Sie sind auf Seite 1von 24

Self Inspection Report (BTS)

Site Name

JATOS

Project Name

Team Leader

Subcontractor

Contact Number

Email

PT.PAS

Representative

Indonesia - (west java)

Customer (Operator)

PT. XL Axiata, Tbk

Product Family

Wireless Network Base Station

Product List

DBS3900

Auditor
Installation Faults
The rack must be firmly fixed and have a clearn and smooth surface, the door of
rack can be opened and closed smoothly.
The connection of RF cableTrunk cableAlarm cableFeeder cableJumper cable
Power and grounding cable should be correct and reliable.
The labels of RF cableTrunk cableAlarm cableFeeder cableJumper
cablePower and grounding cable are filled in and sticked correctly and reliable.
The all grounding cable

must connect firmly.

Antenna high and direction base on planning.


Audit Information

Waterproof and sealed measures for each outdoor connecter should be correctly
adopted.
All cable installation base on requirement, neat and tidy.
The bolt is connectes correctly. (Their flat washersspring washers and nuts are
installed.)All connection Anntena , Microwave, RRU, Cabinet,Power,Battery
connection all ready firmly.
Site

clean after installation

All BTS function run normally. (DCDU, RFU ,BBU, FAN, , etc)
For detail check list refers to Hardware Quality Standard

Feeder Installation

Length
Grounding

Sector 0
Tower:
Tower: 0908
0884 m
m
End:
0768
End: 1006 m
m
2 3
2 3
4 5
4 5

Antenna High
Azimuth
Antenna Installation

Tilting
Mechanical

Sector 1
Sector 2
Tower: 0566 Tower: 0539
Tower: 0662 m
m
m
End:
End:
End:
0565
0542 m
0515 m
m
2 3
2 3
2 3
4 5
4 5
4 5
30 meter

90

210

330

Antenna Installation
Tilting
Electrical
Power cable (m)

From Rectifier to Cabinet

12 meter

Grounding cable (m)

From Cabinet to Grounding Bar

2.5 meter

Summary

INSTALASI : CAB.DBS3900 / CAB. BTS 3900 L /FEEDER/ANT 3BAND/RRU 3G/RRU 4G

Review and Name - Signature (QC PIC)

Date

tion Report (BTS)


PT.PAS

PT. XL Axiata, Tbk


DBS3900

Passed Failed

Passed Failed

Passed Failed

Passed Failed

Passed Failed

Passed Failed

Passed Failed

Passed Failed

Passed Failed

Passed Failed

Sector 2
Tower:
End:

0774
0677 m

2 3
4 5
30 meter
330

12 meter
2.5 meter

Summary

BTS 3900 L /FEEDER/ANT 3BAND/RRU 3G/RRU 4G

Date

( LOA 3G

) Site Picture

Picture for Quality Self-Inspection

N/A

Picture 1. Front of Cabinet

Picture 2 jumper top of cabinet on


wall
(BTS indoor)
View Jumper routing Inlet to
BTS (BTS Outdoor)

Picture 3. Cabinet Bolt con

Picture 4 E1 cable connection in DDF

Picture 5 Grounding cable conection


on BTS

Picture 6 Jumper routing on


cabinet / cable tray (BTS
On Horisontal cable tray f
outdoor

Picture 7 BTS Power cable connection


and Label

Picture 8 BBU Label E1

Picture 9 BBU Label CP

N/A

Picture 10 RFU Board and Label

Picture 11 Power cable at rectifier

Picture 12. Grounding conn


on grounding bar

Antenna Installation

Antenna 1. Height at tower

Antenna 2. Height at tower

Antenna 3. Height at to

Antenna 1. Direction at mounting


with compass soon too

Antenna 2. Direction at mounting


with compass soon too

Antenna 3. Direction at mo
with compass soon to

Antenna 1. Electrical tilting

Antenna 2. Electrical tilting

Antenna 3. Electrical ti

Antenna 1. Mechanical tilting


with tilt meter

Antenna 2. Mechanical tilting


with tilt meter

Antenna 3. Mechanical ti
with tilt meter

Antenna 1 connection at mounting

Antenna 2 connection at mounting

Antenna 3 connection at mou

Connection Jumper to antenna 1

Connection Jumper to antenna 2

Connection Jumper to ante

N/A

N/A

N/A

Picture 1. feeder - Jumper coonection


near antenna sector A

Picture 2. feeder - jumper coonection


antenna sector B

Picture 3. feeder-jumper co
antenna sector C

Picture 4. feeder-jumper coonection


antenna sector 1A

Picture 5 feeder - jumper coonection


antenna sector 1B

Picture 6feeder-jumper coo


antenna sector 2A

N/A

N/A

Picture 7. feeder-jumper near BTS


coonection sector 2B

Picture 8. feeder - jumper


coonection near BTS sector 3A

N/A

Picture 9. feeder - jumper c


near BTS sector 3B

N/A

N/A

Picture 10. feeder - Jumper


coonection near BTS sector 1

Picture 11 feeder - jumper coonection


near BTS sector 2

N/A

N/A

Picture 13. Feeder routing at tray


vertical tower

Picture 14 feeder enter selther


window BTS Indoor

N/A

Picture 12 feeder - jumper c


near BTS sector 3

N/A

Picture 15 Grounding Kit a

Picture 16 Grounding Kit near feeder


bending (below)

Additional Picture

Additional Picture

Additional

Picture

EMU/EMUA box Alarm complete


with label

Cable alarm to BTS

Cable power DC alarm on

N/A

N/A

N/A

Picture Alarm temperatur

Picture Alarm Smoke

Picture Alarm Water

Picture Alarm L1.L2.L3 on rectifier

Picture Inside Base frame BTS Outdoor

Additional Picture

) Site Picture

or Quality Self-Inspection

N/A

Picture 3. Cabinet Bolt connection

Picture 6 Jumper routing on top of


cabinet / cable tray (BTS indoor)
On Horisontal cable tray for BTS
outdoor

Picture 9 BBU Label CPRI

Picture 12. Grounding connection


on grounding bar

tenna Installation

Antenna 3. Height at tower

Antenna 3. Direction at mounting


with compass soon too

Antenna 3. Electrical tilting

Antenna 3. Mechanical tilting


with tilt meter

Antenna 3 connection at mounting

Connection Jumper to antenna 3

N/A

Picture 3. feeder-jumper coonection


antenna sector C

Picture 6feeder-jumper coonection


antenna sector 2A

N/A

Picture 9. feeder - jumper coonection


near BTS sector 3B

N/A

Picture 12 feeder - jumper coonection


near BTS sector 3

N/A

Picture 15 Grounding Kit at tower

Additional Picture

Additional

Cable power DC alarm on MCB

N/A

Picture Alarm Water

Additional Picture

Please Attached capture from VSWR measurement each sector

Das könnte Ihnen auch gefallen