Shallow Gas
The A & B Blocks in the Dutch section of the North Sea (among
others A12, A18 & B13) are located approximately 300 kilometres
the design of the B13 Platform. The B13 Platform was designed
and B13 fields have been in production since December 2007 and
the gas, the pressure and production capacity of both fields are
comparable.
Process Facilities
The A18 Platform is an under construction Gas Production
Platform. It will be located on top of a shallow gas field. The
pressure in the reservoir is relatively low and the gas is very
clean. The latter is advantageous in that minimum process
equipment is necessary. The produced gas will be sent to the
A12 Platform through a 33 kilometre long pipeline, where the
gas will be treated before it is exported to shore.
Initially, three wells will be connected on the platform with an
option for a future well. The gas coming from the different wells
will be collected in the production manifold. The wells will be
checked for sand production on a regular basis by routing the
gas per individual well through a test filter. In order to prevent
hydrates from forming in the pipeline, methanol can be injected
than the fields located much deeper in the earth. As a result, the
total production of the shallow fields is less than that of the deeper
fields.
Over the last few years, several technical developments have led to
A18 Platform
with it. On the A12 Platform, the sphere will enter the Sphere
Receiver.
15
A12-CPP
Planning
The A12 Platform is the Central Process Platform (CPP) where the
In May 2014, Iv-Oil & Gas multidisciplinary project team started with
gas streams of the A12 Platform, B13 Platform and soon the
This gas is then injected into the NOGAT Pipeline to shore. In 2005
and 2006, Iv-Oil & Gas was closely involved in the engineering of the
A12-CPP.
The Sail Away is currently planned for August 2015. After the
installation and commissioning period, First Gas, by completing
the first well, is scheduled for the fourth quarter of 2015. This will
gas flow to the A12-CPP via the tie-in to the existing production
system.
Technical data:
Dimensions
Topside (lxwxh):
25 x 17 x 15 m
Jacket (lxwxh):
24 x 29 x 61 m (base)
Ventboom:
14 m
Weight
Topside:
1110 T (Operational)
Jacket:
1360 T
Challenges
Gas Pressure:
50 bar
Iv-Oil & Gas has faced some technical challenges in this project.
Water Depth:
44.5 m
and construction are performed almost in parallel. Iv-Oil & Gas has
Gas Capacity:
70 MMSCFD
Sander Landkroon
Project Manager, Iv-Oil & Gas
16 IVORMATIE MAGAZINE MARCH 2015