARM SETPOINT:
TRIP SETPOINT:
Tag Nos:
Level transmitter (LEFT)/ LVM LOC:
Level transmitter (RIGHT)/LVM LOC:
Check transmitters and Hydrastep response while drum is
being filled. Ensure all signals relevant to protection logic are
healthy. Check timing set on the timer for drum level trip.
TIME DELAY SET:
_______ mm WCL
_______ mm WCL
___________/______.
___________/______.
____ Sec.
DRUM
LVL:______
Note down drum level reading and Hydrastep window at trip.
H.STEP :______
___ sec.
National Thermal Power Corporation Ltd.
Page - 10
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
5
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 11
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
8.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: FURNACE PRESSURE HI-HI.
No. OF CHANNELS: 2
if checked
PREREQUISITES:
Furnace pressure tapping points on furnace poked and connected impulse
lines purged to remove choke.
Furnace pressure transmitters and switches calibrated, installed and cables
terminated and gland holes sealed to prevent water and dust ingress.
Cable connection and termination at panel end checked.
All root valves and isolation valves in instrument enclosures opened and
instruments charged.
Fuses for transmitters replaced with new ones.
Protection related cables meggered.
Purge completed and MFT reset.
SLNO
I
ACTIVITY
To check furnace pressure hi-hi protection:
ALARM SETPOINT:
TRIP SETPOINT:
Tag Nos:
Furnace Pressure Transmitter(LEFT)/LVM LOC:
Furnace Pressure Switch(LEFT)/(RIGHT):
Furnace Pressure Transmitter(RIGHT)/LVM LOC:
3
4
5
REMARK
_______ mm WCL
_______ mm WCL
__________/_______.
__________/_______.
__________/_______.
Page - 12
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
6
7
(C&I MAINTENANCE)
Page - 13
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
9.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: FURNACE PRESSURE LOLO.
No. OF CHANNELS: 2
MODE OF PROTECTION: 2 OUT OF 3.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
if checked
PREREQUISITES:
Furnace pressure tapping points on furnace poked and connected impulse
lines purged to remove choke.
Furnace pressure transmitters and switches calibrated, installed and cables
terminated and gland holes sealed to prevent water and dust ingress.
Cable connection and termination at panel end checked.
All root valves and isolation valves in instrument enclosures opened and
instruments charged.
Fuses for transmitters replaced with new ones.
Protection related cables meggered.
Purge completed and MFT reset.
SLNO
ACTIVITY
I
To check furnace pressure lo-lo protection:
1
2
3
4
5
ALARM SETPOINT:
TRIP SETPOINT:
Tag Nos:
Furnace Pressure Transmitter(LEFT)/LVM LOC:
Furnace Pressure Switch(LEFT)/(RIGHT):
Furnace Pressure Transmitter(RIGHT)/LVM LOC:
Change furnace pressure in both directions (BY OPERATION
DEPT) and note down response from transmitters (L&R) on
indicators and recorders.
Create DP corresponding to furnace pressure LO LO at
pressure switch using a manometer and observe switch
operation and UCB alarm.
Repeat step 2 for all switches used for Furnace Lo Lo tripping.
Check operation of LVM and its contact by feeding current.
Simulate 2 out of 3 contact for furnace pressure lo lo tripping
using different combinations of LVM and Switch (from local)
and check if MFT acts.
REMARK
_______ mm WCL
_______ mm WCL
__________/_______.
__________/_______.
__________/_______.
Page - 14
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
6
7
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 15
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
10.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: AIR FLOW <30%
No. OF CHANNELS: 2
MODE OF PROTECTION: 2 OUT OF 3.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
if checked
PREREQUISITES:
Ensure aerofoil tapping points poked and cleaned.
Air flow transmitters calibrated, installed, cables connected ,gland holes
sealed and covers tightened.
Thermowells and thermocouples inspected and cable healthiness checked.
Transsmitter cable and thermocouple cables are properly routed and
protected Transmitter fuses replaced with new ones.
Purge completed and MFT reset.
SLNO
I
1
2
3
4
5
6
7
8
9
10
11
ACTIVITY
To check air flow less than 30% protection:
LEFT transmitter 1/ LVM 1/LVM SETTING(V)
LEFT transmitter 2/ LVM 2/LVM SETTING(V)
RIGHT transmitter 1/ LVM 1/LVM SETTING(V)
RIGHT transmitter 2/ LVM 2/LVM SETTING(V)
LEFT CJC No/TERMINAL
RIGHT CJC No/TERMINAL
REMARK
___________/_____/__
___________/_____/__
___________/_____/__
___________/_____/__
________________/__
________________/__
Page - 16
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 17
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
11.0
STATION:
UNIT:3
DATE:
MAIN EQUIPMENT:BOILER
PROTECTION: ALL BFPs TRIPPED
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
PREREQUISITES:
Check tightness at TB where BFP trip contacts are wired in both
FSSS panel and BFP panel /ARP.
MDBFP breaker in test remote position.
Purge completed and MFT reset.
if checked
SLNO
ACTIVITY
I
To check MFT on all BFP trip with a 10 sec delay..
REMARK
_________.
_____ Sec.
_____Sec.
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 18
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
12.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: INADEQUATE
WATERWALL CIRCULATION
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 2.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
if checked
PREREQUISITES:
DP transmitters of all three BCW pumps calibrated, installed and
cable connection and termination at panel end checked.
All root valves and isolation valves in instrument enclosures opened
and transmitters charged.
Fuses for transmitters replaced with new ones.
Purge completed and MFT reset.
SLNO
I
ACTIVITY
To check MFT on inadequate water wall circulation.
Check DP transmitters response while pump is running. Ensure
all signals relevant to protection logic are healthy. Check timing
set on the timer for this trip. TIME DELAY SET:
REMARK
_______ mm WCL
_______ mm WCL
____ Sec.
DRUM LVL:______
H.STEP :______
___ Sec.
Page - 19
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
7
10
11
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 20
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
13.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: ALL ID FANS OFF.
No. OF CHANNELS: 2
MODE OF PROTECTION: 2 OUT OF 3.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
PREREQUISITES:
Purge completed and MFT reset.
if checked
SLNO
ACTIVITY
I
To check all ID fans OFF protection:
Ensure tightness of all wires pertaining to this trip in FSSS
and relay panel.
REMARK
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 21
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
Page - 22
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
14.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: ALL FD FANS OFF.
No. OF CHANNELS: 2
MODE OF PROTECTION: 2 OUT OF 3.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
PREREQUISITES:
Purge completed and MFT reset.
if checked
SLNO
ACTIVITY
I
To check all FD fans OFF protection:
Ensure tightness of all wires pertaining to this trip in FSSS
and relay panel.
REMARK
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 23
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
Page - 24
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
15.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: BOTH SEC. APHs OFF
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
PREREQUISITES:
Purge completed and MFT reset.
if checked
SLNO
ACTIVITY
I
To check both secondary air preheaters OFF protection:
Ensure tightness of all wires pertaining to this trip in FSSS
and relay panel.
REMARK
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 25
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
16.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: LESS THAN FIREBALL
AND LOSS OF AC ON ANY ELEVATION IN
SERVICE.
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
PREREQUISITES:
Purge completed and MFT reset.
if checked
SLNO
ACTIVITY
I
To check MFT on less than fireball and loss of AC on any
elevation in service.
Ensure tightness of all wires pertaining to this trip in
FSSS.
1
Give start command of AB 1,3 or AB 2,4 or CD 1,3 or CD
2,4 or EF 1,3 or EF 2,4 corners.
REMARK
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 26
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
Page - 27
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
17.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: LOSS OF FUEL
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITIO N: BOILER PROTECTION CHECK AFTER OVERHAUL
PREREQUISITES:
Purge completed and MFT reset.
SLNO
I
ACTIVITY
To check MFT on loss of all fuel:
Ensure tightness of all wires pertaining to this trip in FSSS and
feeder panels and field.
Reset MFT.
Reset MFT.
10
11
12
13
14
if checked
REMARK
Page - 28
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
NOTE: NO FURTHER WORK TO BE TAKEN UP IN LOSS
OF ALL FUEL LOGIC.
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 29
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
18.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: FLAME FAILURE
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
PREREQUISITES:
All scanners cleaned and fixed back.
All scanners tested with light source and healthiness checked.
Purge completed and MFT reset.
SLNO
ACTIVITY
I
To check MFT on flame failure.
Ensure tightness of all wires pertaining to this trip in
FSSS.
1
if checked
REMARK
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
National Thermal Power Corporation Ltd.
Page - 30
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
19.0
STATION:
UNIT:
MAIN EQUIPMENT:BOILER
DATE:
PROTECTION: REHEATER PROTECTION.
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL
PREREQUISITES:
HP/LP bypass valves, all ESVs, generator breaker OPEN/CLOSE feedback
available, wiring checked and tightened.
The above valves individually operated and corresponding relay operation
and contacts on OPEN/CLOSE feed back checked.
Generator breaker contact simulated (by EM) and relay operation and
contact checked.
Purge completed and MFT reset.
SLNO
ACTIVITY
I
To check MFT Reheater protection.
ARMING: Simulate boiler ON condition by simulating three
out of four HONV open limit switches.
1
Simulate all ESVs OPEN.
2
Simulate both LP bypass valves OPEN.
3
Check MFT acts in 10 sec. (Generator CB OPEN and HP
bypass fail to open ).
4
Reset MFT.
5
Simulate both HP bypass open and remove LP bypass open.
6
Check MFT acts in 1 minute. (Generator CB open and LP
bypass fail to open)
7
Reset MFT.
8
Simulate all HP ESVs CLOSE.
9
Simulate Generator CB CLOSE.
10
Simulate HP /LP bypass close.
11
Check MFT acts (ESVs closed and HP/LP fail to open).
12
Normalize all contacts.
13
Check alarm and SOE in UCB..
NOTE: NO FURTHER WORK TO BE TAKEN UP IN
REHEATER PROTECTION LOGIC.
if checked
REMARK
Page - 31
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 32
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
20.0
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: MANUAL TURBINE TRIP
No. OF CHANNELS:2
MODE OF PROTECTION:1 OUT OF 1.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
Turbine reset.
if checked
SLNO
ACTIVITY
I
To check manual turbine trip from UCB.
REMARK
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 33
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
21.0
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: AXIAL SHIFT NEGATIVE
No. OF CHANNELS:2
PREREQUISITES:
Turbine rotor in zero position and turbine reset.
Axial shift pickups calibrated.
Pickup, local amplifiers and corresponding cards in the panel identified and
tagged.(LEFT/RIGHT or FRONT/REAR etc).
Axial shift negative LVM contact wiring to turbine panel tightness checked.
Axial shift readings available on indicators, recorder and DAS.
Special tool required- filler gage for setting gap.
Check turbine trip relay healthiness, megger cables from panel to trip relays
and connect cables and tighten terminals
SLNO
I
II
ACTIVITY
To check axial shift negative side protection:
ALARM SETPOINT:
TRIP SETPOINT:
Set voltage on LVM corresponding to TRIP SET Point:
Design:
Measured:
Card locations in panel:
CH1: - SIGNAL CONDITIONING CARD:
- LIMIT VALUE MONITOR:
CH2: - SIGNAL CONDITIONING CARD:
- LIMIT VALUE MONITOR:
if checked
REMARK
_________mm
_________mm.
_________V.
_________V.
__________.
__________.
__________.
__________.
Move the base carrying both pickups until reading matches the
Page - 34
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
Alarm set point and ensure alarm appears on the window and
alarm printer.
Move the base carrying both pickups until reading matches the
TRIP SETPOINT on both indicators.
Measure gap with slip gauge or by suitable mechanical means .
The measured gap should be same as the TRIP SETPOINT.
Check and record output voltage at A.S. measurement card for
both channels.
CH 1 voltage:
CH 2 voltage:
(Ensure voltage corresponds to TRIP SETPOINT).
Check trip relays CR2A, CR2B, TLR-A/B in TSP 3A/3B are
actuated.
Check and record voltage across turbine trip relay terminals.
10
2
3
4
___________ mm
_____ V.
_____ V.
Contd.
_____ V.
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 35
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
22.0
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: AXIAL SHIFT POSITIVE
No. OF CHANNELS:2
MODE OF PROTECTION: 2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL
PREREQUISITES:
Turbine rotor in zero position and turbine reset.
Axial shift pickups calibrated.
Pickup, local amplifiers and corresponding cards in the panel
identified and tagged.(LEFT/RIGHT or FRONT/REAR etc).
Axial shift negative LVM contact wiring to turbine panel tightness
checked.
Axial shift readings available on indicators, recorder and DAS.
Special tool required- filler gage for setting gap.
Check turbine trip relay healthiness, megger cables from panel to trip
relays and connect cables and tighten terminals
SLNO
ACTIVITY
I
To check axial shift positive side protection:
National Thermal Power Corporation Ltd.
if checked
REMARK
Page - 36
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
ALARM SETPOINT:
TRIP SETPOINT:
Set voltage on LVM corresponding to TRIP SET Point:
Design:
Measured:
II
_________mm
_________mm.
_________V.
_________V.
__________.
__________.
__________.
__________.
5
6
7
8
___________ mm
Contd.
_____ V.
_____ V.
_____ V.
10
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 37
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
Page - 38
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
23.0
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: LUB OIL PRESSURE LO-LO
No. OF CHANNELS:2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
if checked
Lub oil system charged and turbine reset.
Lub oil switches, transmitter and local gauge calibrated, fixed back,
root valves and isolation valves opened and no oil leakages
observed..
Pressure switch cables meggered and connected back at both ends.
Pressure switch cable gland sealed.
Lub oil pressure indication on UCB available.
Check turbine trip relay healthiness, megger cables from panel to trip
relays and connect cables and tighten terminals
SLNO
ACTIVITY
REMARK
I
To check turbine lub oil pressure very low protection:
ALARM SETPOINT:
________ kg/cm2
TRIP SETPOINT:
________ kg/cm2
1
Drain low alarm switch slowly and when alarm set point
pressure is read on the gauge ensure alarm appears on UCB
and in alarm printer.
Pressure: ______
Page - 39
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
5
10
11
12
________ V.
Contd.
___________ V.
13
14
Check SOE and alarm in UCB.
15
16
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 40
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
Page - 41
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
24.0
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: HPT EXHAUST
TEMPERATURE HI-HI
No. OF CHANNELS:2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
HPT exhaust thermocouples checked.
Connections tightened at head and cables routed properly and
protected from hot surfaces.
Cable gland hole sealed.
Turbine reset.
if checked
SLNO
ACTIVITY
I
To check HPT exhaust temperature Hi Hi protection (done
by simulation)
Thermocouple tag:
CJC No. and terminal
LVM (TRIP) LOC:
ALARM SETPOINT:
TRIP SETPOINT:
REMARK
__________________.
__________/________.
__________________.
__________DEG C
__________DEG C.
mV:______________
= ___________ deg C
Page - 42
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
NOTE: NO FURTHER WORK TO BE TAKEN UP IN
HP EXHAUST TEMPERATURE PROTECTION
SYSTEM.
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 43
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
25.0 EQUIPMENT PROTECTION CHECKING RECORD: HP CASING
TOP/BOTTOM DIFFERENTIAL TEMPERATURE HI HI
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: HP CASING TOP/BOTTOM
DIFFERENTIAL TEMPERATURE HI HI
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
HP casing top and bottom thermocouples and cables checked.
Connections tightened at head and cables routed properly and
protected from hot surfaces.
Cable gland hole sealed.
Turbine reset.
SLNO
ACTIVITY
I
To check HP casing top/bottom temperature Hi Hi
protection (done by simulation)
Thermocouple tag(TOP/BOTTOM):
CJC No. and terminal(TOP)
CJC No and terminal (BOTTOM)
LVM (TRIP) LOC:
ALARM SETPOINT:
TRIP SETPOINT:
1
if checked
REMARK
_______/_______.
_______/_______
_______/_______
_______deg C.
_______deg C.
mV at
head:______.
Temperature:
___degC
mV at
head:______.
Temperature:
___degC
Page - 44
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
(C&I MAINTENANCE)
26.0
(OPERATION)
(FIELD QUALITY)
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: IP CASING FRONT
TOP/BOTTOM DIFFERNETIAL
TEMPERATURE
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
IP casing front top and bottom thermocouples and cables checked.
Connections tightened at head and cables routed properly and
protected from hot surfaces.
Cable gland hole sealed.
Turbine reset.
SLNO
ACTIVITY
I
To check IP casing front top/bottom temperature Hi Hi
protection (done by simulation)
Thermocouple tag(TOP/BOTTOM):
CJC No. and terminal(TOP)
CJC No and terminal (BOTTOM)
LVM (TRIP) LOC:
ALARM SETPOINT:
TRIP SETPOINT:
1
if checked
REMARK
_______/_______.
_______/_______
_______/_______
_______deg C.
_______deg C.
mV at
head:______.
Temperature:
___degC
mV at
head:______.
Temperature:
___degC
Page - 45
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
5
(C&I MAINTENANCE)
27.0
(OPERATION)
(FIELD QUALITY)
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: IP CASING REAR
TOP/BOTTOM DIFFERNETIAL
TEMPERATURE
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
IP casing rear top and bottom thermocouples and cables checked.
Connections tightened at head and cables routed properly and
protected from hot surfaces.
Cable gland hole sealed.
Turbine reset.
SLNO
ACTIVITY
I
To check IP casing rear top/bottom temperature Hi Hi
protection (done by simulation)
Thermocouple tag(TOP/BOTTOM):
CJC No. and terminal(TOP)
CJC No and terminal (BOTTOM)
LVM (TRIP) LOC:
ALARM SETPOINT:
TRIP SETPOINT:
1
if checked
REMARK
_______/_______.
_______/_______
_______/_______
_______deg C.
_______deg C.
mV at
Page - 46
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
mV and note the temperature when alarm appears.
2
head:______.
Temperature:
___degC
mV at
head:______.
Temperature:
___degC
DATE:
PROTECTION: FIRE PROTECTION OF
MAIN TURBINE
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
MOT Level switches checked.
Push buttons at UCB, MOT room, HP turbine and LPBP rack
checked for sealing and sealing of gland holes.
Turbine reset.
SLNO
ACTIVITY
I
To check Fire protection from MOT level very Low.
1
if checked
REMARK
Loc of Binary
signal module for
ALARM:
TRIP:
Page - 47
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
turbine trips.
4
II
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 48
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
29.0
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: BOILER TRIP TO TURBINE
TRIP
No. OF CHANNELS:2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
Check terminals of boiler trip contact cables from FSSS at both ends
for tightness.
Turbine reset.
SLNO
ACTIVITY
I
To check boiler trip to turbine trip.
1
if checked
REMARK
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 49
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
30.0
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: GENERATOR TRIP TO
TURBINE TRIP
No. OF CHANNELS:2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
Terminals at GRP and turbine panels tightened for both channels.
Turbine reset.
if checked
SLNO
ACTIVITY
I
To check Generator trip to turbine trip.
REMARK
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 50
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
31.0
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: PRIMARY WATER FLOW AT
STATOR OUTLET LO LO
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
Flow instrument inspected and instrument covers and gland holes
sealed.
Cable support and routing checked.
Corresponding terminals in turbine panels tightened.
Turbine reset.
SLNO
ACTIVITY
I
To check Primary water flow at stator outlet Lo Lo trip.
Note setpoint on the LVM for alarm and trip:
1
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):
2
Throttle flow further and note the flow when turbine trips.
if checked
REMARK
_______/_______.
_______/_______.
Page - 51
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
DATE:
PROTECTION: PRIMARY WATER FLOW AT
MAIN BUSHING PHASE U LO LO
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
Flow instrument inspected and instrument covers and gland holes
sealed.
Cable support and routing checked.
Corresponding terminals in turbine panels tightened.
Turbine reset.
SLNO
ACTIVITY
I
To check Primary water flow at main bushing phase U Lo
Lo trip.
1
Note setpoint on the LVM for alarm and trip:
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):
2
Regulate flow through main bushing U and as flow
reduces note down flow when Low alarm appears.
3
Throttle flow further and note the flow when turbine trips.
if checked
REMARK
_______/_______.
_______/_______.
Page - 52
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
(C&I MAINTENANCE)
33.0
(OPERATION)
(FIELD QUALITY)
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: PRIMARY WATER FLOW AT
MAIN BUSHING PHASE V LO LO
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
Flow instrument inspected and instrument covers and gland holes
sealed.
Cable support and routing checked.
Corresponding terminals ain turbine panels tightened.
Turbine reset.
SLNO
ACTIVITY
if checked
REMARK
Page - 53
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
I
1
Throttle flow further and note the flow when turbine trips.
_______/_______.
_______/_______.
(C&I MAINTENANCE)
34.0
(OPERATION)
(FIELD QUALITY)
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: PRIMARY WATER FLOW AT
MAIN BUSHING PHASE W LO LO
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
Page - 54
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
PREREQUISITES:
Flow instrument inspected and instrument covers and gland holes
sealed.
Cable support and routing checked.
Corresponding terminals in turbine panels tightened.
Turbine reset.
SLNO
ACTIVITY
I
To check Primary water flow at main bushing phase W Lo
Lo trip.
1
Note setpoint on the LVM for alarm and trip:
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):
2
Throttle flow further and note the flow when turbine trips.
if checked
REMARK
_______/_______.
_______/_______.
(C&I MAINTENANCE)
35.0
(OPERATION)
(FIELD QUALITY)
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: GENERATOR BUSHING
LEVEL HI HI
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
National Thermal Power Corporation Ltd.
Page - 55
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
PREREQUISITES:
Level sensor and transmitter inspected and instrument covers and
gland holes sealed.
Cable support and routing checked.
Corresponding terminals in turbine panels tightened.
Turbine reset.
SLNO
ACTIVITY
I
To check generator bushing level Hi HI trip.
Note setpoint on the LVM for alarm and trip:
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):
1
if checked
REMARK
_______/_______.
_______/_______.
36.0
(OPERATION)
(FIELD QUALITY)
STATION:
UNIT:
DATE:
Page - 56
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
MAIN EQUIPMENT:TURBINE
PREREQUISITES:
Corresponding RTD terminals in turbine panels tightened.
Turbine reset.
if checked
SLNO
ACTIVITY
I
To check cold gas temperature behind cooler Hi Hi trip.
Note setpoint on the LVM for alarm and trip:
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):
REMARK
_______/_______.
_______/_______.
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 57
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
37.0
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: SEAL OIL TEMPERATURE
BEHIND COOLER TEMPERATURE HI HI
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
Corresponding RTD terminals in turbine panels tightened.
Turbine reset.
if checked
SLNO
ACTIVITY
I
To check seal oil temperature behind cooler temperature
Hi Hi trip.
Note set point on the LVM for alarm and trip:
ALARM: LVM Loc/set point (V):
TRIP: LVM Loc/set point(V):
REMARK
_______/_______.
_______/_______.
Page - 58
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
TEMPERATURE PROTECTION SYSTEM.
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
38.0 EQUIPMENT PROTECTION CHECKING RECORD: PRIMARY WATER
TEMPERATURE BEHIND COOLER HI HI
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: PRIMARY WATER
TEMPERATURE BEHIND COOLER HI HI
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
Corresponding RTD terminals in turbine panels tightened.
Turbine reset.
if checked
SLNO
ACTIVITY
I
To check primary water temperature behind cooler
temperature Hi Hi trip.
Note set point on the LVM for alarm and trip:
ALARM: LVM Loc/set point (V):
TRIP: LVM Loc/set point(V):
REMARK
_______/_______.
_______/_______.
Page - 59
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
4
Install the RTD back and tighten the covers and seal gland
holes.
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
39.0 EQUIPMENT PROTECTION CHECKING RECORD: WARM AIR MAIN
EXCITER TEMPERATURE HI HI
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE
DATE:
PROTECTION: WARM AIR MAIN EXCITER
TEMPERATURE HI HI
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
PREREQUISITES:
Corresponding RTD terminals in turbine panels tightened.
Turbine reset.
if checked
SLNO
ACTIVITY
I
To check warm air main exciter temperature Hi Hi trip.
Note setpoint on the LVM for alarm and trip:
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):
REMARK
_______/_______.
_______/_______.
Page - 60
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
3
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
Page - 61
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
40.0
REVIEW
This Document shall be reviewed by the Executive Director, Operation Services,
on a 2-yearly basis or as necessary.
UNCONTROLLED
II Regional Head Quarters
21. Executive Director (NR), Lucknow
22. Executive Director (SR), Hyderabad
23. Executive Director (WR), Mumbai
24. Executive Director (ER), Patna
25. Executive Director (NCR), Noida
Rihand
Vindhyachal
Kahalgaon
Farakka
Dadri (Coal & Gas)
Unchahar
Korba
Ramagundam
Badarpur
Talcher Kaniha
Kayamkulam
Kawas
Simhadri
Singrauli
Tanda
Talcher Thermal
Auraiya
Jhanor Gandhar
Faridabad
Anta
IV
Head of O&M
37. Singrauli
38. Korba
39. Ramagundam
40. Farakka
41. Vindhyachal
42. Rihand
43. Kahalgaon
44. Dadri(Coal)
45. Unchahar
47.Talcher Thermal
48. Badarpur
49. Simhadri
50. Auraiya
51. Anta
52. Kawas
55. Kayamkulam
56. Faridabad
58. Singrauli
59. Korba
60. Ramagundam
61. Farakka
62. Vindhyachal
63. Rihand
64. Kahalgaon
65. Dadri(Coal)
66. Unchahar
68.Talcher Thermal
69. Badarpur
70. Simhadri
71. Auraiya
72. Anta
73. Kawas
76. Kayamkulam
77. Faridabad