Date : 30.04.

2015

Completion of
section 02 qty
(09/07/2016)

25-Jun-16

11-May-16

19-May-16

27-Apr-16

7-May-16

59

Total Duration

5-May-16

27-Apr-16

End Date

27-Apr-16

24

Start Date

Completion of
section 01 qty
(25/05/2016)

26-Apr-16

End Date

2-Apr-16

Total Duration

40

Start Date

Milestone S/S
qty (25/04/2016)

14-Apr-16

Total Duration

5-Mar-16

End Date

42

Start Date

Milestone 06 qty
(01/03/2016)

2-Mar-16

Total Duration

20-Jan-16

End Date

11

Start Date

Milestone 04 qty
(30/11/2015)

19-Nov-15

Total Duration

DELIVERY
PERIOD from
Milestone 03 qty
the date of
(30/09/2015)
confirmed order

9-Nov-15

End Date

No. Of Days required


New
to complete including
B.O.Q. QTY DESIGNQ
installation, testing
TY
and commissioning

17

Start Date

UNIT

End Date

DESCRIPTION

Start Date

ITEM

1-Sep-15 17-Sep-15

Total Duration

PROJECT: MTC Primary & Secondary Roads Construction Abu Dhabi International Airport Electrical and Street Lighting Works

010 Electrical Distribution

G
5.0
I
K

12-14 weeks

1.00
1.00
2.00

500kVA Transformer
1000kVA Transformer
2000kVATransformer

order date: 16th Nov 2015

No.
No.
No.

1
1
2

1
1
-

5
5

16-18 weeks

Medium voltage Switchgear

order date: 24th Aug 2015

No.

14

28-30 weeks

900.00
-

500.00
-

22kv Cabling

order date: 14th Dec 2015

Low Voltage Switchboard compact station TA 1/4order date: 28th Nov 2015
Low Voltage Cabling XLPE 4Cx6
Low Voltage Cabling XLPE 4Cx10
Low Voltage Cabling XLPE 4Cx16
Low Voltage Cabling XLPE 4Cx25
Low Voltage Cabling XLPE 4Cx35
Low Voltage Cabling XLPE 4Cx70
Low Voltage Cabling XLPE 4Cx95
Low Voltage Cabling XLPE 4Cx120
Bare Copper BC 25 for Earthing system
ECC cable
order date: 30th Jan 2016

Control Cabinet
MDB Distribution Board MV Substation

MV Substation Internal cabling

MDB Distribution - Earthing systems

Ground Rods

MV Substations Lightning protection

MV Substations - internal lighting


and sockets

MV Substations- Portable CO2


and dry powder fire extinguishers

14

MV Substations- air conditioning,


dual

order date: 27th Aug 2015

5,035

No.

m
m
m
m
m
m
m
m
m
lm

15,963
7,876
170
2,356
22,000
23,839

No.

16

No.

3,920
2

21,297
858

21,297
11

22

12-14 weeks
12-14 weeks

60

14
60
60

2,692

18

12-14 weeks

12-14 weeks
28-30 weeks

1-Sep-15

2-Sep-15

A
B
C

MV Substations DMS System

11-Feb-16

2.00

5-Mar-16

16-Mar-16

7,000.00
827.00
2,147.00
2,000.00
-

16-Mar-16

7.00

2-Apr-16

14-Apr-16

16-Apr-16

18-Apr-16

19-Apr-16

21-Apr-16

9,897.00
31.00
545.00

2-Apr-16

14-Apr-16

7-May-16

19-May-16

7-May-16

7-May-16

8-May-16

10-May-16

16,297.00

27-Apr-16

10-May-16

4.00

11-May-16

17-May-16

104.00
169.00
35.00

17-May-16
17-May-16
17-May-16

25-Jun-16
25-Jun-16
25-Jun-16

24-Mar-16

31-Mar-16

24

12-14 weeks

2.00

2-Apr-16

14-Apr-16

10

2.00

2-Apr-16

14-Apr-16

No.

71

12-14 weeks
12-14 weeks

71.00

order date: 28th Nov 2015

No.

10

12-14 weeks

2.00

5-Mar-16

16-Mar-16

order date: 23rd Jan 2016

No.

14

2.00

5-Mar-16

20-Mar-16

order date: 05th April 2016

No.

2.00

15-Apr-16

14-Apr-16

order date: 28th Nov 2015

order date: 08th Dec 2015

Fibre optic cabling


Fibre optic cabling consisting of 144
order date: 26th Sept 2015
standards external type to be laid in MV
duct banks
F.O cable termination cubicle as per ADDC standards

No.

12

4-6 weeks
Ex- Stock

12-14 weeks

Dual Charger single battery bank 48V DC battery system as per ADDC
standards
070 Other items
Other items not priced elsewhere- The Contractor shall list below and price
any other items not priced elsewhere which are deemed necessary for the
completion of the works.

No.

12

No.
No.
No.

308
225
43

274
217
43

No.
No.

93
-

63
-

13

No.

88

18

No.
No.
No.
No.

16-18 weeks

16-18 weeks

8-10 weeks

35
205
6

41
2

5,035

3,920

18

16-18 weeks

30.00
6.00
-

25.00
9.00
-

48.00
-

12.00

43
86
215
5

12-Sep-15

17-Sep-15

12-Sep-15

14-Sep-15

12-Sep-15

17-Sep-15

7.00

17-Nov-15

19-Nov-15

17-Nov-15

19-Nov-15

17-Nov-15

19-Nov-15

16-Mar-16

12-Apr-16

14-Apr-16

115.00
8.00
22.00
50.00

39.00

48.00
-

20-Feb-16

2-Mar-16

15.00
50.00
-

3,920.00

30-Jan-16

18-Feb-16

20-Feb-16

2-Mar-16

order date: 18th Dec 2015

22-Apr-16

25-Apr-16

22-Apr-16

25-Apr-16

22-Apr-16
22-Apr-16

25-Apr-16
25-Apr-16

26.00

17-May-16

25-Jun-16

22-Apr-16

25-Apr-16

30.00

17-May-16

25-Jun-16

22-Apr-16

25-Apr-16

20.00

17-May-16

25-Jun-16

22-Apr-16

25-Apr-16

107.00
6.00

17-May-16
17-May-16

25-Jun-16
25-Jun-16

16-18 weeks
No.

No.

20-22 weeks

order date: 10th Nov 2015

Supply & Install LV, joint 4Cx120

No.

Warning Tape

LM

32,260

24,847

20

4-6 weeks

900.00

9-Sep-15

10-Sep-15

500.00

16-Nov-15

17-Nov-15

500.00

20-Feb-16

Cable Covering tiles 500 x 250 x 50 mm

No.

64,520

49,694

62

8-10 weeks

1,800.00

3-Sep-15

9-Sep-15

1,000.00

11-Nov-15

16-Nov-15

1,000.00

20-Feb-16

E
F
G

Supply and insall foundation for SL Poles 12m


Supply and insall foundation for SL Poles 14m
Chamber for Service Turret
Install bridge lighting including conduits ,
junction boxes internal wiring etc.

No.
No.
No.

No.

43

order date: 12th Jan 2016

5-Mar-16

2.00

10

order date: 23rd Nov 2015

2.00

order date: 17th Oct 2015

No.

12m. Galvanized steel lighting pole single type 2


12m. Galvanized steel lighting pole double type 2
14m. Galvanized steel lighting pole single type 2
14m. Galvanized steel lighting pole Double type 2

Supply & Install 22kv joint

5-Mar-16

020 Site Lighting


Pole mounted LED Luminaire (180Watt)
Pole mounted LED Luminaire (227Watt)
Bridge mounted lighting luminaire (110Watt)

24-Feb-16

31-Mar-16

200.00
-

24-Feb-16

21-Mar-16

2.00

11-Feb-16

24-Mar-16
24-Mar-16

No.

E
F
H
I

10-Nov-15

10-Feb-16

21-Mar-16
21-Mar-16

2.00

No.
order date: 26th Dec 2015

Poles Galvanized steel


D 12m. Galvanized steel lighting pole single type 1
G 14m. Galvanized steel lighting pole single type 1
New
12m. Galvanized steel lighting pole double type 1
item

9-Nov-15

3,000.00
3,000.00
-

20-Jan-16

6.00

3,920.00

59 days

24 days

40 days

No.

42 days

order date: 20th Jan 2016

11days

Lighting Service Cabinet


(turrets) SC01/08

17days

8-10 weeks

43

64

16-18 weeks

6.00

1-Feb-16

14-Feb-16

2.00
-

21-Mar-16

25-Mar-16

2.00

12-Apr-16

14-Apr-16

4.00

19-Apr-16

23-Apr-16

25-Feb-16

10,000.00

6-Apr-16

26-Apr-16

12,947.00

27-Apr-16

7-May-16

25-Feb-16

20,000.00

4-Apr-16

24-Apr-16

25,894.00

27-Apr-16

7-May-16

43.00

17-May-16

25-Jun-16

193