(For Internal Circulation)

COS-ISO-00-OIN/OPS/C&I/006
Rev. No. : 0 September 2005

OPERATION INFORMATION NOTE

C&I Protection Checking of


Boiler & Main Turbine

CORPORATE OPERATION SERVICES

National Thermal Power Corporation Ltd.

NATIONAL THERMAL POWER CORPORATION LTD.


OPERATION & MAINTENANCE FORMAL DOCUMENTATION SYSTEM
OPERATION INFORMATION NOTE : COS-ISO-00-OIN/OPS/C&I/006
Rev. No.: 0

Date : September, 2005

C&I Protection Checking of


Boiler & Main Turbine

Approved for
Implementation by ..
E. D. (OS)
Date: ..
Enquiries to: Head of Corp. Operation Services

C&I Protection Checking of Boiler & Main Turbine

SL.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

INDEX
Contents
Introduction
Superseded Documents
Boiler: Manual Pushbutton
Boiler: Loss of 220V DC
Boiler: Loss of Unit Critical Supply
Boiler: Drum Level Hi Hi
Boiler: Drum Level LO LO
Boiler: Furnace Pressure Hi Hi
Boiler: Furnace pressure lo lo
Boiler: Air flow < 30%
Boiler: All BFPs Tripped
Boiler: Inadequate Water Wall Circulation
Boiler: All ID Fans Off
Boiler: All FD Fans Off
Boiler: Both Sec. APH Off
Boiler: Less than Fireball and Loss of AC
Boiler: Loss of Fuel
Boiler: Flame Failure
Boiler: Reheater Protection
Turbine: Manual Turbine Trip
Turbine: Axial Shift Negative
Turbine: Axial Shift Positive
Turbine: Lub Oil Pressure Lo lo
Turbine: HP Exhaust Temperature Hi Hi
Turbine: HP Casing Top/Bottom Dt Hi Hi
Turbine: IP Casing Front Top/Bott Dt Hi Hi
Turbine: IP Casing Rear Top/Bott Dt Hi Hi
Turbine: Fire Protection
Turbine: Boiler Trip to Turbine Trip
Turbine: Generator Trip to Turbine
Turbine: PW Flow at Stator Outlet Lo Lo
Turbine: PW Flow at Main Bush Phase U Lo Lo
Turbine: PW Flow at Main Bush Phase V Lo Lo
Turbine: PW Flow at Main Bush Phase W Lo Lo
Turbine: Generator Bush Level Hi Hi
Turbine: Cold Gas Temp Behind Cooler Hi Hi
Turbine: Seal Oil Temp Beh. Cooler temp hi hi
Turbine: PW Temp Beh. Cooler Hi Hi
Turbine: Warm Air Main Exciter Temp Hi Hi
Review

Page No.
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
22
24
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

Page - 1
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

C&I Protection Checking of Boiler & Main Turbine


1.0

INTRODUCTION
Corporate Operation Services has made action plan with individual sites to
achieve zero forced outage. The action plan includes various checks and activities
to be carried out during overhaul. One important activity when the unit comes
back after overhaul or after a major shutdown is checking of protections. Though
this activity is being carried out as a routine, it is felt that protection checking
should be carried out with the involvement of Operation, Maintenance and Field
quality departments and each protection check is done with a well documented
procedure which includes checking healthiness of protection related field devices,
calibration, protection of field devices from dust and water ingress, healthiness of
cable, tightness of termination, working of indicators and recorders in UCB,
power supply, availability of alarm system and printers.
In order to cover all these aspects in protection checking of equipment, Corporate
OS-C&I has prepared a procedure for documenting protection checking of boiler
and main turbine. The following pages contain the suggested format in which
protection checking is to be documented. It is expected that the sites would
prepare such procedures in the given format for protection checking of all
equipments taking into account site specific conditions but encompassing all areas
mentioned above like field conditions, alarm etc. A word of caution: The
enclosed protection checking procedure has been prepared for protection common
to most of the boilers and turbines and in no way replaces station specific
protections nor is a suggestion to include new protections. If the present station
practice is an improvement over the suggested practice in the document, the same
may be continued and Corporate OS be informed. It is once again emphasized
that a holistic approach to protection checking is the idea built into the procedure.

2.0

SUPERSEDED DOCUMENTS

Nil

National Thermal Power Corporation Ltd.

Page - 2
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
3.0

EQUIPMENT PROTECTION CHECKING RECORD : BOILER MANUAL


PUSHBUTTON TRIP

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: BOILER MANUAL
PUSHBUTTON TRIP
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

PREREQUISITES:
Purge completed and MFT reset.

if checked

SLNO
ACTIVITY
I
To check manual push button emergency trip to boiler.

REMARK

Push one Boiler trip push button. MFT should not act.

Push the other Boiler trip push button. Now also MFT
should not act.

Push both push buttons simultaneously.

MFT should act.

Check alarm and SOE in UCB.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN
MANUAL TRIP PUSH BUTTONS.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 3
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

4.0 EQUIPMENT PROTECTION CHECKING RECORD : LOSS OF 220V DC > 2 sec


STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: LOSS OF 220V DC > 2 sec.

No. OF CHANNELS:1
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER READY FOR PROTECTION CHECK AFTER
OVERHAUL

if checked

PREREQUISITES:
Check if fuses are replaced with new ones in both feeders of DC to
FSSS.
Ensure tightness in TBs of DCCSP modules and FSSS end
Ensure new fuses are provided in FSSS panel.
Switch on both 220V DC supplies to FSSS.
Purge completed and MFT reset.
.
SLNO
I

ACTIVITY

REMARK

To check MFT on failure of 220V DC supply


Note down feeder numbers and fuse ratings in DC board for both DC
supplies:
Feeder for Normal DC to DCCSP/ fuse:
Feeder for Standby DC to DCCSP/ fuse:

_______/_____.
_______/_____.

Note down timing set on the timer relay and its tag:
Unit DC failure Timer relay tag:
Time set on the timer relay:

________.
________.

Switch off normal DC feeder FSSS and ensure standby supply takes
over.

Switch on normal DC feeder and switch off standby DC feeder.

Ensure normal supply is feeding.

National Thermal Power Corporation Ltd.

Page - 4
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
4

Switch off normal DC feeder. Now both DC feeders are off.

Check if MFT acts.

Ensure alarm in UCB and SOE printer.

Ensure 2 sec delay from printout.

Restore both DC supplies.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN DC
FEEDERS, DCCSP AND FSSS PANEL DC SUPPLIES.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 5
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
5.0

EQUIPMENT PROTECTION CHECKING RECORD : LOSS OF UNIT


CRITICAL SUPPLY > 2 sec.

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: LOSS OF UNIT CRITICAL
SUPPLY > 2 sec.
No. OF CHANNELS:1
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER READY FOR PROTECTION CHECK AFTER
OVERHAUL

PREREQUISITES:
115V AC supply (Normal and standby) off and wiring tightness checked at FSSS
panel Terminal blocks for both supplies.
Old fuses replaced with new fuses in ACCSP and FSSS panels and old fuses
destroyed
AC supplies made ON and voltage measured at FSSS panel.

if checked

_____V AC.

Purge completed and MFT reset.


SLNO
I

ACTIVITY
To check MFT on failure of Unit critical supply which consists of Unit
logic voltage and unit critical interrogation scan voltages, which scans
all MFT input contacts.

REMARK

Note down feeder numbers and fuse ratings in BMCC for both normal
and standby AC supplies:
Feeder for Normal AC to ACCSP/ fuse:
Feeder for Standby AC to ACCSP/ fuse:

_______/_____.
_______/_____.

Note down timing set on the timer relay and its tag:
Unit AC failure Timer relay tag:
Time set on the timer relay:

________.
________.

Switch off normal AC feeder to ACCSP and ensure standby supply


takes over.

Switch on normal AC feeder and switch off standby AC feeder.

Ensure normal supply is feeding.

Switch off normal AC feeder. Now both AC feeders are off.

Check if MFT acts.

National Thermal Power Corporation Ltd.

Page - 6
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
6

Ensure alarm in UCB and SOE printer.

Ensure 2 sec delay from printout.

Restore both normal and standby AC.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN AC
FEEDERS, ACCSP AND FSSS PANEL AC SUPPLIES.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 7
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
6.0

EQUIPMENT PROTECTION CHECKING RECORD : DRUM LEVEL HI HI

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: DRUM LEVEL HI HI.

No. OF CHANNELS: 2
MODE OF PROTECTION: 2OUT OF 3.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

PREREQUISITES:
Drum level transmitter and transmitters calibrated.
Transmitters installed after calibration and cable connection and
termination at panel end checked.
Gland holes sealed and instrument covers fixed with gaskets, O rings etc to
prevent water and dust ingress..
All root valves and isolation valves in instrument enclosures opened and
transmitters charged.
Fuses for transmitters replaced with new ones.
Protection related cables meggered.
If Hydrastep is used, then defective electrodes replaced and system
charged.
Purge completed and MFT reset.
SLNO
ACTIVITY

National Thermal Power Corporation Ltd.

if checked

REMARK

Page - 8
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
I

To check drum level hi-hi protection:


ALARM SETPOINT:
TRIP SETPOINT:
Tag Nos:
Level transmitter (LEFT)/LVM LOC:
Level transmitter (RIGHT)/LVM LOC:

_______ mm WCL
_______ mm WCL
____________/_____.
____________/_____.

Check transmitters and Hydrastep response while drum is


being filled. Ensure all signals relevant to protection logic are
healthy. Check timing set on the timer for drum level trip.
TIME DELAY SET:
Raise drum level to the SETPOINT level.(done by Operation
dept.)
Check if TLR and MFR actuated.

Note down drum level reading and Hydrastep window at trip.

Note down timing for trip to act.

Check trend recording, SOE printout and alarm in UCB

Normalize drum level.

____ Sec.

DRUM LVL:______
H.STEP :______
___ Sec.

NOTE: NO FURTHER WORK TO BE TAKEN UP IN


DRUM LEVEL TRANSMITTERS AND HYDRASTEP.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 9
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
7.0

EQUIPMENT PROTECTION CHECKING RECORD : DRUM LEVEL LO LO

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: DRUM LEVEL LO LO.

No. OF CHANNELS: 2

MODE OF PROTECTION: 2OUT OF 3.

PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

PREREQUISITES:
Drum level transmitter and transmitters calibrated.
Transmitters installed after calibration and cable connection and
termination at panel end checked.
Gland holes sealed and instrument covers fixed with gaskets, O rings etc to
prevent water and dust ingress..
All root valves and isolation valves in instrument enclosures opened and
transmitters charged.
Fuses for transmitters replaced with new ones.
Protection related cables meggered.
If Hydrastep is used, then defective electrodes replaced and system
charged.
Purge completed and MFT reset.

if checked

SLNO

REMARK

ACTIVITY
To check drum level hi-hi protection:
ALARM SETPOINT:
TRIP SETPOINT:
Tag Nos:
Level transmitter (LEFT)/ LVM LOC:
Level transmitter (RIGHT)/LVM LOC:
Check transmitters and Hydrastep response while drum is
being filled. Ensure all signals relevant to protection logic are
healthy. Check timing set on the timer for drum level trip.
TIME DELAY SET:

Reduce drum level to the SETPOINT level.(done by Operation


dept.)

Check if TLR and MFR actuated.

_______ mm WCL
_______ mm WCL
___________/______.
___________/______.

____ Sec.

DRUM
LVL:______
Note down drum level reading and Hydrastep window at trip.
H.STEP :______
___ sec.
National Thermal Power Corporation Ltd.

Page - 10
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
5

Note down timing for trip to act.

Check trend recording, SOE printout and alarm in UCB

Normalize drum level.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN DRUM
LEVEL TRANSMITTERS AND HYDRASTEP.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 11
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
8.0

EQUIPMENT PROTECTION CHECKING RECORD: FURNACE


PRESSURE HI-HI

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: FURNACE PRESSURE HI-HI.

No. OF CHANNELS: 2

MODE OF PROTECTION: 2 OUT OF 3.

PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

if checked

PREREQUISITES:
Furnace pressure tapping points on furnace poked and connected impulse
lines purged to remove choke.
Furnace pressure transmitters and switches calibrated, installed and cables
terminated and gland holes sealed to prevent water and dust ingress.
Cable connection and termination at panel end checked.
All root valves and isolation valves in instrument enclosures opened and
instruments charged.
Fuses for transmitters replaced with new ones.
Protection related cables meggered.
Purge completed and MFT reset.

SLNO
I

ACTIVITY
To check furnace pressure hi-hi protection:
ALARM SETPOINT:
TRIP SETPOINT:
Tag Nos:
Furnace Pressure Transmitter(LEFT)/LVM LOC:
Furnace Pressure Switch(LEFT)/(RIGHT):
Furnace Pressure Transmitter(RIGHT)/LVM LOC:

3
4
5

REMARK

Change furnace pressure in both directions (BY OPERATION


DEPT) and note down response from transmitters (L&R) on
indicators and recorders. (if not done during furn. pressure LO
LO checking)
Create DP corresponding to furnace pressure HI HI at pressure
switch using a manometer and observe switch operation and
UCB alarm.
Repeat step 2 for all switches used for Furnace Hi Hi tripping.
Check operation of LVM and its contact by feeding current.
Simulate 2 out of 3 contact for furnace pressure Hi Hi tripping
using different combinations of LVM and Switch (from local)

_______ mm WCL
_______ mm WCL
__________/_______.
__________/_______.
__________/_______.

1: LVM(L) & PS:


2:LVM(R) & PS:

National Thermal Power Corporation Ltd.

Page - 12
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

6
7

and check if MFT acts.


Check trend recording, SOE printout and alarm in UCB
Normalize impulse line and cable connections to transmitters,
switches and in the panel TBs.
NOTE: NO FURTHER WORK TO BE TAKEN UP IN
FURNACE PRESSURE HI HI SWITCHES AND
TRANSMITTERS.

(C&I MAINTENANCE)

(OPERATION) (FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 13
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
9.0

EQUIPMENT PROTECTION CHECKING RECORD: FURNACE


PRESSURE LO-LO

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: FURNACE PRESSURE LOLO.
No. OF CHANNELS: 2
MODE OF PROTECTION: 2 OUT OF 3.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

if checked

PREREQUISITES:
Furnace pressure tapping points on furnace poked and connected impulse
lines purged to remove choke.
Furnace pressure transmitters and switches calibrated, installed and cables
terminated and gland holes sealed to prevent water and dust ingress.
Cable connection and termination at panel end checked.
All root valves and isolation valves in instrument enclosures opened and
instruments charged.
Fuses for transmitters replaced with new ones.
Protection related cables meggered.
Purge completed and MFT reset.
SLNO
ACTIVITY
I
To check furnace pressure lo-lo protection:

1
2
3
4
5

ALARM SETPOINT:
TRIP SETPOINT:
Tag Nos:
Furnace Pressure Transmitter(LEFT)/LVM LOC:
Furnace Pressure Switch(LEFT)/(RIGHT):
Furnace Pressure Transmitter(RIGHT)/LVM LOC:
Change furnace pressure in both directions (BY OPERATION
DEPT) and note down response from transmitters (L&R) on
indicators and recorders.
Create DP corresponding to furnace pressure LO LO at
pressure switch using a manometer and observe switch
operation and UCB alarm.
Repeat step 2 for all switches used for Furnace Lo Lo tripping.
Check operation of LVM and its contact by feeding current.
Simulate 2 out of 3 contact for furnace pressure lo lo tripping
using different combinations of LVM and Switch (from local)
and check if MFT acts.

REMARK
_______ mm WCL
_______ mm WCL
__________/_______.
__________/_______.
__________/_______.

1: LVM(L) & PS:


2:LVM(R) & PS:

National Thermal Power Corporation Ltd.

Page - 14
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
6
7

Check trend recording, SOE printout and alarm in UCB


Normalize impulse line and cable connections to transmitters,
switches and in the panel TBs.
NOTE: NO FURTHER WORK TO BE TAKEN UP IN
FURNACE PRESSURE LO LO SWITCHES.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 15
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
10.0

EQUIPMENT PROTECTION CHECKING RECORD: AIR FLOW <30%

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: AIR FLOW <30%

No. OF CHANNELS: 2
MODE OF PROTECTION: 2 OUT OF 3.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

if checked

PREREQUISITES:
Ensure aerofoil tapping points poked and cleaned.
Air flow transmitters calibrated, installed, cables connected ,gland holes
sealed and covers tightened.
Thermowells and thermocouples inspected and cable healthiness checked.
Transsmitter cable and thermocouple cables are properly routed and
protected Transmitter fuses replaced with new ones.
Purge completed and MFT reset.
SLNO
I

1
2
3
4
5
6
7
8
9
10
11

ACTIVITY
To check air flow less than 30% protection:
LEFT transmitter 1/ LVM 1/LVM SETTING(V)
LEFT transmitter 2/ LVM 2/LVM SETTING(V)
RIGHT transmitter 1/ LVM 1/LVM SETTING(V)
RIGHT transmitter 2/ LVM 2/LVM SETTING(V)
LEFT CJC No/TERMINAL
RIGHT CJC No/TERMINAL

REMARK
___________/_____/__
___________/_____/__
___________/_____/__
___________/_____/__
________________/__
________________/__

Bring air flow < 30% with boiler load <30%.


Check MFT acts.
Check trend recording, alarm and SOE in UCB.
Purge and Reset MFT
Increase air flow to >30%.
Simulate boiler load >30%.
Reduce air flow to <30% and note MFT does not act.
Increase air flow to >30%.
Remove boiler load > 30% condition and reduce air flow < 30%.
Note MFT does not act.
Check trend recording, alarm and SOE in UCB.
NOTE: NO FURTHER WORK TO BE TAKEN UP IN AIR
FLOW MEASUREMENT SYSTEM.

National Thermal Power Corporation Ltd.

Page - 16
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 17
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
11.0

EQUIPMENT PROTECTION CHECKING RECORD: ALL BFPs TRIPPED

STATION:
UNIT:3
DATE:
MAIN EQUIPMENT:BOILER
PROTECTION: ALL BFPs TRIPPED
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

PREREQUISITES:
Check tightness at TB where BFP trip contacts are wired in both
FSSS panel and BFP panel /ARP.
MDBFP breaker in test remote position.
Purge completed and MFT reset.

if checked

SLNO
ACTIVITY
I
To check MFT on all BFP trip with a 10 sec delay..

REMARK

Note timer tag and setting for this trip.


Timer tag:
Time setting:
1

Ensure TDBFP A and B trip contacts are coming at FSSS


panel.

Trip MDBFP breaker manually.

Check if MFT acts after 10 sec..

Check SOE printout and alarm in UCB and record time to


trip from printout.

_________.
_____ Sec.

_____Sec.

NOTE: NO FURTHER WORK TO BE TAKEN UP IN


DRUM LEVEL TRANSMITTERS AND HYDRASTEP.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 18
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

12.0

EQUIPMENT PROTECTION CHECKING RECORD: INADEQUATE


WATERWALL CIRCULATION

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: INADEQUATE
WATERWALL CIRCULATION
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 2.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

if checked

PREREQUISITES:
DP transmitters of all three BCW pumps calibrated, installed and
cable connection and termination at panel end checked.
All root valves and isolation valves in instrument enclosures opened
and transmitters charged.
Fuses for transmitters replaced with new ones.
Purge completed and MFT reset.
SLNO
I

ACTIVITY
To check MFT on inadequate water wall circulation.
Check DP transmitters response while pump is running. Ensure
all signals relevant to protection logic are healthy. Check timing
set on the timer for this trip. TIME DELAY SET:

Trip the running pump(s).

Check if MFT acts after 5 sec.

Start one BCW pump and reset MFT (by OPERATION).

Open the equalizing valve on the DP transmitter manifold to


create low DP.

Check MFT acts after 5 sec.

If pump cannot be run, simulate pump running contact and


create >10 psi DP from HP side of the transmitter.

REMARK
_______ mm WCL
_______ mm WCL
____ Sec.

DRUM LVL:______
H.STEP :______

___ Sec.

National Thermal Power Corporation Ltd.

Page - 19
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
7

After resetting MFT, open the equalizing valve.

Check MFT acts after 5 sec.

Check trend recording, SOE printout and alarm in UCB

10

Normalize transmitter connections

11

NOTE: NO FURTHER WORK TO BE TAKEN UP IN BCW


DP TRANSMITTERS.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 20
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
13.0

EQUIPMENT PROTECTION CHECKING RECORD: ALL ID FANS OFF

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: ALL ID FANS OFF.

No. OF CHANNELS: 2
MODE OF PROTECTION: 2 OUT OF 3.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

PREREQUISITES:
Purge completed and MFT reset.

if checked

SLNO
ACTIVITY
I
To check all ID fans OFF protection:
Ensure tightness of all wires pertaining to this trip in FSSS
and relay panel.

REMARK

Trip running ID fans.(by OPERATION DEPT)

Check if MFT acts.

Check trend recording, SOE printout and alarm in UCB


NOTE: NO FURTHER WORK TO BE TAKEN UP IN
ID FANS TRIP TO MFT CIRCUIT.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 21
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

National Thermal Power Corporation Ltd.

Page - 22
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
14.0

EQUIPMENT PROTECTION CHECKING RECORD: ALL FD FANS OFF

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: ALL FD FANS OFF.

No. OF CHANNELS: 2
MODE OF PROTECTION: 2 OUT OF 3.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

PREREQUISITES:
Purge completed and MFT reset.

if checked

SLNO
ACTIVITY
I
To check all FD fans OFF protection:
Ensure tightness of all wires pertaining to this trip in FSSS
and relay panel.

REMARK

Trip running FD fans.(by OPERATION DEPT)

Check if MFT acts.

Check trend recording, SOE printout and alarm in UCB


NOTE: NO FURTHER WORK TO BE TAKEN UP IN
FD FANS TRIP TO MFT CIRCUIT.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 23
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

National Thermal Power Corporation Ltd.

Page - 24
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
15.0

EQUIPMENT PROTECTION CHECKING RECORD: BOTH SEC. APHs OFF

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: BOTH SEC. APHs OFF

No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

PREREQUISITES:
Purge completed and MFT reset.

if checked

SLNO
ACTIVITY
I
To check both secondary air preheaters OFF protection:
Ensure tightness of all wires pertaining to this trip in FSSS
and relay panel.

REMARK

Trip running secondary air preheaters.

Check if MFT acts.

Check trend recording, SOE printout and alarm in UCB


NOTE: NO FURTHER WORK TO BE TAKEN UP IN
BOTH SEC. AIR PREHEATERS TRIP TO MFT
CIRCUIT.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 25
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

16.0

EQUIPMENT PROTECTION CHECKING RECORD: LESS THAN


FIREBALL AND LOSS OF AC ON ANY ELEVATION IN SERVICE

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: LESS THAN FIREBALL
AND LOSS OF AC ON ANY ELEVATION IN
SERVICE.
No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

PREREQUISITES:
Purge completed and MFT reset.

if checked

SLNO
ACTIVITY
I
To check MFT on less than fireball and loss of AC on any
elevation in service.
Ensure tightness of all wires pertaining to this trip in
FSSS.
1
Give start command of AB 1,3 or AB 2,4 or CD 1,3 or CD
2,4 or EF 1,3 or EF 2,4 corners.

REMARK

Check HONV in both corners open.

Switch off power supply to respective elevation.

Check MFR trips.

Check alarm and SOE in UCB..

Normalize HONV and power supplies.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN
ELEVATION POWER SUPLIES.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 26
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

National Thermal Power Corporation Ltd.

Page - 27
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
17.0

EQUIPMENT PROTECTION CHECKING RECORD: LOSS OF FUEL

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: LOSS OF FUEL

No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITIO N: BOILER PROTECTION CHECK AFTER OVERHAUL

PREREQUISITES:
Purge completed and MFT reset.
SLNO
I

ACTIVITY
To check MFT on loss of all fuel:
Ensure tightness of all wires pertaining to this trip in FSSS and
feeder panels and field.

Simulate HONV open from AB/CD/EF elevation to arm loss of


all fuel trip.

Remove the above open contact and check if MFT acts.

Reset MFT.

Simulate HOTV open.

Simulate HONV open again from any one elevation.

Remove open contact of HONV and HOTV simulated.

Check if MFT acts.

Reset MFT.

Simulate at least one feeder in service.

10

Simulate HONV open again from any one elevation.

11

Normalize feeder running simulation.

12

Check if MFT acts.

13

Check trend recording, SOE printout and alarm in UCB

14

Normalize all simulations in HONV, HOTV and feeder panels.

National Thermal Power Corporation Ltd.

if checked
REMARK

Page - 28
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
NOTE: NO FURTHER WORK TO BE TAKEN UP IN LOSS
OF ALL FUEL LOGIC.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 29
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
18.0

EQUIPMENT PROTECTION CHECKING RECORD: FLAME FAILURE

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: FLAME FAILURE

No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

PREREQUISITES:
All scanners cleaned and fixed back.
All scanners tested with light source and healthiness checked.
Purge completed and MFT reset.
SLNO
ACTIVITY
I
To check MFT on flame failure.
Ensure tightness of all wires pertaining to this trip in
FSSS.
1

Simulate one feeder in service from feeder panel

Create three out of four HONV open from field limit


switches AB/CD/EF elevation.

Show candle light to any three scanners of corresponding


elevation.

Remove any one candle from the scanner.

Check HONV in that corner closes.

Check MFR trips on flame failure.

Check alarm and SOE in UCB..

Normalize scanners, HONV and feeder.

if checked

REMARK

NOTE: NO FURTHER WORK TO BE TAKEN UP IN


SCANNERS AND FALME FAILURE LOGIC.

(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
National Thermal Power Corporation Ltd.

Page - 30
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

19.0

EQUIPMENT PROTECTION CHECKING RECORD: REHEATER


PROTECTION

STATION:
UNIT:
MAIN EQUIPMENT:BOILER

DATE:
PROTECTION: REHEATER PROTECTION.

No. OF CHANNELS: 2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: BOILER PROTECTION CHECK AFTER OVERHAUL

PREREQUISITES:
HP/LP bypass valves, all ESVs, generator breaker OPEN/CLOSE feedback
available, wiring checked and tightened.
The above valves individually operated and corresponding relay operation
and contacts on OPEN/CLOSE feed back checked.
Generator breaker contact simulated (by EM) and relay operation and
contact checked.
Purge completed and MFT reset.
SLNO
ACTIVITY
I
To check MFT Reheater protection.
ARMING: Simulate boiler ON condition by simulating three
out of four HONV open limit switches.
1
Simulate all ESVs OPEN.
2
Simulate both LP bypass valves OPEN.
3
Check MFT acts in 10 sec. (Generator CB OPEN and HP
bypass fail to open ).
4
Reset MFT.
5
Simulate both HP bypass open and remove LP bypass open.
6
Check MFT acts in 1 minute. (Generator CB open and LP
bypass fail to open)
7
Reset MFT.
8
Simulate all HP ESVs CLOSE.
9
Simulate Generator CB CLOSE.
10
Simulate HP /LP bypass close.
11
Check MFT acts (ESVs closed and HP/LP fail to open).
12
Normalize all contacts.
13
Check alarm and SOE in UCB..
NOTE: NO FURTHER WORK TO BE TAKEN UP IN
REHEATER PROTECTION LOGIC.

National Thermal Power Corporation Ltd.

if checked

REMARK

Page - 31
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 32
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
20.0

EQUIPMENT PROTECTION CHECKING RECORD: MANUAL


TURBINE TRIP

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: MANUAL TURBINE TRIP

No. OF CHANNELS:2
MODE OF PROTECTION:1 OUT OF 1.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
Turbine reset.

if checked

SLNO
ACTIVITY
I
To check manual turbine trip from UCB.

REMARK

Trip turbine by giving manual push button command from


UCB by pressing both push buttons.

Check TTS operates and turbine trips.

Check SOE and alarm in UCB.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN
MANUAL TRIP PUSH BUTTONS.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 33
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

21.0

EQUIPMENT PROTECTION CHECKING RECORD: AXIAL SHIFT


NEGATIVE

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: AXIAL SHIFT NEGATIVE

No. OF CHANNELS:2

MODE OF PROTECTION: 2 OUT OF 2.

PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER


OVERHAUL

PREREQUISITES:
Turbine rotor in zero position and turbine reset.
Axial shift pickups calibrated.
Pickup, local amplifiers and corresponding cards in the panel identified and
tagged.(LEFT/RIGHT or FRONT/REAR etc).
Axial shift negative LVM contact wiring to turbine panel tightness checked.
Axial shift readings available on indicators, recorder and DAS.
Special tool required- filler gage for setting gap.
Check turbine trip relay healthiness, megger cables from panel to trip relays
and connect cables and tighten terminals
SLNO
I

II

ACTIVITY
To check axial shift negative side protection:
ALARM SETPOINT:
TRIP SETPOINT:
Set voltage on LVM corresponding to TRIP SET Point:
Design:
Measured:
Card locations in panel:
CH1: - SIGNAL CONDITIONING CARD:
- LIMIT VALUE MONITOR:
CH2: - SIGNAL CONDITIONING CARD:
- LIMIT VALUE MONITOR:

if checked

REMARK
_________mm
_________mm.
_________V.
_________V.
__________.
__________.
__________.
__________.

Move the base carrying both pickups until reading matches the

National Thermal Power Corporation Ltd.

Page - 34
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

Alarm set point and ensure alarm appears on the window and
alarm printer.
Move the base carrying both pickups until reading matches the
TRIP SETPOINT on both indicators.
Measure gap with slip gauge or by suitable mechanical means .
The measured gap should be same as the TRIP SETPOINT.
Check and record output voltage at A.S. measurement card for
both channels.
CH 1 voltage:
CH 2 voltage:
(Ensure voltage corresponds to TRIP SETPOINT).
Check trip relays CR2A, CR2B, TLR-A/B in TSP 3A/3B are
actuated.
Check and record voltage across turbine trip relay terminals.

Ensure operation of turbine trip relays by physical verification.

Check trend recording, SOE and alarm.

Restore both pickups to zero position, fix them firmly and


confirm zero readings on both channels.

10

Ensure JB covers tightly closed, terminals tightened and cards


firmly fixed with screws.

2
3
4

___________ mm
_____ V.
_____ V.

Contd.
_____ V.

NOTE: NO FURTHER WORK TO BE TAKEN UP IN AXIAL


SHIFT SYSTEM.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 35
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

22.0

EQUIPMENT PROTECTION CHECKING RECORD: AXIAL SHIFT


POSITIVE

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: AXIAL SHIFT POSITIVE

No. OF CHANNELS:2
MODE OF PROTECTION: 2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL

PREREQUISITES:
Turbine rotor in zero position and turbine reset.
Axial shift pickups calibrated.
Pickup, local amplifiers and corresponding cards in the panel
identified and tagged.(LEFT/RIGHT or FRONT/REAR etc).
Axial shift negative LVM contact wiring to turbine panel tightness
checked.
Axial shift readings available on indicators, recorder and DAS.
Special tool required- filler gage for setting gap.
Check turbine trip relay healthiness, megger cables from panel to trip
relays and connect cables and tighten terminals
SLNO
ACTIVITY
I
To check axial shift positive side protection:
National Thermal Power Corporation Ltd.

if checked

REMARK

Page - 36
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
ALARM SETPOINT:
TRIP SETPOINT:
Set voltage on LVM corresponding to TRIP SET Point:
Design:
Measured:
II

_________mm
_________mm.
_________V.
_________V.

Card locations in panel:


CH1: - SIGNAL CONDITIONING CARD:
- LIMIT VALUE MONITOR:
CH2: - SIGNAL CONDITIONING CARD:
- LIMIT VALUE MONITOR:

__________.
__________.
__________.
__________.

Move the base carrying both pickups until reading matches


the Alarm set point and ensure alarm appears on the
window and alarm printer.

Move the base carrying both pickups until reading matches


the TRIP SETPOINT on both indicators.

Measure gap with slip gauge or by suitable mechanical


means. The measured gap should be same as the TRIP
SETPOINT.
Check and record output voltage at A.S. measurement card
for both channels.
CH 1 voltage:
CH 2 voltage:
(Ensure voltage corresponds to TRIP SETPOINT).

5
6
7
8

Check trip relays CR2A, CR2B, TLR-A/B in TSP 3A/3B


are actuated.
Check and record voltage across turbine trip relay
terminals.
Ensure operation of turbine trip relays by physical
verification.
Check trend recording, SOE and alarm.

___________ mm

Contd.
_____ V.
_____ V.

_____ V.

Restore both pickups to zero position, fix them firmly and


confirm zero readings on both channels.

10

Ensure JB covers tightly closed, terminals tightened and


cards firmly fixed with screws.
NOTE: NO FURTHER WORK TO BE TAKEN UP IN
AXIAL SHIFT SYSTEM.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 37
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

National Thermal Power Corporation Ltd.

Page - 38
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
23.0

EQUIPMENT PROTECTION CHECKING RECORD: LUB OIL


PRESSURE LO-LO

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: LUB OIL PRESSURE LO-LO

No. OF CHANNELS:2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
if checked
Lub oil system charged and turbine reset.
Lub oil switches, transmitter and local gauge calibrated, fixed back,
root valves and isolation valves opened and no oil leakages
observed..
Pressure switch cables meggered and connected back at both ends.
Pressure switch cable gland sealed.
Lub oil pressure indication on UCB available.
Check turbine trip relay healthiness, megger cables from panel to trip
relays and connect cables and tighten terminals
SLNO
ACTIVITY
REMARK
I
To check turbine lub oil pressure very low protection:
ALARM SETPOINT:
________ kg/cm2
TRIP SETPOINT:
________ kg/cm2
1

Drain low alarm switch slowly and when alarm set point
pressure is read on the gauge ensure alarm appears on UCB
and in alarm printer.

Close alarm switch drain valve.

Drain CH-A pressure switch of lo-lo protection very slowly


while observing the pressure gauge.

Note and record the pressure on the gauge at which TLR


actuates and ESV/IV closes.

Pressure: ______

National Thermal Power Corporation Ltd.

Page - 39
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
5

Check and record voltage across turbine trip relay terminals.

Ensure operation of turbine trip relays by physical


verification.

Check for barring gear stop.

Check SOE and alarm in UCB.

Normalize CH-A switch, reset turbine and put on barring


gear.

10

Drain CH-B pressure switch of lo-lo protection very slowly


while observing the pressure gauge.

11

Note the pressure on the gauge at which TLR actuates and


ESV/IV closes.

12

Check and record voltage across turbine trip relay terminals.

________ V.

Contd.

___________ V.
13

Ensure operation of turbine trip relays by physical


verification.
Check for barring gear stop.

14
Check SOE and alarm in UCB.
15
16

Normalize CH-B switch, reset turbine and put on barring


gear.
NOTE: NO FURTHER WORK TO BE TAKEN UP ON
LUB OIL PRESSURE SWITCHES.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 40
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

National Thermal Power Corporation Ltd.

Page - 41
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
24.0

EQUIPMENT PROTECTION CHECKING RECORD: HPT EXHAUST


TEMPERATURE HI-HI

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: HPT EXHAUST
TEMPERATURE HI-HI
No. OF CHANNELS:2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
HPT exhaust thermocouples checked.
Connections tightened at head and cables routed properly and
protected from hot surfaces.
Cable gland hole sealed.
Turbine reset.

if checked

SLNO
ACTIVITY
I
To check HPT exhaust temperature Hi Hi protection (done
by simulation)
Thermocouple tag:
CJC No. and terminal
LVM (TRIP) LOC:
ALARM SETPOINT:
TRIP SETPOINT:

REMARK

Using a mV calibrator, feed mV corresponding to alarm set


point.

Note mV and corresponding temperature at which LVM


acted and alarm appeared.

__________________.
__________/________.
__________________.
__________DEG C
__________DEG C.

mV:______________
= ___________ deg C

Feed mV corresponding to trip value from the calibrator.


mV:______________
= ___________ deg C

Note mV and corresponding temperature at which turbine


trips.

Check alarm and SOE in UCB.

Connect back wires removed and tighten the terminals.


National Thermal Power Corporation Ltd.

Page - 42
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
NOTE: NO FURTHER WORK TO BE TAKEN UP IN
HP EXHAUST TEMPERATURE PROTECTION
SYSTEM.
(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 43
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
25.0 EQUIPMENT PROTECTION CHECKING RECORD: HP CASING
TOP/BOTTOM DIFFERENTIAL TEMPERATURE HI HI
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: HP CASING TOP/BOTTOM
DIFFERENTIAL TEMPERATURE HI HI
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
HP casing top and bottom thermocouples and cables checked.
Connections tightened at head and cables routed properly and
protected from hot surfaces.
Cable gland hole sealed.
Turbine reset.
SLNO
ACTIVITY
I
To check HP casing top/bottom temperature Hi Hi
protection (done by simulation)
Thermocouple tag(TOP/BOTTOM):
CJC No. and terminal(TOP)
CJC No and terminal (BOTTOM)
LVM (TRIP) LOC:
ALARM SETPOINT:
TRIP SETPOINT:
1

Remove casing top thermocouple and heat it. Measure the


mV and note the temperature when alarm appears.

Continue to heat and note the mV at which trip LVM acts.

Fix back the thermocouple.

During protection checking, simulate from LVM and


check turbine trips.

Check alarm and SOE in UCB.

if checked

REMARK
_______/_______.
_______/_______
_______/_______
_______deg C.
_______deg C.
mV at
head:______.
Temperature:
___degC
mV at
head:______.
Temperature:
___degC

NOTE: NO FURTHER WORK TO BE TAKEN UP IN


HP CASING TOP AND BOTTOM THERMOCOUPLES.

National Thermal Power Corporation Ltd.

Page - 44
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

(C&I MAINTENANCE)

26.0

(OPERATION)

(FIELD QUALITY)

EQUIPMENT PROTECTION CHECKING RECORD: IP CASING FRONT


TOP/BOTTOM DIFFERNETIAL TEMPERATURE

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: IP CASING FRONT
TOP/BOTTOM DIFFERNETIAL
TEMPERATURE
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
IP casing front top and bottom thermocouples and cables checked.
Connections tightened at head and cables routed properly and
protected from hot surfaces.
Cable gland hole sealed.
Turbine reset.
SLNO
ACTIVITY
I
To check IP casing front top/bottom temperature Hi Hi
protection (done by simulation)
Thermocouple tag(TOP/BOTTOM):
CJC No. and terminal(TOP)
CJC No and terminal (BOTTOM)
LVM (TRIP) LOC:
ALARM SETPOINT:
TRIP SETPOINT:
1

Remove casing top thermocouple and heat it. Measure the


mV and note the temperature when alarm appears.

Continue to heat and note the mV at which trip LVM acts.

Fix back the thermocouple.

During protection checking, simulate from LVM and


check turbine trips.

if checked

REMARK
_______/_______.
_______/_______
_______/_______
_______deg C.
_______deg C.
mV at
head:______.
Temperature:
___degC
mV at
head:______.
Temperature:
___degC

National Thermal Power Corporation Ltd.

Page - 45
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
5

Check alarm and SOE in UCB.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN IP
FRONT CASING TOP AND BOTTOM
THERMOCOUPLES.

(C&I MAINTENANCE)
27.0

(OPERATION)

(FIELD QUALITY)

EQUIPMENT PROTECTION CHECKING RECORD: IP CASING REAR


TOP/BOTTOM DIFFERNETIAL TEMPERATURE

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: IP CASING REAR
TOP/BOTTOM DIFFERNETIAL
TEMPERATURE
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
IP casing rear top and bottom thermocouples and cables checked.
Connections tightened at head and cables routed properly and
protected from hot surfaces.
Cable gland hole sealed.
Turbine reset.
SLNO
ACTIVITY
I
To check IP casing rear top/bottom temperature Hi Hi
protection (done by simulation)
Thermocouple tag(TOP/BOTTOM):
CJC No. and terminal(TOP)
CJC No and terminal (BOTTOM)
LVM (TRIP) LOC:
ALARM SETPOINT:
TRIP SETPOINT:
1

Remove casing top thermocouple and heat it. Measure the

if checked

REMARK
_______/_______.
_______/_______
_______/_______
_______deg C.
_______deg C.
mV at

National Thermal Power Corporation Ltd.

Page - 46
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
mV and note the temperature when alarm appears.
2

Continue to heat and note the mV at which trip LVM acts.

Fix back the thermocouple.

During protection checking, simulate from LVM and


check turbine trips.

Check alarm and SOE in UCB.

head:______.
Temperature:
___degC
mV at
head:______.
Temperature:
___degC

NOTE: NO FURTHER WORK TO BE TAKEN UP IN IP


REAR CASING TOP AND BOTTOM
THERMOCOUPLES.
(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
28.0 EQUIPMENT PROTECTION CHECKING RECORD: FIRE PROTECTION
OF MAIN TURBINE
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: FIRE PROTECTION OF
MAIN TURBINE
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
MOT Level switches checked.
Push buttons at UCB, MOT room, HP turbine and LPBP rack
checked for sealing and sealing of gland holes.
Turbine reset.
SLNO
ACTIVITY
I
To check Fire protection from MOT level very Low.
1

Check functioning of Low and very low switches when


MOT is drained during overhaul.

Check healthiness of contacts at binary signal modules.

During protection checking, simulate very low contact


from binary signal conditioning module and check if

if checked

REMARK
Loc of Binary
signal module for
ALARM:
TRIP:

National Thermal Power Corporation Ltd.

Page - 47
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
turbine trips.
4

Check alarm and SOE in UCB.

II

To check Fire protection from Push buttons at different


locations:
For each location, reset turbine, press pushbutton at that
location and check if turbine trips:
a. UCB
b. MOT ROOM
c. HP TURBINE
d. LPBP RACK

Check alarm and SOE in UCB.


2

NOTE: NO FURTHER WORK TO BE TAKEN UP IN


FIRE PROTECTION SYSTEM OF MAIN TURBINE.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 48
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
29.0

EQUIPMENT PROTECTION CHECKING RECORD: BOILER TRIP TO


TURBINE TRIP

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: BOILER TRIP TO TURBINE
TRIP
No. OF CHANNELS:2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
Check terminals of boiler trip contact cables from FSSS at both ends
for tightness.
Turbine reset.
SLNO
ACTIVITY
I
To check boiler trip to turbine trip.
1

Simulate one set of contacts at FSSS and check if turbine


trips.

Check alarm and SOE in UCB.

Simulate other set of contacts at FSSS and check if turbine


trips.

Check alarm and SOE in UCB.

if checked

REMARK

NOTE: NO FURTHER WORK TO BE TAKEN UP IN


BOILER TRIP TO TURBINE TRIP WIRING.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 49
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

30.0

EQUIPMENT PROTECTION CHECKING RECORD: GENERATOR TRIP


TO TURBINE TRIP

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: GENERATOR TRIP TO
TURBINE TRIP
No. OF CHANNELS:2
MODE OF PROTECTION: 1 OUT OF 1.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
Terminals at GRP and turbine panels tightened for both channels.
Turbine reset.

if checked

SLNO
ACTIVITY
I
To check Generator trip to turbine trip.

REMARK

Simulate one set of contacts at GRP end (by EM) and


check if turbine trips.

Check alarm and SOE in UCB.

Simulate other set of contacts at GRP end (by EM) and


check if turbine trips.

Check alarm and SOE in UCB.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN
GENERATOR TRIP TO TURBINE TRIP WIRING.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 50
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

31.0

EQUIPMENT PROTECTION CHECKING RECORD: PRIMARY WATER


FLOW AT STATOR OUTLET LO LO

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: PRIMARY WATER FLOW AT
STATOR OUTLET LO LO
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
Flow instrument inspected and instrument covers and gland holes
sealed.
Cable support and routing checked.
Corresponding terminals in turbine panels tightened.
Turbine reset.
SLNO
ACTIVITY
I
To check Primary water flow at stator outlet Lo Lo trip.
Note setpoint on the LVM for alarm and trip:
1
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):
2

Regulate flow through stator and as flow reduces note


down flow when Low alarm appers.

Throttle flow further and note the flow when turbine trips.

Check SOE and alarm in UCB.

Normalize the regulating valve.

if checked

REMARK
_______/_______.
_______/_______.

NOTE: NO FURTHER WORK TO BE TAKEN UP IN


STATOR WATER FLOW PROTECTION SYSTEM.
National Thermal Power Corporation Ltd.

Page - 51
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

32.0 EQUIPMENT PROTECTION CHECKING RECORD: PRIMARY WATER


FLOW AT MAIN BUSHING PHASE U LO LO
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: PRIMARY WATER FLOW AT
MAIN BUSHING PHASE U LO LO
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
Flow instrument inspected and instrument covers and gland holes
sealed.
Cable support and routing checked.
Corresponding terminals in turbine panels tightened.
Turbine reset.
SLNO
ACTIVITY
I
To check Primary water flow at main bushing phase U Lo
Lo trip.
1
Note setpoint on the LVM for alarm and trip:
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):
2
Regulate flow through main bushing U and as flow
reduces note down flow when Low alarm appears.
3

Throttle flow further and note the flow when turbine trips.

Check SOE and alarm in UCB.

if checked

REMARK

_______/_______.
_______/_______.

National Thermal Power Corporation Ltd.

Page - 52
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

Normalize the regulating valve.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN
MAIN BUSHING U FLOW PROTECTION SYSTEM.

(C&I MAINTENANCE)

33.0

(OPERATION)

(FIELD QUALITY)

EQUIPMENT PROTECTION CHECKING RECORD: PRIMARY WATER


FLOW AT MAIN BUSHING PHASE V LO LO

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: PRIMARY WATER FLOW AT
MAIN BUSHING PHASE V LO LO
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
Flow instrument inspected and instrument covers and gland holes
sealed.
Cable support and routing checked.
Corresponding terminals ain turbine panels tightened.
Turbine reset.
SLNO
ACTIVITY

National Thermal Power Corporation Ltd.

if checked

REMARK

Page - 53
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
I
1

To check Primary water flow at main bushing phase V Lo


Lo trip.
Note setpoint on the LVM for alarm and trip:
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):

Regulate flow through main bushing U and as flow


reduces note down flow when Low alarm appears.

Throttle flow further and note the flow when turbine trips.

Check SOE and alarm in UCB.

Normalize the regulating valve.

_______/_______.
_______/_______.

NOTE: NO FURTHER WORK TO BE TAKEN UP IN


MAIN BUSHING V FLOW PROTECTION SYSTEM.

(C&I MAINTENANCE)

34.0

(OPERATION)

(FIELD QUALITY)

EQUIPMENT PROTECTION CHECKING RECORD: PRIMARY WATER


FLOW AT MAIN BUSHING PHASE W LO LO

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: PRIMARY WATER FLOW AT
MAIN BUSHING PHASE W LO LO
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

National Thermal Power Corporation Ltd.

Page - 54
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
PREREQUISITES:
Flow instrument inspected and instrument covers and gland holes
sealed.
Cable support and routing checked.
Corresponding terminals in turbine panels tightened.
Turbine reset.
SLNO
ACTIVITY
I
To check Primary water flow at main bushing phase W Lo
Lo trip.
1
Note setpoint on the LVM for alarm and trip:
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):
2

Regulate flow through main bushing U and as flow


reduces note down flow when Low alarm appears.

Throttle flow further and note the flow when turbine trips.

Check SOE and alarm in UCB.

Normalize the regulating valve.

if checked

REMARK
_______/_______.
_______/_______.

NOTE: NO FURTHER WORK TO BE TAKEN UP IN


MAIN BUSHING W FLOW PROTECTION SYSTEM.

(C&I MAINTENANCE)

35.0

(OPERATION)

(FIELD QUALITY)

EQUIPMENT PROTECTION CHECKING RECORD: GENERATOR


BUSHING LEVEL HI HI

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: GENERATOR BUSHING
LEVEL HI HI
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE
National Thermal Power Corporation Ltd.

Page - 55
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine

PREREQUISITES:
Level sensor and transmitter inspected and instrument covers and
gland holes sealed.
Cable support and routing checked.
Corresponding terminals in turbine panels tightened.
Turbine reset.
SLNO
ACTIVITY
I
To check generator bushing level Hi HI trip.
Note setpoint on the LVM for alarm and trip:
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):
1

During shutdown take out the level probe and check


functioning by dipping probe in water. Slowly lower the
probe and note that alarm appears.

Further lower the probe and LVM detects the trip


condition.

Install the probe back and tighten the covers.

Simulate trip contact from LVM and check turbine trips.

Check SOE and alarm in UCB.

Normalize the regulating valve.

if checked

REMARK
_______/_______.
_______/_______.

NOTE: NO FURTHER WORK TO BE TAKEN UP IN


GENERATOR BUSHING LEVEL PROTECTION
SYSTEM.
(C&I MAINTENANCE)

36.0

(OPERATION)

(FIELD QUALITY)

EQUIPMENT PROTECTION CHECKING RECORD: COLD GAS


TEMPERATURE BEHIND COOLER HI HI

STATION:

UNIT:

DATE:

National Thermal Power Corporation Ltd.

Page - 56
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
MAIN EQUIPMENT:TURBINE

PROTECTION: COLD GAS TEMPERATURE


BEHIND COOLER HI HI
No. OF CHANNELS:2
MODE OF PROTECTION: 2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
Corresponding RTD terminals in turbine panels tightened.
Turbine reset.

if checked

SLNO
ACTIVITY
I
To check cold gas temperature behind cooler Hi Hi trip.
Note setpoint on the LVM for alarm and trip:
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):

REMARK
_______/_______.
_______/_______.

During shutdown take out the RTD and check by heating


in a portable hot bath or hot water. Cross check RTD
output with a thermometer or another RTD.

Raise temperature to alarm value and check appearance of


alarm.

Further raise temperature to trip value. Check trip contacts


from LVM.

Install the RTD back and tighten the covers.

Tighten trip contact connections in turbine panel.

During protection checking, simulate trip contact from


LVM and check turbine trips.

Check SOE and alarm in UCB.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN
COLD GAS TEMPERATURE PROTECTION SYSTEM.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 57
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
37.0

EQUIPMENT PROTECTION CHECKING RECORD: SEAL OIL


TEMPERATURE BEHIND COOLER TEMPERATURE HI HI

STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: SEAL OIL TEMPERATURE
BEHIND COOLER TEMPERATURE HI HI
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
Corresponding RTD terminals in turbine panels tightened.
Turbine reset.

if checked

SLNO
ACTIVITY
I
To check seal oil temperature behind cooler temperature
Hi Hi trip.
Note set point on the LVM for alarm and trip:
ALARM: LVM Loc/set point (V):
TRIP: LVM Loc/set point(V):

REMARK

During shutdown take out the RTD and check by heating


in a portable hot bath or hot water. Cross check RTD
output with a thermometer or another RTD.

Raise temperature to alarm value and check appearance of


alarm.

Further raise temperature to trip value. Check trip contacts


from LVM.

Install the RTD back and tighten the covers.

Tighten trip contact connections in turbine panel.

During protection checking, simulate trip contact from


LVM and check turbine trips.

Check SOE and alarm in UCB.

_______/_______.
_______/_______.

NOTE: NO FURTHER WORK TO BE TAKEN UP IN


SEAL OIL TEMPERATURE BEHIND COOLER
National Thermal Power Corporation Ltd.

Page - 58
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
TEMPERATURE PROTECTION SYSTEM.

(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
38.0 EQUIPMENT PROTECTION CHECKING RECORD: PRIMARY WATER
TEMPERATURE BEHIND COOLER HI HI
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: PRIMARY WATER
TEMPERATURE BEHIND COOLER HI HI
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
Corresponding RTD terminals in turbine panels tightened.
Turbine reset.

if checked

SLNO
ACTIVITY
I
To check primary water temperature behind cooler
temperature Hi Hi trip.
Note set point on the LVM for alarm and trip:
ALARM: LVM Loc/set point (V):
TRIP: LVM Loc/set point(V):

REMARK

During shutdown take out the RTD and check by heating


in a portable hot bath or hot water. Cross check RTD
output with a thermometer or another RTD.

Raise temperature to alarm value and check appearance of


alarm.

Further raise temperature to trip value. Check trip contacts


from LVM.

_______/_______.
_______/_______.

National Thermal Power Corporation Ltd.

Page - 59
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
4

Install the RTD back and tighten the covers and seal gland
holes.

Tighten trip contact connections in turbine panel.

During protection checking, simulate trip contact from


LVM and check turbine trips.

Check SOE and alarm in UCB.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN
PRIMARY WATER TEMPERATURE BEHIND
COOLER TEMPERATURE PROTECTION SYSTEM.

(C&I MAINTENANCE)
(OPERATION)
(FIELD QUALITY)
39.0 EQUIPMENT PROTECTION CHECKING RECORD: WARM AIR MAIN
EXCITER TEMPERATURE HI HI
STATION:
UNIT:
MAIN EQUIPMENT:TURBINE

DATE:
PROTECTION: WARM AIR MAIN EXCITER
TEMPERATURE HI HI
No. OF CHANNELS:2
MODE OF PROTECTION:2 OUT OF 2.
PLANT CONDITION: TURBINE READY FOR PROTECTION CHECK AFTER
OVERHAUL AND BARRING GEAR IN SERVICE

PREREQUISITES:
Corresponding RTD terminals in turbine panels tightened.
Turbine reset.

if checked

SLNO
ACTIVITY
I
To check warm air main exciter temperature Hi Hi trip.
Note setpoint on the LVM for alarm and trip:
ALARM: LVM Loc/setpoint (V):
TRIP: LVM Loc/setpoint(V):

REMARK

During shutdown take out the RTD and check by heating


in a portable hot bath or hot water. Cross check RTD
output with a thermometer or another RTD.

Raise temperature to alarm value and check appearance of


alarm.

_______/_______.
_______/_______.

National Thermal Power Corporation Ltd.

Page - 60
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
3

Further raise temperature to trip value. Check trip contacts


from LVM.

Install the RTD back and tighten the covers.

Tighten trip contact connections in turbine panel.

During protection checking, simulate trip contact from


LVM and check turbine trips.

Check SOE and alarm in UCB.


NOTE: NO FURTHER WORK TO BE TAKEN UP IN
WARM AIR MAIN EXCITER TEMPERATURE
PROTECTION SYSTEM.

(C&I MAINTENANCE)

(OPERATION)

(FIELD QUALITY)

National Thermal Power Corporation Ltd.

Page - 61
COS-ISO-00-OIN/OPS/C&I/006 Rev. No.: 0
C&I Protection Checking of Boiler & Main Turbine
40.0

REVIEW
This Document shall be reviewed by the Executive Director, Operation Services,
on a 2-yearly basis or as necessary.

National Thermal Power Corporation Ltd.

Document for Distribution to:


CONTROLLED
I. Power Stations
1. General Manager
2. General Manager
3. General Manager
4. General Manager
5. General Manager
6. General Manager
7. General Manager
8. General Manager
9. General Manager
10. General Manager
11. General Manager
12. General Manager
13. General Manager
14. General Manager
15. General Manager
16. General Manager
17. General Manager
18. General Manager
19. General Manager
20. General Manager

UNCONTROLLED
II Regional Head Quarters
21. Executive Director (NR), Lucknow
22. Executive Director (SR), Hyderabad
23. Executive Director (WR), Mumbai
24. Executive Director (ER), Patna
25. Executive Director (NCR), Noida

Rihand
Vindhyachal
Kahalgaon
Farakka
Dadri (Coal & Gas)
Unchahar
Korba
Ramagundam
Badarpur
Talcher Kaniha
Kayamkulam
Kawas
Simhadri
Singrauli
Tanda
Talcher Thermal
Auraiya
Jhanor Gandhar
Faridabad
Anta

III Corporate Head Quarter


26. STA to Chairman & Managing Director, SCOPE, New Delhi
27. STA to Director (Technical), SCOPE, New Delhi
28. STA to Director (Operations) , SCOPE, New Delhi
29. STA to Director (Commercial), SCOPE, New Delhi
30. STA to Director (Projects) , SCOPE, New Delhi
31. Executive Director, PMI, Noida
32. Executive Director (Engg.), EOC, Noida
33. Executive Director (OS),EOC, Noida
34. General Manager (R&D), Noida
35. General Manager (CENPEEP), Noida
36. Concerned Group Heads in Operation Services, CC

IV

Head of O&M

37. Singrauli

38. Korba

39. Ramagundam

40. Farakka

41. Vindhyachal

42. Rihand

43. Kahalgaon

44. Dadri(Coal)

45. Unchahar

46. Talcher Kaniha

47.Talcher Thermal

48. Badarpur

49. Simhadri

50. Auraiya

51. Anta

52. Kawas

55. Kayamkulam

56. Faridabad

53. Jhanor Gandhar 54. Dadri (Gas)


57. Tanda

Head of C&I Maintenance

58. Singrauli

59. Korba

60. Ramagundam

61. Farakka

62. Vindhyachal

63. Rihand

64. Kahalgaon

65. Dadri(Coal)

66. Unchahar

67. Talcher Kaniha

68.Talcher Thermal

69. Badarpur

70. Simhadri

71. Auraiya

72. Anta

73. Kawas

76. Kayamkulam

77. Faridabad

74. Jhanor Gandhar 75. Dadri (Gas)


78. Tanda