Sie sind auf Seite 1von 7

GVK POWER (GOINDWAL SAHIB)

LIMITED
STANDARD OPERATING PROCEDURE
Doc. No.
TITLE: HT/LT Switchgear charging
DEPARTMENT : OPERATION

Issue No. /
Date
Rev. No /
Date

OPN/SOP/001
01/ 12.09.13
00/ 12.09.13

STANDARD OPERATING PROCEDURE


FOR
HT/LT SWITCHGEAR CHARGING

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name: Sanjib Kumar Panda

Name: P. Krishna Gopal

Manager (Operation)

DGM (Operation)

V.P. (O&M)

Page 1 of 7

GVK POWER (GOINDWAL SAHIB)


LIMITED
STANDARD OPERATING PROCEDURE
Doc. No.
TITLE: HT/LT Switchgear charging
DEPARTMENT : OPERATION

Issue No. /
Date
Rev. No /
Date

OPN/SOP/001
01/ 12.09.13
00/ 12.09.13

INDEX
Section
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0

Description
System Name
System Description
Purpose
Scope
Responsibility
Procedure
Safety Checks
Records

Page No.
3-3
3-3
3-3
4
4
4-14
14
15-15

SYSTEM NAME:
HT/LT Switchgear charging.
SYSTEM DESCRIPTION:
There are eight HT panel. Four for unit-1 and four for unit-2.OCA, OCB, OCC, OCD and
1CA, 1CB, 2CA,2CB.Working voltage for HT switchgear is 6.6 KV. Station board Feed by ST
OCA, OCB for UNIT-1 OCC, OCD for UNIT-2 . Unit board Feed by UAT, 1CA ,1CB for UNIT1, 2CA, 2CB for UNIT -2. Siemens made 8BK80 with 3AK VCB 2000A for station & unit I/c &
Tie, 1250A for motor ,trafo, o/g etc feeder. In LT SWITCHGEAR working voltage is 415 Type
of module in LT SWITCHGEAR are ACB module DOL module SFU and MCCB.

1.0

PURPOSE:
The purpose of making this Standard Operating Procedure (SOP) is to provide
standard instructions in a sequential manner for charging of HT/LT switchgear.

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name: Sanjib Kumar Panda

Name: P. Krishna Gopal

Manager (Operation)

DGM (Operation)

V.P. (O&M)

Page 2 of 7

GVK POWER (GOINDWAL SAHIB)


LIMITED
STANDARD OPERATING PROCEDURE
Doc. No.
TITLE: HT/LT Switchgear charging
DEPARTMENT : OPERATION

2.0

OPN/SOP/001
01/ 12.09.13

Issue No. /
Date
Rev. No /
Date

00/ 12.09.13

SCOPE:
It includes all activities for charging of HT/LT SWTCHGEAR and associated outgoing
feeders.

RESPONSIBILITY:
First Line Responsibility:
Shift In Charge/Unit In charge - Will instruct Unit In charge/DCS Engineer for charging
of HT/LT switchgear
Second Line Responsibility:
DCS Engineer Will inform Field Operators to prepare for charging of HT/LT switchgear
Third Line Responsibility:
Area Field Operators (Elect) - Will prepare & make ready for system charging and give
clearance to DCS Engineer for charging of switchgear

3.0

PROCEDURE:

6.1

SWITCHGEAR CHARGING OPERATION:

Sl No.
1

Pre-Requisites :
Activity Description
Permission for charging of HT/LT switchgear.

No PTW is pending on INCOMER ,TIE, and bus couplers of


all boards including Mech, Elect, C&I.
ST and UAT are charged and voltage and frequency is
appropriate.

3
4

Before charging INCOMER put BUS PT in service.

Turn on A.C,D.C MCB from BUS PT module

Ensure control supply(D.C) MCB is OFF of concern


INCOMER.

Prepared by:

Reviewed by:

Responsibility
Shift In Charge /Unit
In charge
Unit In Charge/DCS
Engineer
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.

Approved by:

Signature:

Signature:

Signature:

Name:

Name: Sanjib Kumar Panda

Name: P. Krishna Gopal

Manager (Operation)

DGM (Operation)

V.P. (O&M)

Page 3 of 7

GVK POWER (GOINDWAL SAHIB)


LIMITED
STANDARD OPERATING PROCEDURE
Doc. No.
TITLE: HT/LT Switchgear charging
DEPARTMENT : OPERATION

OPN/SOP/001
01/ 12.09.13

Issue No. /
Date
Rev. No /
Date

00/ 12.09.13

Put LOCAL/ REMOTE selector switch in LOCAL position of


INCOMER

Discharge the spring by inserting the rod sequentially in I and


0 in TEST position.

Rack in the breaker of incomer and make sure that it is proper


in service condition

10

Turn on A.C, D.C and line PT MCB of incomer and ensure that
all indications (spring charge,TCS healthy, breaker in service
etc)are healthy.
supply to all relay is healthy and all FLAGs are RESET

11
12

Put LOCAL/ REMOTE selector switch in REMOTE position


select the DEAD BUS mode from DCS. give close command
to INCOMER from DCS and charge OCA and OCB from ST-1
After charging ensures SPRING CHARGED indication has
come and checks the voltage in BUS PT of all three phase.

13
13

Charge 1CA, 1CB from UAT-1.

14

Similarly charge OCC,OCD from ST-2 and 2CA,2CB from


UAT-2

15

After charging the HT panels charge the outgoing feeder


(transformers , oil and dry type ,switchgear) similarly. Before
charging ensure that respective L/T incomer is in SERVICE
mode ,its D.C supply is on and breaker is in OFF condition.

16

Ensure transformer is completely BOX UP and at suitable TAP


position and BUS COUPLER of respective MCC is in OFF
condition.
Select the INCOMER of LT switchgear in DEAD bus charge
the incomer from DCS. Charge other incomer similarly.

17

Prepared by:

Reviewed by:

Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical

Approved by:

Signature:

Signature:

Signature:

Name:

Name: Sanjib Kumar Panda

Name: P. Krishna Gopal

Manager (Operation)

DGM (Operation)

V.P. (O&M)

Page 4 of 7

GVK POWER (GOINDWAL SAHIB)


LIMITED
STANDARD OPERATING PROCEDURE
Doc. No.
TITLE: HT/LT Switchgear charging
DEPARTMENT : OPERATION

OPN/SOP/001
01/ 12.09.13

Issue No. /
Date
Rev. No /
Date

00/ 12.09.13

engg.
20

After charging both INCOMERS check the voltage in both


sections of BUS PT.

21

Put the bus coupler in service mode with DC supply on and


selector switch in remote.

22

Put the bus coupler in AUTO MODE.

Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.

Checks by DCS Engineer in DCS :


All voltage and current transducers are healthy and showing same value as in
switchgear.
All incomers of LT should be selected in DEAD BUS and BUS
couplers in AUTO mode
A.C, D.C supply is available for BTS.
CHANGEOVER FROM BTS(MANUAL
Sl No.
Activity Description
Responsibility
1
Ensure A.C, D.C supply is available for BTS
Field
Operator/Electrical
engg.
2
Put the selection switch in BTS controller in BTS IN mode and Field
reset all alarms
Operator/Electrical
engg.
3
Check for direction of changeover IN BTS controller which will Field
be automatically selected .(if you want to isolate UAT
Operator/Electrical
INCOMER then direction will be STN-UT)
engg.
4
Check for all interlocks and finally check BTS READY.
Field
Operator/Electrical
engg.
5
Push button on controller and wait for changeover .during this Field
UAT INCOMER will trip and TIE from station will close. After
Operator/Electrical
changeover monitor the last transfer LOG.
engg.
ISOLATION PROCEDUERS

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name: Sanjib Kumar Panda

Name: P. Krishna Gopal

Manager (Operation)

DGM (Operation)

V.P. (O&M)

Page 5 of 7

GVK POWER (GOINDWAL SAHIB)


LIMITED
STANDARD OPERATING PROCEDURE
Doc. No.
TITLE: HT/LT Switchgear charging
DEPARTMENT : OPERATION

OPN/SOP/001
01/ 12.09.13

Issue No. /
Date
Rev. No /
Date

00/ 12.09.13

ISOLATION OF MOTOR FEEDER


Sl No.
Activity Description
1
Ensure breaker is in OFF condition.
2

Down all the MCB (AC, DC) except motor and panel space
heater.

Rack out the circuit breaker.

Put tag on respective breaker along with all details(PTW


NO,PLACED BY,REQ BY,DATE etc)

Discharge spring of respective breaker.

Put lock on breaker power circuit module.

Put the respective lock key in the LOTO cabinet and give one
key of LOTO cabinet to PTW HOLDER.

Responsibility
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.

ISOLATION OF TRANFORMER FEEDER


Sl No.
1
2

Activity Description
Before isolating any trafo feeder make sure that the supply to
outgoing LT MCC board is available from other source
(incomer) and bus coupler in AUTO mode.
E

Down all the MCB (AC, DC) except panel space heater MCB.

Prepared by:

Reviewed by:

Responsibility

Shift In Charge /Unit


In charge
Unit In Charge/DCS
Engineer

Approved by:

Signature:

Signature:

Signature:

Name:

Name: Sanjib Kumar Panda

Name: P. Krishna Gopal

Manager (Operation)

DGM (Operation)

V.P. (O&M)

Page 6 of 7

GVK POWER (GOINDWAL SAHIB)


LIMITED
STANDARD OPERATING PROCEDURE
Doc. No.
TITLE: HT/LT Switchgear charging
DEPARTMENT : OPERATION

OPN/SOP/001
01/ 12.09.13

Issue No. /
Date
Rev. No /
Date

00/ 12.09.13

Rack out the circuit breaker.


Put tag on respective breaker along with all details(PTW
NO,PLACED BY,REQ BY,DATE etc)
Put lock on breaker power circuit module.
Put the respective lock key in the LOTO cabinet and give one
key of LOTO cabinet to PTW HOLDER.

4
5

Field Operator
Field Operator
Field Operator

ISOLATION OF TIE FEEDER


Sl No.
Activity Description
Before isolating any tie feeder make sure that the supply to
concern bus should be available from incomer(its breaker
should be in service ,D.C supply on, and in REMOTE)
1
Select the incomer of bus in SYNCH mode and give close
command
2
Down all the MCB (AC, DC) except (F and panel space
heater.
3
Rack out the circuit breaker.
4
Put tag on respective breaker along with all details(PTW
NO,PLACED BY,REQ BY,DATE etc)
5
Put lock on breaker power circuit module.
6
Put the respective lock key in the LOTO cabinet and give one
key of LOTO cabinet to PTW HOLDER.

Prepared by:

Reviewed by:

Responsibility

Shift In Charge /Unit


In charge
Unit In Charge/DCS
Engineer
Field Operator
Field Operator
Field Operator

Approved by:

Signature:

Signature:

Signature:

Name:

Name: Sanjib Kumar Panda

Name: P. Krishna Gopal

Manager (Operation)

DGM (Operation)

V.P. (O&M)

Page 7 of 7

Das könnte Ihnen auch gefallen